Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
LONG-TERM CARE PERMIT RENEWAL APPLICATION
ENGINEERING REPORT
WRIGHT LANDFILL
Okaloosa County
WACS ID Number 9064/Permit No. 0070768-003
April 2014
Prepared for:
Environmental Services Division
Public Works Department
Okaloosa County
1759 South Ferdon Blvd.
Crestview Florida 32536
Phone: 850-689-5772
Prepared by:
HDR Engineering, Inc.
200 W. Forsyth Street, Suite 800
Jacksonville, Florida 32202
904-598-8900
LONG-TERM CARE PERMIT RENEWAL APPLICATION
Table of Contents
INTRODUCTION ........................................................................................................................................ 3
Regulatory History ................................................................................................................................... 3
APPLICATION Form ................................................................................................................................... 4
Parts A and B – GENERAL INFORMATION ............................................................................................. 4
PART C – PROHIBITIONS ......................................................................................................................... 4
PART D – SOLID WASTE MANAGEMENT FACILITY PERMIT REQUIREMENTS, GENERAL ..... 4
PART E – LANDFILL PERMIT REQUIREMENTS .................................................................................. 6
PART F – GENERAL CRITERIA FOR LANDFILLS ................................................................................ 8
PART G – LANDFILL CONSTRUCTION REQUIREMENTS ................................................................. 9
PART H – HYDROGEOLOGICAL INVESTIGATION REQUIREMENTS ............................................. 9
PART I – GEOTECHNICAL INVESTIGATION REQUIREMENTS ........................................................ 9
PART J – VERTICAL EXPANSION OF LANDFILLS ............................................................................ 10
PART K – LANDFILL OPERATION REQUIREMENTS........................................................................ 10
PART L – WATER QUALITY AND LEACHATE MONITORING REQUIREMENTS ........................ 10
PART M – SPECIAL WASTE HANDLING REQUIREMENTS ............................................................. 11
PART N – GAS MANAGEMENT SYSTEM REQUIREMENTS ............................................................ 11
PART O – LANDFILL CLOSURE REQUIREMENTS ............................................................................ 12
PART P – OTHER CLOSURE PROCEDURES ........................................................................................ 12
PART Q – LONG-TERM CARE ............................................................................................................... 12
PART R – FINANCIAL ASSURANCE .................................................................................................... 13
PART S – CERTIFICATION BY APPLICANT AND ENGINEER OR PUBLIC OFFICER .................. 14
PROFESSIONAL CERTIFICATION ........................................................................................................ 15
ATTACHMENTS
ATTACHMENT A – FDEP FORM # 62-791.900(1), APPLICATION TO CONSTRUCT, OPERATE,
MODIFY, OR CLOSE A SOLID WASTE MANAGEMENT FACILITY
ATTACHMENT B – FIGURES
ATTACHMENT C – PART L DATA WITH 2014 S1 UPDATE
ATTACHMENT D – LONG-TERM CARE PLAN
ATTACHMENT E – FINANCIAL ASSURANCE
2
LONG-TERM CARE PERMIT RENEWAL APPLICATION
`
INTRODUCTION
This permit renewal application is being submitted to the Florida Department of Environmental
Protection (FDEP) to continue long-term care, monitoring, and maintenance of the closed Wright Landfill
(WACS ID Number 9064/Permit No. 0070768-003). The facility is located in the southern part of
Okaloosa County, in the southwest quarter of Section 22 and the northwest quarter of Section 27,
Township 1 South, Range 24 West. The 327-acre property (221 acres used) is situated on the southern
boundary of the Eglin Air Force Base (Eglin AFB) Reservation on land leased to the County by the U.S.
Air Force. The County executed a 25-year easement for closure construction and maintenance during the
long-term care period in June 1989 with the Air Force.
Local knowledge dates original landfilling activities in this area as early as the 1950s. County landfilling
operations began in 1964 when Okaloosa County executed a lease on the 160-acre Section 22 parcel
(northern parcel). Upon expiration of the lease in June 1974, the 160-acre Section 27 parcel (southern
parcel) was added to the renewed lease. The facility was first permitted by the FDEP in June 7, 1977.
Through a number of lease extensions, the County continued to operate WLF until February 1990, when
the site was effectively closed to incoming waste. In November 1991, the County initiated a yard waste
mulching operation at the landfill, the product of which is used to supplement final cover materials that
have been placed over the landfill for the post-closure long-term care and monitoring period. The facility
was formally closed to incoming waste and began long-term care on December 19, 1994.
The inactive wastewater treatment plant effluent sprayfields for the city of Fort Walton Beach and
Okaloosa County are located adjacent to the east side of the landfill. Property surrounding the landfill,
including the sprayfields, is owned by the US Air Force. The surrounding land to the north and west of
the site is mostly undeveloped. Land use a short distance south of the site is mixed residential and
commercial. The undeveloped areas are expected to remain under Air Force ownership.
Regulatory History
Water quality testing was initiated in 1978 under permit SO46-0012, and later continued under SO46-
73637 issued in 1984. In February 1986, the County installed a groundwater monitoring network in
accordance with its operational permit (#SO46-103539; issued November 1985). In 1986, low
concentrations of benzene and vinyl chloride were detected in groundwater samples at concentrations
slightly above the State maximum contaminant levels (MCLs). The area of impacted groundwater
extended westward from the landfill. The County commenced investigation activities and in October 1986
executed Consent Order #86-0879 with the FDEP to address the low level Volatile Organic Compound
(VOC) impacts. The County continued investigation of these VOC impacts culminating in submittal of a
Remedial Action Plan (RAP) in October 1991 and subsequently approved by FDEP in September 1992.
The County proceeded with construction of a phased pump and treat system and in December 1993, the
County began groundwater remediation from recovery well RW-1. RW-2 was placed into service in
October 1996. Additional recovery wells specified in the 1991 RAP were never installed. The discharge
from two wells is pumped to a synthetically lined aeration basin. Aerators provide aeration of the
extracted groundwater to volatilize any remaining VOCs. Upon aeration, the water is decanted into a
series of settling/percolation ponds located in the southeastern portion of the site. The aeration and
settling/percolation ponds facilitate the precipitation of iron that is present in the groundwater. After
revisiting the objectives 1991 RAP, both the FDEP and County agreed to produce a RAP Modification in
order to clarify inconsistencies in the full RAP implementation. The primary objective of the RAP
Modification, which is in progress, is to maintain hydraulic control of impacted groundwater at the west
property line of the landfill.
3
LONG-TERM CARE PERMIT RENEWAL APPLICATION
APPLICATION FORM
The Solid Waste Management Facility Permit Application Form Parts A through S are included as
Attachment 1. In accordance with INSTRUCTIONS TO APPLY FOR A SOLID WASTE
MANAGEMENT FACILITY PERMIT Section III. Application Parts Required for a Closure Permit,
submittal of Parts A, B, L, and N through S are required for closed landfills. All Parts in the application
are addressed in this submittal with emphasis on Parts A, B, L, and N through S.
PARTS A AND B – GENERAL INFORMATION
Parts A and B provide general information and disposal facility information. See the application form,
Attachment 1.
PART C – PROHIBITIONS
Part C pertains to prohibitions, exemptions, and restrictions associated with siting criterion. Part C is not
applicable to this Long-term Care permit renewal application.
PART D – SOLID WASTE MANAGEMENT FACILITY PERMIT REQUIREMENTS,
GENERAL
1. APPLICATION FORM AND ALL SUPPORTING DATA AND REPORTS
Four copies of the completed application form and all supporting data and reports were submitted to the
Northwest District Office of the Florida Department of Environmental Protection (FDEP) with the 1994
closure application.
2. PROFESSIONAL CERTIFICATIONS
HDR Engineering, Inc. has prepared this application and is an authorized engineering firm in Florida
(Certificate of Authorization 4213). This application has been certified, signed, and sealed by Bradford
M. Stone, P.E., (a registered Professional Engineer in Florida [Professional Engineer License No.
53110]). Applicable sections of the application have also been certified, signed, and sealed by John
Catches (a registered Professional Geologist in Florida [Professional Geologist License No. 2203]).
3. LETTER OF TRANSMITTAL
A letter of transmittal is included with this Solid Waste Permit Application.
4. APPLICATION FORM
FDEP Form No. 62-701.900(1), effective date of August 12, 2012, has been completed and is signed and
dated by the applicant (Attachment A).
5. PERMIT FEE
4
LONG-TERM CARE PERMIT RENEWAL APPLICATION
A check in the amount of $2,000 has been submitted with this permit application. A copy of the check is
included in Attachment A.
6. ENGINEERING REPORT
This application and supporting documentation meet the requirements of an engineering report required
by Rule 62-701.320(7)(d), FAC.
7. OPERATION PLAN AND CLOSURE PLAN
This application is for renewal of the Wright Landfill Long-Term Care permit issued July 1, 2004 and
modified April 9, 2010, April 5, 2012, October 5, 2012, and November 27, 2012. The Long-term Care
Plan is included in Part Q of this document, and it identifies the policies, procedures, and guidelines for
Long-Term Care.
8. CONTINGENCY PLAN
Not applicable.
9. PLANS OR DRAWINGS
There have been no significant changes to the Class I/III landfill since final closure.
a. Regional Map or Plan
See the Aerial Site Plan – Attachment B, Figure D.9.b
b. Vicinity Map or Aerial Photograph
An aerial photograph of the site and surrounding vicinity is included as Attachment B,
Figure D.9.a
c. Site Plan
A boundary survey for the entire site, certified by a registered Florida land surveyor, was
submitted with the original closure design. The survey drawing “SPECIFIC PURPOSE
SURVEY FOR WRIGHT LANDFILL CLOSURE & CLASS III OPERATIONS” is
included in Attachment B, Figure D.9.c. No substantial changes have been made to the
original boundary survey.
d. Supporting Details
Not applicable.
10. DOCUMENTATION FROM PROPERTY OWNER
Okaloosa County leases the property occupied by the Wright Landfill from the Federal Government
through Eglin Air Force Base. There have been no boundary changes to the lease agreement.
5
LONG-TERM CARE PERMIT RENEWAL APPLICATION
11. WASTE REDUCTION AND RECYCLING GOALS
This is a Long-term Care Plan application. The Wright Landfill no longer accepts solid waste for disposal.
12. HISTORY AND DESCRIPTION OF ENFORCEMENT ACTIONS
The list below summarizes enforcement action history for the applicant, the Okaloosa County Solid
Waste Management Department. Enforcement actions at the Wright Landfill, based on a review of the
FDEP files (Oculus), the County files, and information provided by County staff, are listed below. Any
errors or omissions are not to be construed as a misrepresentation of the facts.
August 1977 – General Consent Order for operating several County Dumps including the are now
known as Wright Landfill. Temporary permit issued.
May 1986 – Consent Order 86-0879 – Expired Permit. County ordered to continue operating the
facility in accordance with expired permit.
August 1986 – Notice of Violation of groundwater standards, County ordered modify
groundwater sampling plan to monthly and too submit a permit modification plan. Conduct
contamination assessment, etc.
October 1991 – County submitted a Remedial Action Plan to address groundwater impact.
September 1992 – Remedial Action Plan approved by the FDEP.
1992 to present – Remedial Action Plan implementation
February 2014 – Remedial Action Plan Modification request submitted to the FDEP is currently
being reviewed.
13. PROOF OF PUBLICATION
Not applicable to a Long-term Care permit renewal. Newspaper publication is required to construct or
substantially modify a solid waster facility.
14. AIRPORT SAFETY
Not applicable to Long-term Care permit renewal.
15. OPERATOR TRAINING REQUIREMENTS
Not applicable to Long-term Care permit renewal.
PART E – LANDFILL PERMIT REQUIREMENTS
1. VICINITY MAP SHOWING AIRPORTS
Attachment B, Figure D.9.b of this application shows all airports in the vicinity of the Wright Landfill.
The airport location information was obtained from the 2008 Federal Aviation Administration Dataset.
2. PLOT PLAN
6
LONG-TERM CARE PERMIT RENEWAL APPLICATION
As required by Rule 62-701.330(3)(b), FAC, the Drawing Set was submitted in the 1989 closure
application. The Drawing Set is included by reference in this application and can be found in the FDEP
database, Oculus.
a. Dimensions
The Drawing Set is drawn to scale. The as-built survey is included in Attachment B,
Figure D.9.c.
b. Monitoring Wells
Locations of existing water quality monitoring wells are shown in Attachment B, Figure
D.9.a.
c. Soil Borings
Locations of soil borings are shown on the Boring Location Map in the Drawing Set,
Sheet C-4 (Oculus).
d. Disposal Areas
The waste disposal areas are shown on the Site Plan drawing in the Drawing Set, Sheet
C-1 (Oculus).
e. Cross Sections
Cross sections showing the original elevations and proposed bottom contours of the
disposal: See Drawing Set, Sheet C-3 (Oculus).
f. Previously Filled Waste Disposal Areas
See Drawing Set, Sheet C-2 (Oculus).
g. Fencing or Other Measures to Restrict Access
See Attachment B, Figure D.9.c
3. TOPOGRAPHIC MAPS
As required by Rule 62-701.330(3)(b), FAC, the Drawing Set submitted in the 1989 closure application is
included by reference (Oculus). The final closure contours are shown in the as-built survey included in
Attachment B, Figure D.9.c. An updated topographic map is included in Attachment B, Figure E.3
a. Fill Areas – No change
b. Borrow Areas – No change
c. Access Roads – No change
7
LONG-TERM CARE PERMIT RENEWAL APPLICATION
d. Grades – No change
e. Cross Sections – No change
f. Drainage Devices – No change
g. Fencing – No change
h. Facilities – No change
4. LANDFILL REPORT
This is a Long-term Care Plan application. The Wright Landfill was closed to incoming waste in
1991 and no longer accepts solid waste disposal.
a. Population – Not applicable.
b. Solid Waste – Not applicable.
c. Facility Life – Not applicable
d. Cover Material –Not applicable
5. WATER QUALITY MONITORING
Water quality at the Wright Landfill is currently analyzed by Pace Analytical Services, Inc. in accordance
with Chapter 62-160, FAC (62-701.330(3)(h), FAC). Pace Analytical is NELAC certified (FL DOH
E83079, FL DOH E86240, and FL DOH E84973)
6. FINANCIAL RESPONSIBILITY
Part R of this permit application demonstrates financial responsibility for the Long-term care period of the
Wright Landfill.
PART F – GENERAL CRITERIA FOR LANDFILLS
LOCATION
8
LONG-TERM CARE PERMIT RENEWAL APPLICATION
1. Relative to the 100 year flood plain.
2. Horizontal separation between waste deposits and the landfill property boundary.
Not applicable. This is a Long-term Care Plan application. The Wright Landfill no longer accepts solid
waste for disposal.
PART G – LANDFILL CONSTRUCTION REQUIREMENTS
Not applicable. This is a Long-term Care Plan renewal application. The landfill is closed. There are no
landfill construction projects planned or proposed for the Wright Landfill.
PART H – HYDROGEOLOGICAL INVESTIGATION REQUIREMENTS
BCM Converse conducted the original hydrogeological investigation and presented the findings in an
April 1985 submittal titled OPERATIONS PLAN TO MODIFY AND CLOSE SOLID WASTE
MANAGEMENT FACILITY. Other Hydrogeological Investigation documents include, but are not
limited to the following:
Preliminary Groundwater Contamination Assessment, BCM Engineers, 1987
Contamination Report Addendum, BCM Engineering, July 1989
Aquifer Pumping Tests – Surficial Aquifer – RAP Phase II, BCM Engineering, October 1990
Remedial Action Plan (Aquifer Modeling), Okaloosa County, October 1991
Potable Water Well Survey, HDR, Inc., June 2005
These documents are incorporated by reference, and all are available in the FDEP online database –
Oculus.
PART I – GEOTECHNICAL INVESTIGATION REQUIREMENTS
This is an application to renew the Long-term Care permit for the Wright Landfill (closed Class I/Class
III). No additional geotechnical work is being submitted and no changes are being submitted that are
applicable to Chapter 62-701.410(2),
Applicable documents:
Operation Plan to Modify and Close Solid Waste Facility, BCM Converse, Inc., April 1985.
Closure Permit Application for Wright Landfill, BCM, August 1988.
Closure Permit Application full size drawings, Wright Landfill, BCM, August 1988.
“As built” Cap Panel Layout & Details, MWM Contracting, January 1993.
HDPE Cap Liner Testing results, MWM Contracting, June 1993.
9
LONG-TERM CARE PERMIT RENEWAL APPLICATION
These documents are incorporated by reference, and all are available in the FDEP online database –
Oculus.
PART J – VERTICAL EXPANSION OF LANDFILLS
Not applicable. This is a Long-term Care Plan renewal application. Vertical expansion is not planned or
proposed for the Wright Landfill.
PART K – LANDFILL OPERATION REQUIREMENTS
Part K items 1 through 12 are not applicable during the long-term care period. Refer to Part R – Long-
term Care and Maintenance Plan.
