Okaloosa County BOCC — December 1, 2015 — Deductive Change Order #14-12 Okaloosa County Administrative Bu — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Deductive Change Order #14-12 Okaloosa County Administrative Bu — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
CHANGE ORDER FORM
Change Order No.: __14-12
pate: 31 0ct2015 contract No.: _C12-1995-FM
Owner: _ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS
Contractor: Lord & Son Construction, Inc.
CHANGE TO CONTRACT PRICE
DESCRIPTION AMOUNT
Original Contract Price: $ 904,667.00
Net change by previously authorized Change Orders: 8,031,184.09
Prescnt Contract Price: 8,935,851.09 B
This Change Order will (add/deduci]) (133,598.30)
P TE——
New Contract Price: $8,902,252.79
CHANGE TO CONTRACT TIME
DESCRIPTION DATE or NUMBER OF DAYS
Original Contract Time: TBD
Original Substantial Completion Date: TBD
Net change by previously authorized Change Orders: N/A
This Change Order will (add/deduct): N/A
New Contract Time: N/A
N/A
New Substantial Completion Date:
APPROVALS
REQUESTED BY:
PROJECT ENGINEER:
CONTRACTOR:
Leven D. Lox"a'n, Presidént
OWNER;
This Change Order is an amendment to the Contract/Agre
DATE
DATE
DATE
DATE:
el
/(778
ement between Contractor and the
Owner, and all other contract provisions shall remain in full force and effect unless specifically
amended in writing, signed by both parties.
CHANGE OWNER 0
ORDER ARCHITECT O
CONTRACTOR O
FIELD O
AIA DOCUMENT G701 (Modified) OTHER O
PROJECT: Shalimar Courthouse Annex Repurpose CHANGE ORDER NUMBER: Twelve (12)
(name, address) 1250 Eglin Parkway DATE: 9 November 2015
Shalimar, FL 32579
TO CONTRACTOR: ARCHITECT'S PROJECT NO: 12009
(name, address)
Lord & Son Construction, Inc. CONTRACT DATE: October 16, 2012
Post Office Box 1808
Fort Walton Beach, FL 32549 CONTRACT FOR: CM @ Risk Services
The Contract is changed as follows:
Savings from GMP budget returned to Okaloosa County:
Remaining Contingency Balance $33,598.30
Total Deduct for Savings Returned to County ($33,598.30)
Not valid until signed by the Owner and Contractor.
The onginal (CONtrACt S WAS. ....pessrssssisssies i S ner s R T s $904,667.00
;\let change by previously authorized Change Orders................cccccoeeeinin. $8,031,184.09
The (Contract Sum) prior to this Change Orderwas ..o $8,935,851.09
The (Contract Sum)) will be (decreased) by this Change Order in the amount of ($33,598.30)
The new (Contract Sum) including this Change Order will be .............cccevereenennnn. $8,902,252.79
The Contract Time will be changed by: N/A
The date of Substantial Completion as of the date of this Change Order therefore is: Per Contract
NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized
by Construction Change Directive.
DAG Architects, Inc. Lord & Son Construction, Inc. Okaloosa County BOCC
Architect Contracior Owner
1223 Airport Road Post Office Box 1808 1804 Lewis Turner Bivd., Ste. 100
Destin, FL 32541 Fort Walton Beach, FL 32549 Fort Walton Beach, FL 32547
Address W // ! Au% /)% Address
Charles i, FA Ucgven D. Lord T > Nathan D. Boyles
Archlt Presiden ( Chairman
Date: / Date: / I / Date:
AlA DOCUMENT G701 - CHANGE ORDER - 1987 EDITION = AlA « 1987 « THE AMERICAN INSTITUTE OF ARCHITECTS
1755 NEW YORK AVE, NW., WASHINGTON, DC. 20006 G701-1987 (Modified)
Contingency Summary
Beginning Contingency from GMP
001
002
003
004
005
006
007
008
009
010
011
012
013
014
015
016
017
018
019
020
021
022
023
024
025
026
027
028
029
030
031
032
033
034
035
Temporary fencing needed was less than original estimate
Deleted silt fence installation from Demo subcontract
Demo fee (reverse)
Demo fee not taken
Concrete - Risk Category Ill (BarrCrete)
Gypsum Wallboard - Risk Category Il (DPF Const)
