READ ALONGSIDE THE SOURCE
Fort Walton Beach — 03-08-11 regular — reading text
Part 3 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
streetscape grant applications for eligibility and completeness for the site at 2
Eglin Parkway NE.
The applicant desires to install decorative sidewalk pavers and landscaping along Eglin
Parkway NE and Hollywood Boulevard NE. The scope of the work includes the
complcte installation of the pavers, including base, sand, pavers, and stabilization, and
landscaping and irrigation. The sidewalk will be nine (9) fect wide on Eglin Parkway
and seven (7) feet wide on Hollywood Boulevard. The applicant has stated that the
landscaping, paver design and color will conform to the requirements in the CRA
To:
From:
Date:
Subject:
City Council of Fort Walton Beach
ENGINEERING & UTILITY SERVICES
MEMORANDUM
Robert T. Mearns, City Manager
Michael Beedie, Engineering & Utility Services Director
March 8, 2011
Matching Grant Request for 2 Eglin Parkway NE
2.3.
2.4.
2.5.
streetscape grant manual.
A total of two (2) grant requests were submitted by the property owner: one for Eglin
Parkway and one for Hollywood Boulevard. The total cost for the streetscape and
landscape improvements on Eglin Parkway is $22,091.75, making the project eligible
for $10,000.00 in grant funds (maximum allowable). The total cost for the streetscape
and landscape improvements on Hollywood Boulevard is $13,643.25, making the
project eligible for $6,821.63 in grant funds (50% of the total cost).
2.3.1. There are two separate requests for this property because the requirements for
the improvements are drastically different along cach roadway. The sidewalk
requircments along an FDOT roadway such as Eglin Parkway (nine-foot width)
are different along a non-FDOT roadway such as Hollywood Boulevard (seven-
foot width). The grant manual allows Staff to amend the program guidelines and
application process as experience may dictate.
If approved, grant funds are released to the applicant after approval of the maintenance
agreements, completion of all improvements listed on the approved site plan, submittal
of all invoices relative to the approved improvements, and verification by Staff that the
improvements have been installed in accordance with the approved plan.
This request for grant funding is in conjunction with the City’s ongoing project to
install a new mast arm traffic signal at this corner through a partnership with FDOT.
This project was approved by the CRA Board and City Council in June 2010, and
FDOT has completed the design of the new mast arm signals. A requirement to
complcte the installation of the mast arm signal at this corner includes the acquisition of
approximately 635 square feet of property and the relocation of the existing landmark
sign. The relocation of the landmark sign is estimated to cost $9,000.
3. FINANCIAL INFORMATION:
3.1.
3.2,
A total of $50,000.00 was allocated in the FY 2010-11 CRA Matching Streetscape
Grant Program (Account No. 109-2000-552-8200). The total amount of the two
individual grant requests is $16,821.63.
Also, the $9,000 required to relocate the existing landmark sign was not included in the
original funding request for the design and construction of the mast arm traffic signals
because the requirement and cost were unknown. Sufficient funding is available in
CRA Fund Balance to cover this cost.
City Council of Fort Walton Beach
ENGINEERING & UTILITY SERVICES
MEMORANDUM
To: Robert T. Mearns, City Manager
From: Michael Beedie, Engineering & Utility Services Director
Date: March 8, 2011
Subject: Matching Grant Request for 2 Eglin Parkway NE
4, RECOMMENDATION:
4.1. Staff requests City Council approval of four (4) individual requests to utilize
$16,821.63 of the FY 2010-11 CRA Matching Streetscape Grant funds for streetscape
and landscape improvements along Eglin Parkway NE and Hollywood Boulevard NE at
2 Eglin Parkway NE.
4.2. Staff also requests City Council approval to utilize $9,000.00 from CRA Fund Balance
to relocate the existing landmark sign at 2 Eglin Parkway NE to accommodate the
construction of new mast arm traffic signals as part of an agreement with FDOT.