No changes are recommended to Part K item 13 a through c. The County will continue to keep and report
records in substantial accordance to Chapter 62-701.500(13) FAC:
(13) Recordkeeping. In addition to records and reporting required by other sections of this chapter,
the landfill owner or operator shall:
(a) Keep records of all information used to develop or support the permit applications and any
supplemental information submitted to comply with this chapter pertaining to construction of the landfill
throughout the design period. Records pertaining to the operation, except for weigh tickets, of the landfill
shall be kept for the design period of the landfill. Weigh tickets shall be kept for five years.
(b) Retain records of all monitoring information, including calibration and maintenance records, all
original chart recordings for continuous monitoring instrumentation, and copies of all reports required by
permit, for at least ten years. Background water quality records shall be kept for the design period of the
landfill.
(c) Maintain an annual estimate of the remaining life and capacity in cubic yards of the existing,
constructed landfill and an annual estimate of the life and capacity in cubic yards of other permitted areas
not yet constructed. The estimate shall be made and reported annually to the Department.
(d) Records which are more than five years old and which are required to be retained may be archived,
provided that the landfill operator can retrieve them for inspection within seven days.
PART L – WATER QUALITY AND LEACHATE MONITORING REQUIREMENTS
1. WATER QUALITY AND LEACHATE MONITORING PLAN
i. Purpose
The Water Quality Monitoring Plan (WQMP) for the Wright Landfill describes the monitoring network
that includes an array of monitoring wells and surface water sampling points installed to detect or
characterize potential environmental impacts from the landfill. The WQMP specifies the methods of
collecting and analyzing groundwater and surface water samples and reporting the results to the FDEP
and describes actions to be taken if an impact occurs.
ii. Regulatory Authority
10
LONG-TERM CARE PERMIT RENEWAL APPLICATION
A Five-Year Water Quality Technical Report (WQTR) was submitted to the FDEP in November 2013.
The November 2013 document is incorporated by reference as the Water Quality Monitoring Plan
(WQMP) for this LTC permit renewal. The WQTR was prepared in substantial accordance with Chapter
62-701.510 FAC and the Wright Landfill permit. Paragraph 62-701.510(1)(b) FAC states that the solid
waste water quality monitoring requirements are meant to supplement the requirements in Chapters 62-
520 and 62-522, FAC. Division 62-520.600 FAC states that “a monitoring program instituted under some
other state, federal, or local government regulation or permit shall be substituted for this program if it is
in substantial compliance with [62-520.600] subsection (3).”
Paragraph 62-701.510(2)(c) FAC states that the WQMP must comply with the provisions of Section 62-
520.600(3) FAC. Because Section 62-520.600(3) FAC is thereby incorporated into Division 62-701.510
FAC by citation, it is in substantial compliance with Section 62-522.600(3) FAC and the monitoring
system instituted under Section 62-701.510, FAC qualifies to be substituted for the program described in
Chapter 62-520 FAC.
The information required by Section 62-520.600(3) FAC is included in the Five-year WQTR which is
available in Oculus.
The November 2013 WQMP reviewed data collected from the first semiannual event of 2008 through the
second semiannual event of 2013. The first 2014 semiannual event has been conducted since the WQMP
was submitted. To supplement the Five-year WQTR, an updated Table of detected parameters and select
time series plots have been included in this application (Attachment C).
PART M – SPECIAL WASTE HANDLING REQUIREMENTS
Not applicable. This is a Long-term Care Plan renewal application. The Wright Landfill no longer accepts
waste.
PART N – GAS MANAGEMENT SYSTEM REQUIREMENTS
1. GAS MANAGEMENT SYSTEM DESIGN
a. Preventative Design
The Wright Landfill stopped accepting waste in November 1991 and was officially
closed to incoming waste and began long-term care on December 19, 1994. The landfill
gas (LFG) monitoring system consists of 30 methane monitoring probes located along the
perimeter of the property. Quarterly gas monitoring and reporting was required until
January 2012. The County submitted a 5-year Evaluation Gas Migration Survey to the
FDEP and requested reducing LFG monitoring from quarterly to annually. The request
was approved by the FDEP in their response to the request, dated January 18, 2012.
b. Site-Specific Conditions
LFG monitoring probes are spaced approximately equally around the entire site.
Although the Wright Landfill may potentially still be generating landfill gas (LFG) it
11
LONG-TERM CARE PERMIT RENEWAL APPLICATION
appears to be a minimal amount. Annual monitoring is conducted to ensure that gas
levels do not exceed 25% of the lower explosive limit (LEL) for combustible gases at the
property boundary. LFG has not been detected in perimeter probes for several years.
c. Gas Pressure
The existing system of landfill gas vents and capping adequately controls gas pressure as
evidenced by perimeter probe measurements and the prior twenty years of post closure
care.
d. Non-Interference
2. GAS MONITORING POINTS AND SOIL MONITORING PROBES
Okaloosa County monitors LFG at 30 perimeter monitoring probes. See Part Q Long-term care
plan.
3. GAS REMEDIATION PLAN AND ODOR REMEDIATION PLAN
See Part Q Long-term care plan.
PART O – LANDFILL CLOSURE REQUIREMENTS
Not applicable. This is a Long-term Care permit renewal application. Final closure was completed and
certified on December 19, 1994. See as-built survey (Attachment B, Figure D.9.c).
PART P – OTHER CLOSURE PROCEDURES
Not applicable. This is a Long-term Care permit renewal application.
PART Q – LONG-TERM CARE
This is a Long-term Care permit renewal application. The information presented in this application is
intended to provide the general intent of the closure and long-term care. The long-term care plan is
included in Attachment D.
1. GAS COLLECTION AND MONITORING SYSTEM
Okaloosa County monitors 30 gas probes at the property limits for LFG to ensure that concentrations do
not exceed 25% LEL.
2. STABILIZATION REPORT REQUIREMENTS
12
LONG-TERM CARE PERMIT RENEWAL APPLICATION
Okaloosa County will submit a report to the Department regarding stabilization of the landfill every
5 years during the long-term care, in accordance with Rule 62-701.620(6), FAC. The most recent
stabilization report was submitted in October 2013. The stabilization report was submitted as Appendix 9
of the 2013 Water Quality Technical Report. The reports have been uploaded to the FDEP online
database (Oculus).
3. RIGHT OF ACCESS
In accordance with Rule 62-701.620(7), FAC, Okaloosa County will retain the right of entry to the
landfill property for the long-term care period after termination of solid waste operations for inspecting,
monitoring, and maintaining the site.
4. REPLACEMENT OF MONITORING DEVICES
If a monitoring well or monitoring point cited by the permit is destroyed or becomes inoperable, the
landfill Owner or operator (Okaloosa County) shall immediately, upon discovery, notify FDEP in writing.
Inoperative monitoring devices shall be replaced with functioning devices within 60 days of the discovery
or as required by Rule 62-701.620(8), FAC.
5. COMPLETION OF LONG-TERM CARE
Upon completion of the long-term care period, the Owner or operator (Okaloosa County) will certify to
FDEP that the long-term care was completed in accordance with the closure plan as permitted. The
certification will be signed and sealed by a professional engineer.
PART R – FINANCIAL ASSURANCE
Information presented in this section shall be used to describe the financial mechanism to be used to
demonstrate proof of financial assurance to the Florida Department of Environmental Protection (FDEP).
1. COST ESTIMATES
The closure and long-term care cost estimates prepared on FDEP Form 62-701.900(28) are included in
Attachment E of this application.
2. PROCEDURES FOR PROVIDING ANNUAL COST ADJUSTMENTS
An annual cost adjustment will be provided to FDEP in accordance with Rule 62-701.630(4) and (8),
FAC. The estimate will address closure and long-term care costs, as well as corrective action costs, if
required.
3. FUNDING MECHANISMS
The funding mechanism to cover closure and long-term care will be provided by a financial mechanism
authorized by Rule 62-701.630, FAC. The Applicant will submit the financial assurance funding to
FDEP as required by Rule 62-701.630, FAC.
4. DELAYED PROOF OF FINANCIAL ASSURANCE SUBMITTAL
13
LONG-TERM CARE PERMIT RENEWAL APPLICATION
Documentation and appropriate forms will be provided to FDEP if delaying the issuance of proof
financial assurance, in accordance with Rule 62-701.630(2)(c), FAC.
PART S – CERTIFICATION BY APPLICANT AND ENGINEER OR PUBLIC OFFICER
The certifications by the applicant and the engineer are included on the last page of the permit application
form (Attachment A).
14
ATTACHMENT A
FDEP FORM # 62-701.900(1), APPLICATION TO CONSTRUCT,
OPERATE, MODIFY, OR CLOSE A SOLID WASTE
MANAGEMENT FACILITY
Florida Department of
DEP Form #: 62-701.900(1), F.A.C.
Form Title: Application to Construct, Operate, Modify, or
Close a Solid Waste Management Facility
Environmental Protection Effective Date: August 12, 2012
Bob Martinez Center Incorporated in Rule: 62-701.330(3), F.A.C.
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
APPLICATION TO CONSTRUCT, OPERATE, MODIFY, OR CLOSE A
SOLID WASTE MANAGEMENT FACILITY
APPLICATION INSTRUCTIONS AND FORMS
Northwest District Northeast District Central District Southwest District South District Southeast District
160 Governmental Center 7777 Baymeadows Way West 3319 Maguire Boulevard 13051 North Telecom Pkwy 2295 Victoria Ave, Suite 364 400 North Congress Avenue
Suite 308 Suite 100 Suite 232 Temple Terrace, FL 33637 P.O. Box 2549 Suite 200
Pensacola, FL 32502-5794 Jacksonville, FL 32256-7590 Orlando, FL 32803-3767 813-632-7600 Fort Myers, FL 33901-3881 West Palm Beach, FL 33401
850-595-8300 904-256-1700 407-897-4100 239-344-5600 561-681-6600
INSTRUCTIONS TO APPLY FOR A SOLID WASTE MANAGEMENT FACILITY PERMIT
I. General
Solid Waste Management Facilities shall be permitted pursuant to Section 403.707, Florida Statutes (FS) and in accordance
with Florida Administrative Code (FAC) Chapter 62-701. A minimum of four copies of the application shall be submitted to
the appropriate Department office having jurisdiction over the facility. The appropriate fee in accordance with Rule 62-
701.315, FAC, shall be submitted with the application by check made payable to the Department of Environmental
Protection (DEP).
Complete appropriate sections for the type of facility for which application is made. Entries shall be typed or printed in ink.
All blanks shall be filled in or marked "Not Applicable" or "No Substantial Change". Information provided in support of the
application shall be marked "Submitted" and the location of this information in the application package indicated. The
application shall include all information, drawings, and reports necessary to evaluate the facility. Information required to
complete the application is listed on the attached pages of this form.
II. Application Parts Required for Construction and Operation Permits
A. Landfills and Ash Monofills - Submit Parts A through S
B. Asbestos Monofills - Submit Parts A, B, C, D, E, F, I, K, M, O through S
C. Industrial Solid Waste Disposal Facilities - Submit Parts A through S
NOTE: Portions of some Parts may not be applicable.
NOTE: For facilities that have been satisfactorily constructed in accordance with their construction permit, the
information required for A, B and C type facilities does not have to be resubmitted for an operation permit if the
information has not substantially changed during the construction period. The appropriate portion of the form
should be marked "no substantial change".
III. Application Parts Required for Closure Permits
A. Landfills and Ash Monofills - Submit Parts A, B, L, N through S
B. Asbestos Monofills - Submit Parts A, B, M, O through S
C. Industrial Solid Waste Disposal Facilities - Submit Parts A, B, L through S
NOTE: Portions of some Parts may not be applicable.
IV. Permit Renewals
The above information shall be submitted at time of permit renewal in support of the new permit. However, facility
information that was submitted to the Department to support the expiring permit, and which is still valid, does not need to be
re-submitted for permit renewal. Portions of the application not re-submitted shall be marked "no substantial change" on the
application form.
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 2 of 36
V. Application Codes
S - Submitted
LOCATION - Physical location of information in application
N/A - Not Applicable
N/C - No Substantial Change
VI. Listing of Application Parts
PART A: GENERAL INFORMATION
PART B: DISPOSAL FACILITY GENERAL INFORMATION
PART C: PROHIBITIONS
PART D: SOLID WASTE MANAGEMENT FACILITY PERMIT REQUIREMENTS, GENERAL
PART E: LANDFILL PERMIT REQUIREMENTS
PART F: GENERAL CRITERIA FOR LANDFILLS
PART G: LANDFILL CONSTRUCTION REQUIREMENTS
PART H: HYDROGEOLOGICAL INVESTIGATION REQUIREMENTS
PART I: GEOTECHNICAL INVESTIGATION REQUIREMENTS
PART J: VERTICAL EXPANSION OF LANDFILLS
PART K: LANDFILL OPERATION REQUIREMENTS
PART L: WATER QUALITY AND LEACHATE MONITORING REQUIREMENTS
PART M: SPECIAL WASTE HANDLING REQUIREMENTS
PART N: GAS MANAGEMENT SYSTEM REQUIREMENTS
PART O: LANDFILL CLOSURE REQUIREMENTS
PART P: OTHER CLOSURE PROCEDURES
PART Q: LONG-TERM CARE
PART R: FINANCIAL ASSURANCE
PART S: CERTIFICATION BY APPLICANT AND ENGINEER OR PUBLIC OFFICER
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 3 of 36
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
APPLICATION FOR A PERMIT TO CONSTRUCT, OPERATE, MODIFY OR CLOSE A
SOLID WASTE MANAGEMENT FACILITY
Please Type or Print
PART A. GENERAL INFORMATION
1. Type of disposal facility (check all that apply):
□
✔ Class I Landfill □ Ash Monofill
□
✔ Class III Landfill □ Asbestos Monofill
□ Industrial Solid Waste
□ Other (describe):
NOTE: Waste Processing Facilities should apply on Form 62-701.900(4), FAC;
Yard Trash Disposal Facilities should notify on Form 62-701.900(3), FAC;
Compost Facilities should apply on Form 62-709.901(1), FAC; and
C&D Disposal Facilities should apply on Form 62-701.900(6), FAC
2. Type of application:
□ Construction
□ Operation
□ Construction/Operation
□ Closure
□
✔ Long-term Care Only
3. Classification of application:
□ New □ Substantial Modification
□
✔ Renewal □ Intermediate Modification
□ Minor Modification
4. Facility name: Wright Sanitary Landfill - Class I/III
5. DEP ID number: NWD/46/00009064 County: Okaloosa
6. Facility location (main entrance):
Located on the North Beal Extension, approximately 1.1 mile north of the State Road
189 and Green Acres Drive intersection in south Okaloosa County.
7. Location coordinates:
Section: 22 & 27 Township: 1S Range: 24W
Latitude: 30 ° 28 ‘ 32.64 “ Longitude: 86 ° 38 ‘ 30.64 “
Datum: WGS84 Coordinate method: DMS
Collected by: Scott R. Henson Company/Affiliation: Okaloosa County
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 4 of 36
8. Applicant name (operating authority): Okaloosa County Board of County Commissioners
Mailing address: 302 N. Wilson St., Crestview, Florida 32536
Street or P.O. Box City State Zip
Contact person: Kelly Windes Telephone: ( 850 ) 689-5030
Title: Chairman
kwindes@co.okaloosa.fl.us
E-Mail address (if available)
9. Authorized agent/Consultant: HDR Engineering, Inc.
Mailing address: 200 W Forsyth St., Suite 800, Jacksonville, Florida 32202-4321
Street or P.O. Box City State Zip
Contact person: John Catches Telephone: ( 904 ) 598-8900
Title: Professional Geologist/Sr. Project Manager
john.catches@hdrinc.com
E-Mail address (if available)
10. Landowner (if different than applicant): Eglin Air Force Base
Mailing address: 501 Deleon St, Suite 100, Eglin AFB, FL. 32542
Street or P.O. Box City State Zip
Telephone: ( 850 ) 882-1348
Melinda Hazzard, CIV USAF 96 CEG/CEAR, Real Estate Specialist
Contact person:
Melinda.Hazzard@EGLIN.AF.MIL
E-Mail address (if available)
11. Cities, towns, and areas to be served:
N/A
12. Population to be served:
Five-Year
Current: N/A Projection: N/A
13. Date site will be ready to be inspected for completion: N/A
14. Expected life of the facility: N/A years
15. Estimated costs:
Total Construction: $ N/A Closing Costs: $ N/A
16. Anticipated construction starting and completion dates:
From: N/A To: N/A
17. Expected volume or weight of waste to be received:
N/A 3
yds /day N/A tons/day N/A gallons/day
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 5 of 36
PART B. DISPOSAL FACILITY GENERAL INFORMATION
1. Provide brief description of disposal facility design and operations planned under this application:
The Wright Landfill is a closed Class I /Class III landfill facility in Long Term Care
2. Facility site supervisor: Darryl Roper, Solid Waste Division, Okaloosa Co. Public Works
Title: Landfill Supervisor Telephone: ( 850 ) 546-0654
E-Mail address (if available)
3. Disposal area: Total acres: 327 Used acres: 210 Available acres: N/A
4. Weighing scales used: □ Yes □
✔ No
5. Security to prevent unauthorized use: □
✔ Yes □ No
Charge for waste received: N/A N/A
3
6. $/yds $/ton
7. Surrounding land use, zoning:
□
✔ Residential □ Industrial
□ Agricultural □ None
□
✔ Commercial □
✔ Other (describe):
Military
8. Types of waste received:
□
✔ Household □
✔ C & D debris
□
✔ Commercial □
✔ Shredded/cut tires
□ Incinerator/WTE ash □
✔ Yard trash
□ Treated biomedical □
✔ Septic tank
□
✔ Water treatment sludge □
✔ Industrial
□ Air treatment sludge □ Industrial sludge
□
✔ Agricultural □ Domestic sludge
□
✔ Asbestos □ Other (describe):
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 6 of 36
9. Salvaging permitted: □ Yes □
✔ No
10. Attendant: □
✔ Yes □ No Trained operator: □ Yes □
✔ No
11. Trained spotters: □
✔ Yes □ No Number of spotters used: N/A
12. Site located in: □ Floodplain □ Wetlands □
✔ Other (describe):
The landfill is located in uplands adjacent to Alligator Slough.
