Fort Walton Beach — 03-08-11 regular — reading text

Part 7 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Over time, the boat motor and trailer tires have left a large hole at the end of each ramp causing some vehicles to get stuck. The project would consist of constructing a cafferdam around the area and pumping out the water. An 8” thick pad would be poured to extend the end of the ramp by 12 feet with a curbing at the end of the proposed extension to prevent boat trailers from falling off the end of the ramp. The project will also include bumpers on the poles within each launch lane and replace some damaged wood around the launch lanes. ‘4 o — o > ° 2 & D & 3 i) o ” = = a < 2 3 o v o a 1» oe = < 3 3S 2£ r-% a < 2 iv) ir e 3 E £ re) S = < FWCI/FBIP-B (02/10) Page 2 of 8 10.1.4 Ill - FACILITY INFORMATION a. Facility Name: Liza Jackson Park b. Type of Facility: & Existing Boat Ramp / Public Launching Facility (1 Existing Marina / Tie-up / Overnight Moorage Facility 1 Proposed Boat Ramp / Public Launching Facility 1 Proposed Marina / Tie-up / Overnight Moorage Facility CO Other: ¢. Facility location: County: Okaloosa Water body: Santa Rosa Sound, Class III Waters of the State Township: 2-South Section: 15 & 22 Latitude: N 30 deg. 24 min. 20.53” sec. Range: 24- West Longitude: W 86 deg. 38 min. 17.34 sec. Facility Street Address or Location: 340 Miracle Strip Parkway, SW___ Fort Walton Beach, Fl. 32548 d. Upland Ownership: Name of Owner: City of Fort Walton Beach &X] Public - Fee Simple (1 Public — Lease Number of Years Remaining in Lease: ¢. Is this facility open to the general public? IX] Yes [No f. Estimate Percent (%) Use of Launching Facility: 90% Motorboats/Sailboats 10 % Non-Motorboats g. Day Use, Parking or Launch Fee Amount: $5.00 _ Tie-up/Overnight Moorage: $ 0.00_ h. Number of Launch Lanes: 2 Condition: []New [])Good (Average [XJ Poor Condition: []New []Good [Average [Poor Type of docks: Dd Fixed Wooden []Fixedconcrete | [Floating concrete [J Other: j. Number of Boat Trailer Parking Spaces: 51 Condition: L]New [Good [Average [Poor Condition: [JNew []Good [Average [] Poor Type of docks: [XJ Fixed Wooden [[] Fixed concrete (1 Floating concrete [] Other: 1. Other Facility Attributes: Restroom: [J] Yes [] No [1] Proposed Other: 2 Restroom Facilities, 7 Pavilions, 2 Modular Playgrounds Pump out or Dump Station: [J] Yes I] No Other: FWC/FBIP-B (02/10) Page 3 of 8 Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement) Name m. Names of adjacent boating facilities, public and private (ramps, tie-up facilities/marinas) within a 10-mile radius. 9. Distance Name Distance 1. Legendary Marine 3.Miles 2. Shalimar Yacht Basin 8 Miles 3. Adventure Marina 3 Miles 4, Deckhands Marina. 4 Miles 5. Marler Park. 4 Miles. 6._Cinco Bayou Bridge Boat Launch 4 Miles 7, Ft. Walton Landing 2 Miles 8. 10. FWCIFBIP-B (02/10) Page 4 of 8 Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement) IV - PROJECT DESCRIPTION a. List Primary Need for Project: {X Safety ms High Demand by Users [1 Recommended by FWC Staff Li Lack of In-house Capability (1 Age-end of Useful Life (1 Environmental Needs of the Area (2 Other: b. Need Statement: The Liza Jackson Boat Launch (2 Ramps) are not long enough to accommodate boats larger than 20 feet on a regular basis. At low tide, even the people with smaller boats have a difficult time getting their boats down far enough to get them off of the trailer. Usually, trailers back down to the end of the ramp and the trailer tires fall off the end of the ramp causing trailers to get stuck, Liza Jackson Boat Launch is an extremely high volumed launch facility which brings boats in from Okaloosa County, as well as other counties and states, The citizens constantly place requests to extend the boat launch. c. Approach (Scope of Work): Describe the project’s scope of work by providing a list of tasks and deliverables: The project, if approved, will consist