JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PENSACOLA REGULATORY OFFICE
41 NORTH JEFFERSON STREET, SUITE 301
PENSACOLA, FL 32502
REPLY TO
ATTENTION OF
Regulatory Division June 8,2011
North Permits Branch
SAJ-2002-2330 (IP-MBH)
MODIFICATION #2
Destin West Marina, LLC
clo Fred E. Tolbert, III
1500 Miracle Strip Parkway SE
Fort Walton Beach, FL 32548
Dear Mr. Tolbert:
The U.S. Army Corps of Engineers has completed the review and evaluation of your
modification request received May 16, 2011 , in which you asked to revise the plans authorized
by Department of the Army permit number SAJ-2002-2330, for the construction of a commercial
marina consisting of 89 permanent slips and 10 to 13 transient slips, for temporary mooring, with
two breakwater structures located on the east and north portions of the facility, and two sewage
pumpout facilities, dated July 10, 2006. The Corps issued a modification to the permit on
November 5,2009. The modification revised the project to the construction of a multi-family dock
consisting of 25 permanent slips, 56 mooring pilings, two transient slips, a 326' wave fence
installed around the boatslips on the north portion of the facility, and two sewage pumpout
facilities . The project is located on the north side of Highway 98 between Seagull Restaurant
and Hermitage Crossing in Fort Walton Beach, Section 00, Township 2 South, Range 24 West,
Okaloosa County, Florida.
The proposed modification is for the construction of a multi-family dock consisting of 25
permanent slips, 56 mooring pilings, four transient slips, a 6' by 4' stairway attached to an
existing seawall , and a 322' wave fence installed around the boatslips on the north portion of the
facility. In addition, the proposed modification is to extend the expiration date to complete your
proposed project. The modification must be completed in accordance with the 12 enclosed
construction drawings, and the special conditions, which are incorporated in, and made a part of
the permit.
Special Conditions:
1. All reports, documentation and correspondence required by the conditions of this
permit shall be submitted to the following address: U.S. Army Corps of Engineers, Pensacola
Regulatory Office, Enforcement Section, 41 North Jefferson Street, Suite 301, Pensacola,
Florida 32502 . The Permittee shall reference this permit number, SAJ-2002-2330 (IP-MBH), on
all submittals.
2. Within 10 days from the date of initiating the authorized work, the Permittee shall provide to
the Corps a written notification of the date of commencement of work authorized by this permit.
3. Immediately upon completion of the activity authorized, the Permittee shall complete the
attached "Self-Certification Statement of Compliance" form and submit the form to the Corps. In
the event that the completed work deviates, in any manner, from the authorized work, the
, ,
-2-
Permittee shall describe, on the Self-Certification Form, the deviations between the work
authorized by the permit and the work as constructed. Please note that the description of any
deviations on the Self-Certification Form does not constitute approval of any deviations by the
Corps.
4. The Permittee understands and agrees that, if future operations by the United States require
the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the
opinion of the secretary of the Army or his authorized representative, said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will
be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the
structural work or obstructions caused thereby, without expense to the United States. No claim
shall be made against the United States on account of any such removal or alteration.
5. The Permittee shall follow the enclosed standard manatee construction precautions and
manatee special conditions.
a. All personnel associated with the project shall be instructed about the
presence of manatees and manatee speed zones, and the need to avoid collisions
with and injury to manatees. The Permittee shall advise all construction personnel
that there are civil and criminal penalties for harming, harassing, or killing manatees,
which are protected under the Marine Mammal Protection Act, the Endangered
Species Act, and the Florida Manatee Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle
Speed/No Wake" at all times while in the immediate area and while in water where
the draft of the vessel provides less than a four-foot clearance from the bottom. All
vessels will follow routes of deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees can not
become entangled , shall be properly secured, and shall be regularly monitored to
avoid manatee entanglement or entrapment. Barriers must not impede manatee
movement.
d. All on-site project personnel are responsible for observing water-related activities
for the presence of manatee(s). All in-water operations, including vessels, must be
shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not
resume until the manatee(s) has moved beyond the 50-foot radius of the project
operation, or until 30 minutes elapses if the manatee(s) has not reappeared within
50 feet of the operation. Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the
FWC Hotline at 1-888-404-FWCC. Collision and/or injury should also be reported to
the U.S. Fish and Wildlife Service in Jacksonville (1-904-232-2580) for north Florida
or Vero Beach (1-561-562-3909) for south Florida.
