READ ALONGSIDE THE SOURCE
Fort Walton Beach — 03-08-11 regular — reading text
Part 8 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Required Attachments - - -
a. Cover Letter: application transmittal cover letter (Identify priority rank with multiple applications).
b. Application: One (1) application with original signature from authorized individual.
c. Resolution: An adopted resolution, by the Governing Body, authorizing that the Project Manager has the authority to
apply for and administer the grant on behalf of the applicant. If the Applicant is applying on behalf of another public
entity, then a Memorandum of Understanding between the Applicant and the public entity must also be submitted.
d. Boundary Map: indicate boundary of the project area.
Site Control Documentation: (c.g. a deed, lease, results of title search, etc. for the project site.)
e.
f. Existing Condition Photographs (sufficient to depict the physical characteristics of the project area)
g. Aerial Photographs (marked with the approximate boundaries of the project site)
h.
Navigational Chart: An 8.5” x 11” photocopy of a current NOAA North American Datum 83 nautical chart (provide
the NOAA chart name and number) indicating the precise location of the project site.
ojo o jor
--- Optional Attachments - - -
i. Detailed Cost Estimate: Cost estimate in the form of a formal bid, written quote from proposed vendor or an
engineer’s cost estimate.
j. Plans: preliminary design/engineering plans (if completed).
O00
k. Permits: Photocopies of necessary project permit(s) or permit application(s). If exempt, provide notification of
exemption from permitting agency.
(1 | 1. Support/Opposition: Attach letters of known public support or known public opposition.
APPLICANT SIGNATURE
Application is hereby made for the activities described herein. I certify that I am familiar with the information contained
in the application, and, to the best of my knowledge and belief, this information is true, complete, and accurate. I further
certify that I possess the authority including the necessary requisite property interests to undertake the proposed activities.
Talso certify that the Applicant’s governing body is aware of and has authorized the Project Manager as the official
representative of the Applicant to act in connection with this application and subsequent project as well as to provide
additional information as may be required. By signature below, the Applicant agrees to comply with all applicable
federal, state, and local laws in conjunction with this proposal and resulting project so approved.
Print/Type Name Title
Applicant Signature Date
WARNING: “Whoever knowingly makes a false statement in writing with the intent to mislead a public servant in the performance of
his or her official duty shall be guilty of a misdemeanor of the second degree, punishable as provided in s. 775.082 or s. 775.083.” §
837.06, Florida Statutes.
NOTE: Instruction and further information regarding this application and the Florida Boating Improvement Program can be found in
the Florida Boating Improvement Program Procedure Guide or you may contact the Program Administrator at: Florida Fish and
Wildlife Conservation Commission, Florida Boating Improvement Program, 620 South Meridian Street, Tallahassee, FL 32399-1600;
or call (850) 488-5600; or email foip@MyFWC.com.
FWC/FBIP-B (02/10) Page 11 of 8
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION
FLORIDA BOATING IMPROVEMENT PROGRAM
Instructions for completing the Grant Application for Boat Access Facilities
General Instructions:
Submit one (1) original and seven (7) copies.
Submit an electronic copy of application on CD or floppy disk.
Staple application in upper left-hand corner, or clip with one binder clip. DO NOT
SPIRAL BIND OR PLACE IN A THREE-RING BINDER OR REPORT COVER.
Please place a tabbed divider between each attachment.
Please make all photocopies of attachments on paper no larger than 11” x 17”.
1- APPLICANT INFORMATION
a. Applicant: Enter the name of the county, municipality, or other
governmental entity applying for the grant.
b. Federal Employer Id. No.: Enter the applicant’s Federal Employer Identification
(FEID) Number. Payment will be sent to the address
associated with this FEID number.
c. Project Manager Name: Enter the name and title of the person in charge of the
Title: project. All correspondence will be sent to this person.
d. Mailing Address: Enter the mailing address for the Project Manager. All
correspondence will be sent to this address.
e. Shipping Address: If mailing address is a P.O. box, please include a street
address for overnight deliveries.
f. Telephone No.: Enter the telephone number, fax number, and email
Fax No.: address where the Project Manager may be contacted
E-mail: during regular business hours.
g. District Numbers: Enter the District numbers for the State House, State
Senate and the County Commission for the project
location.
Page 1 of 6
e
@
&
o
>
3S
2
a
E
a
=
&
3
oO
2
=
Ss
a
<
g
3
°
®
Q
oe
in
°
=
c
£
=
3
2
a
i
<
2
o
irs
a4
G
—
s
£
4
Il - PROJECT SUMMARY
a. Project Title:
Provide a brief title for the project.
b. Type of Application:
Check “New” if you have never applied for FBIP funding
for this project. Check “Reconsideration” if you have
applied before but did not receive funding. Check
“Phased Continuation” if the project has previously
received FBIP funding.
c. Project Category:
Check only one project category. Refer to the guidelines
for project category descriptions. Application will
compete only against other applications within the same
project category. The Commission reserves the right to
re-assign the application to a different project category to
maximize funding.
d. Project Cost:
Enter total amount of project cost, including only the
eligible project elements where grant funds will be used.
Enter the amount of funds requested from FBIP (rounded
to the nearest dollar).