13. Days of operation: N/A
14. Hours of operation: N/A
15. Days working face covered: N/A
16. Elevation of water table: 45 ft. 65 ft. ft. Datum Used: NGVD 1929
17. Number of monitoring wells: 17
18. Number of surface monitoring points: 4
19. Gas controls used: □
✔ Yes □ No Type controls: □ Active □
✔ Passive
Gas flaring: □ Yes □
✔ No Gas recovery: □ Yes □
✔ No
20. Landfill unit liner type:
□ Natural soils □ Double geomembrane
□ Single clay liner □ Geomembrane & composite
□
✔ Single geomembrane □ Double composite
□ Single composite □ None
□ Slurry wall □ Other (describe):
21. Leachate collection method:
□
✔ Collection pipes □ Double geomembrane
□ Geonets □ Gravel layer
□ Well points □ Interceptor trench
□ Perimeter ditch □ None
□
✔ Other (describe):
Sand layer
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 7 of 36
22. Leachate storage method:
□
✔ Tanks □ Surface impoundments
□ Other (describe):
23. Leachate treatment method:
□ Oxidation □ Chemical treatment
□ Secondary □ Settling
□ Advanced □
✔ None
□ Other (describe):
24. Leachate disposal method:
□ Recirculated □ Pumped to WWTP
□
✔ Transported to WWTP □ Discharged to surface water/wetland
□ Injection well □ Percolation ponds
□ Evaporation □ Spray irrigation
□ Other (describe):
25. For leachate discharged to surface waters:
Name and Class of receiving water:
N/A
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 8 of 36
26. Storm Water:
Collected: □
✔ Yes □ No
Type of treatment:
Evaporation and percolation in swales and retention ponds.
Name and Class of receiving water:
N/A
27. Environmental Resources Permit (ERP) number or status:
N/A
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 9 of 36
PART C. PROHIBITIONS (62-701.300, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Provide documentation that each of the siting criteria will be satisfied for
the facility; (62-701.300(2), FAC)
S □ □
N/A ✔ N/C □ 2. If the facility qualifies for any of the exemptions contained in Rules 62-
701.300(12) through (18), FAC, then document this qualification(s);
S □ □
N/A ✔ N/C □ 3. Provide documentation that the facility will be in compliance with the
burning restrictions; (62-701.300(3), FAC)
S □ □
N/A ✔ N/C □ 4. Provide documentation that the facility will be in compliance with the
hazardous waste restrictions; (62-701.300(4), FAC)
S □ □
N/A ✔ N/C □ 5. Provide documentation that the facility will be in compliance with the PCB
disposal restrictions; (62-701.300(5), FAC)
S □ □
N/A ✔ N/C □ 6. Provide documentation that the facility will be in compliance with the
biomedical waste restrictions; (62-701.300(6), FAC)
S □ □
N/A ✔ N/C □ 7. Provide documentation that the facility will be in compliance with the
Class I surface water restrictions; (62-701.300(7), FAC)
S □ □
N/A ✔ N/C □ 8. Provide documentation that the facility will be in compliance with the
special waste for landfills restrictions; (62-701.300(8), FAC)
S □ □
N/A ✔ N/C □ 9. Provide documentation that the facility will be in compliance with the liquid
restrictions; (62-701.300(10), FAC)
S □ □
N/A ✔ N/C □ 10. Provide documentation that the facility will be in compliance with the used
oil and oily waste restrictions; (62-701.300(11), FAC)
PART D. SOLID WASTE MANAGEMENT FACILITY PERMIT REQUIREMENTS, GENERAL (62-701.320, FAC)
LOCATION
S ✔ □ Electronic Submittal
N/A □ N/C □ 1. Four copies, at minimum, of the completed application form, all supporting
data and reports; (62-701.320(5)(a), FAC)
□ □ N/C □
Hard Copy certification pages
S ✔ N/A 2. Engineering and/or professional certification (signature, date, and seal)
provided on the applications and all engineering plans, reports, and
supporting information for the application; (62-701.320(6), FAC)
S ✔ □ Attached N/A □ N/C □ 3. A letter of transmittal to the Department; (62-701.320(7)(a), FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 10 of 36
LOCATION PART D CONTINUED
S ✔ □ Engineering Report (ER) Att. A
N/A □ N/C □ 4. A completed application form dated and signed by the applicant; (62-
701.320(7)(b), FAC)
S ✔ □ Attached N/A □ N/C □ 5. Permit fee specified in Rule 62-701.315, FAC in check or money order,
payable to the Department; (62-701.320(7)(c), FAC)
S ✔ □ Attached N/A □ N/C □ 6. An engineering report addressing the requirements of this rule and with
the following format: a cover sheet, text printed on 8 ½ inch by 11 inch
consecutively numbered pages, a table of contents or index, the body of the
report and all appendices including an operation plan, contingency plan,
illustrative charts and graphs, records or logs of tests and investigations,
engineering calculations; (62-701.320(7)(d), FAC)
S□ Oculus N/A □ N/C □
✔ 7. Operation Plan and Closure Plan; (62-701.320(7)(e)1, FAC)
S□ N/A □ N/C □
Oculus ✔ 8. Contingency Plan; (62-701.320(7)(e)2, FAC)
S□ N/A □ N/C □
Oculus ✔ 9. Plans or drawings for the solid waste management facilities in appropriate
format (including sheet size restrictions, cover sheet, legends, north arrow,
horizontal and vertical scales, elevations referenced to NGVD 1929)
showing: (62-701.320(7)(f), FAC)
S ✔ □ ER Attachment B N/A □ N/C □ a. A regional map or plan with the project location in relation to major
roadways and population centers;
S ✔ □ ER Attachment B N/A □ N/C □ b. A vicinity map or aerial photograph no more than one year old
showing the facility site and relevant surface features located within
1000 feet of the facility;
□ □ N/C □
ER Attachment B and Oculus
S N/A ✔ c. A site plan showing all property boundaries certified by a Florida
Licensed Professional Surveyor and Mapper;
S □ □
N/A ✔ N/C □ d. Other necessary details to support the engineering report,
including referencing elevations to a consistent, nationally
recognized datum, and identifying the method used for collecting
latitude and longitude data;
S □ Oculus N/A □ N/C □
✔ 10. Documentation that the applicant either owns the property or has legal
authority from the property owner to use the site; (62-701.320(7)(g), FAC)
S □ □
N/A ✔ N/C □ 11. For facilities owned or operated by a county, provide a description of
how, if any, the facilities covered in this application will contribute to the
county’s achievement of the waste reduction and recycling goals contained in
Section 403.706, FS; (62-701.320(7)(h), FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 11 of 36
LOCATION PART D CONTINUED
S ✔ □ ER, Pages 3 and 6 N/A □ N/C □ 12. Provide a history and description of any enforcement actions taken by the
Department against the applicant for violations of applicable statutes, rules,
orders, or permit conditions relating to the operation of any solid waste
management facility in the state; (62-701.320(7)(i), FAC)
S □ □
N/A ✔ N/C □ 13. Proof of publication in a newspaper of general circulation of notice of
application for a permit to construct or substantially modify a solid waste
management facility; (62-701.320(8), FAC)
S □ □
N/A ✔ N/C □ 14. Provide a description of how the requirements for airport safety will be
achieved, including proof of required notices if applicable. If exempt, explain
how the exemption applies; (62-701.320(13), FAC)
S □ □
N/A ✔ N/C □ 15. Explain how the operator and spotter training requirements and special
criteria will be satisfied for the facility; (62-701.320(15), FAC)
PART E. LANDFILL PERMIT REQUIREMENTS (62-701.330, FAC)
LOCATION
S ✔ □c N/A □ N/C □ 1. Regional map or aerial photograph no more than five years old showing all
airports that are located within five miles of the proposed landfill; (62-
701.330(3)(a), FAC)
□ □ N/C □
ER Part D & Attachment B
S ✔ N/A 2. Plot plan with a scale not greater than 200 feet to the inch showing: (62-
701.330(3)(b), FAC)
□ ER Attachment B N/A □ N/C □
S ✔ a. Dimensions;
S□ N/A □ N/C □
ER Attachment B
✔ b. Locations of proposed and existing water quality monitoring wells;
S□ N/A □ N/C □
✔
Oculus
c. Locations of soil borings;
S□ N/A □
✔ N/C □ d. Proposed plan of trenching or disposal areas;
S□ N/A □
✔ N/C □ e. Cross sections showing original elevations and proposed final
contours which shall be included either on the plot plan or on
separate sheets;
S□ ER Attachment B N/A □ N/C □
✔ f. Any previously filled waste disposal areas;
S□ N/A □ N/C □
ER Attachment B
✔ g. Fencing or other measures to restrict access;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 12 of 36
LOCATION PART E CONTINUED
S ✔ □ ER Attachment B N/A □ N/C □ 3. Topographic maps with a scale not greater than 200 feet to the inch with
five foot contour intervals showing: (62-701.330(3)(c), FAC)
S□ □ □
N/A ✔ N/C a. Proposed fill areas;
S□ N/A □
✔ N/C □ b. Borrow areas;
S□ N/A □ N/C □
✔ c. Access roads;
S□ N/A □ N/C □
✔ d. Grades required for proper drainage;
S□ N/A □
✔ N/C □ e. Cross sections of lifts;
S□ N/A □
✔ N/C □ f. Special drainage devices if necessary;
S□ N/A □ N/C □
✔ g. Fencing;
S□ N/A □
✔ N/C □ h. Equipment facilities;
S□ N/A □
✔ N/C □ 4. A report on the landfill describing the following: (62-701.330(3)(d), FAC)
S□ N/A □
✔ N/C □ a. The current and projected population and area to be served by the
proposed site;
S □ □
N/A ✔ N/C □ b. The anticipated type, annual quantity, and source of solid waste
expressed in tons;
S □ □
N/A ✔ N/C □ c. Planned active life of the facility, the final design height of the
facility, and the maximum height of the facility during its operation;
S□ □ □
N/A ✔ N/C d. The source and type of cover material used for the landfill;
S□ N/A □ N/C □
ER Part E.5
✔ 5. Provide evidence that an approved laboratory shall conduct water quality
monitoring for the facility in accordance with Chapter 62-160, FAC; (62-
701.330(3)(g), FAC
S ✔ □ ER Part R N/A □ N/C □ 6. Provide a statement of how the applicant will demonstrate financial
responsibility for the closing and long-term care of the landfill; (62-
701.330(3)(h), FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 13 of 36
PART F. GENERAL CRITERIA FOR LANDFILLS (62-701.340, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Describe (and show on a Federal Insurance Administration flood map, if
available) how the landfill or solid waste disposal unit shall not be located in
the 100 year floodplain where it will restrict the flow of the 100 year flood,
reduce the temporary water storage capacity of the floodplain unless
compensating storage is provided, or result in a washout of solid waste; (62-
701.340(3)(b), FAC)
S □ □
N/A ✔ N/C □ 2. Describe how the minimum horizontal separation between waste deposits
in the landfill and the landfill property boundary shall be 100 feet, measured
from the toe of the proposed final cover slope; (62-701.340(3)(c), FAC)
PART G. LANDFILL CONSTRUCTION REQUIREMENTS (62-701.400, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Describe how the landfill shall be designed so the solid waste disposal
units will be constructed and closed at planned intervals throughout the
design period of the landfill, and shall be designed to achieve a minimum
factor of safety of 1.5 using peak strength values to prevent failures of side
slopes and deep-seated failures; (62-701.400(2), FAC)
S□ □ □
N/A ✔ N/C 2. Landfill liner requirements; (62-701.400(3), FAC)
S□ N/A □
✔ N/C □ a. General construction requirements; (62-701.400(3)(a), FAC)
S□ N/A □
✔ N/C □ (1) Provide test information and documentation to ensure the
liner will be constructed of materials that have appropriate
physical, chemical, and mechanical properties to prevent
failure;
S□ □ □
N/A ✔ N/C (2) Document foundation is adequate to prevent liner failure;
S□ N/A □
✔ N/C □ (3) Constructed so bottom liner will not be adversely impacted
by fluctuations of the ground water;
S □ □
N/A ✔ N/C □ (4) Designed to resist hydrostatic uplift if bottom liner located
below seasonal high ground water table;
S □ □
N/A ✔ N/C □ (5) Installed to cover all surrounding earth which could come
into contact with the waste or leachate;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 14 of 36
LOCATION PART G CONTINUED
S□ □ □
N/A ✔ N/C b. Composite liners; (62-701.400(3)(b), FAC)
S□ N/A □
✔ N/C □ (1) Upper geomembrane thickness and properties;
S□ N/A □
✔ N/C □ (2) Design leachate head for primary leachate collection and
removal system (LCRS) including leachate recirculation if
appropriate;
S □ □
N/A ✔ N/C □ (3) Design thickness in accordance with Table A and number of
lifts planned for lower soil component;
S□ □ □
N/A ✔ N/C c. Double liners; (62-701.400(3)(c), FAC)
S□ N/A □
✔ N/C □ (1) Upper and lower geomembrane thickness and properties;
S□ N/A □
✔ N/C □ (2) Design leachate head for primary LCRS to limit the head to
one foot above the liner;
S□ □ □
N/A ✔ N/C (3) Lower geomembrane sub-base design;
S□ N/A □
✔ N/C □ (4) Leak detection and secondary leachate collection system
minimum design criteria (k ≥ 10 cm/sec, head on lower liner
≤ 1 inch, head not to exceed thickness of drainage layer);
S□ □ □
N/A ✔ N/C d. Standards for geosynthetic components; (62-701.400(3)(d), FAC)
S□ N/A □
✔ N/C □ (1) Factory and field seam test methods to ensure all
geomembrane seams achieve the minimum specifications;
S □ □
N/A ✔ N/C □ (2) Geomembranes to be used shall pass a continuous spark
test by the manufacturer;
S □ □
N/A ✔ N/C □ (3) Design of 24-inch-thick protective layer above upper
geomembrane liner;
S □ □
N/A ✔ N/C □ (4) Describe operational plans to protect the liner and leachate
collection system when placing the first layer of waste above
a 24-inch-thick protective layer;
S □ □
N/A ✔ N/C □ (5) HDPE geomembranes, if used, meet the specifications in
GRI GM13, and LLDPE geomembranes, if used, meet the
specifications in GRI GM17;
S □ □
N/A ✔ N/C □ (6) PVC geomembranes, if used, meet the specifications in
PGI 1104;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 15 of 36
LOCATION PART G CONTINUED
S □ □
N/A ✔ N/C □ (7) Interface shear strength testing results of the actual
components which will be used in the liner system;
S □ □
N/A ✔ N/C □ (8) Transmissivity testing results of geonets if they are used in
the liner system;
S □ □
N/A ✔ N/C □ (9) Hydraulic conductivity testing results of geosynthetic clay
liners if they are used in the liner system;
S□ □ □
N/A ✔ N/C e. Geosynthetic specification requirements; (62-701.400(3)(e), FAC)
S□ N/A □
✔ N/C □ (1) Definition and qualifications of the designer, manufacturer,
installer, QA consultant and laboratory, and QA program;
S □ □
N/A ✔ N/C □ (2) Material specifications for geomembranes, geocomposites,
geotextiles, geogrids, and geonets;
S □ □
N/A ✔ N/C □ (3) Manufacturing and fabrication specifications including
geomembrane raw material and roll QA, fabrication
personnel qualifications, seaming equipment and
procedures, overlaps, trial seams, destructive and non-
destructive seam testing, seam testing location, frequency,
procedure, sample size, and geomembrane repairs;
S □ □
N/A ✔ N/C □ (4) Geomembrane installation specifications including
earthwork, conformance testing, geomembrane placement,
installation personnel qualifications, field seaming and
testing, overlapping and repairs, materials in contact with
geomembranes, and procedures for lining system
acceptance;
S □ □
N/A ✔ N/C □ (5) Geotextile and geogrids specifications including handling
and placement, conformance testing, seams and overlaps,
repair, and placement of soil materials and any overlying
materials;
S □ □
N/A ✔ N/C □ (6) Geonet and geocomposites specifications including handling
and placement, conformance testing, stacking and joining,
repair, and placement of soil materials and any overlying
materials;
S □ □
N/A ✔ N/C □ (7) Geosynthetic clay liner specifications including handling and
placement, conformance testing, seams and overlaps,
repair, and placement of soil materials and any overlying
materials;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 16 of 36
LOCATION PART G CONTINUED
S□ □ □
N/A ✔ N/C f. Standards for soil liner components; (62-701.400(3)(f), FAC)
S□ N/A □
✔ N/C □ (1) Description of construction procedures including over-
excavation and backfilling to preclude structural
inconsistencies and procedures for placing and compacting
soil components in layers;
S □ □
N/A ✔ N/C □ (2) Demonstration of compatibility of the soil component with
actual or simulated leachate in accordance with EPA Test
Method 9100, or an equivalent test method;
S □ □
N/A ✔ N/C □ (3) Procedures for testing in situ soils to demonstrate they meet
the specifications for soil liners;
S □ □
N/A ✔ N/C □ (4) Specifications for soil component of liner including at a