ATTACHMENTS:
« 2Eglin Parkway NE Streetscape App (PDF)
¢ 2 Eglin Parkway NE Landscape Estimate (PDF)
« 2 Eglin Parkway NE Site Plan (PDF)
SIGNATURE BLOCK:
Michael Beedie Completed 03/01/2011 1:43 PM
Finance Completed 03/01/2011 1:59 PM
Carole Jones Completed 03/01/2011 2:06 PM
City Manager Completed 03/01/2011 2:17 PM
City Council Pending
Aemeg uly Z 40) jsanbay yueig Buryojew : -ZLL) ddy adeosjae.jg 3N Aemmsed uly zZ usWYyoRny
pan
NOV 18 7010
TRIPLE R CONSTRUCTION
P.O. Box 5883
Destin, Fla. 32540
850-585-7682
850-936-1022
City of Fort Walton Beach
Community Development Services Dept
105 Miracle Strip Pkwy. S.W.
Fort Walton Beach, Fla. 32549
Attention: Stella Jones
Re: Grant funds for #2 Eglin Pkwy. N.E. Nabors Building
Please except this letter as a request for Grant funds for the improvements to Hollywood
Blvd with approx. 1110 Sq.ft. of pavers installed on City R.O.W.. The sidewalk
will be a total of 6-0 wide with 5-0 wide made with a max. 2% side slope. All colors,
sizes, and patterns will be consistent with the Uptown Station / East side of Eglin
Pkwy.
The total cost for this work for complete installation of pavers, including base,sand,
pavers, stabilization is $ 5,550.00.
The city as the plans for this project from Choctaw Engineering, Nabors Building Parking
Site Plan Dated Oct 4, 2010 page 3 of 5
Please review this request and call me with any question.
ZMELA
Rick Rausch, Triple R Construction
1117/10
Aenped uy6g Z 40) sanbay yueig Guiysjew : LZL}) ddy edessyaens 3N Aemoued wba 2 usyoeny i
. 25
Nov 18 2010
Packet P
TRIPLE R CONSTRUCTION
P.O. Box 5883
Destin, Fla. 32540
850-585-7682
850-936-1022
City of Fort Walton Beach
Community Development Services Dept
105 Miracle Strip Pkwy. S.W.
Fort Walton Beach, Fla. 32549
Attention: Stella Jones
Re: Grant funds for #2 Eglin Pkwy. N.E. Nabors Building
Please except this letter as a request for Grant funds for the improvements to Eglin
Parkway with approx. 2450 Sq.ft. of pavers installed on City R.O.W.. The sidewalk
will be a total of 9-0 wide with 5-0 wide made with a max. 2% side slope. All colors,
sizes, and patterns will be consistent with the Uptown Station / East side of Eglin
Pkwy.
The total cost for this work for complete installation of pavers, including base,sand,
pavers, stabilization is $12,200.00.
The city as the plans for this project from Choctaw Engineering, Nabors Building Parking
Site Pian Dated Oct 4, 2010 page 3 of 5
Please review this request and cali me with any question.
FLAME,
Rick Rausch, Triple R Construction
11A7NO
East Bay Landscaping & Irrigation, Inc.
8365 Highway 90
Milton, FL 32583
(850) 981-0069
eastbaylandscape@bellsouth.net
Name / Address
Jim Nabors
Re: Regions Bank FWB
245 Yacht Club Dr.
Fort Walton Beach, FL
Estimate
Date
Estimate #
2/14/2011
472
Project
Description
Qty
Cost
Total
Install an irrigation system including a 2” well, 3HP pump,
Rainbird digital timer, pump-start relay, and 6 zones (1 rotor zone
and 5 spray zones using +/- 82 spray heads).
One year warranty on parts and labor.
Install 5 Washingtonia palms, 20'-28' B&B; | Pindo palm, 12’ B&B;
29 Sabal palms, 8'-14' B&B; 2 Mediterranean Fan palms, 5'-6' B&B;
11 Live oak tree, 3"caliper B&B; 9 European Fan Palm, 1 5gal.; 26
Bottlebrush, 7gal.; 24 Podocarpus, 7gal.; 11 Saw Silver Palmetto,
Teal.; 2 Camellia, 7gal.; 207 Indian Hawthorn, 3gal.; 39 Knockout
roses, 3gal.; 10 Philodendron, 3gal.; 394 Variegated Flax Lily,
Igal.; 99 African Iris, Igal.; 28 Agapanthus, 1gal.; 27 Asparagus
Fem, I gal.; 20 Pansies, 6"; and 98 bales of pinestraw.
Install St. Augustine sod. (per pallet price)
BUILDING LANDSCAPING & IRRIGATION
HOLLYWOOD LANDSCAPING & IRRIGATION
EGLIN PARKWAY LANDSCAPING & IRRIGATION
"The owner is to provide the sleeving under the parking lot and a
220 power source.
