December 20, 2016

Okaloosa County BOCC — December 20, 2016 — Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request

Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request in the December 20, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the December 20, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1369). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used January 1, 2017; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
December 20, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 4.1 KB · 2

Download ↓

Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 158.0 KB · 2

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: December 20, 2016 TO: Honorable Chairman and Members of the Board FROM: Tracy Stage SUBJECT: Change Order No. 3 for Destin Air Traffic Control Tower Project DEPARTMENT: Airport BCC DISTRICT: 5 STATEMENT OF ISSUE: The Airports Department requests the Board of County Commissioners approve Change Order No. 3 with Environmental Management Resources of Washington, Inc. (EMR, Inc.) to extend the construction time by 326 days on Contract No. C16- 2335-AP in order to complete the FAA equipment certification in the Destin Executive Airport (DTS) Air Traffic Control Tower (ATCT) Project. BACKGROUND: The construction contract for the ATCT Project at DTS was issued on October 6, 2015 to EMR and the Notice-to-Proceed was issued on November 9, 2015. The project includes the construction, equipping, roadway, and utilities of the DTS ATCT. Change Order No. 1 was approved by the Board on October 4, 2016. Change Order No. 1 increased the amount of time needed to complete the project by 47 days due to multiple months that exceeded the normal amounts of rainfall giving the contract a scheduled substantial completion date of October 24, 2016. Change Order No. 2 was approved by the Board on November 15, 2016. Change Order No. 2 increased the amount of time needed to complete the project by 14 days due to additional requirements discovered during construction giving the contract a new substantial completion date of November 7, 2016. The project is funded by Federal Aviation Administration (FAA), Florida Department of Transportation (FDOT), Local Match (County), and approved Passenger Facility Charges (PFC). See funding breakdown below. FAA $2,000,000.00 FDOT $1,736,682.00 Local Match $597,356.00 Approved PFC $1,250.000.00 Total Funding $5,584,038.00 Additional supporting documentation to this Agenda Request:  Change Order No. 3 incorporates revisions to the contract documents for extension of the contract date. The contract is required to be extended so that the Contractor’s Sub- Contractor, Woolen, L.L.C., can complete work. Woolen is the sub-contractor providing and installing all of the FAA equipment list and will not be able to complete the required work until the FAA completes their work. At this time, the completion date for the FAA’s work is unknown and as such, EMR’s contract is required to be extended. The project is 99% complete with only the tower cab equipment lacking. We are at a standstill until the FAA schedules their visit to test and accept the systems. Change Order #3 has been approved by Airports Director, Tracy Stage, Project Engineer, Brad Wente, and EMR, Inc.’s President, James Foster. Project Manager, Aaron Jackson signed for Brad Wente in his absence. Mr. Wente confirmed his approval via email and the email is attached as supporting documentation to this agenda request. The Change Order was also approved by FDOT District 3 Program Manager, Philip Deal and FAA Program Manager, Chastity Clark.  Change Order No. 3 will increase the amount of time needed to complete the project by 326 days. This Change Order will give the contract a new substantial completion date of September 29, 2017.  Retainage attributable to completed services, work, or materials will be released upon the submittal and approval of a future Contractor’s Pay Application. Retainage will be withheld on any unfinished work and will be released upon completion of all work.  The County internal coordination by the Purchasing Department and Legal Department. OPTIONS: Approve, Reject, or Table. RECOMMENDATIONS: It is Staff’s recommendation that the Board approve Change Order No. 3 with En

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — December 20, 2016 — Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request.” December 20, 2016. Action Item Printout. Crypt of Echoes evidence ID LED-2026-6b312310c89b4b1fb1d2f65624e91e69. http://127.0.0.1:58097/evidence/LED-2026-6b312310c89b4b1fb1d2f65624e91e69. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Change Order No. 3 for Destin Air Traffic Control Tower Project — agenda request, meeting materials for December 20, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=23070&MeetingID=1369

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