Gulf Power - Underground pad mount
Threshhold Inspection (DAG)
Additional Tie Beams (BarrCrete CO3)
Misc. Electrical Changes (Harrington CO2)
Savings from Building Permit
Savngs from Bonds
Savings from Insurance-Builder's Risk
Threshold Inspection
Contractor's Steel - Risk Category 3 Revisions
Threshhold Inspection (DAG)
Sitework Revisions from Plan Review
Miscellaneous Electrical Changes
Threshhold Inspection (DAG)
Site Work Changes (H&T)
Mud Work in Restroom Vestibules (Big Bend Floor)
Misc. Extra Work (Ed Emmons Steel Erectors)
Miscellaneous Electrical Changes (Harrington)
Window Lentels, Etc. (DPF)
Knox Box (Nutech Fire & Security)
Repair Water Damage (DPF)
Electrical Changes per Fire Marshall (Harrington)
Additional HM Frames (Warren HM)
Chiller Pad (BarrCrete)
Emerge 5000 Hardware (Warren HM)
Well Upgrade/Permit (Bay Landscape)
Add for Risk Il Changes (Sheet Metal Masters)
Add Access Control HW/Delete Storefront @ Office (Area Glass)
Repaint Walls - Water Damage (Harrison)
Electrical Changes per Fire Marshall (Harrington)
$305.50
$1,854.00
($149.34)
$149.34
($21,181.00)
($20,591.00)
($7,434.00)
($18,210.00)
($10,525.00)
' ($8,000.00)
$9,643.97
$12,554.11
$32,152.90
($2.810.00)
($27,742.32)
($345.00)
($19,130.80)
($4,097.10)
(§755.00)
($28,696.20)
($4,689.00)
($46,497.00)
($3,000.00)
($8,384.00)
($263.34)
($14,076.00)
(520,000.00)
(81,146.92)
($3,125.00)
(518,310.44)
($1,150.00)
(89,600.00)
$15.70
(81,975.00)
($5,308.90)
365,901.87
Contingency Summary
Beginning Contingency from GMP
036
037
038
039
040
041
042
043
044
045
046
047
048
049
050
051
052
053
054
055
056
057
058
059
060
061
062
063
064
065
066
067
068
069
Additional Cable Devices/Accessories (Glaze)
Warren Hollow Metal - Draw #4
Savings from Unit Paving-Bought out for less than original estimate
Bayou Mechanical - Draw #9 (Part 2)
Harrington Electric - Draw #10 (Part 2)
Big Bend Floor Covering - Draw #4 (Part 2)
Glaze Communications - Draw #3 (Part 2)
Area Glass - Access Controls from Previous Pay App #3
Bayou Mechanical (Plumbing) - Draw #7
DAG Threshold Insp. - Inv. 12009_0815 (Part 2)
Misc. concrete items not used
ABG Caulking Contractors - Inv. 16618
Access Controls - Warren Hollow Metal - Draw #5
Harrison Contracting - Draw #6 (Part 2)
Rework Entrance - H & T Contractors - Draw #10 (Part 2)
Rubber Tile at Staif A - Pro Floors Plus - Draw #2 (Part 2)
Harrington Electric - Draw #11 (Part 2)
Add FM200 Systems - Interstate Fire Systems (Part 2)
Phipps Cabinets - Draw #2 (Part 2)
Bay Landscape - Draw #2 (Part 2)
Revise Landscape Drawings - Horton Land Works - Inv. 473
Sales Tax Savings Surplus @ 8/31/15
Bayou Mechanical - Draw #9 (added damper @ Room 332)
Glaze - Draw #6 (added cabling, devices, accessories)
Harrington Electric - Draw #12 (Part 2) (misc. fire alarm/power adds)
Harrington Electric - Draw #5 (Part 2) - Correction to
Owner Draw 22-R
Seago Fire Protection - Draw #9 (misc. fire sprinkler changes)
Southern Rail - Inv. #15-0488
Warren HM Doors - Draw #6 (access controls)
Sales Tax Savings Surplus @ 9/30/15
Savings from Painting
Permit for Monument Sign
Unused Balance from General Requirements
Unused Balance from Survey and Layout
($5,100.00)
($23,202.26)
$10,760.00
(8960.05)
($4,500.00)
($1,400.00)
($2,697.41)
($15,007.50)
($1,897.86)
($195.00)
$2,066.54
($3,571.00)
($4,137.60)
($4,075.00)
($10,655.25)
($2,970.59)
($4,483.00)
($20,441.70)
($5,400.00)
(86,525.00)
($1,858.75)
$33,028.50
($1,011.99)
($5,000.40)
($18,941.74)
($6,908.00)
($2,600.00)
($480.00)
($7,689.06)
$4,586.09
$750.39
($230.00)
$13,383.86
$4,741.25
365,901.87
Contingency Summary
Beginning Contingency from GMP 365,901.87
070 Unused Balance from Allowances $10,835.80
Total Contingency Costs (332,303.57)
Remaining Contingency Balance