Okaloosa County BOCC — July 21, 2016 — II. p. Local Govt Funding Request — reading text
Part 2 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
II. p. Local Govt Funding Request — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Feasibility
2022/ Design & Permitting
2023 Construction
Monitoring Physical
Feasibility
2023/ Design & Permitting
2024 Construction Sand bypassing
Monitoring Physical
Feasibility
2024/ Design & Permitting
2025 Construction
Monitoring Physical
Feasibility
2025/ Design & Permitting
2026 Construction Sand bypassing
Monitoring Physical
Feasibility
2026/ Design & Permitting
2027 Construction
Monitoring Physical
Description of inlet, area of inlet influence, and sediment budget from inlet management plan:
Description of Inlet:
The East Pass inlet serves as the only connection between the Gulf of Mexico, Destin Harbor and
Choctawhatchee Bay. The inlet channel, from the offshore ebb shoat to the bay, is approximately
6,000-ft long. Choctawhatchee bay is approximately 28 miles long and 6 miles wide, and Destin
Harbor is approximately 2 miles long and ¼ mile wide. Holiday Isle separates the Harbor from the
Gulf of Mexico and Norriego Point separates the Harbor from East Pass. Two rubble mound jetties
protect East pass, the west jetty is approximately 3,860 ft and the east jetty is approximately 1,200
ft. The landward end of the east jetty features an approximate 330 ft rubble mound spur jetty that
extends into the inlet. The spur jetty is designed to divert flow away from the eastern bank of the
inlet and is currently experiencing significant scour near the tip (scour depths extending beyond -
50 ft) due to the eastward channel migration across East Pass.
Area of Influence:
The East Pass area of inlet influence ranges from 6,000-ft to 12,000-ft contingent on selected time
period and storm events. These values are in reference to the 1999 (original) and the 2010 (updated)
East Pass Inlet Management Plans. The adopted 2013 Inlet Management Implementation Plan cites
“the area direct inlet impact was determined to be approximately 10,000 feet to the east and west
of East Pass.”
From the adopted 2013 Inlet Management Implementation Plan: “The net accretion (not including
fill placement) west of the inlet between V611 and the west jetty (approximately 10,000 feet) has
been approximately +6,000 cy/yr [15,000 + 26,000 = 41,000 cy/yr, less 35,000 cy/yr of fill
placement]. The net erosion loss (not including fill placement) to the east of the inlet between the
jetty and R27 (approximately 10,000 feet) has been approximately -54,000 cy/yr [-50,000 cy/yr -
4,000 cy/yr of fill placement].”
Sediment Budget:
[abbreviated version from the IMIP]
The 2000 inlet management plan, based on the study by Taylor Engineering (1999), determined a
net east to west longshore transport at the inlet. The 1999 sediment budget established the need to
bypass 82,000 cy/yr to the west of East Pass to offset the impact of the inlet. This sediment budget
was based upon a seven-year time period between 1990 and 1997 and without the benefit of beach
profile data west of the inlet or bathymetric data north of the U.S. Highway 98 bridge. Due to the
inherent problems with the development of the 1999 sediment budget, the adopted inlet
management plan called for updating the sediment budget by the end of 2005. Previously, most
researchers estimated an east to west net longshore transport in northwest Florida ranging generally
between 52,000 and 91,000 cy/yr (Gorsline, 1966; Stone 1990; USAED, Mobile, 1963). However,
Levin (1983) noted geological evidence of a localized eastward sediment transport at East Pass.
Historically, the east end of Santa Rosa Island grew from west to east as seen by the southwest to
northeast orientation of beach ridges and the eastward migration of the inlet. The 1871 survey
showed the inlet migration was eastward two miles from its location today (refer to History
section).
Based upon wave data obtained by the Corps of Engineers, Morang (1992) suggested a drift nodal
point existed at East Pass and that frequent drift reversals occurred leading to transport in both
directions. The wave data collected between 1987 and 1990 revealed a predominant wave direction
from the southwest. This wave direction would provide a net longshore transport to the east.
Most recently, the City of Destin and the Department contracted a study by Coastal Planning and
Engineering, Inc., to update the inlet sediment budget (CP&E, 2010). The study area included the
entire 14-mile stretch of coast from FDEP reference monument R-1, at the west end of the beach
community of Okaloosa Island, to FDEP reference monument R-50 at the east Okaloosa County
line. The actual area of direct inlet impact was determined to be approximately 10,000 feet to the
east and to the west of East Pass. For the time period between March 1996 and July 2007, CP&E
found a change from the earlier 7-year period (1990-1997) determined in the 1999 study. Between
1996 and 2007, the trend of westward longshore transport to the west of the inlet generally
continued; however, east of the inlet, the net direction of longshore transport was predominately
eastward. This recent period of west to east longshore transport in the vicinity of the inlet has
resulted in a small net gain immediately west of the inlet and a significant loss along Holiday Isles
to the east of the inlet.