of constructing a cofferdam around the area to pump out the water up the end of the boat launch lanes and pouring an additional 12 feet (in length) concrete slab to accommodate all boats. The project would also include marina style bumpers on each pole on the dock as many boats have had damaged done to their boats from the hardware on the poles. d. Project Benefits: The project would benefit all boating citizens from Penasacola to Panama City, as well as vacationers that tow down boats. The Liza Jackson boat launch is an extremely high voltumed boat ramp. Many boating events are held in the area, as well, that bring in large boats that have a very difficult time releasing and retrieving their boats. FWC/FBIP-B (02/10) Page 5 of 8 Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement) V —- PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES a. Type of project: C1 Engineering / Planning only &] Renovation / Repair [X] New Construction / Expansion b. Boat Ramp Type of ramp: (1 Asphalt Eiconcrete [] Other Number of existing launch lanes to be repaired: 2 Number of new/added launch lanes: 0 Type of boarding docks: Fixed wooden []Fixed concrete [[] Floating Concrete [J] Other Number of existing boarding docks to be repaired/replaced: 0 Number of new/added boarding docks: 0 Length of docks: 0 ft. Length of docks: N/A ft. c. Lifts, Hoists, Marine Railways Number of lifts or hoists to be repaired / replaced: Q Number of new lifts or hoists to be installed / added: 0 Length of marine railway to be repaired / replaced: 0 ft. Length of new marine railway to be added: Of. Maximum length of vessel that can be lifted: N/A Maximum length of vessel that can be lifted: N/A VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES (Piers / Docks) a. Type of project: (1 Engineering / Planning only C1 Renovation / Repair (New Construction / Expansion b. Docks /In-water slips N/A Type of dock: [] Fixed Wooden [[] Fixed Concrete [[] Floating Concrete [[] Other Length of existing docks to be repaired / replaced: ft. Length of new docks to be added / installed: ft. Number of tie-ups / slips: Number of tie-ups / slips: c. Mooring Buoys N/A d. Dry Storage N/A Number of existing dry storage slips to be repaired / replaced: Number of new dry storage slips to be constructed: Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement) FWC/FBIP-B (02/10) Page 6 of 8 Packet Pg. 51. VII - PROJECT ELEMENTS: AMENITIES a. Type of project: (1 Engineering / Planning [1 Renovate / Repair (New Construction / Expansion b. Parking N/A Type of parking: CDiAsphatt [] Concrete ([] Other Size of parking area; square feet, or acres Number of existing boat trailer parking spaces to be refurbished Number of existing vehicle parking spaces to be refurbished Number of new/added vehicle parking spaces Number of new/added boat trailer parking spaces c, Other amenities: N/A g Fy & o > 2 Qa E a & [1 Restrooms Describe 3 [7 oO ” CJ Access Road: Length of access road: yds. Type of road: [Gravel [J Asphalt [] Other = Nn c 2 (1 Pump-out or Dump station 3 a [1 Breakwater/Groin/Jetty/Wave attenuator Length: Describe: iv wo U1 Other 2 0 Other c 2 Oi Other 8 Other & < a o VIII - PERMITS S i= Submitted | Approved N/A 2 = o a. Florida Department of Environmental Protection & Oo | £ < b. Florida Fish and Wildlife Conservation Commission* Oo Oo Xl c. U.S. Army Corps of Engineers ® Oo Oo d. Local and Others (If needed) QO & O * For mooring buoy projects, a Florida Uniform Waterway Marker Application must be submitted to FWC prior to submittal of the grant application. IX - PROJECT ENGINEERING AND CONSTRUCTION FWC/FBIP-B (02/10) Page 7 of 8 " Packet Pg. 52 a. Who is or will be completing project design/enginecring? &] Applicant’s Own Staff (1 Consulting Engineers (N/A (Materials or Equipment Purchase) OD Other: b. Level of engineering completed at time of application: [1 None {-] Conceptual (Master Plan Phase) (1 Preliminary X