, '
"
-3-
6. Best management practices shall be used at all times during the permitted activities to
minimize turbidity. Methods for controlling turbidity shall include, but not be limited to the use of
floating turbidity curtains. Prior to initiating the permitted activity, floating turbidity curtains shall
encircle the permit area and shall be maintained for the duration of the permitted activities.
7. No building or fill materials, tools or other equipment shall be stockpiled within waters of the
United States.
8. All contractors involved in this permitted activity shall be provided copies of this permit in its
entirety. A copy shall remain on site at all times during construction.
This letter contains an approved jurisdictional determination for your subject site. If you
object to this determination/decision, you may request an administrative appeal under Corps'
regulations at 33 CFR Part 331 . Enclosed you will find a Notification of Appeal Process fact
sheet and Request for Appeal (RFA) form. If you request to appeal this determination/decision,
you must submit a completed RFA form to the South Atlantic Division Office at the following
address:
Mr. Jason Steele
South Atlantic Division
U.S. Army Corps of Engineers
CESAD-CM-CO-R, Room 9M15
60 Forsyth St., SW.
Atlanta, Georgia 30303-8801 .
Mr. Steele can be reached by telephone number at 404-562-5137, or by facsimile at 404-562-
5138. .
In order for an RFA to be accepted by the Corps, the Corps must determine that it is
complete , that it meets the criteria for appeal under 33 CFR Part 331.5, and that it has been
received by the Division office within 60 days of the date of the RFA. Should you decide to
submit an RFA form, it must be received at the above address by August 7, 2011. It is not
necessary to submit an RFA form to the Division office, if you do not object to the
determination/decision in this letter.
The impact of your proposal on navigation and the environment have been reviewed and
found to be insignificant. The permit is hereby modified in accordance with your request, and
the permit is hereby extended for an additional one year. Therefore, all work should be
completed on or before July 10, 2012. You should attach this letter to the permit. All other
conditions of the permit remain in full force and effect.
If you have any questions concerning permit modification, please contact the project
manager, Mary Hartshorn, at the letterhead address, by telephone at 850-433-3510 or by
electronic mail at mary.b.hartshorn@usace.army.mil.
· '
-4-
Thank you for your cooperation with our permit program. The Corps Jacksonville District
Regulatory Division is committed to improving service to our customers. We strive to perform
our duty in a friendly and timely manner while working to preserve our environment. We invite
you to take a few minutes to visit the following link and complete our automated Customer
Service Survey: http://per2.nwp.usace.army.millsurvey.html. Your input is appreciated -
favorable or otherwise.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
~~-.:~
/ } / Alfred A. Pantano, Jr.
{7 Colonel, U.S. Army
District Commander
Enclosure:
Permit Drawings
Request for Appeals form
Copy/ies Furnished:
MRD Associates, Inc.
CESAJ-RD-PE
INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: ffyou received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. ff you received a Letter ofPermission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights
to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that
the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer.
Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right
to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a)
modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify
the permit having determined that the permit should be issued as previously written. After evaluating your objections, the
district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: ffyou received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. ff you received a Letter ofPermission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the pelmit in its entirety, and waive all rights
to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this
form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the
date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received
by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary
JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting
the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate
the JD.
'$EG1JGN II -REQU!ES:;r FOIt'MP:EJA't;5rbB1EGI~bNS ,To:Aiji;~Tw., PROFFERED PERMlt~ ",,:.a;~\~I;'k"0 ~¥#' )~i~I:f;;"
REASONS FOR APPEAL OR OBJECTIONS : (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However,
you may provide additional information to clarify the location of information that is already in the administrative record.
POIN;C OF ,CONTAC'f;'F6R QUESU9NS OR INl1'ORMj\TlON":.~;';~/: ,'~",~" ~j':, ,},~,,1;""';rti.i;:$~t~;,. ",' ':'~~'T "
If you have questions regarding this decision andlor the appeal If you only have questions regarding the appeal process you may
process you may contact: also contact: _
Mary Hartshorn Jason Steele
850-433-3510 404-562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date: Telephone number:
Signature of appellant or agent.