¢, Project Summary:
Provide a brief description of the goal of the project, the
work to be done and the expected outcome or final
product.
TI - GENERAL FACILITY INFORMATION
Describe existing conditions by checking all that apply. For new facilities, provide
information as facility is proposed to be and check “New” for questions about condition of
facility.
IV - PROJECT DESCRIPTION
a. List Primary Need for Project:
Check the category that is most applicable.
b. Need Statement:
Briefly describe why this project is needed. Explain any
existing problems and how this project will correct the
problem.
¢c. Project Tasks:
Describe in detail the exact work to be completed. For
example, Task | - Construct onc-lane, conercte boat
ramp, Task 2 — Construct 20 boat/trailer parking spaces.
d. Project Benefits:
Describe how this project will enhance boating in the
local community.
Page 2 of 6
=
i=
o
E
o
>
£
Q
£
o
£
g
o
ao
4
=
S
N
i=
2
3
[-}
a
oa
x
Ltd
3
i
2
rs
g
4
a
<
a
a
a
€
o
£
=
oO
£
<
V —- PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES
Check only those elements of the project that will use grant funding. Note: elements must be
completed before FWC will reimburse costs.
Indicate the type of project:
= Engineering/Planning only = no grant funds will be used for construction
= Renovate/Repair = replacement or repair of existing facilities with no increased capacity
= Expansion = increased boat access by adding more boat launch lanes, more docks, or
increased parking, etc.
"New = construction of a facility where none currently exists, or adding a new amenity to an
existing facility where none existed before
VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES
Check only those elements of the project that will use grant funding. Note: elements must be
completed before FWC will reimburse costs.
Indicate the type of project:
= Enginecring/Planning only = no grant funds will be used for construction
* Renovate/Repair = replacement or repair of existing facilities with no increased capacity
= Expansion = increased boat access by adding more boat launch lanes, more docks, or
increased parking, etc.
» New = construction of a facility where none currently exists, or adding a new amenity to an
existing facility where none existed before
VII - PROJECT ELEMENTS: AMENITIES
Check only those elements of the project that will use grant funding. Note: elements must be
completed before FWC will reimburse costs.
Indicate the type of project:
Engineering/Planning only = no grant funds will be used for construction
= Renovatc/Repair = replacement or repair of existing facilities with no increased capacity
= Expansion = increased boat access by adding more boat launch lanes, more docks, or
increased parking, etc.
« New = construction of a facility where none currently exists, or adding a new amenity to an
existing facility where none existed before
Page 3 of 6
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
Packet Pg. 59
10-1.a
VIIE- PERMITS
Check status of all permit applications. If project type does
not require permits, or project is exempt from permitting
requirements, check “N/A”. If applicable, attach a
a. Florida Department of
Environmental Protection
photocopy of all permits or permit applications. If project is
b. Florida Fish and Wildlife cxempt, attach a copy of exemption notification.
Conservation Commission
Note: For projects involving mooring buoys, a Florida
c. U.S. Army Corps of Engineers | Uniform Waterway Marker Application must be
submitted to FWC prior to submittal of the grant
application. A copy of the Florida Uniform Waterway
d. Local and Others (If needed) Marker Application may be downloaded at
http://MyF WC.conyboating/waterways/
IX - PROJECT ENGINEERING AND CONSTRUCTION
a. Who is or will be completing project Please check as appropriate.
design/engineering?
b. Level of engineering completed at time of Please check as appropriate. If engineering is
application: complete (conceptual, preliminary, or final),
please include a copy of the plans with your
application.
X - BUDGET
a. Has a detailed cost estimate Indicate whether a preliminary or final cost estimate has
been developed for this been developed. If yes, attach a copy of the estimate to the
project? application.
Enter amount of in-kind match for each cost item. Amounts
in “Other” column should include in-kind match from any
b. CRT MATOuE ~ NON- third-party agreements (provided by someone other than the
applicant). *Please note: All applications must include
some form of non-cash match.
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
¢. PROJECT COST - CASH Enter amount of funding to be provided by the applicant and
FUNDS other sources. Enter the amount of funding requested in the
column labeled “FBIP Grant Request.”
d. TOTAL COST Sum of non-cash match and cash funds for each column.
Page 4 of 6
XI - OTHER SOURCE OF FUNDS (Partnerships)
Include information on funding from sources other than FBIP or the applicant. Enter information
for each funding source.
a. Funding Source / Agency:
Enter the name of the funding source or the partner
b. Type of funding:
Check source of funds: Federal grant, State/Local grant, or
loan.
c. Grant Name:
Enter the name of the grant program (if applicable).
d. Approval Status:
Enter status of grant/loan application. If “Intending to
Apply”, enter date of application deadline.
XII - ENVIRONMENTAL ASSESSMENT
a. Will the project significantly
or adversely affect the
environment?
b. If Yes, please explain key
issues and describe any
mitigation actions proposed.
Explain how the project will have a significant or adverse
affect on the environment and include information on the
impacts to water quality, wetlands, seagrasses, imperiled
species, etc.
XIII - BOATER SAFETY
a. Explain how the project may
affect boater safety whether
positively or negatively.
Provide explanation of how the project may improve boater
safety (i.e. increased education, increased law