Final (Ready to Bid) X-— BUDGET a. Has a detailed cost estimate been developed for this project? If yes, attach a copy to application. XJ Yes, Preliminary O Yes, Final [No b. PROJECT COST: NON-CASH MATCH Cost Item Applicant (oss ms TOTAL Section XT) Administration $ $1,400 | $ Ss 1,400 Project Management Ss $1,600 | $ $ 1,600 Tn-Kind Engineering § $1,200 | $ s 1,200 In-Kind Labor Ss $ $ In-Kind Materials $s $ $ In-Kind Equipment $ $ $ Total Non-Cash Match | $ $4,200 | $ $ 4,200 c. PROJECT COST: CASH FUNDS Cost Item Other source . FBIP Grant Applicant (List below in Request Section XI) TOTAL Administration / Project Management Design / Engineering Permitting Construction / Repair: Boat Ramps 10,000 18,000 28,000 Construction / Repair: Lifts, Hoists, Marine Railways Construction / Repair: Piers or Docks Construction / Repair: Parking Construction / Repair: Restrooms aelnlalalelalule Other: Other: Other: anlalalalalalelealelelelea Other: alalalelalalalwlalseleluw aianlsinlalnlalelelalele alalalw FWC/FBIP-B (02/10) Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement) Page 8 of 8 Packet Pg. 53 10.1.a— Other: Total Cash Funds $ 10,000 $ 18,000 Ss 28,000 d. TOTAL COST: non-cash match + cash funds FWC/FBIP-B (02/10) Page 9 of 8 e o = o > 3 2 a = D e £ 3 3 ie) 2 3S a © 2 3 ° a a 4 ve o 2 < 2 S £ a 2 ¢ o oO mm = o E £ o s « Xi — OTHER SOURCE OF FUNDS (Partnerships) a. Funding source / Agency: b. Type of funding: (1 Federal grant c. Grant Name: State/Local grant 1 Loan g Amount $ d, Approval Status: 1 Approved (1 Pending {J Intend to Apply, Date: a, Funding source / Agency: b. Type of funding: (1 Federal grant c. Grant Name: (1 State/Local grant Loan Amount $ d. Approval Status: D1 Approved C1 Pending C1 Intend to Apply, Date: XII - ENVIRONMENTAL ASSESSMENT a. Explain how the project may impact the environment and describe any mitigation or actions proposed to minimize impacts. The boat ramp is not located in any vegetated wetlands (including seagrass beds) and no estuarine wetlands will be filled, dredged, or altered to accomplish the proposed project. The initial construction including damming, pumping, and installation is expected to minimally impact the shallow intertidal sea floor and temporariliy displace fauna in the immediate project area; however, the damming should decrease the incidence of suspended particles and increased turbidity in the water column of nearby habitats {similar to the effects of a turbidity curtain). Pumping will be carefully monitored to ensure minimal adverse impacts to fish and other estuarine species within the project area. The boat ramp is an existing facility and is currently used for boating activities, so fauna present in the area is already regularly exposed to disturbance from boating activities. The project will also consist of the most environmentally safe materials available, where feasible and practical. XII — BOATER SAFETY a. Explain how the project may affect boater safety whether positively or negatively. Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement) The proposed project will positively affect boater safety. It is difficult for boaters to release and retrieve boats due to the shortness of the two (2) boat launch ramps at Liza Jackson Park. The majority of issues at the launch area relate to the trailer tires falling off the end of the ramp. Other issues include the trailers not being able to back their trailers up far enough to get boats back on the trailers. The boats have to push to full throttle to get back on the trailer which has blown out a large section of the sand at the base of the ramp. The drop off from the edge of the ramp to the sand is severe. FWC/FBIP-B (02/10) Page 10 of 8 Packet Pg. 55. (iota XIV — APPLICATION ATTACHMENTS CHECKLIST Submit one (1) electronic copy on CD or floppy disk and seven (7) photocopies of the application with attachments. -

Download this text file with its original spacing ↓