Cho whatchee
20- PALM COURT YACHT CLUB
21 - WATERW/iy
22- VERANDA :
23- TURTLE ~LK
24- TIKI BEACIjI
25- ISLAND G~RDENS
26- LA CASITA;
27- SANTA RD~A
28- SUNTIDE ;
29- SUMMER PLACE
30- DESTIN W~ST GULFSIDE VILLAS
31 - GRAND B~Y
32- DOLPHIN IiIUN i
33- 0KALOOSAISLAND
34- _ -
-- .BLUEFISH
......... ......... Gulf of Me:Xico
Applicant: Destin West Marina, LLC
File: SAJ-2002-02330 CIP-MBH)
Date: 8 June 2011
Page __1_ of -.lL
@ Nun-16
North Edge of Federal Navigational Channel
---.Centerline of FedJMal Navigational Chan.......,n""ec..I_ __ --
South Edge of Federal Navigational Channel
r-(J--
N: 515,475.2 N: 515,442.1 Can-15
100' Setback from Channel E: 1,310,564.6 E: 1,311,050.1@
I
I 1 1
1 1
25' ---I I - ----i 1.........-- 25'
ii ---~ --if- -15'
1 -·'·' ... '" _ J ~ . II - -. · 16'
I I I ~
.~I 1 1 :.:::i
!/I
~
.9- 1
a:: 1
1
:!
1 ex::
11
~
11 11
-16'-· ~ --,I
1 r · - . -- " .." '" . . ". --,
_J --
. IlJ _. _._- 16'
_14
-1 ', ' .-_ h""_ 1__ - - _. _.-' _/../ ' r , ". -.-
~__ ~
' . . .-.
_'. 1 /.··:-:=
../ __./,,_ L1__ -- ~42:
.r_ .----
2
! '" .~-- '-1 .·-~- 10·
;
-10'- _ - ' - .... .- /" - '"
.r- _. -. -- -
_8" / J~:, ~:::::- ::r 'c, :: ~ ~ ~
--.,- ..... -. - '.- --=--. -::
J--~~'
. . . . ::.- - -- --- --8'
-6) }
-4 /1
-2'r ~
r1 oJ .... · ., , . /
/ .
Shallow Water
J\- / - .
L .- :
Ii /
I
-
N I I Existing Bulkhead
~rl I'
+
.~/.~ --"' 0' " - .. . , '... ..-,
Mean High Water Located At Bulkhead
.f . +0.6' NAVD88 (643.69 If)
o 100 200
'-
\
1
t1
1 0'
-
~..-J I
(IN FEET)
1 inch = 200 ft.
Rita Jasin , P .E.
Applicant: Destin West Marina, LLC EXISTING CONDITIONS Florida P.E. Number 69932
Destin West Marina Date: S eptember 3. 2009
File: SAJ-2002-02330 (IP-MBH) - - - - - - - - - - - - - t Sheet Rev Date: August 10,2010
Date: 8 June 2011 Destin West Marina, LLC. PROJ ECT NUMBER SHEET NUMBER
Page _2_ of ---R. Strip Parkway SE. Fort W alton Beach, Florida, 32548 09-103.6 2
Mean High Water
Located At Bulkhead
+0.6' NAVD881643.69If)
a 50
LIyJ
(IN FEET)
1 inch = 100
A1h " . Rita Jasin . P .E.
, !<\pplicant: Destin West Marina, LLC ED SITE PLAN WITH AERIAL Flonda P.E. Number 69932
~~ · SAl-2001-02330 (IP-MBR) Destin West Marina
r
Date: September 15. 2009
-------------~ Sheet Rev Date: August 10. 2010
Date: 8 June 2011 Destin West Marina , LLC .
3 _ of --.lL
PROJECT MJMBER SHEET NUMBER
. Page __ rp Parkway SE. Fort Walton Beach . Florida. 32548 09-103.6 3a
,1/3) 09.103.6.dwg
816' To South
Edge Of Federal
Navigational Channel
Proposed Fixed Dock
wI Wave Fence.