minimum:
S □ □
N/A ✔ N/C □ (a) Allowable particle size distribution, and Atterberg
limits including shrinkage limit;
S□ □ □
N/A ✔ N/C (b) Placement moisture and dry density criteria;
S□ N/A □
✔ N/C □ (c) Maximum laboratory-determined saturated hydraulic
conductivity using simulated leachate;
S□ □ □
N/A ✔ N/C (d) Minimum thickness of soil liner;
S□ N/A □
✔ N/C □ (e) Lift thickness;
S□ N/A □
✔ N/C □ (f) Surface preparation (scarification);
S□ N/A □
✔ N/C □ (g) Type and percentage of clay mineral within the soil
component;
S □ □
N/A ✔ N/C □ (5) Procedures for constructing and using a field test section to
document the desired saturated hydraulic conductivity and
thickness can be achieved in the field;
S □ □
N/A ✔ N/C □ g. If a Class III landfill is to be constructed with a bottom liner system,
provide a description of how the minimum requirements for the liner
will be achieved;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 17 of 36
LOCATION PART G CONTINUED
S□ □ □
N/A ✔ N/C 3. Leachate collection and removal system (LCRS); (62-701.400(4), FAC)
S□ N/A □
✔ N/C □ a. The primary and secondary LCRS requirements; (62-
701.400(4)(a), FAC)
S □ □
N/A ✔ N/C □ (1) Constructed of materials chemically resistant to the waste
and leachate;
S □ □
N/A ✔ N/C □ (2) Have sufficient mechanical properties to prevent collapse
under pressure;
S □ □
N/A ✔ N/C □ (3) Have granular material or synthetic geotextile to prevent
clogging;
S □ □
N/A ✔ N/C □ (4) Have a method for testing and cleaning clogged pipes or
contingent designs for reducing leachate around failed
areas;
S□ □ □
N/A ✔ N/C b. Other LCRS requirements; (62-701.400(4)(b) and (c), FAC
S□ N/A □
✔ N/C □ (1) Bottom 12 inches having hydraulic conductivity ≥ 1 x 10 ³
cm/sec;
S □ □
N/A ✔ N/C □ (2) Total thickness of 24 inches of material chemically resistant
to the waste and leachate;
S □ □
N/A ✔ N/C □ (3) Bottom slope design to accommodate for predicted
settlement and still meet minimum slope requirements;
S □ □
N/A ✔ N/C □ (4) Demonstration that synthetic drainage material, if used, is
equivalent or better than granular material in chemical
compatibility, flow under load, and protection of
geomembranes liner;
S□ □ □
N/A ✔ N/C 4. Leachate recirculation; (62-701.400(5), FAC)
S□ N/A □
✔ N/C □ a. Describe general procedures for recirculating leachate;
S□ N/A □
✔ N/C □ b. Describe procedures for controlling leachate runoff and minimizing
mixing of leachate runoff with storm water;
S □ □
N/A ✔ N/C □ c. Describe procedures for preventing perched water conditions and
gas buildup;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 18 of 36
LOCATION PART G CONTINUED
S □ □
N/A ✔ N/C □ d. Describe alternate methods for leachate management when it
cannot be recirculated due to weather or runoff conditions, surface
seeps, wind-blown spray, or elevated levels of leachate head on the
liner;
S □ □
N/A ✔ N/C □ e. Describe methods of gas management in accordance with Rule
62-701.530, FAC;
S □ □
N/A ✔ N/C □ f. If leachate irrigation is proposed, describe treatment methods and
standards for leachate treatment prior to irrigation over final cover,
and provide documentation that irrigation does not contribute
significantly to leachate generation;
S □ □
N/A ✔ N/C □ 5. Leachate storage tanks and leachate surface impoundments; (62-
701.400(6), FAC)
S□ □ □
N/A ✔ N/C a. Surface impoundment requirements; (62-701.400(6)(b), FAC)
S□ N/A □
✔ N/C □ (1) Documentation that the design of the bottom liner will not be
adversely impacted by fluctuations of the ground water;
S □ □
N/A ✔ N/C □ (2) Designed in segments to allow for inspection and repair, as
needed, without interruption of service;
S□ □ □
N/A ✔ N/C (3) General design requirements;
S□ N/A □
✔ N/C □ (a) Double liner system consisting of an upper and
lower 60-mil minimum thickness geomembrane;
S □ □
N/A ✔ N/C □ (b) Leak detection and collection system with hydraulic
conductivity ≥ 1 cm/sec;
S □ □
N/A ✔ N/C □ (c) Lower geomembrane place on subbase ≥ 6 inches
thick with k ≤ 1 x 10 cm/sec or on an approved
-5
geosynthetic clay liner with k ≤ 1 x 10 cm/sec;
-7
S □ □
N/A ✔ N/C □ (d) Design calculation to predict potential leakage
through the upper liner;
S □ □
N/A ✔ N/C □ (e) Daily inspection requirements, and notification and
corrective action requirements if leakage rates
exceed that predicted by design calculations;
S □ □
N/A ✔ N/C □ (4) Description of procedures to prevent uplift, if applicable;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 19 of 36
LOCATION PART G CONTINUED
S □ □
N/A ✔ N/C □ (5) Design calculations to demonstrate minimum two feet of
freeboard will be maintained;
S□ □ □
N/A ✔ N/C (6) Procedures for controlling vectors and off-site odors;
S□ N/A □
✔ N/C □ b. Above-ground leachate storage tanks; (62-701.400(6)(c), FAC)
S□ N/A □
✔ N/C □ (1) Describe tank materials of construction and ensure
foundation is sufficient to support tank;
S □ □
N/A ✔ N/C □ (2) Describe procedures for cathodic protection for the tank, if
needed;
S □ □
N/A ✔ N/C □ (3) Describe exterior painting and interior lining of the tank to
protect it from the weather and the leachate stored;
S □ □
N/A ✔ N/C □ (4) Describe secondary containment design to ensure adequate
capacity will be provided and compatibility of materials of
construction;
S □ □
N/A ✔ N/C □ (5) Describe design to remove and dispose of stormwater from
the secondary containment system;
S □ □
N/A ✔ N/C □ (6) Describe an overfill prevention system, such as level
sensors, gauges, alarms, and shutoff controls to prevent
overfilling;
S□ □ □
N/A ✔ N/C (7) Inspections, corrective action, and reporting requirements;
S□ N/A □
✔ N/C □ (a) Weekly inspection of overfill prevention system;
S□ N/A □
✔ N/C □ (b) Weekly inspection of exposed tank exteriors;
S□ N/A □
✔ N/C □ (c) Inspection of tank interiors when tank is drained, or
at least every three years;
S □ □
N/A ✔ N/C □ (d) Procedures for immediate corrective action if failures
detected;
S□ □ □
N/A ✔ N/C (e) Inspection reports available for Department review;
S□ N/A □
✔ N/C □ c. Underground leachate storage tanks; (62-701.400(6)(d), FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 20 of 36
LOCATION PART G CONTINUED
S□ □ □
N/A ✔ N/C (1) Describe materials of construction;
S□ N/A □
✔ N/C □ (2) A double-walled tank design system to be used with the
following requirements:
S□ □ □
N/A ✔ N/C (a) Interstitial space monitoring at least weekly;
S□ N/A □
✔ N/C □ (b) Corrosion protection provided for primary tank
interior and external surface of outer shell;
S □ □
N/A ✔ N/C □ (c) Interior tank coatings compatible with stored
leachate;
S □ □
N/A ✔ N/C □ (d) Cathodic protection inspected weekly and repaired
as needed;
S □ □
N/A ✔ N/C □ (3) Describe an overfill prevention system, such as level
sensors, gauges, alarms, and shutoff controls to prevent
overfilling, and provide for weekly inspections;
S□ □ □
N/A ✔ N/C (4) Inspection reports available for Department review;
S□ N/A □
✔ N/C □ d. Schedule provided for routine maintenance of LCRS; (62-
701.400(6)(e), FAC)
S□ □ □
N/A ✔ N/C 6. Liner systems construction quality assurance (CQA); (62-701.400(7), FAC)
S□ N/A □
✔ N/C □ a. Provide CQA Plan including:
S□ N/A □
✔ N/C □ (1) Specifications and construction requirements for liner
system;
S □ □
N/A ✔ N/C □ (2) Detailed description of quality control testing procedures and
frequencies;
S□ □ □
N/A ✔ N/C (3) Identification of supervising professional engineer;
S□ N/A □
✔ N/C □ (4) Identify responsibility and authority of all appropriate
organizations and key personnel involved in the construction
project;
S □ □
N/A ✔ N/C □ (5) State qualifications of CQA professional engineer and
support personnel;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 21 of 36
LOCATION PART G CONTINUED
S□ □ □
N/A ✔ N/C (6) Description of CQA reporting forms and documents;
S□ N/A □
✔ N/C □ b. An independent laboratory experienced in the testing of
geosynthetics to perform required testing;
S□ □ □
N/A ✔ N/C 7. Soil liner CQA; (62-701.400(8), FAC)
S□ N/A □
✔ N/C □ a. Documentation that an adequate borrow source has been located
with test results, or description of the field exploration and laboratory
testing program to define a suitable borrow source;
S □ □
N/A ✔ N/C □ b. Description of field test section construction and test methods to
be implemented prior to liner installation;
S □ □
N/A ✔ N/C □ c. Description of field test methods, including rejection criteria and
corrective measures to insure proper liner installation;
S □ □
N/A ✔ N/C □ 8. For surface water management systems at aboveground disposal units,
provide documentation showing the design of any features intended to
convey stormwater to a permitted or exempted treatment system; (62-
701.400(9), FAC)
S□ □ □
N/A ✔ N/C 9. Gas control systems; (62-701.400(10), FAC)
S□ N/A □
✔ N/C □ a. Provide documentation that if the landfill is receiving degradable
wastes, it will have a gas control system complying with the
requirements of Rule 62-701.530, FAC;
S □ □
N/A ✔ N/C □ 10. For landfills designed in ground water, provide documentation that the
landfill will provide a degree of protection equivalent to landfills designed with
bottom liners not in contact with ground water; (62-701.400(11), FAC)
PART H. HYDROGEOLOGICAL INVESTIGATION REQUIREMENTS (62-701.410(1), FAC)
LOCATION
S □ ER Part H & Oculus
N/A □ N/C □
✔ 1. Submit a hydrogeological investigation and site report including at least
the following information:
□ □ N/C □
ER Part H & Oculus
S N/A ✔ a. Regional and site specific geology and hydrology;
S□ N/A □ N/C □
ER Part H & Oculus
✔ b. Direction and rate of ground water and surface water flow
including seasonal variations;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 22 of 36
LOCATION PART H CONTINUED
S□ ER Part H & Oculus
N/A □ N/C □
✔ c. Background quality of ground water and surface water;
S□ N/A □ N/C □
ER Part H & Oculus
✔ d. Any on-site hydraulic connections between aquifers;
S□ N/A □ N/C □
ER Part H & Oculus
✔ e. Site stratigraphy and aquifer characteristics for confining layers,
semi-confining layers, and all aquifers below the landfill site that may
be affected by the landfill;
□ □ N/C □
ER Part H & Oculus
S N/A ✔ f. Description of topography, soil types, and surface water drainage
systems;
□ □ N/C □
ER Part H & Oculus
S N/A ✔ g. Inventory of all public and private water wells within a one mile
radius of the landfill including, where available, well top of casing and
bottom elevations, name of owner, age and usage of each well,
stratigraphic unit screened, well construction technique, and static
water level;
□ □ N/C □
ER Part H & Oculus
S N/A ✔ h. Identify and locate any existing contaminated areas on the site;
S□ N/A □ N/C □
ER Part H & Oculus
✔ i. Include a map showing the locations of all potable wells within 500
feet of the waste storage and disposal areas;
□ □ N/C □
ER Part H & Oculus
S N/A ✔ 2. Report signed, sealed, and dated by P.E. and/or P.G.;
PART I. GEOTECHNICAL INVESTIGATION REQUIREMENTS (62-701.410(2), FAC)
LOCATION
S □ ER Part I & Oculus N/A □ N/C □
✔ 1. Submit a geotechnical site investigation report defining the engineering
properties of the site including at least the following:
S □ ER Part I & Oculus N/A □ N/C □ a. Description of subsurface conditions including soil stratigraphy
and ground water table conditions;
S □ ER Part I & Oculus N/A □ N/C □
✔ b. Investigate for the presence of muck, previously filled areas, soft
ground, lineaments, and sink holes;
S □ ER Part I & Oculus N/A □ N/C □
✔ c. Estimates of average and maximum high water table across the
site;
S□ ER Part I & Oculus N/A □ N/C □
✔ d. Foundation analysis including:
S□ N/A □ N/C □
ER Part I & Oculus
✔ (1) Foundation bearing capacity analysis;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 23 of 36
LOCATION PART I CONTINUED
S□ ER Part I & Oculus N/A □ N/C □
✔ (2) Total and differential subgrade settlement analysis;
S□ N/A □ N/C □
ER Part I & Oculus
✔ (3) Slope stability analysis;
S□ N/A □ N/C □
ER Part I & Oculus
✔ e. Description of methods used in the investigation, and includes soil
boring logs, laboratory results, analytical calculations, cross sections,
interpretations, and conclusions;
S □ ER Part I & Oculus N/A □ N/C □
✔ f. An evaluation of fault areas, seismic impact zones, and unstable
areas as described in 40 CFR 258.13, 40 CFR 258.14, and 40 CFR
258.15;
S □ ER Part I & Oculus N/A □ N/C □
✔ 2. Report signed, sealed, and dated by P.E. and/or P.G.;
PART J. VERTICAL EXPANSION OF LANDFILLS (62-701.430, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Describe how the vertical expansion shall not cause or contribute to
leachate leakage from the existing landfill, shall not cause objectionable
odors, or adversely affect the closure design of the existing landfill;
S □ □
N/A ✔ N/C □ 2. Describe how the vertical expansion over unlined landfills will meet the
requirements of Rule 62-701.400, FAC with the exceptions of Rule 62-
701.430(1)(c), FAC;
S□ □ □
N/A ✔ N/C 3. Provide foundation and settlement analysis for the vertical expansion;
S□ N/A □
✔ N/C □ 4. Provide total settlement calculations demonstrating that the final elevations
of the lining system, gravity drainage, and no other component of the design
will be adversely affected;
S □ □
N/A ✔ N/C □ 5. Minimum stability factor of safety of 1.5 for the lining system component
interface stability and for deep stability;
S □ □
N/A ✔ N/C □ 6. Provide documentation to show the surface water management system
will not be adversely affected by the vertical expansion;
S □ □
N/A ✔ N/C □ 7. Provide gas control designs to prevent accumulation of gas under the new
liner for the vertical expansion;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 24 of 36
PART K. LANDFILL OPERATION REQUIREMENTS (62-701.500, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Provide documentation that the landfill will have at least one trained
operator during operation and at least one trained spotter at each working
face; (62-701.500(1), FAC)
S □ □
N/A ✔ N/C □ 2. Provide a landfill operation plan including procedures for: (62-701.500(2),
FAC)
S□ □ □
N/A ✔ N/C a. Designating responsible operating and maintenance personnel;
S□ N/A □
✔ N/C □ b. Emergency preparedness and response, as required in subsection
62-701.320(16), FAC;
S□ □ □
N/A ✔ N/C c. Controlling types of waste received at the landfill;
S□ N/A □
✔ N/C □ d. Weighing incoming waste;
S□ N/A □
✔ N/C □ e. Vehicle traffic control and unloading;
S□ N/A □
✔ N/C □ f. Method and sequence of filling waste;
S□ N/A □
✔ N/C □ g. Waste compaction and application of cover;
S□ N/A □
✔ N/C □ h. Operations of gas, leachate, and stormwater controls;
S□ N/A □
✔ N/C □ i. Water quality monitoring;
S□ N/A □
✔ N/C □ j. Maintaining and cleaning the leachate collection system;
S□ N/A □
✔ N/C □ 3. Provide a description of the landfill operation record to be used at the
landfill, details as to location of where various operational records will be kept
(i.e. DEP permit, engineering drawings, water quality records, etc.); (62-
701.500(3), FAC)
S □ □
N/A ✔ N/C □ 4. Describe the waste records that will be compiled monthly and provided to
the Department annually; (62-701.500(4), FAC)
S□ □ □
N/A ✔ N/C 5. Describe methods of access control; (62-701.500(5), FAC)
S□ N/A □
✔ N/C □ 6. Describe load checking program to be implemented at the landfill to
discourage disposal of unauthorized waste at the landfill; (62-701.500(6),
FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 25 of 36
LOCATION PART K CONTINUED
S □ □
N/A ✔ N/C □ 7. Describe procedures for spreading and compacting waste at the landfill
that include: (62-701.500(7), FAC)
S□ □ □
N/A ✔ N/C a. Waste layer thickness and compaction frequencies;
S□ N/A □
✔ N/C □ b. Special considerations for first layer of waste placed above the
liner and leachate collection system;
S □ □
N/A ✔ N/C □ c. Slopes of cell working face and side grades above land surface,
and planned lift depths during operation;
S□ □ □
N/A ✔ N/C d. Maximum width of working face;
S□ N/A □
✔ N/C □ e. Description of type of initial cover to be used at the facility that
controls:
S□ □ □
N/A ✔ N/C (1) Vector breeding/animal attraction;
S□ N/A □
✔ N/C □ (2) Fires;
S□ N/A □
✔ N/C □ (3) Odors;
S□ N/A □
✔ N/C □ (4) Blowing litter;
S□ N/A □
✔ N/C □ (5) Moisture infiltration;
S□ N/A □
✔ N/C □ f. Procedures for applying initial cover, including minimum cover
frequencies;
S□ □ □