Estimated annual quantity of beach quality sand reaching the updrift boundary of the
improved jetty or inlet channel: 82,000 cy
In the 1999 East Pass Inlet Management plan, Taylor Engineering reported that the annual net
longshore sediment transport was between 58,000 and 82,000 cy. The updated 2010 Inlet
Management Plan suggests volume and direction of the longshore sediment transport varies and
greatly depends on dredging and storm activity. The adopted bypassing objective remains as 82,000
cy/year (minimum), as adopted in 2000. As such, the estimated quantity of beach quality sand
reaching the updrift boundary of the improved inlet channel is estimate as 82,000 cy/year.
Pursuant to Rule 62B-36.006(2)(a), the annual quantity of 82,000 cy of beach quality sand
reaching the updrift boundary of the improved inlet channel divided by 20,000 cy per year
awards 4.1 points for the “Sand Reaching the Inlet” ranking criteria.
Balancing the sediment budget:
Annual bypassing objective adopted by the IMP or the SMBP or as determined by a department
approved study: 82,000 cy/year
The annual average of bypassed material (cubic yards) since adoption of a bypass objective:
64,140 cy/year
Pursuant to Rule 62B-36.006(2)(b), the annual average bypassing volume to be placed of
64,140 cy on adjacent eroding shoreline, divided by the annual bypassing objective of
82,000 cy multiplied by 20, awards 15.6 points for the “Balancing the Sediment Budget”
ranking criteria.
Cost effective alternatives:
Unmet annual bypassing objective using material from within the inlet system: 17,860 cy/year
Proposed increase in annual bypassing of material from within the inlet system: 20,000 cy/year
(minimum)
With reference to the September 2012 USACE hydrographic data of the East Pass Federal
Navigation Channel, approximately 260,000 cy of material can be dredged and bypassed to
adjacent beaches in a one-time nourishment. Upon investigation of the feasibility of alternatives
(i.e. channel re-alignment or widening, sand traps, and structure configuration), the quantity of sand
to be bypassed should far exceed the current yearly deficit. Again, the goal of the study is to
determine methods to reduce the cost of frequent maintenance dredging within the inlet.
Pursuant to Rule 62B-36.006(2)(c), the proposed annual increase in bypassing of 40,000
cy (minimum) of material within the inlet system, divided by the unmet annual bypassing
of 17,860 cy, multiplied by 10, awards 10 points (maximum) for the “Cost Effectiveness”
ranking criteria.
Local Sponsor Financial and Administrative Commitment
Rule
Is funding for the project in the local sponsor’s 10-year comprehensive financial plan?
Please provide copy or web link to the plan. Yes
Local match will come from 1st percentage of the Tourist Development Tax
Pursuant to Rule 62B-36.006(2)(d), the funding for the project is/is not in the local
sponsor’s 10-year comprehensive plan, which awards 0 or 2 points for the “10-Year
Comprehensive Financial Plan” ranking criteria.
Is funding provided through a source established by referendum? Yes
Please provide a copy or web link to the referendum.
Local match will come from 1st percentage of the Tourist Development Tax
Pursuant to Rule 62B-36.006(2)(d), local sponsor provides funding for the beach project
via a funding source established by referendum or legislative authority, which awards 0or2
points for the “Designated Funding Source” ranking criteria.
Is funding provided by a third party? No
What is the percentage of total project costs provided by the third party? ______
Please provide a copy of the cost sharing agreement. ______
Pursuant to Rule 62B-36.006(2)(d), local sponsors who provide additional funding from a
third party, other than the federal government, shall receive 1 point for a 10 percent
reduction or 2 points for a 25 percent reduction of the non-federal share obtained from a
third party , which awards 0 or 2 points for the “Third Party Funding” ranking criteria.
Quarterly Report Compliance:
FY2015/2016 End Date Report Sent Compliant
Qtr 1 (Sept) 10/31/2015 N/A N/A
Qtr 2 (Dec) 01/31/2016 N/A N/A
Qtr 3 (Mar) 04/30/2016 N/A N/A
Qtr4 (June) 7/31/2016 N/A N/A
Pursuant to Rule 62B-36.006(2)(d), the local sponsor has a 100 percent compliance record
for submitting quarterly reports correctly and on time over the previous year, which awards
2 points for the “Quarterly Reporting Requirements” ranking criteria.
Are there active federal and state permits for the project? Yes (federal channel dredging only)
Federal permit #:SAJ-2007-04911 Expiration date:__May 11, 2026__
State permit #: 028799-003-JC Expiration date:__Feb 26, 2030___
Pursuant to Rule 62B-36.006(2)(d), the local sponsors hold active state and federal permits
for the proposed project, which awards 1 point for the “Active Permits” ranking criteria.
Have local funds been secured for the project? Yes
Explain: FY17 Tourist Development Department budget approved by Tourist Development
Council
Pursuant to Rule 62B-36.006(2)(d), the local sponsors have entered into an interlocal
agreement with regional partners for the purpose of joint inlet management, which awards
1 point for the “Interlocal Agreement for Inlet Management” ranking criteria.
In order to acquire state funding, a resolution from the local sponsor must be provided by the
application deadline which declares:
• Support from the Sponsor for the Proposed Project
• Willingness to serve as the Local Sponsor
• Ability to provide the full Local Cost Share
• And the source of the funding
Please attach copy of resolution. To be provided