_16'
_14'
,
_ -4 '
I
I
I /
I
I t2
I 587' '
:._- i
I
,,
I
,, I
..:.::\ \ 0.>
0' .~
rol...J
:9 1\ C
o.>lro
(/) I ' c
_ I ro
Mean High Water ~I .9-
10::
Located At Bulkhead I
I
+0.6' NAVD88 (643.69 If) I
I
I
I
. / "-'- -. -.. -,./ 0' - I
I
I
I
CI.>
I:§
Proposed 10' Wide ,I
I
Conservation
o 50 100 Ie Easement
I
~~~.·~J~~I 8.
(IN FEET) IE
1 inch = 100 ft. a..
IL Existing Bulkhead
________________ A .....I -..
_
Rita Jasin, P.E.
Applicant: Destin West Marina, LLC 'ROPOSED SITE PLAN Florida P .E. Nu mber 69932
Destin West Marina Date: September 15.2009
File: SAJ-2002-02330 (IF-MBR) _ _ _ _ _ _ _ _ _ _ _ _-1 Sheet Rev Date: Au gust 13, 2010
Date: 8 June 2011 Destin West Marina, LLC . PROJECT HUMBER SHEET HUMBER
Page __ 4 _ of ...lL ;trip Parkway SE, Fort Walton Beach, ROOda, 32548 09-103,6 3b
'"Ot::J"rj ...... R PERMIT REVIEW
~ ~ ::.:>6"
~ ft~"C .. . . .
00 [{; o'
'-<,-<§
IH)o
u.§t!Jr7
~II
Ct>0t::J
o tv 0 Ct>
tv en
:::~S'
N ~:E
J oCt>
en .~
fa~
, !:l .e-~
rr:
SS·
:r:~ 1
Shaflow Water
~
(j
I (1)
c:
S71°29'35-E 55.19'
:.:J
I
c:
~
't:
N81°58'13"E 13.97' [
0::
N51°13'23·E 21.18'
....t--.....;;:::.. 1 Existing Bulkhead :~
~ ~I
~i
~~
~.
Proposed Stairs ~
":::
°
~
0)
Mean High Wat r Located At Bulkhead
~
+0.6' NAVD88 ( 3.69 If) ':1 .1
1
Q
.~I S81°SS'13·W 19.07'
'-.
-l ...~
~I ?
~I
~~.
N'l1 °29 '35·W 45.79'
a
+f 40 J 80
S09°23'53·W 28.04'
S80031;'07-E 10.00'
Proposed 10' Wide
Conservation Easement 1(1)
c:::
I:.:J
~
~
S04°0B'03·W
10.38' ~
~
'lS
:f
;::,
!~
::5
'-.";
,..,
e
a.
::~',
.,...
~
L 1 inch ~O t .
6;
J%
r miltI 543 ""bo, 80,1 .."" S,II. 204
Destin, Florida 32541
Certification of Authorization Number 9482
EXISTING BULKHEAD & PROPOSED EASEMENT
Destin West Marina
Rita Jasin, P .E.
,.,.. ,.,. , ••••••"
Date: July 12, 2010
Sheet Rev Date: August 10, 2010
£~.
; :
. .
• . 850.654 .1555 (""k:e) . 850 .654.0550 (lax) Destin West Marina. LLC . PROJECT NUMBER I SHEET NUMBER '"
.-,
mrd aSSOclates, me.
CcftSllli. M.uilllllt Wilier R\..~\U\'es 1:.n~lnl'Ulflg
www.mrd"ilssociates .com 1500 MirBcle Strip Parkway SE. FOri Wal ton Beach , Florida, 32548 09-103.6 3c
_ ____4' j _______ Matchlin,,---A-A~
Matchline A-A'
_ '\ _ -C,=-:" -~ -=- -:_ ;
-6' I I
t~~~~~(~ _
1_." __. \ /1 I
"" ~- - -. I 1 f
t _·4' ,. "'" _1--
/
I /
I I
"-2' (\
\
Proposed Fixed Dock I
I \. I
I
\..
'--
~J
I I
I I
\ 1- ,_ -J --2" _'_-J
Proposed Hand Rails .-~ .- --
(Total Combined Length: 1,157 If) I
I
I
I 465' To South
I Edge Of Dock
6'Wide : I "8" Access Pier
(Typ.)
Shallow Water
i'
\I
~
I~ -0
Mean High Water len l))
::!.