N/A ✔ N/C g. Procedures for applying intermediate cover;
S□ N/A □
✔ N/C □ h. Time frames for applying final cover;
S□ N/A □
✔ N/C □ i. Procedures for controlling scavenging and salvaging;
S□ N/A □
✔ N/C □ j. Description of litter policing methods;
S□ N/A □
✔ N/C □ k. Erosion control procedures;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 26 of 36
LOCATION PART K CONTINUED
S □ □
N/A ✔ N/C □ 8. Describe operational procedures for leachate management including: (62-
701.500(8), FAC)
S□ □ □
N/A ✔ N/C a. Leachate level monitoring;
S□ N/A □
✔ N/C □ b. Operation and maintenance of leachate collection and removal
system, and treatment as required;
S □ □
N/A ✔ N/C □ c. Procedures for managing leachate if it becomes regulated as a
hazardous waste;
S □ □
N/A ✔ N/C □ d. Identification of treatment or disposal facilities that may be used
for off-site discharge and treatment of leachate;
S □ □
N/A ✔ N/C □ e. Contingency plan for managing leachate during emergencies or
equipment problems;
S □ □
N/A ✔ N/C □ f. Procedures for recording quantities of leachate generated in
gal/day and including this in the operating record;
S □ □
N/A ✔ N/C □ g. Procedures for comparing precipitation experienced at the landfill
with leachate generation rates and including this information in the
operating record;
S □ □
N/A ✔ N/C □ h. Procedures for water pressure cleaning or video inspecting
leachate collection systems;
S □ □
N/A ✔ N/C □ 9. Describe how the landfill receiving degradable wastes shall implement a
gas management system meeting the requirements of Rule 62-701.530,
FAC; (62-701.500(9), FAC)
S □ □
N/A ✔ N/C □ 10. Describe procedures for operating and maintaining the landfill stormwater
management system to comply with the requirements of Rule 62-701.400(9),
FAC; (62-701.500(10), FAC)
S□ □ □
N/A ✔ N/C 11. Equipment and operation feature requirements; (62-701.500(11), FAC)
S□ N/A □
✔ N/C □ a. Sufficient equipment for excavating, spreading, compacting, and
covering waste;
S □ □
N/A ✔ N/C □ b. Reserve equipment or arrangements to obtain additional
equipment within 24 hours of breakdown;
S □ □
N/A ✔ N/C □ c. Communications equipment;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 27 of 36
LOCATION PART K CONTINUED
S□ □ □
N/A ✔ N/C d. Dust control methods;
S□ N/A □
✔ N/C □ e. Fire protection capabilities and procedures for notifying local fire
department authorities in emergencies;
S□ □ □
N/A ✔ N/C f. Litter control devices;
S□ N/A □
✔ N/C □ g. Signs indicating operating authority, traffic flow, hours of
operation, and disposal restrictions;
S □ □
N/A ✔ N/C □ 12. Provide a description of all-weather access road, inside perimeter road,
and other on-site roads necessary for access at the landfill; (62-701.500(12),
FAC)
S □ N/A □ N/C □
✔ 13. Additional record keeping and reporting requirements; (62-701.500(13),
FAC)
S □ N/A □ N/C □
✔ a. Records used for developing permit applications and
supplemental information maintained for the design period of the
landfill;
S □ N/A □ N/C □
✔ b. Monitoring information, calibration and maintenance records, and
copies of reports required by permit maintained for at least 10 years;
S □ N/A □ N/C □
✔ c. Maintain annual estimates of the remaining life of constructed
landfills, and of other permitted areas not yet constructed, and
submit this estimate annually to the Department;
S □ N/A □ N/C □
✔ d. Procedures for archiving and retrieving records which are more
than five years old;
PART L. WATER QUALITY MONITORING REQUIREMENTS (62-701.510, FAC)
LOCATION
S ✔ □ ER Part L & Oculus 2013
N/A □ N/C □ 1. A water quality monitoring plan shall be submitted describing the proposed
ground water and surface water monitoring systems, and shall meet at least
the following requirements:
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A a. Based on the information obtained in the hydrogeological
investigation and signed, dated, and sealed by the P.G. or P.E. who
prepared it; (62-701.510(2)(a), FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 28 of 36
LOCATION PART L CONTINUED
□
S ✔
ER Part L & Oculus 2013
N/A □ N/C □ b. All sampling and analysis performed in accordance with Chapter
62-160, FAC; (62-701.510(2)(b), FAC)
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A c. Ground water monitoring requirements; (62-701.510(3), FAC)
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (1) Detection wells located downgradient from and within 50 feet
of disposal units;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (2) Downgradient compliance wells as required;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (3) Background wells screened in all aquifers below the landfill
that may be affected by the landfill;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (4) Location information for each monitoring well;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (5) Well spacing no greater than 500 feet apart for downgradient
wells and no greater than 1500 feet apart for upgradient
wells, unless site specific conditions justify alternate well
spacings;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (6) Properly selected well screen locations;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (7) Monitoring wells constructed to provide representative
ground water samples;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (8) Procedures for properly abandoning monitoring wells;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (9) Detailed description of detection sensors, if proposed;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ d. Surface water monitoring requirements; (62-701.510(4), FAC)
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (1) Location of and justification for all proposed surface water
monitoring points;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (2) Each monitoring location to be marked and its position
determined by a registered Florida land surveyor;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A e. Initial and routine sampling frequency and requirements; (62-
701.510(5), FAC)
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (1) Initial background ground water and surface water sampling
and analysis requirements;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 29 of 36
LOCATION PART L CONTINUED
□
S ✔
ER Part L & Oculus 2013
N/A □ N/C □ (2) Routine monitoring well sampling and analysis requirements;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ (3) Routine surface water sampling and analysis requirements;
S□ N/A □ N/C □
ER Part L & Oculus 2013
✔ f. Describe procedures for implementing evaluation monitoring,
prevention measures, and corrective action as required; (62-
701.510(6), FAC)
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A g. Water quality monitoring report requirements; (62-701.510(8),
FAC)
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (1) Semi-annual report requirements; (see paragraphs 62-
701.510(5)(c) and (d), FAC for sampling frequencies)
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (2) Documentation that the water quality data shall be provided
to the Department in an electronic format consistent with
requirements for importing into Department databases,
unless an alternate form of submittal is specified in the
permit;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A (3) Two and one-half year report requirements, or every five
years if in long-term care, signed dated, and sealed by P.G.
or P.E.;
PART M. SPECIAL WASTE HANDLING REQUIREMENTS (62-701.520, FAC)
LOCATION
S□ □ □
N/A ✔ N/C 1. Describe procedures for managing motor vehicles; (62-701.520(1), FAC)
S□ N/A □
✔ N/C □ 2. Describe procedures for landfilling shredded waste; (62-701.520(2), FAC)
S□ N/A □
✔ N/C □ 3. Describe procedures for asbestos waste disposal; (62-701.520(3), FAC)
S□ N/A □
✔ N/C □ 4. Describe procedures for disposal or management of contaminated soil;
(62-701.520(4), FAC)
S □ □
N/A ✔ N/C □ 5. Describe procedures for disposal of biological wastes; (62-701.520(5),
FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 30 of 36
PART N. GAS MANAGEMENT SYSTEM REQUIREMENTS (62-701.530, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Provide documentation for a gas management system that will: (62-
701.530(1), FAC)
S □ □
N/A ✔ N/C □ a. Be designed to prevent concentrations of combustible gases from
exceeding 25% the LEL in structures and 100% the LEL at the
property boundary;
S□ □ □
N/A ✔ N/C b. Be designed for site specific conditions;
S□ N/A □
✔ N/C □ c. Be designed to reduce gas pressure in the interior of the landfill;
S□ N/A □
✔ N/C □ d. Be designed to not interfere with the liner, leachate control
system, or final cover;
S □ □
N/A ✔ N/C □ 2. Provide documentation that will describe locations, construction details,
and procedures for monitoring gas at ambient monitoring points and with soil
monitoring probes; (62-701.530(2), FAC)
S □ □
N/A ✔ N/C □ 3. Provide documentation describing how the gas remediation plan and odor
remediation plan will be implemented; (62-701.530(3), FAC)
S□ □ □
N/A ✔ N/C 4. Landfill gas recovery facilities; (62-701.530(5), FAC)
S□ N/A □
✔ N/C □ a. Provide information required in Rules 62-701.320(7) and 62-
701.330(3), FAC;
S □ □
N/A ✔ N/C □ b. Provide information required in Rule 62-701.600(4), FAC, where
relevant and practical;
S □ □
N/A ✔ N/C □ c. Provide estimates of current and expected gas generation rates
and description of condensate disposal methods;
S □ □
N/A ✔ N/C □ d. Provide description of procedures for condensate sampling,
analyzing, and data reporting;
S □ □
N/A ✔ N/C □ e. Provide closure plan describing methods to control gas after
recovery facility ceases operation, and any other requirements
contained in Rule 62-701.400(10), FAC;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 31 of 36
PART O. LANDFILL FINAL CLOSURE REQUIREMENTS (62-701.600, FAC)
LOCATION
S□ Oculus N/A □ N/C □
✔ 1. Closure permit requirements; (62-701.600(2), FAC)
S□ N/A □ N/C □
Oculus
✔ a. Application submitted to the Department at least 90 days prior to
final receipt of wastes;
S□ Oculus N/A □ N/C □
✔ b. Closure plan shall include the following:
S□ N/A □ N/C □
Oculus
✔ (1) Closure design plan;
S□ N/A □ N/C □
Oculus
✔ (2) Closure operation plan;
S□ N/A □ N/C □
Oculus
✔ (3) Plan for long-term care;
S□ N/A □ N/C □
ER Part R
✔ (4) A demonstration that proof of financial assurance for long-
term care will be provided;
S □ Oculus N/A □ N/C □
✔ 2. Closure design plan including the following requirements: (62-701.600(3),
FAC)
S□ Oculus N/A □ N/C □
✔ a. Plan sheet showing phases of site closing;
S□ N/A □ N/C □
Oculus
✔ b. Drawings showing existing topography and proposed final grades;
S□ N/A □ N/C □
Oculus
✔ c. Provisions to close units when they reach approved design
dimensions;
S□ Oculus N/A □ N/C □
✔ d. Final elevations before settlement;
S□ N/A □ N/C □
Oculus
✔ e. Side slope design including benches, terraces, down slope
drainage ways, energy dissipaters, and description of expected
precipitation effects;
S□ Oculus N/A □ N/C □
✔ f. Final cover installation plans including:
S□ N/A □ N/C □
Oculus
✔ (1) CQA plan for installing and testing final cover;
S□ N/A □ N/C □
Oculus
✔ (2) Schedule for installing final cover after final receipt of waste;
S□ N/A □ N/C □
Oculus
✔ (3) Description of drought resistant species to be used in the
vegetative cover;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 32 of 36
LOCATION PART O CONTINUED
S □ Oculus N/A □ N/C □
✔ (4) Top gradient design to maximize runoff and minimize
erosion;
S □ Oculus N/A □ N/C □
✔ (5) Provisions for cover material to be used for final cover
maintenance;
S□ Oculus N/A □ N/C □
✔ g. Final cover design requirements;
S□ N/A □ N/C □
Oculus
✔ (1) Protective soil layer design;
S□ N/A □ N/C □
Oculus
✔ (2) Barrier soil layer design;
S□ N/A □ N/C □
Oculus
✔ (3) Erosion control vegetation;
S□ N/A □ N/C □
Oculus
✔ (4) Geomembrane barrier layer design;
S□ N/A □ N/C □
Oculus
✔ (5) Geosynthetic clay liner design, if used;
S□ N/A □ N/C □
Oculus
✔ (6) Stability analysis of the cover system and the disposed
waste;
S□ Oculus N/A □ N/C □
✔ h. Proposed method of stormwater control;
S□ N/A □ N/C □
Oculus
✔ i. Proposed method of access control;
S□ N/A □ N/C □
Oculus
✔ j. Description of the proposed or existing gas management system
which complies with Rule 62-701.530, FAC;
S□ Oculus N/A □ N/C □
✔ 3. Closure operation plan shall include: (62-701.600(4), FAC)
S□ N/A □ N/C □
Oculus
✔ a. Detailed description of actions which will be taken to close the
landfill;
S□ Oculus N/A □ N/C □
✔ b. Time schedule for completion of closing and long-term care;
S□ N/A □ N/C □
Oculus
✔ c. Describe proposed method for demonstrating financial assurance
for long-term care;
□ □ N/C □
ER Part L & Oculus 2013
S ✔ N/A d. Operation of the water quality monitoring plan required in Rule 62-
701.510, FAC;
S □ Oculus N/A □ N/C □
✔ e. Development and implementation of gas management system
required in Rule 62-701.530, FAC;
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 33 of 36
LOCATION PART O CONTINUED
S □ Oculus December 1994
N/A □ N/C □
✔ 4. Certification of closure construction completion including: (62-701.600(6),
FAC)
S□ Oculus December 1994
N/A □ N/C □
✔ a. Survey monuments; (62-701.600(6)(a), FAC)
S□ N/A □ N/C □
Oculus December 1994
✔ b. Final survey report; (62-701.600(6)(b), FAC)
S□ N/A □ N/C □
Oculus December 1994
✔ 5. Declaration to the public; (62-701.600(7), FAC)
S□ N/A □ N/C □
Oculus December 1994
✔ 6. Official date of closing; (62-701.600(8), FAC)
S□ N/A □ N/C □
Oculus December 1994
✔ 7. Justification for and detailed description of procedures to be followed for
temporary closure of the landfill, if desired; (62-701.600(9), FAC)
PART P. OTHER CLOSURE PROCEDURES (62-701.610, FAC)
LOCATION
S □ □
N/A ✔ N/C □ 1. Describe how the requirements for use of closed solid waste disposal
areas will be achieved; (62-701.610(1), FAC)
S □ □
N/A ✔ N/C □ 2. Describe how the requirements for relocation of wastes will be achieved;
(62-701.610(2), FAC)
PART Q. LONG-TERM CARE (62-701.620, FAC)
LOCATION
S ✔ □ ER Part Q & Attachment C
N/A □ N/C □ 1. Maintaining the gas collection and monitoring system; (62-701.620(5),
FAC)
□
S ✔
ER Part Q & Attachment C
N/A □ N/C □ 2. Stabilization report requirements; (62-701.620(6), FAC)
S□ N/A □ N/C □
ER Part Q & Attachment C
✔ 3. Right of access; (62-701.620(7), FAC)
S□ N/A □ N/C □
ER Part Q & Attachment C
✔ 4. Requirements for replacement of monitoring devices; (62-701.620(8), FAC)
S□ N/A □ N/C □
ER Part Q & Attachment C
✔ 5. Completion of long-term care signed and sealed by professional engineer;
(62-701.620(9), FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 34 of 36
PART R. FINANCIAL ASSURANCE (62-701.630, FAC)
LOCATION
□
S ✔
ER Part R & Attachment D
N/A □ N/C □ 1. Provide cost estimates for closing, long-term care, and corrective action
costs estimated by a P.E. for a third party performing the work, on a per unit
basis, with the source of estimates indicated; (62-701.630(3) & (7), FAC)
□
S ✔
ER Part R & Attachment D
N/A □ N/C □ 2. Describe procedures for providing annual cost adjustments to the
Department based on inflation and changes in the closing, long-term care,
and corrective action plans; (62-701.630(4) & (8), FAC)
□
S ✔
ER Part R & Attachment D
N/A □ N/C □ 3. Describe funding mechanisms for providing proof of financial assurance
and include appropriate financial assurance forms. (62-701.630(5), (6), & (9),
FAC)
DEP Form 62-701.900(1)
Effective August 12, 2012
Page 35 of 36
ATTACHMENT B
FIGURES
Figure D.9.a
Figure D.9.b
Figure D.9.c
80
80
50
50
100
100
90
90
70
70
72 75 77 76 65 68 64 67 71 66 69
62
WRIGHT LANDFILL
Okaloosa County, FL
WRIGHT LANDFILL
MAP PROJECTION: CONTOUR DISCLAIMER:
Lambert Conformal Conic Projection Okaloosa County hereby expressly disclaims any
Stateplane: Florida North (0903) liability for errors or omissions in the tpgmn (contour)
CONTOUR LINES
NAD 1983(90), NAVD 1988. data. The contour data is useable for planning
Wright Landfill
purposes only and it is not a survey, or survey grade
®
PUBLIC RECORD: data. These are qualified differently for various areas
Percey Lane & N Beal Extension
of the county due to data collection methods and
PROPERTY LINES
This map was created by Okaloosa County GIS
and is in the public domain pursuant processing. As a whole, these are suitable for
Fort Walton Beach FL, 32547
to Chapter 119, Florida Statutes. planning purposes and not as surveys.
