Over time, the boat motor and trailer tires have
left a large hole at the end of each ramp causing some vehicles to get stuck. The project would consist of constructing a
cafferdam around the area and pumping out the water. An 8” thick pad would be poured to extend the end of the ramp by 12 feet
with a curbing at the end of the proposed extension to prevent boat trailers from falling off the end of the ramp. The project will
also include bumpers on the poles within each launch lane and replace some damaged wood around the launch lanes.
‘4
o
—
o
>
°
2
&
D
&
3
i)
o
”
=
=
a
<
2
3
o
v
o
a
1»
oe
=
<
3
3S
2£
r-%
a
<
2
iv)
ir
e
3
E
£
re)
S
=
<
FWCI/FBIP-B (02/10) Page 2 of 8
10.1.4
Ill - FACILITY INFORMATION
a. Facility Name: Liza Jackson Park
b. Type of Facility:
& Existing Boat Ramp / Public Launching Facility (1 Existing Marina / Tie-up / Overnight Moorage Facility
1 Proposed Boat Ramp / Public Launching Facility 1 Proposed Marina / Tie-up / Overnight Moorage Facility
CO Other:
¢. Facility location:
County: Okaloosa Water body: Santa Rosa Sound, Class III Waters of the State
Township: 2-South Section: 15 & 22
Latitude: N 30 deg. 24 min. 20.53” sec.
Range: 24- West
Longitude: W 86 deg. 38 min. 17.34 sec.
Facility Street Address or Location: 340 Miracle Strip Parkway, SW___ Fort Walton Beach, Fl. 32548
d. Upland Ownership:
Name of Owner: City of Fort Walton Beach
&X] Public - Fee Simple (1 Public — Lease Number of Years Remaining in Lease:
¢. Is this facility open to the general public? IX] Yes [No
f. Estimate Percent (%) Use of Launching Facility: 90% Motorboats/Sailboats
10 % Non-Motorboats
g. Day Use, Parking or Launch Fee Amount: $5.00 _ Tie-up/Overnight Moorage: $ 0.00_
h. Number of Launch Lanes: 2 Condition: []New [])Good (Average [XJ Poor
Condition: []New []Good [Average [Poor
Type of docks: Dd Fixed Wooden []Fixedconcrete | [Floating concrete [J Other:
j. Number of Boat Trailer Parking Spaces: 51 Condition: L]New [Good [Average [Poor
Condition: [JNew []Good [Average [] Poor
Type of docks: [XJ Fixed Wooden [[] Fixed concrete (1 Floating concrete [] Other:
1. Other Facility Attributes:
Restroom: [J] Yes [] No [1] Proposed
Other: 2 Restroom Facilities, 7 Pavilions, 2 Modular Playgrounds
Pump out or Dump Station: [J] Yes I] No Other:
FWC/FBIP-B (02/10) Page 3 of 8
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
Name
m. Names of adjacent boating facilities, public and private (ramps, tie-up facilities/marinas) within a 10-mile radius.
9.
Distance Name Distance
1. Legendary Marine 3.Miles 2. Shalimar Yacht Basin 8 Miles
3. Adventure Marina 3 Miles 4, Deckhands Marina. 4 Miles
5. Marler Park. 4 Miles. 6._Cinco Bayou Bridge Boat Launch 4 Miles
7, Ft. Walton Landing 2 Miles 8.
10.
FWCIFBIP-B (02/10)
Page 4 of 8
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
IV - PROJECT DESCRIPTION
a. List Primary Need for Project: {X Safety ms
High Demand by Users
[1 Recommended by FWC Staff
Li Lack of In-house Capability
(1 Age-end of Useful Life
(1 Environmental Needs of the Area
(2 Other:
b. Need Statement:
The Liza Jackson Boat Launch (2 Ramps) are not long enough to accommodate boats larger than 20 feet on a regular
basis. At low tide, even the people with smaller boats have a difficult time getting their boats down far enough to get them
off of the trailer. Usually, trailers back down to the end of the ramp and the trailer tires fall off the end of the ramp
causing trailers to get stuck, Liza Jackson Boat Launch is an extremely high volumed launch facility which brings boats in
from Okaloosa County, as well as other counties and states, The citizens constantly place requests to extend the boat
launch.
c. Approach (Scope of Work): Describe the project’s scope of work by providing a list of tasks and deliverables:
The project, if approved, will consist of constructing a cofferdam around the area to pump out the water up the end of the
boat launch lanes and pouring an additional 12 feet (in length) concrete slab to accommodate all boats. The project would
also include marina style bumpers on each pole on the dock as many boats have had damaged done to their boats from the
hardware on the poles.
d. Project Benefits:
The project would benefit all boating citizens from Penasacola to Panama City, as well as vacationers that tow down boats.