I~
Q)
Located At Bulkhead
+0.6' NAVD88 (643,69 If) I~;l'\
I~
S'
I ICD
" Proposed
I
~
'-- -0' ~, Stairs
~-- ~-- .- I
--,
"
25'
"
" ." \
~ ~5
~~~.~.~.~~~~~
50, Conservation
Proposed 10' Wide
Easement
(IN FEET) Existing Bulkhead
1 inch = 50 ft.
\ Rita Jasin , P .E.
'POSED DIMENSIONS SOUTH Flori da P.E. Numb ... 69932
Applicant: Destin West Marina, LLC Destin West Marina Date. September 15, 2009
File: SAJ-2002-02330 CIP-MBH) - - - - - - - - - - - - - - - 1 Sheet Rev Date. August 10,2010
Desti n West Marina, LLC .
Date: 8 June 2011 PROJECT NUMBER S HEET NUMBER
! Strip Parkway SE, Fort Walton Beach, Florida, 32548 09-103,6 4
Page _6_ of -..lL
1;'!Atl:·;: Of) 1:'\3 r; ilW~J
..
I
: t I
816' To South
Edge Of Federal
Proposed Timber Proposed Wave Proposed Navigational
Mooring Pile Fence (322If) Fixed Dock Channel
--~--------------4.--~~25'---
l' I I I
I I
•
.... ....
Dock a.! a.!
"An 38'
. w
~
(0)
- C?
' -16' . _
- - - . -.
• .1 .1 •
.1
....\ .... .... ~
.... .... ~
..... ....
u:! \ ~ u:! u:! u:! u:! ~ ~
_ - -16' --
- -14' _ _ _ _ _
48.3' \
I .... ....w .... ..... / - --
--.
I ~
~
--.
~ ~ ~ ~ ~/~ ~ 122.3'
~ u:! u.! . u:! u:! I
-- --
~]~
/ ~
-
/
• .--- .---
~T.--- .~ /
- ~T
' -12' ·- _ _ .--- .--- .w
C?
.--- --- -ti /" . ..,-- 02 I
'\ .... /
\ ~
.--- • I
Dock 62' I - -10' - -
"sn I /
~ ..... •
.-
- -10' _ N
- .,.--
.I N -- -8' -
~
.1
--,-- - __ -6'l-
~ ..... ~ ..lr. ...&. ...,.,
I
~ ~ ~ ~~~ ~~~ ~~~ ~_~~ I
N
-4'~ I-I--_~_-_-_- "3.7\5' ---p-r-o-p-~-se-d-H-~-n-d-R-a-i-IS------
I
6'
- - -- - - ---
- '""-
-- - -......
---.-- -- -
- -"-
.
4' ~ ---
I
(T~I Combined Length: 1,153 If) 465'Tq I
.--- " 6' - - - '
o 15 30
\ I '\. -- -
Bulkhe~d
_ _ ~atchlin~A~~ _L __ ~ --------
~-.J
(IN FEET)
I Matchline A-A' I - - "- 1-1; ---
I
1 inch = 30 ft_ I "- I I
r
, Rita Jasin, P .E.
'OSED DIMENSIONS NORTH Florida P .E. Number 69932
Applicant: Destin West Marina, LLC Destin West Marina Date: September 15, 2009
File: SAJ-2002-02330 CIP-MBH) Sheet Rev Date: August 13, 2010
Date: 8 June 2011 Destin West Marina, LLC . PROJECT NUMBER SHEET NUMBER
itrip Parkway SE. Fort Walton Beach, Florida, 32548 09-103.6 5
Page ___ 7_ of -.lL
IAt!.1) 09-103tJdwq
.
'"O\:j'":r1"'- NSTRUCTION.
~ ~ =:-d"
(1) (1) !1! "d
.. ....... I
~ (=).
00
'-,-§ Proposed 10' Wide Conservation Easement S!:IS!:
oost!.J rf
Io (1)0\:j
NO (1)
....,ONen
:::i3S' )-
_._w. - - -.- __
, ; 1; MLW+O.1'
jN ~~
0(1) en
)-
)- ,~ M / / I NAVD88 \•
~~
A
5
, ej ) t-- - I--- - - - I- -1- - .