11,869.50
8,093.25
9,891.75
0.00
9.00
11,869.50
8,093.25
9,891.75
This estimate is good for 30 days.
Total
$29,854.50
Customer Signature
Attachment: 2 Eglin Parkway NE Landscape Estimate (1171 : Matching Grant Request for 2 Eglin Parkway NE)
a
Br |e z=
sel:
gk |B
Bh |e
“Heals
ia =|
EB
pa
fe
fe|é
1 i]s
i Ub lz
Lo LR
| a
bik
i é
iN
( 2
ra
[
ED)
‘aunaay NOLATL EL
at vardona Hovaa wounve sod
‘ONT “ONINTANIDNG MV.LOOHO
gTvas oMavEO
Wiad aang IVa alagONOD
O04 SS mASHIO
‘oyeaz1n08 aooNTION
City Council of Fort Walton Beach
FINANCE
MEMORANDUM.
To: Robert T. Mearns, City Manager
From: Brandy Wunker, Finance Director
Date: March 8, 2011
Subject: Lease-Purchase Financing
1. Background
1.1, During the development of the FY 2010-11 budget, staff discussed with City Council the
possibility of entering into a master lease agreement to assist with financing for
equipment and vehicles.
1.2. The process requires the City to issue a Request for Proposals for any purchases. The
issuance of the RFP requires that the tentative projects be identified, with a maximum
funding limit requirement for each project listed.
2. Discussion
2.1. Included in the FY 2010-11 budget is the lease-purchase of two (2) greens mowers and
one (1) grounds mower.
2.2. Although not included in the FY 2010-11 budget, the replacement of one (1) ladder truck
for the fire department is needed. The current ladder truck was purchased in 1996 for
$315K and has reached the end of its useful life. The City has spent approximately
$219K (70% of the purchase cost) in repairs and maintenance for the truck, which
continues to require additional repairs.
2.3. With the above referenced purchases in mind, the City issued RFP 11-014 for master
lease funding proposals which included maximum total funding of $965K.
2.4. The City received six (6) proposals in response to RFP 11-014. The lowest responsive
responsible bidder was Hancock Bank, with a combined interest rate of 2.55%,
2.5. Hancock Bank requests City Council acceptance of their proposal. This acceptance does
not obligate the City to accept the note. The acceptance of the note will be presented
to City Council at a later date after purchases have been identified through the bidding
process..
3. Financial Information
3.1. The FY 2010-11 budget includes funding for the lease-purchase of the golf equipment.
3.2. The FY 2010-11 budget does not include funding for the debt service payment on the
ladder truck. The budget does include funding for the debt service payment on a
previously purchased fire pumper, the final payment of which will be made in the
current fiscal year (approximately $50K). A portion of the debt service payment for the
proposed acquisition of the ladder truck can be funded utilizing this already dedicated
expense stream.
3.3. Additional funding, in the event that the debt service payment required for the proposed
new acquisition of the ladder truck exceeds $50K, will require identification during the
FY 2011-12 budget process.
8.4
City Council of Fort Walton Beach
FINANCE
MEMORANDUM
To: Robert T. Mearns, City Manager
From: Brandy Wunker, Finance Director
Date: March 8, 2011
Subject: Lease-Purchase Financing
3.4. FY 2010-11 funding for the proposed acquisition of the ladder truck is approximatcly
$26K. A budget amendment from fund balance will likely be required in the current year
to cover this cost.
4. Recommendation
4.1, Staff respectfully requests City Council acceptance of the financing proposal from
Hancock Bank, authorizing the Mayor to sign the necessary documents. This acceptance
does not obligate the City to the note.
ATTACHMENTS:
« Hancock Bank (revised proposal) Ft. Walton Beach (PDF)
* RFP 11-014 FOR LEASE-PURCHASE FINANCING final (PDF)
SIGNATURE BLOCK:
Brandy Wunker Completed 03/01/2011 3:20 PM
Finance Completed 03/01/2011 3:20 PM
Carole Jones Completed 03/01/2011 3:27 PM
City Manager Completed 03/03/2011 1:35 PM
City Council Pending
Hancock Bank
PUBLIC FINANCE DEPARTMENT
VIA E-MAIL
February 25, 20114
Honorable Mayor and City Council