The Liza Jackson boat launch is an extremely high voltumed boat ramp. Many boating events are held in the area, as well,
that bring in large boats that have a very difficult time releasing and retrieving their boats.
FWC/FBIP-B (02/10) Page 5 of 8
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
V —- PROJECT ELEMENTS: BOAT RAMPS & PUBLIC LAUNCHING FACILITIES
a. Type of project: C1 Engineering / Planning only &] Renovation / Repair [X] New Construction / Expansion
b. Boat Ramp
Type of ramp: (1 Asphalt Eiconcrete [] Other
Number of existing launch lanes to be repaired: 2
Number of new/added launch lanes: 0
Type of boarding docks: Fixed wooden []Fixed concrete [[] Floating Concrete [J] Other
Number of existing boarding docks to be repaired/replaced: 0
Number of new/added boarding docks: 0
Length of docks: 0 ft.
Length of docks: N/A ft.
c. Lifts, Hoists, Marine Railways
Number of lifts or hoists to be repaired / replaced: Q
Number of new lifts or hoists to be installed / added: 0
Length of marine railway to be repaired / replaced: 0 ft.
Length of new marine railway to be added: Of.
Maximum length of vessel that can be lifted: N/A
Maximum length of vessel that can be lifted: N/A
VI - PROJECT ELEMENTS: MARINAS & OTHER MOORING FACILITIES (Piers / Docks)
a. Type of project: (1 Engineering / Planning only
C1 Renovation / Repair
(New Construction / Expansion
b. Docks /In-water slips N/A
Type of dock: [] Fixed Wooden [[] Fixed Concrete [[] Floating Concrete [[] Other
Length of existing docks to be repaired / replaced: ft.
Length of new docks to be added / installed: ft.
Number of tie-ups / slips:
Number of tie-ups / slips:
c. Mooring Buoys N/A
d. Dry Storage N/A
Number of existing dry storage slips to be repaired / replaced:
Number of new dry storage slips to be constructed:
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
FWC/FBIP-B (02/10) Page 6 of 8
Packet Pg. 51.
VII - PROJECT ELEMENTS: AMENITIES
a. Type of project: (1 Engineering / Planning [1 Renovate / Repair
(New Construction / Expansion
b. Parking N/A
Type of parking: CDiAsphatt [] Concrete ([] Other
Size of parking area; square feet, or acres
Number of existing boat trailer parking spaces to be refurbished
Number of existing vehicle parking spaces to be refurbished
Number of new/added vehicle parking spaces
Number of new/added boat trailer parking spaces
c, Other amenities: N/A
g
Fy
&
o
>
2
Qa
E
a
&
[1 Restrooms Describe 3
[7
oO
”
CJ Access Road: Length of access road: yds. Type of road: [Gravel [J Asphalt [] Other =
Nn
c
2
(1 Pump-out or Dump station 3
a
[1 Breakwater/Groin/Jetty/Wave attenuator Length: Describe: iv
wo
U1 Other 2
0 Other c
2
Oi Other 8
Other &
<
a
o
VIII - PERMITS S
i=
Submitted | Approved N/A 2
=
o
a. Florida Department of Environmental Protection & Oo | £
<
b. Florida Fish and Wildlife Conservation Commission* Oo Oo Xl
c. U.S. Army Corps of Engineers ® Oo Oo
d. Local and Others (If needed) QO & O
* For mooring buoy projects, a Florida Uniform Waterway Marker Application must be submitted to FWC prior to submittal of the
grant application.
IX - PROJECT ENGINEERING AND CONSTRUCTION
FWC/FBIP-B (02/10) Page 7 of 8
" Packet Pg. 52
a. Who is or will be completing project design/enginecring?