Ser 5-= J
I- - ---4j - -
::r:~
b
()
)-
5-
)-
5-
::l
o
Proposed Timber Dock Pile
25 50 75 100 125 150
Embedment Depth Varies
175 200 225 250 275
EXistin1 Grade
300
J7
'325 350
::..~ ,
Jth Distance From Centerline Of existing Bulkhead (feet)
.~:
.:.c
CROSS SECTION A-A'
SCALE : 1" =40' .:;::
Q
~,
VlHW +0 .6' S!: IS!: 't!:;
«:
til til Proposed Proposed i.
NAVD88 nln
"::J"::J Hand Rail Proposed Tubidity 8·8' A'
Fixed Dock m a5
I
- ~
-o·
.~
MLW +0.1' , , ----- . 0- 20
,/ ~
;-
»1»
/ NAVD88 I I '\ r- 15
r- 10
l- 5 :::J
Q
",
Q
~
I-- - - I- -1- - - --tl - -
- - --- -- - - 1---
-- -- --- --- I-
o5 -Z o
J7 :10 ~
"
t-- fi.
- - r--- --- -' -'-
r- -20
-15 C
~ ;~
EXistinJ Grade Proposed Timber Dock Pile Embedment Depth Varies I- -25 • .~
-30 cr ~
250 275 300 325 350 375 400 425 450 475 500 525 550 575 600
-!a.
S
:..~
'b
.2;:
'"
Distance From Centerline Of existing Bulkhead (feet) North ~
:l)
'0
~~
~.
CROSS SECTION A-A' (continued) 0:.:
;,:;;
Q
SCALE : 1" = 40'
n:
~
.,.,"n
ii'.
~ 543 ""bo, Boo,."" , So," 20'
Rita Jasin, P.E.
CROSS SECTION A-A' Florida P.E . Number 69932 J.
Destin, Florida 32541 Destin West Marina Date: Septermer 15, 2009 Q
Certification of Aulhorizalion Number 9482 -.
mrd aSSOCIates, me.
. . 850 .654 .1555 (""ke) . 850.654 .0550 (f..)
www.mrd-associales .com
Destin West Marina , LLC . SHEET NUMBER ~
[,'11:.1111. M,U:ilft & WIltt.r Ihsvun:cs Fn&illlcinS
1500 Miracle Strip Parkway SE. Fort Walton Beach. Florida, 32548 6 ,:~
THESE DRAWINGS ARE FOR PERMIT REVIEW ONLY AND NOT FOR CONSTRUCTI0-ti.;
~e;,21~
C1C/ ~ ••en '0
: ........
~~ .
CD (1) ...-
I\O~~tj
o N ~ ~
m
8 Proposed Tubldlty
Screen
Proposed Fixed
Dock Elev: +4.5'
Proposed Hand Rail
(42" High)
A-A'
tII ~
~.
8'
m
~o· 201510
~.
~
.......,0 I
~ ~ S ~. 20
l ::a ...a: _ 5
.N. . W:!E
Wen
0",
:::J
MHW +0.6', NAVD88
.... I
l'
L.!.-!5-
ICD
:::J 15
o·
10
5_
:::J
, el z 0 --=- I 0 z
~ S· ~ -1'5 MLW +0.1', NAVD88 I :10 ~
::r:!>'
0t"""
t"""
C
~ -20
-15 ---- -7.- -- -- - - I
--
25'
-15 C
-20 ~
(')
~ ·25 Existing Grade Proposed Timber Dock Pile Embedment Depth Varies Setback -25 ~
--
~~ ~~
--
(I) 250 225 200 175 150 125 100 75 50 25 0 25 m I
\'
West Distance From Eastern Riparian Line (feet) East
~
CROSS SECTION 8-8' ,:;
SCALE : 1" = 40'
~ .
.~.
s
~
~
~
a:
"
'"
~~
~=?
,~-
'"
~'"
~:r
$
".
"
'l:
8
'"
"'1
.~
<z.:
isQ::
~
-:i:
'~."'
I ~ 543 ""bo, Boul""d, Suit.204 CROSS SECTION B-B'
Rita Jasin, P .E.
Florida P.E. Number 69932 d:
Destin, Florida 32541 Destin West Marina Dale: Seplerrber 15. 2009 a,...,
Certification of Auillorization Nurrber 9482
Sheet Rev Date: June 7. 2010 .>~
mrd aSSOCIates, IDC.
. . 850 .654 .1555 (voice) . 850 .654 .0550 ("X)
www.mrd-associa les.com
Desti n West Marina. LLC .
