JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PENSACOLA REGULATORY OFFICE
41 NORTH JEFFERSON STREET, SUITE 301
PENSACOLA, FL 32502
REPLY TO
ATTENTION OF
Regulatory Division June 8,2011
North Permits Branch
SAJ-2002-2330 (IP-MBH)
MODIFICATION #2
Destin West Marina, LLC
clo Fred E. Tolbert, III
1500 Miracle Strip Parkway SE
Fort Walton Beach, FL 32548
Dear Mr. Tolbert:
The U.S. Army Corps of Engineers has completed the review and evaluation of your
modification request received May 16, 2011 , in which you asked to revise the plans authorized
by Department of the Army permit number SAJ-2002-2330, for the construction of a commercial
marina consisting of 89 permanent slips and 10 to 13 transient slips, for temporary mooring, with
two breakwater structures located on the east and north portions of the facility, and two sewage
pumpout facilities, dated July 10, 2006. The Corps issued a modification to the permit on
November 5,2009. The modification revised the project to the construction of a multi-family dock
consisting of 25 permanent slips, 56 mooring pilings, two transient slips, a 326' wave fence
installed around the boatslips on the north portion of the facility, and two sewage pumpout
facilities . The project is located on the north side of Highway 98 between Seagull Restaurant
and Hermitage Crossing in Fort Walton Beach, Section 00, Township 2 South, Range 24 West,
Okaloosa County, Florida.
The proposed modification is for the construction of a multi-family dock consisting of 25
permanent slips, 56 mooring pilings, four transient slips, a 6' by 4' stairway attached to an
existing seawall , and a 322' wave fence installed around the boatslips on the north portion of the
facility. In addition, the proposed modification is to extend the expiration date to complete your
proposed project. The modification must be completed in accordance with the 12 enclosed
construction drawings, and the special conditions, which are incorporated in, and made a part of
the permit.
Special Conditions:
1. All reports, documentation and correspondence required by the conditions of this
permit shall be submitted to the following address: U.S. Army Corps of Engineers, Pensacola
Regulatory Office, Enforcement Section, 41 North Jefferson Street, Suite 301, Pensacola,
Florida 32502 . The Permittee shall reference this permit number, SAJ-2002-2330 (IP-MBH), on
all submittals.
2. Within 10 days from the date of initiating the authorized work, the Permittee shall provide to
the Corps a written notification of the date of commencement of work authorized by this permit.
3. Immediately upon completion of the activity authorized, the Permittee shall complete the
attached "Self-Certification Statement of Compliance" form and submit the form to the Corps. In
the event that the completed work deviates, in any manner, from the authorized work, the
, ,
-2-
Permittee shall describe, on the Self-Certification Form, the deviations between the work
authorized by the permit and the work as constructed. Please note that the description of any
deviations on the Self-Certification Form does not constitute approval of any deviations by the
Corps.
4. The Permittee understands and agrees that, if future operations by the United States require
the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the
opinion of the secretary of the Army or his authorized representative, said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will
be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the
structural work or obstructions caused thereby, without expense to the United States. No claim
shall be made against the United States on account of any such removal or alteration.
5. The Permittee shall follow the enclosed standard manatee construction precautions and
manatee special conditions.
a. All personnel associated with the project shall be instructed about the
presence of manatees and manatee speed zones, and the need to avoid collisions
with and injury to manatees. The Permittee shall advise all construction personnel
that there are civil and criminal penalties for harming, harassing, or killing manatees,
which are protected under the Marine Mammal Protection Act, the Endangered
Species Act, and the Florida Manatee Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle
Speed/No Wake" at all times while in the immediate area and while in water where
the draft of the vessel provides less than a four-foot clearance from the bottom. All
vessels will follow routes of deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees can not
become entangled , shall be properly secured, and shall be regularly monitored to
avoid manatee entanglement or entrapment. Barriers must not impede manatee
movement.
d. All on-site project personnel are responsible for observing water-related activities
for the presence of manatee(s). All in-water operations, including vessels, must be
shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not
resume until the manatee(s) has moved beyond the 50-foot radius of the project
operation, or until 30 minutes elapses if the manatee(s) has not reappeared within
50 feet of the operation. Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the
FWC Hotline at 1-888-404-FWCC. Collision and/or injury should also be reported to
the U.S. Fish and Wildlife Service in Jacksonville (1-904-232-2580) for north Florida
or Vero Beach (1-561-562-3909) for south Florida.
, '
"
-3-
6. Best management practices shall be used at all times during the permitted activities to
minimize turbidity. Methods for controlling turbidity shall include, but not be limited to the use of
floating turbidity curtains. Prior to initiating the permitted activity, floating turbidity curtains shall
encircle the permit area and shall be maintained for the duration of the permitted activities.
7. No building or fill materials, tools or other equipment shall be stockpiled within waters of the
United States.
8. All contractors involved in this permitted activity shall be provided copies of this permit in its
entirety. A copy shall remain on site at all times during construction.
This letter contains an approved jurisdictional determination for your subject site. If you
object to this determination/decision, you may request an administrative appeal under Corps'
regulations at 33 CFR Part 331 . Enclosed you will find a Notification of Appeal Process fact
sheet and Request for Appeal (RFA) form. If you request to appeal this determination/decision,
you must submit a completed RFA form to the South Atlantic Division Office at the following
address:
Mr. Jason Steele
South Atlantic Division
U.S. Army Corps of Engineers
CESAD-CM-CO-R, Room 9M15
60 Forsyth St., SW.
Atlanta, Georgia 30303-8801 .
Mr. Steele can be reached by telephone number at 404-562-5137, or by facsimile at 404-562-
5138. .
In order for an RFA to be accepted by the Corps, the Corps must determine that it is
complete , that it meets the criteria for appeal under 33 CFR Part 331.5, and that it has been
received by the Division office within 60 days of the date of the RFA. Should you decide to
submit an RFA form, it must be received at the above address by August 7, 2011. It is not
necessary to submit an RFA form to the Division office, if you do not object to the
determination/decision in this letter.
The impact of your proposal on navigation and the environment have been reviewed and
found to be insignificant. The permit is hereby modified in accordance with your request, and
the permit is hereby extended for an additional one year. Therefore, all work should be
completed on or before July 10, 2012. You should attach this letter to the permit. All other
conditions of the permit remain in full force and effect.
If you have any questions concerning permit modification, please contact the project
manager, Mary Hartshorn, at the letterhead address, by telephone at 850-433-3510 or by
electronic mail at mary.b.hartshorn@usace.army.mil.
· '
-4-
Thank you for your cooperation with our permit program. The Corps Jacksonville District
Regulatory Division is committed to improving service to our customers. We strive to perform
our duty in a friendly and timely manner while working to preserve our environment. We invite
you to take a few minutes to visit the following link and complete our automated Customer
Service Survey: http://per2.nwp.usace.army.millsurvey.html. Your input is appreciated -
favorable or otherwise.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
~~-.:~
/ } / Alfred A. Pantano, Jr.
{7 Colonel, U.S. Army
District Commander
Enclosure:
Permit Drawings
Request for Appeals form
Copy/ies Furnished:
MRD Associates, Inc.
CESAJ-RD-PE
INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: ffyou received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. ff you received a Letter ofPermission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights
to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that
the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer.
Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right
to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a)
modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify
the permit having determined that the permit should be issued as previously written. After evaluating your objections, the