I
S
L
A
K
O
DISCLAIMER:
GPS: 30.466667,:-86.63889
G
CONTOUR SOURCE:
S
Okaloosa County hereby expressly disclaims
Aerial Image Source imagery NorthOkaloosa10-06-03.ecw
any liability for errors or omissions in
these maps, indexes or legends.
300 150 0 300 600 900 1,200
Feet
Y
T
N
U
O
C
PARCEL DISCLAIMER:
Figure E.3 This Property Ownership Map was prepared for
1 in = 655 ft
appraisal purposes only. It is not intended Produced by:
for conveyances, nor is it a survey. Okaloosa County GIS
April 2014
Project: \\gissv2\MapDocs\PublicWorks\Landfill\WrightLandfill.mxd, \\gissv2\gisprojects\PDFdocs\Landfill\WrightLandfill.PDF, Image Date: 10/2003, By: K.Steele
ATTACHMENT C
PART L DATA WITH 2014 S1 UPDATE
Table ‐ Part L Update
Summary of Detected Groundwater Parameters ‐ Compliance Monitoring 2008 S1 to 2014 S1
Wright Landfill
Well ID Date Parameter Limit Result Units Qualifier Period
MW-48S 3/12/09 1,2-Dibromo-3-chloropropane 0.2* 0.011 µg/L 09S1
MW-12S 8/20/09 1,2-Dibromo-3-chloropropane 0.2* 0.02 µg/L I 09S2
MW-14S 8/20/09 1,2-Dibromo-3-chloropropane 0.2* 0.024 µg/L 09S2
MW-15S 8/20/09 1,2-Dibromo-3-chloropropane 0.2* 0.06 µg/L 09S2
MW-23S 8/20/09 1,2-Dibromo-3-chloropropane 0.2* 0.053 µg/L 09S2
MW-50S 8/20/09 1,2-Dibromo-3-chloropropane 0.2* 0.12 µg/L 09S2
MW-13S 8/25/09 1,2-Dibromo-3-chloropropane 0.2* 0.008 µg/L I 09S2
MW-19D 10/7/10 1,2-Dibromo-3-chloropropane 0.2* 0.0049 µg/L I 10S2
MW-50S 10/11/10 1,2-Dibromo-3-chloropropane 0.2* 0.073 µg/L 10S2
MW-48S 10/12/10 1,2-Dibromo-3-chloropropane 0.2* 0.012 µg/L I 10S2
MW-48S 2/21/11 1,2-Dibromo-3-chloropropane 0.2* 0.013 µg/L I 11S1
MW-11D 2/19/08 1,2-Dichlorobenzene 600* 0.16 µg/L 08S1
MW-12S 2/19/08 1,2-Dichlorobenzene 600* 0.45 µg/L 08S1
MW-23S 2/20/08 1,2-Dichlorobenzene 600* 0.3 µg/L 08S1
MW-15S 2/21/08 1,2-Dichlorobenzene 600* 0.3 µg/L 08S1
MW-48S 2/21/08 1,2-Dichlorobenzene 600* 0.2 µg/L 08S1
MW-50S 2/21/08 1,2-Dichlorobenzene 600* 0.25 µg/L 08S1
MW-15S 8/20/09 1,2-Dichlorobenzene 600* 0.61 µg/L I 09S2
MW-8S 3/26/10 1,2-Dichloroethane 3* 0.69 µg/L I 10S1
MW-11D 2/19/08 1,4-Dichlorobenzene 75* 2.1 µg/L 08S1
MW-12S 2/19/08 1,4-Dichlorobenzene 75* 3.9 µg/L 08S1
MW-13S 2/20/08 1,4-Dichlorobenzene 75* 0.91 µg/L 08S1
MW-23S 2/20/08 1,4-Dichlorobenzene 75* 3.8 µg/L 08S1
MW-15S 2/21/08 1,4-Dichlorobenzene 75* 1.9 µg/L 08S1
MW-48S 2/21/08 1,4-Dichlorobenzene 75* 1.8 µg/L 08S1
MW-50S 2/21/08 1,4-Dichlorobenzene 75* 1.9 µg/L 08S1
MW-12S 8/25/08 1,4-Dichlorobenzene 75* 3 µg/L 08S2
MW-15S 8/25/08 1,4-Dichlorobenzene 75* 1.9 µg/L 08S2
MW-11D 8/26/08 1,4-Dichlorobenzene 75* 0.61 µg/L 08S2
MW-23S 8/26/08 1,4-Dichlorobenzene 75* 5.4 µg/L 08S2
MW-15S 3/11/09 1,4-Dichlorobenzene 75* 2.4 µg/L 09S1
MW-50S 3/11/09 1,4-Dichlorobenzene 75* 1.8 µg/L 09S1
MW-11D 3/12/09 1,4-Dichlorobenzene 75* 1.9 µg/L 09S1
MW-12S 3/12/09 1,4-Dichlorobenzene 75* 2.5 µg/L 09S1
MW-23S 3/12/09 1,4-Dichlorobenzene 75* 5.1 µg/L 09S1
MW-48S 3/12/09 1,4-Dichlorobenzene 75* 3 µg/L 09S1
MW-12S 8/20/09 1,4-Dichlorobenzene 75* 2.5 µg/L 09S2
MW-15S 8/20/09 1,4-Dichlorobenzene 75* 4 µg/L 09S2
MW-23S 8/20/09 1,4-Dichlorobenzene 75* 5.1 µg/L 09S2
MW-50S 8/20/09 1,4-Dichlorobenzene 75* 2 µg/L 09S2
MW-13S 8/25/09 1,4-Dichlorobenzene 75* 1.4 µg/L 09S2
MW-12S 3/29/10 1,4-Dichlorobenzene 75* 1.6 µg/L 10S1
MW-14S 3/29/10 1,4-Dichlorobenzene 75* 0.5 µg/L I 10S1
MW-15S 3/29/10 1,4-Dichlorobenzene 75* 2.6 µg/L 10S1
MW-50S 3/29/10 1,4-Dichlorobenzene 75* 1.4 µg/L 10S1
MW-23S 3/30/10 1,4-Dichlorobenzene 75* 6.5 µg/L 10S1
MW-48S 3/30/10 1,4-Dichlorobenzene 75* 1.7 µg/L 10S1
MW-14S 10/7/10 1,4-Dichlorobenzene 75* 0.55 µg/L I 10S2
MW-15S 10/11/10 1,4-Dichlorobenzene 75* 1.1 µg/L 10S2
MW-50S 10/11/10 1,4-Dichlorobenzene 75* 1.2 µg/L 10S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-48S 10/12/10 1,4-Dichlorobenzene 75* 1.5 µg/L 10S2
MW-11D 10/13/10 1,4-Dichlorobenzene 75* 0.56 µg/L I 10S2
MW-12S 10/13/10 1,4-Dichlorobenzene 75* 2.4 µg/L 10S2
MW-23S 10/13/10 1,4-Dichlorobenzene 75* 5.3 µg/L 10S2
MW-13S 2/18/11 1,4-Dichlorobenzene 75* 1.2 µg/L 11S1
MW-15S 2/18/11 1,4-Dichlorobenzene 75* 1.2 µg/L 11S1
MW-50S 2/18/11 1,4-Dichlorobenzene 75* 3.1 µg/L 11S1
MW-11D 2/21/11 1,4-Dichlorobenzene 75* 0.78 µg/L I 11S1
MW-12S 2/21/11 1,4-Dichlorobenzene 75* 2.7 µg/L 11S1
MW-23S 2/21/11 1,4-Dichlorobenzene 75* 5.3 µg/L 11S1
MW-24D 2/21/11 1,4-Dichlorobenzene 75* 3.1 µg/L 11S1
MW-48S 2/21/11 1,4-Dichlorobenzene 75* 0.96 µg/L I 11S1
MW-11D 9/23/11 1,4-Dichlorobenzene 75* 0.56 µg/L 11S2
MW-12S 9/23/11 1,4-Dichlorobenzene 75* 2.4 µg/L 11S2
MW-13S 9/23/11 1,4-Dichlorobenzene 75* 1.2 µg/L 11S2
MW-14S 9/23/11 1,4-Dichlorobenzene 75* 7.5 µg/L 11S2
MW-15S 9/23/11 1,4-Dichlorobenzene 75* 1.4 µg/L 11S2
MW-23S 9/23/11 1,4-Dichlorobenzene 75* 4.6 µg/L 11S2
MW-48S 9/23/11 1,4-Dichlorobenzene 75* 0.53 µg/L 11S2
MW-50S 9/23/11 1,4-Dichlorobenzene 75* 3.2 µg/L 11S2
MW-48S 2/21/12 1,4-Dichlorobenzene 75* 0.65 µg/L I 12S1
MW-11D 2/22/12 1,4-Dichlorobenzene 75* 0.69 µg/L I 12S1
MW-12S 2/22/12 1,4-Dichlorobenzene 75* 2.2 µg/L 12S1
MW-13S 2/22/12 1,4-Dichlorobenzene 75* 3.8 µg/L 12S1
MW-14S 2/22/12 1,4-Dichlorobenzene 75* 0.79 µg/L I 12S1
MW-50S 2/22/12 1,4-Dichlorobenzene 75* 2.8 µg/L 12S1
MW-56D 2/22/12 1,4-Dichlorobenzene 75* 1.6 µg/L 12S1
MW-23S 2/23/12 1,4-Dichlorobenzene 75* 3.9 µg/L 12S1
MW-24D 2/23/12 1,4-Dichlorobenzene 75* 3 µg/L 12S1
MW-23S 10/16/12 1,4-Dichlorobenzene 75* 3.1 µg/L 12S2
MW-24D 10/16/12 1,4-Dichlorobenzene 75* 3.1 µg/L 12S2
MW-12S 10/17/12 1,4-Dichlorobenzene 75* 1.5 µg/L 12S2
MW-48S 10/17/12 1,4-Dichlorobenzene 75* 1.9 µg/L 12S2
MW-12S 2/27/13 1,4-Dichlorobenzene 75* 2 µg/L 13S1
MW-23S 2/27/13 1,4-Dichlorobenzene 75* 3.5 µg/L 13S1
MW-24D 2/27/13 1,4-Dichlorobenzene 75* 3 µg/L 13S1
MW-48S 2/27/13 1,4-Dichlorobenzene 75* 0.64 µg/L I 13S1
MW-12S 9/17/13 1,4-Dichlorobenzene 75* 0.69 µg/L I 13S2
MW-48S 9/17/13 1,4-Dichlorobenzene 75* 1.4 µg/L 13S2
MW-23S 9/19/13 1,4-Dichlorobenzene 75* 4.6 µg/L 13S2
MW-24D 9/19/13 1,4-Dichlorobenzene 75* 3 µg/L 13S2
MW-10S 2/7/14 1,4-Dichlorobenzene 75* <0.5 µg/L 14S1
MW-12S 2/7/14 1,4-Dichlorobenzene 75* 1.5 µg/L 14S1
MW-23S 2/7/14 1,4-Dichlorobenzene 75* 3.9 µg/L 14S1
MW-24D 2/7/14 1,4-Dichlorobenzene 75* 3 µg/L 14S1
MW26D 2/7/14 1,4-Dichlorobenzene 75* <0.5 µg/L 14S1
MW48S 2/7/14 1,4-Dichlorobenzene 75* 1.7 µg/L 14S1
MW-56D 2/7/14 1,4-Dichlorobenzene 75* <0.5 µg/L 14S1
MW-8S 2/7/14 1,4-Dichlorobenzene 75* <0.5 µg/L 14S1
MW-11D 10/13/10 Acetone 6300*** 8.9 µg/L I 10S2
MW-12S 10/13/10 Acetone 6300*** 20.1 µg/L 10S2
MW-23S 10/13/10 Acetone 6300*** 7.4 µg/L I 10S2
MW-24D 10/13/10 Acetone 6300*** 8.7 µg/L I 10S2
MW-24D 9/19/13 Acetone 6300*** 6.5 µg/L I 13S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-11D 2/19/08 Ammonia (N) 2.8*** 7 mg/L 08S1
MW-12S 2/19/08 Ammonia (N) 2.8*** 7.7 mg/L 08S1
MW-13S 2/20/08 Ammonia (N) 2.8*** 0.99 mg/L 08S1
MW-19D 2/20/08 Ammonia (N) 2.8*** 2.6 mg/L 08S1
MW-23S 2/20/08 Ammonia (N) 2.8*** 12 mg/L 08S1
MW-24D 2/20/08 Ammonia (N) 2.8*** 0.18 mg/L 08S1
MW-14S 2/21/08 Ammonia (N) 2.8*** 7.7 mg/L 08S1
MW-15S 2/21/08 Ammonia (N) 2.8*** 11 mg/L 08S1
MW-48S 2/21/08 Ammonia (N) 2.8*** 5.1 mg/L 08S1
MW-50S 2/21/08 Ammonia (N) 2.8*** 22 mg/L 08S1
MW-56D 2/21/08 Ammonia (N) 2.8*** 1.8 mg/L 08S1
MW-13S 8/21/08 Ammonia (N) 2.8*** 4.1 mg/L 08S2
MW-14S 8/21/08 Ammonia (N) 2.8*** 3.6 mg/L 08S2
MW-18D 8/21/08 Ammonia (N) 2.8*** 0.028 mg/L 08S2
MW-19D 8/21/08 Ammonia (N) 2.8*** 1.8 mg/L 08S2
MW-21D 8/21/08 Ammonia (N) 2.8*** 0.52 mg/L 08S2
MW-12S 8/25/08 Ammonia (N) 2.8*** 8.7 mg/L 08S2
MW-15S 8/25/08 Ammonia (N) 2.8*** 13 mg/L 08S2
MW-48S 8/25/08 Ammonia (N) 2.8*** 7.1 mg/L 08S2
MW-50S 8/25/08 Ammonia (N) 2.8*** 28 mg/L 08S2
MW-56D 8/25/08 Ammonia (N) 2.8*** 2.3 mg/L 08S2
MW-11D 8/26/08 Ammonia (N) 2.8*** 0.37 mg/L 08S2
MW-23S 8/26/08 Ammonia (N) 2.8*** 11 mg/L 08S2
MW-26D 8/26/08 Ammonia (N) 2.8*** 0.022 mg/L 08S2
MW-13S 3/11/09 Ammonia (N) 2.8*** 0.62 mg/L 09S1
MW-14S 3/11/09 Ammonia (N) 2.8*** 3.9 mg/L 09S1
MW-15S 3/11/09 Ammonia (N) 2.8*** 14 mg/L 09S1
MW-19D 3/11/09 Ammonia (N) 2.8*** 5 mg/L 09S1
MW-21D 3/11/09 Ammonia (N) 2.8*** 0.9 mg/L 09S1
MW-50S 3/11/09 Ammonia (N) 2.8*** 22 mg/L 09S1
MW-11D 3/12/09 Ammonia (N) 2.8*** 8.3 mg/L 09S1
MW-12S 3/12/09 Ammonia (N) 2.8*** 8.2 mg/L 09S1
MW-23S 3/12/09 Ammonia (N) 2.8*** 12 mg/L 09S1
MW-48S 3/12/09 Ammonia (N) 2.8*** 7.7 mg/L 09S1
MW-56D 3/12/09 Ammonia (N) 2.8*** 2.2 mg/L 09S1
MW-11D 8/20/09 Ammonia (N) 2.8*** 0.34 mg/L 09S2
MW-12S 8/20/09 Ammonia (N) 2.8*** 7.4 mg/L 09S2
MW-14S 8/20/09 Ammonia (N) 2.8*** 5.9 mg/L 09S2
MW-15S 8/20/09 Ammonia (N) 2.8*** 23 mg/L 09S2
MW-18D 8/20/09 Ammonia (N) 2.8*** 0.03 mg/L I 09S2
MW-19D 8/20/09 Ammonia (N) 2.8*** 2.4 mg/L 09S2
MW-23S 8/20/09 Ammonia (N) 2.8*** 11 mg/L 09S2
MW-48S 8/20/09 Ammonia (N) 2.8*** 5.5 mg/L 09S2
MW-50S 8/20/09 Ammonia (N) 2.8*** 24 mg/L 09S2
MW-56D 8/20/09 Ammonia (N) 2.8*** 2.7 mg/L 09S2
MW-13S 8/25/09 Ammonia (N) 2.8*** 4.7 mg/L 09S2
MW-11D 3/29/10 Ammonia (N) 2.8*** 0.41 mg/L 10S1
