About this source
Grant Application Cost Estimate from the Okaloosa County BOCC meeting of May 6, 2014 (IQM2 meeting #1198). Original portal label: Grant Application Cost Estimate. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Grant Application Cost Estimate
- Date
- May 6, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Grant Application Cost Estimate (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 310.6 KB
Download ↓Machine-extracted text — 112-Grant Application Cost Estimate.pdf
Text extracted on 2026-10-31 from 112-Grant Application Cost Estimate.pdf using optical character recognition (ocrmypdf/tesseract). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 2.9 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
Preliminary Cost Estimate
Houston Lane Water Main
Line No. Line Item Quantity Unit Unit Price Total
Material
1 12" C-900 DR-14 2650 - ~=siLLF S 20.00 S 53,000.00
2 12" Gate Valves & Box 2 EA S 1,250.00 S$ 2,500.00
3 Fire Hydrant Assembly 2 EA § 1,500.00 S$ 3,000.00
4 12" 90-deg bend 1 EA S 175.00 S$ 175.00
5 12"x12" Tapping Tee 1 EA S 500.00 S$ 500.00
6 Joint Restraints 10 EA S 95.00 S$ 950.00
7 Locate Wire 2650 ~—siLF S 0.10 S 265.00
8 Locate Tape 2650 ~—s LF S 0.02 S$ 53.00
9 Marker Posts 5 EA S$ 15.00 $ 75.00
10 ~ ~=Testing Tap Assembly 2 EA $ 300.00 $ 600.00
11 Seeding/Sodding/Silt Fence/Restoration 1 LS S 3,000.00 S 3,000.00
TOTAL MATERIALS S 64,118.00
Labor/Equipment
13 OCWS in-house labor 5 days S$ 2,917.10 $ 14,585.50
14 OCWS in-house equipment 5 days S$ 2,330.00 $ 11,650.00
TOTAL LABOR/EQUIPMENT S 26,235.50
Subcontracted Work
15 16" Jack and Bore 55 LF S 150.00 S$ 8,250.00
TOTAL SUBCONTRACTED WORK S 8,250.00
General & Administrative
16 15% admin/overhead fee on labor/mat'l (not equip or contracted) S 11,805.53
Design/Permitting/Submerged Land Easement
17 Engineering Services (design, permitting, clearance) 1 LS S$ 15,000.00 S$ 15,000.00
18 Permitting Fees 1 LS S 650.00 S$ 650.00
TOTAL DESIGN S 15,650.00
TOTAL PROJECT | $ 126,059.03 |
Preliminary Estimate for Houston Lane Water Main.xlsx
Beth Brant
From: Kevin Gallagher <kgallagher@caldwelltanks.com>
Sent: Tuesday, October 22, 2013 4:02 PM
To: Beth Brant
Subject: Budget Pricing - Okaloosa County-FL
Beth,
Again, what a pleasure it was to have you, Damon and Ronnie to Louisville. | look forward as well to working with you
for years to come. Budget pricing on Okaloosa County...
Thank you for your inquiry on the Okaloosa County-FL project. We have prepared budget pricing as follows.
The following budget pricing includes a shallow foundation system, tank fabricated/erected, shep-primed and field
painted:
1,000,000 Gallon Fluted Column Tank with a 150’ HWL = $2,500,000
Please add money to cover any additional scope such as: deep foundation system, valve vaults, altitude valves, yard
piping, site work, fencing, electrical, SCADA, cellular antenna provisions, cathodic protection, containment (shrouding)
during the blasting and painting operation, Fluereurethane paint, mixing systems, dewatering, rock excavation, etc.
Also, for standard specifications and background drawings, please visit: http://www.caldwellwatertanks.com/water-
tank-specs-drawings.html
For information on ACTNOW, our program for One Routine Service Payment for Your Community’s Water Project please
visit: http://caldwellactnow.com/caldwell-act-now/
And for our tank mixing system, the TAP-APP, please visit: http://caldwelltap.com/tap-programs/tap-app/
Please feel free to contact me at any time.
Thank you and we look forward to the opportunity of working with you.
Kevin J. Gallagher, P.E.
Vice President - Water
Caldwell Tanks, Inc.
4000 Tower Road
Louisville, KY 40219
O: (502) 964-3361
C: (502) 299-0092