About this source
Action Item Printout from the Okaloosa County BOCC meeting of September 16, 2014 (IQM2 meeting #1234). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- September 16, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 435.8 KB
Download ↓Machine-extracted text — 247-Action Item Printout.pdf
Text extracted on 2026-10-31 from 247-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 3.9 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: September 16, 2014
TO: Honorable Chairman and Members of the Board
FROM: Don Turner
SUBJECT: Head Start Request for Assistance
DEPARTMENT: Facility Maintenance
BCC DISTRICT: 4
STATEMENT OF ISSUE: (FM) Requests BCC direction regarding a recent request for
assistance from the BCC in replacing framing and sheetrock removed due to a mold remediation
project at the McGriff Street Head Start.
BACKGROUND: On or about August 19th of this year, Mr. Frank Godbout, Head Start
Executive Director, made a request for assistance from Okaloosa County in replacing framing
and sheetrock removed as a part of a mold remediation project conducted at the McGriff Street
location in Ft Walton Beach.
The spring storms that caused so much damage to Okaloosa County roads and buildings, also
damaged the Head Start building on McGriff Street. The rains flooded the building causing wide
spread damage to the interior. After the building was dried out, it was tested for mold. Mold
was detected, which is pretty typical for about anywhere in Florida. However, black mold was
discovered. Black mold can cause a variety of allergic reactions with the most severe resulting
in death.
With children present in the building almost every day, remediation was ordered. The black
mold was discovered in numerous areas of the sheetrock and had even spread into the wood
studs. The remediation project includes removing all the affected building components,
including the studs.
The Head Start Program provides area families with early childhood care and education for a low
or no cost. In addition, they provide job and housing referral services to the families, along with
other programs.
The remediation project cost the Head Start Program about $175,000 out of their budget, which
wasn't budgeted. They are trying to get that money back from a pool of state funds for Head
Start programs. The remediation project didn't include repairing any of the remediated
components.
To get the remediated space ready, so the students can return, Mr. Godbout is requesting BCC
assistance with the needed repairs to the remediated areas. They are really "Caught Between the
Devil and the Deep Blue Sea" in this matter. Their revenue is based on the number of students
attending the school. They can't have the students back at the school until the work is completed,
but the work can't get completed unless they have the money to pay for the repairs, but they have
no way to get the money for the repairs without the students being at the school.
Mr. Godbout is probing all possible sources to get the money for the repairs; however, the
prospects of getting the needed money wasn't looking good as of the time of his request to the
county. The county provides $10,000 annually, through the Facilities Maintenance Department,
to support the Head Start program. The exact cost of the repairs is unknown at this time as the
remediation work was ongoing as of the time this item was penned. The remediated areas are off
limits until the remediation is complete and air monitoring results are normal.
The Board has authorized FM to provide up to $5,000 in labor and has approved $5,000 for
materials for maintenance to the McGriff St. facility. While the request isn't for maintenance, the
school needs the repairs more than maintenance in the coming budget cycle.
Staff requests Board direction in the use of the maintenance resources allocated for Head Start in
the FM budget toward making the necessary repairs from the mold remediation project to the
McGriff Street facility so students can return.
RECOMMENDATIONS: (FM) Requests BCC direction regarding a recent request for assistance
from the BCC in replacing framing and sheetrock removed due to a mold remediation project at
the McGriff Street Head Start.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Related sources
This action item printout is part of the Okaloosa County BOCC meeting of September 16, 2014.