MW-12S 3/29/10 Ammonia (N) 2.8*** 6.9 mg/L 10S1
MW-13S 3/29/10 Ammonia (N) 2.8*** 0.15 mg/L 10S1
MW-14S 3/29/10 Ammonia (N) 2.8*** 4 mg/L 10S1
MW-15S 3/29/10 Ammonia (N) 2.8*** 16.6 mg/L 10S1
MW-19D 3/29/10 Ammonia (N) 2.8*** 0.049 mg/L I 10S1
MW-21D 3/29/10 Ammonia (N) 2.8*** 0.35 mg/L 10S1
MW-50S 3/29/10 Ammonia (N) 2.8*** 14.3 mg/L 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-23S 3/30/10 Ammonia (N) 2.8*** 12.3 mg/L 10S1
MW-48S 3/30/10 Ammonia (N) 2.8*** 6.6 mg/L 10S1
MW-56D 3/30/10 Ammonia (N) 2.8*** 1.6 mg/L 10S1
MW-13S 10/7/10 Ammonia (N) 2.8*** 1.6 mg/L 10S2
MW-14S 10/7/10 Ammonia (N) 2.8*** 6.1 mg/L 10S2
MW-19D 10/7/10 Ammonia (N) 2.8*** 2.6 mg/L 10S2
MW-10S 10/8/10 Ammonia (N) 2.8*** 0.038 mg/L I 10S2
MW-15S 10/11/10 Ammonia (N) 2.8*** 10.2 mg/L 10S2
MW-50S 10/11/10 Ammonia (N) 2.8*** 11.8 mg/L 10S2
MW-48S 10/12/10 Ammonia (N) 2.8*** 5.9 mg/L 10S2
MW-56D 10/12/10 Ammonia (N) 2.8*** 2 mg/L 10S2
MW-11D 10/13/10 Ammonia (N) 2.8*** 1 mg/L 10S2
MW-12S 10/13/10 Ammonia (N) 2.8*** 8.5 mg/L 10S2
MW-23S 10/13/10 Ammonia (N) 2.8*** 12.1 mg/L 10S2
MW-13S 2/18/11 Ammonia (N) 2.8*** 5.8 mg/L 11S1
MW-14S 2/18/11 Ammonia (N) 2.8*** 2.2 mg/L 11S1
MW-15S 2/18/11 Ammonia (N) 2.8*** 9.3 mg/L 11S1
MW-19D 2/18/11 Ammonia (N) 2.8*** 3.8 mg/L 11S1
MW-50S 2/18/11 Ammonia (N) 2.8*** 42.9 mg/L 11S1
MW-10S 2/21/11 Ammonia (N) 2.8*** 0.092 mg/L 11S1
MW-11D 2/21/11 Ammonia (N) 2.8*** 8.3 mg/L 11S1
MW-12S 2/21/11 Ammonia (N) 2.8*** 8.5 mg/L 11S1
MW-21D 2/21/11 Ammonia (N) 2.8*** 0.67 mg/L 11S1
MW-23S 2/21/11 Ammonia (N) 2.8*** 15.7 mg/L 11S1
MW-24D 2/21/11 Ammonia (N) 2.8*** 2.7 mg/L 11S1
MW-48S 2/21/11 Ammonia (N) 2.8*** 5.6 mg/L 11S1
MW-56D 2/21/11 Ammonia (N) 2.8*** 2.1 mg/L 11S1
MW-8S 9/22/11 Ammonia (N) 2.8*** 0.022 mg/L 11S2
MW-11D 9/23/11 Ammonia (N) 2.8*** 1.8 mg/L 11S2
MW-12S 9/23/11 Ammonia (N) 2.8*** 8.2 mg/L 11S2
MW-13S 9/23/11 Ammonia (N) 2.8*** 7.8 mg/L 11S2
MW-14S 9/23/11 Ammonia (N) 2.8*** 11 mg/L 11S2
MW-15S 9/23/11 Ammonia (N) 2.8*** 11 mg/L 11S2
MW-19D 9/23/11 Ammonia (N) 2.8*** 3.7 mg/L 11S2
MW-23S 9/23/11 Ammonia (N) 2.8*** 19.4 mg/L 11S2
MW-48S 9/23/11 Ammonia (N) 2.8*** 3.1 mg/L 11S2
MW-50S 9/23/11 Ammonia (N) 2.8*** 68.2 mg/L 11S2
MW-56D 9/23/11 Ammonia (N) 2.8*** 2 mg/L 11S2
MW-10S 2/21/12 Ammonia (N) 2.8*** 0.46 mg/L 12S1
MW-48S 2/21/12 Ammonia (N) 2.8*** 2.4 mg/L 12S1
MW-11D 2/22/12 Ammonia (N) 2.8*** 4.1 mg/L 12S1
MW-12S 2/22/12 Ammonia (N) 2.8*** 7.1 mg/L 12S1
MW-13S 2/22/12 Ammonia (N) 2.8*** 22.7 mg/L 12S1
MW-14S 2/22/12 Ammonia (N) 2.8*** 4.6 mg/L 12S1
MW-15S 2/22/12 Ammonia (N) 2.8*** 10.8 mg/L 12S1
MW-19D 2/22/12 Ammonia (N) 2.8*** 3.7 mg/L 12S1
MW-21D 2/22/12 Ammonia (N) 2.8*** 0.55 mg/L 12S1
MW-50S 2/22/12 Ammonia (N) 2.8*** 18.4 mg/L 12S1
MW-56D 2/22/12 Ammonia (N) 2.8*** 1.9 mg/L 12S1
MW-23S 2/23/12 Ammonia (N) 2.8*** 12.8 mg/L 12S1
MW-24D 2/23/12 Ammonia (N) 2.8*** 2.2 mg/L 12S1
MW-14S 10/16/12 Ammonia (N) 2.8*** 2.2 mg/L 12S2
MW-15S 10/16/12 Ammonia (N) 2.8*** 9.5 mg/L 12S2
MW-19D 10/16/12 Ammonia (N) 2.8*** 7.3 mg/L 12S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-23S 10/16/12 Ammonia (N) 2.8*** 12.4 mg/L 12S2
MW-24D 10/16/12 Ammonia (N) 2.8*** 2.2 mg/L 12S2
MW-50S 10/16/12 Ammonia (N) 2.8*** 21.8 mg/L 12S2
MW-11D 10/17/12 Ammonia (N) 2.8*** 8.9 mg/L 12S2
MW-12S 10/17/12 Ammonia (N) 2.8*** 5.6 mg/L 12S2
MW-13S 10/17/12 Ammonia (N) 2.8*** 5.1 mg/L 12S2
MW-48S 10/17/12 Ammonia (N) 2.8*** 9.8 mg/L 12S2
MW-56D 10/17/12 Ammonia (N) 2.8*** 3.3 mg/L 12S2
MW-13S 2/26/13 Ammonia (N) 2.8*** 18.6 mg/L 13S1
MW-14S 2/26/13 Ammonia (N) 2.8*** 0.48 mg/L 13S1
MW-15S 2/26/13 Ammonia (N) 2.8*** 10.4 mg/L 13S1
MW-19D 2/26/13 Ammonia (N) 2.8*** 8.3 mg/L 13S1
MW-50S 2/26/13 Ammonia (N) 2.8*** 11.8 mg/L 13S1
MW-11D 2/27/13 Ammonia (N) 2.8*** 6 mg/L 13S1
MW-12S 2/27/13 Ammonia (N) 2.8*** 8.2 mg/L 13S1
MW-23S 2/27/13 Ammonia (N) 2.8*** 12.2 mg/L 13S1
MW-24D 2/27/13 Ammonia (N) 2.8*** 2.7 mg/L 13S1
MW-48S 2/27/13 Ammonia (N) 2.8*** 4.1 mg/L 13S1
MW-56D 2/27/13 Ammonia (N) 2.8*** 0.82 mg/L 13S1
MW-12S 9/17/13 Ammonia (N) 2.8*** 0.54 mg/L 13S2
MW-48S 9/17/13 Ammonia (N) 2.8*** 8.3 mg/L 13S2
MW-56D 9/17/13 Ammonia (N) 2.8*** 2.1 mg/L 13S2
MW-11D 9/18/13 Ammonia (N) 2.8*** 8.8 mg/L J 13S2
MW-13S 9/18/13 Ammonia (N) 2.8*** 0.74 mg/L 13S2
MW-15S 9/18/13 Ammonia (N) 2.8*** 11.9 mg/L 13S2
MW-50S 9/18/13 Ammonia (N) 2.8*** 9.9 mg/L 13S2
MW-14S 9/19/13 Ammonia (N) 2.8*** 5.6 mg/L 13S2
MW-19D 9/19/13 Ammonia (N) 2.8*** 7.9 mg/L 13S2
MW-23S 9/19/13 Ammonia (N) 2.8*** 11.1 mg/L 13S2
MW-24D 9/19/13 Ammonia (N) 2.8*** 4.1 mg/L 13S2
MW-11D 2/7/14 Ammonia (N) 2.8*** 8.9 mg/L 14S1
MW-12S 2/7/14 Ammonia (N) 2.8*** 6.9 mg/L 14S1
MW-13S 2/7/14 Ammonia (N) 2.8*** 0.054 mg/L 14S1
MW-14S 2/7/14 Ammonia (N) 2.8*** 3 mg/L 14S1
MW-15S 2/7/14 Ammonia (N) 2.8*** 10.8 mg/L 14S1
MW-19D 2/7/14 Ammonia (N) 2.8*** 5.9 mg/L 14S1
MW-23S 2/7/14 Ammonia (N) 2.8*** 11.3 mg/L 14S1
MW-24D 2/7/14 Ammonia (N) 2.8*** 4.5 mg/L 14S1
MW-48S 2/7/14 Ammonia (N) 2.8*** 11.1 mg/L 14S1
MW-50S 2/7/14 Ammonia (N) 2.8*** 36.6 mg/L 14S1
MW-56D 2/7/14 Ammonia (N) 2.8*** 1.4 mg/L 14S1
MW-11D 2/19/08 Arsenic 10* 9.2 µg/L 08S1
MW-12S 2/19/08 Arsenic 10* 9.2 µg/L 08S1
MW-13S 2/20/08 Arsenic 10* 11 µg/L 08S1
MW-23S 2/20/08 Arsenic 10* 11 µg/L 08S1
MW-14S 2/21/08 Arsenic 10* 11 µg/L 08S1
MW-48S 2/21/08 Arsenic 10* 7.3 µg/L 08S1
MW-50S 2/21/08 Arsenic 10* 7.8 µg/L 08S1
MW-56D 2/21/08 Arsenic 10* 20 µg/L 08S1
MW-13S 8/21/08 Arsenic 10* 10 µg/L 08S2
MW-19D 8/21/08 Arsenic 10* 6.7 µg/L 08S2
MW-15S 8/25/08 Arsenic 10* 6 µg/L 08S2
MW-48S 8/25/08 Arsenic 10* 8.3 µg/L 08S2
MW-50S 8/25/08 Arsenic 10* 9.9 µg/L 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-56D 8/25/08 Arsenic 10* 22 µg/L 08S2
MW-23S 8/26/08 Arsenic 10* 9 µg/L 08S2
MW-13S 3/11/09 Arsenic 10* 5.1 µg/L 09S1
MW-19D 3/11/09 Arsenic 10* 6.8 µg/L 09S1
MW-50S 3/11/09 Arsenic 10* 6.2 µg/L 09S1
MW-11D 3/12/09 Arsenic 10* 9.7 µg/L 09S1
MW-23S 3/12/09 Arsenic 10* 11 µg/L 09S1
MW-48S 3/12/09 Arsenic 10* 12 µg/L 09S1
MW-56D 3/12/09 Arsenic 10* 22 µg/L 09S1
MW-12S 8/20/09 Arsenic 10* 5.2 µg/L I 09S2
MW-23S 8/20/09 Arsenic 10* 8.3 µg/L I 09S2
MW-48S 8/20/09 Arsenic 10* 7.8 µg/L I 09S2
MW-50S 8/20/09 Arsenic 10* 6.6 µg/L I 09S2
MW-56D 8/20/09 Arsenic 10* 26 µg/L 09S2
MW-13S 8/25/09 Arsenic 10* 7.1 µg/L I 09S2
MW-50S 3/29/10 Arsenic 10* 5.2 µg/L I 10S1
MW-23S 3/30/10 Arsenic 10* 7.6 µg/L I 10S1
MW-48S 3/30/10 Arsenic 10* 5.2 µg/L I 10S1
MW-56D 3/30/10 Arsenic 10* 18 µg/L 10S1
MW-13S 10/7/10 Arsenic 10* 6.9 µg/L I 10S2
MW-19D 10/7/10 Arsenic 10* 6.2 µg/L I 10S2
MW-10S 10/8/10 Arsenic 10* 11.2 µg/L 10S2
MW-48S 10/12/10 Arsenic 10* 7.5 µg/L I 10S2
MW-56D 10/12/10 Arsenic 10* 22.4 µg/L 10S2
MW-12S 10/13/10 Arsenic 10* 6.2 µg/L I 10S2
MW-23S 10/13/10 Arsenic 10* 9.6 µg/L I 10S2
MW-13S 2/18/11 Arsenic 10* 8.6 µg/L I 11S1
MW-50S 2/18/11 Arsenic 10* 5.7 µg/L I 11S1
MW-10S 2/21/11 Arsenic 10* 7.2 µg/L I 11S1
MW-11D 2/21/11 Arsenic 10* 6.4 µg/L I 11S1
MW-12S 2/21/11 Arsenic 10* 5.6 µg/L I 11S1
MW-23S 2/21/11 Arsenic 10* 8.7 µg/L I 11S1
MW-24D 2/21/11 Arsenic 10* 28 µg/L 11S1
MW-48S 2/21/11 Arsenic 10* 7.4 µg/L I 11S1
MW-56D 2/21/11 Arsenic 10* 22.1 µg/L 11S1
MW-12S 9/23/11 Arsenic 10* 5.4 µg/L 11S2
MW-13S 9/23/11 Arsenic 10* 8.3 µg/L 11S2
MW-23S 9/23/11 Arsenic 10* 11.1 µg/L 11S2
MW-48S 9/23/11 Arsenic 10* 8 µg/L 11S2
MW-50S 9/23/11 Arsenic 10* 6.2 µg/L 11S2
MW-56D 9/23/11 Arsenic 10* 19.5 µg/L 11S2
MW-48S 2/21/12 Arsenic 10* 5.6 µg/L I 12S1
MW-13S 2/22/12 Arsenic 10* 14.2 µg/L 12S1
MW-14S 2/22/12 Arsenic 10* 5.7 µg/L I 12S1
MW-19D 2/22/12 Arsenic 10* 5.2 µg/L I 12S1
MW-50S 2/22/12 Arsenic 10* 6.2 µg/L I 12S1
MW-56D 2/22/12 Arsenic 10* 20.4 µg/L 12S1
MW-24D 2/23/12 Arsenic 10* 12.2 µg/L 12S1
MW-23S 10/16/12 Arsenic 10* 9.7 µg/L I 12S2
MW-24D 10/16/12 Arsenic 10* 17 µg/L 12S2
MW-56D 10/17/12 Arsenic 10* 16.2 µg/L 12S2
MW-13S 2/26/13 Arsenic 10* 16.7 µg/L 13S1
MW-23S 2/27/13 Arsenic 10* 7.5 µg/L I 13S1
MW-24D 2/27/13 Arsenic 10* 21 µg/L 13S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-48S 9/17/13 Arsenic 10* 7 µg/L I 13S2
MW-56D 9/17/13 Arsenic 10* 18.2 µg/L 13S2
MW-11D 9/18/13 Arsenic 10* 6 µg/L I 13S2
MW-50S 9/18/13 Arsenic 10* 5.3 µg/L I 13S2
MW-23S 9/19/13 Arsenic 10* 11.1 µg/L 13S2
MW-24D 9/19/13 Arsenic 10* 23.2 µg/L 13S2
MW-11D 2/7/14 Arsenic 10* 10 µg/L 14S1
MW-12S 2/7/14 Arsenic 10* 8.8 µg/L I 14S1
MW-13S 2/7/14 Arsenic 10* <5 µg/L 14S1
MW-14S 2/7/14 Arsenic 10* <5 µg/L 14S1
MW-15S 2/7/14 Arsenic 10* 7.1 µg/L I 14S1
MW-19D 2/7/14 Arsenic 10* <5 µg/L 14S1
MW-23S 2/7/14 Arsenic 10* 13.2 µg/L 14S1
MW-24D 2/7/14 Arsenic 10* 35.9 µg/L 14S1
MW-48S 2/7/14 Arsenic 10* 11 µg/L 14S1
MW-50S 2/7/14 Arsenic 10* 9.8 µg/L I 14S1
MW-56D 2/7/14 Arsenic 10* 20.6 µg/L 14S1
MW-10S 2/19/08 Barium 2000* 13 µg/L 08S1
MW-11D 2/19/08 Barium 2000* 89 µg/L 08S1
MW-12S 2/19/08 Barium 2000* 34 µg/L 08S1
MW-26D 2/19/08 Barium 2000* 15 µg/L 08S1
MW-8S 2/19/08 Barium 2000* 7.9 µg/L 08S1
