December 1, 2015

Okaloosa County BOCC — December 1, 2015 — Deductive Change Order #14-12 Okaloosa County Administrative Bu

Deductive Change Order #14-12 Okaloosa County Administrative Bu in the December 1, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.

FILED WITH

About this source

Preserved among the December 1, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1302). The date shown is the verified meeting context, not an independently established creation date for every attachment. Meeting date checked against the agenda/minutes heading and matching source filename.

Original publication
Deductive Change Order #14-12 Okaloosa County Administrative Bu
Date
December 1, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
5
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Deductive Change Order #14-12 Okaloosa County Administrative Bu — extracted reading text

Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.

Text · 7.2 KB · 5

Download ↓

Deductive Change Order #14-12 Okaloosa County Administrative Bu — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 1.6 MB · 5

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Deductive Change Order #14-12 Okaloosa County Administrative Bu — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

CHANGE ORDER FORM Change Order No.: __14-12 pate: 31 0ct2015 contract No.: _C12-1995-FM Owner: _ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor: Lord & Son Construction, Inc. CHANGE TO CONTRACT PRICE DESCRIPTION AMOUNT Original Contract Price: $ 904,667.00 Net change by previously authorized Change Orders: 8,031,184.09 Prescnt Contract Price: 8,935,851.09 B This Change Order will (add/deduci]) (133,598.30) P TE—— New Contract Price: $8,902,252.79 CHANGE TO CONTRACT TIME DESCRIPTION DATE or NUMBER OF DAYS Original Contract Time: TBD Original Substantial Completion Date: TBD Net change by previously authorized Change Orders: N/A This Change Order will (add/deduct): N/A New Contract Time: N/A N/A New Substantial Completion Date: APPROVALS REQUESTED BY: PROJECT ENGINEER: CONTRACTOR: Leven D. Lox"a'n, Presidént OWNER; This Change Order is an amendment to the Contract/Agre DATE DATE DATE DATE: el /(778 ement between Contractor and the Owner, and all other contract provisions shall remain in full force and effect unless specifically amended in writing, signed by both parties. CHANGE OWNER 0 ORDER ARCHITECT O CONTRACTOR O FIELD O AIA DOCUMENT G701 (Modified) OTHER O PROJECT: Shalimar Courthouse Annex Repurpose CHANGE ORDER NUMBER: Twelve (12) (name, address) 1250 Eglin Parkway DATE: 9 November 2015 Shalimar, FL 32579 TO CONTRACTOR: ARCHITECT'S PROJECT NO: 12009 (name, address) Lord & Son Construction, Inc. CONTRACT DATE: October 16, 2012 Post Office Box 1808 Fort Walton Beach, FL 32549 CONTRACT FOR: CM @ Risk Services The Contract is changed as follows: Savings from GMP budget returned to Okaloosa County: Remaining Contingency Balance $33,598.30 Total Deduct for Savings Returned to County ($33,598.30) Not valid until signed by the Owner and Contractor. The onginal (CONtrACt S WAS. ....pessrssssisssies i S ner s R T s $904,667.00 ;\let change by previously authorized Change Orders................cccccoeeeinin. $8,031,184.09 The (Contract Sum) prior to this Change Orderwas ..o $8,935,851.09 The (Contract Sum)) will be (decreased) by this Change Order in the amount of ($33,598.30) The new (Contract Sum) including this Change Order will be .............cccevereenennnn. $8,902,252.79 The Contract Time will be changed by: N/A The date of Substantial Completion as of the date of this Change Order therefore is: Per Contract NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. DAG Architects, Inc. Lord & Son Construction, Inc. Okaloosa County BOCC Architect Contracior Owner 1223 Airport Road Post Office Box 1808 1804 Lewis Turner Bivd., Ste. 100 Destin, FL 32541 Fort Walton Beach, FL 32549 Fort Walton Beach, FL 32547 Address W // ! Au% /)% Address Charles i, FA Ucgven D. Lord T > Nathan D. Boyles Archlt Presiden ( Chairman Date: / Date: / I / Date: AlA DOCUMENT G701 - CHANGE ORDER - 1987 EDITION = AlA « 1987 « THE AMERICAN INSTITUTE OF ARCHITECTS 1755 NEW YORK AVE, NW., WASHINGTON, DC. 20006 G701-1987 (Modified) Contingency Summary Beginning Contingency from GMP 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 034 035 Temporary fencing needed was less than original estimate Deleted silt fence installation from Demo subcontract Demo fee (reverse) Demo fee not taken Concrete - Risk Category Ill (BarrCrete) Gypsum Wallboard - Risk Category Il (DPF Const) Gulf Power - Underground pad mount Threshhold Inspection (DAG) Additional Tie Beams (BarrCrete CO3) Misc. Electrical Changes (Harrington CO2) Savings from Building Permit Savngs from Bonds Savings from Insurance-Builder's Risk Threshold Inspection Contractor's Steel - Risk Category 3 Revisions Threshhold Inspection (DAG) Sitework Revisions from Plan Review Miscellaneous Electrical Changes Threshhold Inspection (DAG) Site Work Changes (H&T)

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — December 1, 2015 — Deductive Change Order #14-12 Okaloosa County Administrative Bu.” December 1, 2015. Deductive Change Order #14-12 Okaloosa County Administrative Bu. Crypt of Echoes evidence ID LED-2026-73dd8e3c172e43539f3f231f2e559515. http://127.0.0.1:58097/evidence/LED-2026-73dd8e3c172e43539f3f231f2e559515. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Deductive Change Order #14-12 Okaloosa County Administrative Bu, meeting materials for December 1, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=10011&MeetingID=1302

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