1500 Miracle Sirip Parkway SE. Fori Wallon Beach . Florida. 32548
P RO JECT
09-103.6
T
~MgeR SH EET NUMBER
7
Q
u
"-
ConS'l3i. Mom",. & 1.1,'• ..,. RuooUI,;t:s l:"J!il'll.ui.n8
I
816' To South
t
Edge Of Federal
Proposed Fixed Dock Proposed Wave Fence (322 If) Navigational
Channel
•
• • •
Dock
"A" • • • •
-16' . • • • • • •
.......
\
\
- -16' -
I
- -14' _ I
------ -- ! 122.3' I
--- I
~]~
./
•
I .-~
" ,-
/'
/
i /'
~~
• / . •
---
. I ./
--12' - _ _
-~ /----
\ v' •
--- /
•
I
\ I
Dock l - -10' - -
"B" I
- -10' _
"'\
l..
-_. -- --... - .
- -8' --
-- -
./
I, - - - - ---<I - _. . _. _ ~ •
r-
:- -- ~ - ./ •
--8' - -- - - - - -
~
- --. - . -
---- -- ~J
• - ~
·-6' - N - - - - - - - - _.-_ prOJ>OS:d Ti:ber~O~ng Pile
. -4' - L -------- "" \ Proposed Handrails
o
T 15 30 &
LEGEND:
Proposed Lighthouse Power Pedestal I- -- -
465' Tf> I
-4' ~ --
I
Bulkhefld
~.-J I ~ Proposed Safety Ladder
(IN FEET)
1 inch = 30 ft.
\
\ I I t/ I
Rita Jasin , P .E.
:>ROPOSED UTILITIES Florida P.E. Numb ... 69932
Applicant: Destin West Marina, LLC Destin West Marina Date: September 15, 2009
File: SAJ-2002-02330 (IP-MBH) Sheet Rev Date : August 13. 2010
Date: 8 June 2011 Destin West Marina, LLC . PROJECT NUMBER SHEET NUMBER
trip Parkw ay SE, Fort Walton Beach , F1ooda, 32548 09-103.6 8
Page _1_0_of--1L
THESE DRAWINGS AR . ERMIT REVIEW ONLY AND NOT FOR CONSTRUCTION.
r-
6'
4'
-I
42"
V Proposed Fixed
Timber Dock
Elev: +4.5'
- r--
I I I
I
I
I
I
I
I
I
3.9'To
MLW 4.4'To
Proposed MLW
Timber
MHW +0.6'
Dock Pile
...
NAVD 1988
MLW +0.1'
- NAVD 1988
...
-
-'-vA-~ -~~
Bottom
Elevation Varies
I ~-3lT1 rYE:
Ih-r.,.,.,.+'-'-_.~ 1TfTTt=-~,.;:
Pile Embedment Varies
TYPICAL FIXED DOCK SECTION
SCALE: 1" = 2'
, Rita Jasin, P .E.
'ICAl FIXED DOCK SECTION Florida P.E. Number 69932
Applicant: Destin West Marina, LLC Destin West Marina Date: September 15. 2009
File: SAJ-2002-02330 CIP-MBH) Sheet Rev Date: July 13, 2010
Date: 8 June 2011 Destin West Marina, LLC . PROJ ECT NUMBER SHEET NUMBER
Strip Parkway SE, Fort Walton Beach . Florida. 32548
Page _1_1_ of -!L 09-103.6 12
B-1 B-2 B-3 B-4 B~ B-6 B-7 8-8
Dock
"B"
B.g B-10 B-11 B-12
o
+
t.-.-J
15
(IN FEET)
30
I
1 inch = 30 ft.
, Rita Jasin, P .E.
JP COUNT & SCHEDULE Flori da P.E. Numb er 69932
Applicant: Destin West Marina, LLC Destin West Marina Date: September 15. 2009
File: SAJ-2002-02330 (IP-MBR) - - - - - - - - -------1 Sheet Rev Dale: Augusl13, 201 0
Date: 8 June 2011 Destin West Marina, LLC. PROJECT NUMBER SHEET NUMBER
Page ~ of ---1L itrip Parkway SE, Fort Walton Beach , Rorida, 32548 09-103.6 16
tAft.1} 0O-1(31).chv9