&] Applicant’s Own Staff
(1 Consulting Engineers
(N/A (Materials or Equipment Purchase)
OD Other:
b. Level of engineering completed at time of application:
[1 None
{-] Conceptual (Master Plan Phase)
(1 Preliminary
X Final (Ready to Bid)
X-— BUDGET
a. Has a detailed cost estimate been developed for this project? If yes, attach a copy to application.
XJ Yes, Preliminary O Yes, Final [No
b. PROJECT COST: NON-CASH MATCH
Cost Item Applicant (oss ms TOTAL
Section XT)
Administration $ $1,400 | $ Ss 1,400
Project Management Ss $1,600 | $ $ 1,600
Tn-Kind Engineering § $1,200 | $ s 1,200
In-Kind Labor Ss $ $
In-Kind Materials $s $ $
In-Kind Equipment $ $ $
Total Non-Cash Match | $ $4,200 | $ $ 4,200
c. PROJECT COST: CASH FUNDS
Cost Item
Other source
. FBIP Grant
Applicant (List below in Request
Section XI)
TOTAL
Administration / Project Management
Design / Engineering
Permitting
Construction / Repair: Boat Ramps
10,000 18,000 28,000
Construction / Repair: Lifts, Hoists, Marine Railways
Construction / Repair: Piers or Docks
Construction / Repair: Parking
Construction / Repair: Restrooms
aelnlalalelalule
Other:
Other:
Other:
anlalalalalalelealelelelea
Other:
alalalelalalalwlalseleluw
aianlsinlalnlalelelalele
alalalw
FWC/FBIP-B (02/10)
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
Page 8 of 8 Packet Pg. 53
10.1.a—
Other:
Total Cash Funds
$
10,000
$
18,000
Ss
28,000
d. TOTAL COST: non-cash match + cash funds
FWC/FBIP-B (02/10)
Page 9 of 8
e
o
=
o
>
3
2
a
=
D
e
£
3
3
ie)
2
3S
a
©
2
3
°
a
a
4
ve
o
2
<
2
S
£
a
2
¢
o
oO
mm
=
o
E
£
o
s
«
Xi — OTHER SOURCE OF FUNDS (Partnerships)
a. Funding source / Agency:
b. Type of funding: (1 Federal grant
c. Grant Name:
State/Local grant 1 Loan
g
Amount $
d, Approval Status: 1 Approved (1 Pending
{J Intend to Apply, Date:
a, Funding source / Agency:
b. Type of funding: (1 Federal grant
c. Grant Name:
(1 State/Local grant Loan
Amount $
d. Approval Status: D1 Approved C1 Pending
C1 Intend to Apply, Date:
XII - ENVIRONMENTAL ASSESSMENT
a. Explain how the project may impact the environment and describe any mitigation or actions proposed to minimize impacts.
The boat ramp is not located in any vegetated wetlands (including seagrass beds) and no estuarine wetlands will be filled, dredged,
or altered to accomplish the proposed project. The initial construction including damming, pumping, and installation is expected to
minimally impact the shallow intertidal sea floor and temporariliy displace fauna in the immediate project area; however, the
damming should decrease the incidence of suspended particles and increased turbidity in the water column of nearby habitats
{similar to the effects of a turbidity curtain). Pumping will be carefully monitored to ensure minimal adverse impacts to fish and
other estuarine species within the project area. The boat ramp is an existing facility and is currently used for boating activities, so
fauna present in the area is already regularly exposed to disturbance from boating activities. The project will also consist of the
most environmentally safe materials available, where feasible and practical.
XII — BOATER SAFETY
a. Explain how the project may affect boater safety whether positively or negatively.
Attachment: FBIP Application (1165 : Resolution 2011-5 Boating Improvement)
The proposed project will positively affect boater safety. It is difficult for boaters to release and retrieve boats due to the shortness
of the two (2) boat launch ramps at Liza Jackson Park. The majority of issues at the launch area relate to the trailer tires falling off
the end of the ramp. Other issues include the trailers not being able to back their trailers up far enough to get boats back on the
trailers. The boats have to push to full throttle to get back on the trailer which has blown out a large section of the sand at the base
of the ramp. The drop off from the edge of the ramp to the sand is severe.
FWC/FBIP-B (02/10) Page 10 of 8
Packet Pg. 55.
(iota
XIV — APPLICATION ATTACHMENTS CHECKLIST
Submit one (1) electronic copy on CD or floppy disk and seven (7) photocopies of the application with attachments.
-