MW-9S 2/19/08 Barium 2000* 8.4 µg/L 08S1
MW-13S 2/20/08 Barium 2000* 25 µg/L 08S1
MW-18D 2/20/08 Barium 2000* 19 µg/L 08S1
MW-19D 2/20/08 Barium 2000* 12 µg/L 08S1
MW-21D 2/20/08 Barium 2000* 12 µg/L 08S1
MW-23S 2/20/08 Barium 2000* 82 µg/L 08S1
MW-24D 2/20/08 Barium 2000* 170 µg/L 08S1
MW-14S 2/21/08 Barium 2000* 31 µg/L 08S1
MW-15S 2/21/08 Barium 2000* 60 µg/L 08S1
MW-48S 2/21/08 Barium 2000* 28 µg/L 08S1
MW-50S 2/21/08 Barium 2000* 50 µg/L 08S1
MW-56D 2/21/08 Barium 2000* 62 µg/L 08S1
MW-13S 8/21/08 Barium 2000* 49 µg/L 08S2
MW-14S 8/21/08 Barium 2000* 56 µg/L 08S2
MW-18D 8/21/08 Barium 2000* 22 µg/L 08S2
MW-19D 8/21/08 Barium 2000* 13 µg/L 08S2
MW-21D 8/21/08 Barium 2000* 17 µg/L 08S2
MW-12S 8/25/08 Barium 2000* 30 µg/L 08S2
MW-15S 8/25/08 Barium 2000* 67 µg/L 08S2
MW-48S 8/25/08 Barium 2000* 26 µg/L 08S2
MW-50S 8/25/08 Barium 2000* 53 µg/L 08S2
MW-56D 8/25/08 Barium 2000* 65 µg/L 08S2
MW-11D 8/26/08 Barium 2000* 98 µg/L 08S2
MW-23S 8/26/08 Barium 2000* 62 µg/L 08S2
MW-24D 8/26/08 Barium 2000* 120 µg/L 08S2
MW-8S 8/26/08 Barium 2000* 19 µg/L 08S2
MW-9S 8/26/08 Barium 2000* 10 µg/L 08S2
MW-10S 8/27/08 Barium 2000* 13 µg/L 08S2
MW-10S 3/11/09 Barium 2000* 11 µg/L 09S1
MW-13S 3/11/09 Barium 2000* 51 µg/L 09S1
MW-14S 3/11/09 Barium 2000* 60 µg/L 09S1
MW-15S 3/11/09 Barium 2000* 58 µg/L 09S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-18D 3/11/09 Barium 2000* 20 µg/L 09S1
MW-19D 3/11/09 Barium 2000* 12 µg/L 09S1
MW-21D 3/11/09 Barium 2000* 23 µg/L 09S1
MW-50S 3/11/09 Barium 2000* 40 µg/L 09S1
MW-9S 3/11/09 Barium 2000* 14 µg/L 09S1
MW-11D 3/12/09 Barium 2000* 94 µg/L 09S1
MW-12S 3/12/09 Barium 2000* 45 µg/L 09S1
MW-23S 3/12/09 Barium 2000* 87 µg/L 09S1
MW-24D 3/12/09 Barium 2000* 130 µg/L 09S1
MW-48S 3/12/09 Barium 2000* 32 µg/L 09S1
MW-56D 3/12/09 Barium 2000* 60 µg/L 09S1
MW-8S 3/12/09 Barium 2000* 17 µg/L 09S1
MW-10S 8/20/09 Barium 2000* 12 µg/L 09S2
MW-11D 8/20/09 Barium 2000* 100 µg/L 09S2
MW-12S 8/20/09 Barium 2000* 39 µg/L 09S2
MW-14S 8/20/09 Barium 2000* 42 µg/L 09S2
MW-15S 8/20/09 Barium 2000* 71 µg/L 09S2
MW-18D 8/20/09 Barium 2000* 21 µg/L 09S2
MW-19D 8/20/09 Barium 2000* 12 µg/L 09S2
MW-21D 8/20/09 Barium 2000* 18 µg/L 09S2
MW-23S 8/20/09 Barium 2000* 79 µg/L 09S2
MW-48S 8/20/09 Barium 2000* 21 µg/L 09S2
MW-50S 8/20/09 Barium 2000* 43 µg/L 09S2
MW-56D 8/20/09 Barium 2000* 82 µg/L 09S2
MW-13S 8/25/09 Barium 2000* 43 µg/L 09S2
MW-24D 8/25/09 Barium 2000* 120 µg/L 09S2
MW-26D 8/25/09 Barium 2000* 28 µg/L 09S2
MW-9S 8/26/09 Barium 2000* 5.7 µg/L I 09S2
MW-10S 3/26/10 Barium 2000* 10.4 µg/L 10S1
MW-26D 3/26/10 Barium 2000* 7.6 µg/L I 10S1
MW-8S 3/26/10 Barium 2000* 18.2 µg/L 10S1
MW-9S 3/26/10 Barium 2000* 11.3 µg/L 10S1
MW-11D 3/29/10 Barium 2000* 99.1 µg/L 10S1
MW-12S 3/29/10 Barium 2000* 33.4 µg/L 10S1
MW-13S 3/29/10 Barium 2000* 29.7 µg/L 10S1
MW-14S 3/29/10 Barium 2000* 68.4 µg/L 10S1
MW-15S 3/29/10 Barium 2000* 64.9 µg/L 10S1
MW-18D 3/29/10 Barium 2000* 23.1 µg/L 10S1
MW-19D 3/29/10 Barium 2000* 15 µg/L 10S1
MW-21D 3/29/10 Barium 2000* 16.5 µg/L 10S1
MW-50S 3/29/10 Barium 2000* 33.6 µg/L 10S1
MW-23S 3/30/10 Barium 2000* 76.2 µg/L 10S1
MW-24D 3/30/10 Barium 2000* 115 µg/L 10S1
MW-48S 3/30/10 Barium 2000* 23 µg/L 10S1
MW-56D 3/30/10 Barium 2000* 49.3 µg/L 10S1
MW-13S 10/7/10 Barium 2000* 38.2 µg/L 10S2
MW-14S 10/7/10 Barium 2000* 68.7 µg/L 10S2
MW-18D 10/7/10 Barium 2000* 18.7 µg/L 10S2
MW-19D 10/7/10 Barium 2000* 17.3 µg/L 10S2
MW-10S 10/8/10 Barium 2000* 34.9 µg/L 10S2
MW-8S 10/8/10 Barium 2000* 17.2 µg/L 10S2
MW-9S 10/8/10 Barium 2000* 6.7 µg/L I 10S2
MW-15S 10/11/10 Barium 2000* 43.4 µg/L 10S2
MW-21D 10/11/10 Barium 2000* 19.5 µg/L 10S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-50S 10/11/10 Barium 2000* 30.4 µg/L 10S2
MW-48S 10/12/10 Barium 2000* 22.4 µg/L 10S2
MW-56D 10/12/10 Barium 2000* 61.9 µg/L 10S2
MW-11D 10/13/10 Barium 2000* 93.7 µg/L 10S2
MW-12S 10/13/10 Barium 2000* 37.7 µg/L 10S2
MW-23S 10/13/10 Barium 2000* 77 µg/L 10S2
MW-24D 10/13/10 Barium 2000* 121 µg/L 10S2
MW-13S 2/18/11 Barium 2000* 49.1 µg/L 11S1
MW-14S 2/18/11 Barium 2000* 67.4 µg/L 11S1
MW-15S 2/18/11 Barium 2000* 42.7 µg/L 11S1
MW-18D 2/18/11 Barium 2000* 16.4 µg/L 11S1
MW-19D 2/18/11 Barium 2000* 17.3 µg/L 11S1
MW-50S 2/18/11 Barium 2000* 46.3 µg/L 11S1
MW-10S 2/21/11 Barium 2000* 34 µg/L 11S1
MW-11D 2/21/11 Barium 2000* 75.8 µg/L 11S1
MW-12S 2/21/11 Barium 2000* 37.8 µg/L 11S1
MW-21D 2/21/11 Barium 2000* 26.6 µg/L 11S1
MW-23S 2/21/11 Barium 2000* 71.6 µg/L 11S1
MW-24D 2/21/11 Barium 2000* 136 µg/L 11S1
MW-48S 2/21/11 Barium 2000* 16.4 µg/L 11S1
MW-56D 2/21/11 Barium 2000* 71.2 µg/L 11S1
MW-8S 2/21/11 Barium 2000* 20.2 µg/L 11S1
MW-9S 2/21/11 Barium 2000* 7.7 µg/L I 11S1
MW-10S 9/22/11 Barium 2000* 8.9 µg/L 11S2
MW-8S 9/22/11 Barium 2000* 9.8 µg/L 11S2
MW-9S 9/22/11 Barium 2000* 9.5 µg/L 11S2
MW-11D 9/23/11 Barium 2000* 89.4 µg/L 11S2
MW-12S 9/23/11 Barium 2000* 49.2 µg/L 11S2
MW-13S 9/23/11 Barium 2000* 50.9 µg/L 11S2
MW-14S 9/23/11 Barium 2000* 44.9 µg/L 11S2
MW-15S 9/23/11 Barium 2000* 52.4 µg/L 11S2
MW-18D 9/23/11 Barium 2000* 17.4 µg/L 11S2
MW-19D 9/23/11 Barium 2000* 18.3 µg/L 11S2
MW-21D 9/23/11 Barium 2000* 21.2 µg/L 11S2
MW-23S 9/23/11 Barium 2000* 68.6 µg/L 11S2
MW-24D 9/23/11 Barium 2000* 121 µg/L 11S2
MW-48S 9/23/11 Barium 2000* 12 µg/L 11S2
MW-50S 9/23/11 Barium 2000* 33.3 µg/L 11S2
MW-56D 9/23/11 Barium 2000* 61.9 µg/L 11S2
MW-10S 2/21/12 Barium 2000* 20.4 µg/L 12S1
MW-48S 2/21/12 Barium 2000* 10.1 µg/L 12S1
MW-11D 2/22/12 Barium 2000* 84.2 µg/L 12S1
MW-12S 2/22/12 Barium 2000* 38.1 µg/L 12S1
MW-13S 2/22/12 Barium 2000* 107 µg/L 12S1
MW-14S 2/22/12 Barium 2000* 26.4 µg/L 12S1
MW-15S 2/22/12 Barium 2000* 47.4 µg/L 12S1
MW-18D 2/22/12 Barium 2000* 16.8 µg/L 12S1
MW-19D 2/22/12 Barium 2000* 15.6 µg/L 12S1
MW-21D 2/22/12 Barium 2000* 24.3 µg/L 12S1
MW-50S 2/22/12 Barium 2000* 23.5 µg/L 12S1
MW-56D 2/22/12 Barium 2000* 68.8 µg/L 12S1
MW-23S 2/23/12 Barium 2000* 63.7 µg/L 12S1
MW-24D 2/23/12 Barium 2000* 102 µg/L 12S1
MW-26D 2/23/12 Barium 2000* 5.3 µg/L I 12S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-8S 2/23/12 Barium 2000* 7.5 µg/L I 12S1
MW-9S 2/23/12 Barium 2000* 8.4 µg/L I 12S1
MW-11D 2/19/08 Benzene 1* 0.37 µg/L 08S1
MW-23S 2/20/08 Benzene 1* 0.36 µg/L 08S1
MW-50S 2/21/08 Benzene 1* 0.21 µg/L 08S1
MW-48S 3/12/09 Benzene 1* 1.1 µg/L 09S1
MW-23S 10/13/10 Benzene 1* 0.53 µg/L I 10S2
MW-24D 2/21/11 Benzene 1* 1.7 µg/L 11S1
MW-24D 2/23/12 Benzene 1* 1.6 µg/L 12S1
MW-24D 10/16/12 Benzene 1* 1.3 µg/L 12S2
MW-12S 10/17/12 Benzene 1* 0.19 µg/L I 12S2
MW-48S 10/17/12 Benzene 1* 0.2 µg/L I 12S2
MW-12S 2/27/13 Benzene 1* 0.23 µg/L I 13S1
MW-24D 2/27/13 Benzene 1* 1.5 µg/L 13S1
MW-23S 9/19/13 Benzene 1* 0.1 µg/L I 13S2
MW-24D 9/19/13 Benzene 1* 1.5 µg/L 13S2
MW-10S 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-12S 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-23S 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-24D 2/7/14 Benzene 1* 1.5 µg/L 14S1
MW-26D 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-48S 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-56D 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-8S 2/7/14 Benzene 1* <0.1 µg/L 14S1
MW-48S 2/21/08 Cadmium 5* 0.59 µg/L 08S1
MW-12S 8/25/08 Cadmium 5* 0.8 µg/L 08S2
MW-23S 3/30/10 Cadmium 5* 0.59 µg/L I 10S1
MW-48S 3/30/10 Cadmium 5* 0.69 µg/L I 10S1
MW-11D 10/13/10 Cadmium 5* 0.51 µg/L I 10S2
MW-12S 10/13/10 Cadmium 5* 0.54 µg/L I 10S2
MW-23S 10/13/10 Cadmium 5* 0.5 µg/L I 10S2
MW-14S 3/29/10 Carbon disulfide 700*** 0.58 µg/L I 10S1
MW-18D 3/29/10 Carbon disulfide 700*** 0.55 µg/L I 10S1
MW-19D 3/29/10 Carbon disulfide 700*** 0.52 µg/L I 10S1
MW-21D 3/29/10 Carbon disulfide 700*** 0.53 µg/L I 10S1
MW-23S 2/21/11 Carbon disulfide 700*** 0.52 µg/L I 11S1
MW-10S 2/19/08 Chloride 250** 35 mg/L 08S1
MW-11D 2/19/08 Chloride 250** 46 mg/L 08S1
MW-12S 2/19/08 Chloride 250** 33 mg/L 08S1
MW-26D 2/19/08 Chloride 250** 85 mg/L 08S1
MW-8S 2/19/08 Chloride 250** 120 mg/L 08S1
MW-9S 2/19/08 Chloride 250** 42 mg/L 08S1
MW-13S 2/20/08 Chloride 250** 5.1 mg/L 08S1
MW-18D 2/20/08 Chloride 250** 46 mg/L 08S1
MW-19D 2/20/08 Chloride 250** 41 mg/L 08S1
MW-21D 2/20/08 Chloride 250** 55 mg/L 08S1
MW-23S 2/20/08 Chloride 250** 38 mg/L 08S1
MW-24D 2/20/08 Chloride 250** 26 mg/L 08S1
MW-14S 2/21/08 Chloride 250** 63 mg/L 08S1
MW-15S 2/21/08 Chloride 250** 47 mg/L 08S1
MW-48S 2/21/08 Chloride 250** 29 mg/L 08S1
MW-50S 2/21/08 Chloride 250** 77 mg/L 08S1
MW-56D 2/21/08 Chloride 250** 55 mg/L 08S1
MW-13S 8/21/08 Chloride 250** 12 mg/L 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-14S 8/21/08 Chloride 250** 61 mg/L 08S2
MW-18D 8/21/08 Chloride 250** 42 mg/L 08S2
MW-19D 8/21/08 Chloride 250** 43 mg/L 08S2
MW-21D 8/21/08 Chloride 250** 50 mg/L 08S2
MW-12S 8/25/08 Chloride 250** 40 mg/L 08S2
MW-15S 8/25/08 Chloride 250** 59 mg/L 08S2
MW-48S 8/25/08 Chloride 250** 42 mg/L 08S2
MW-50S 8/25/08 Chloride 250** 79 mg/L 08S2
MW-56D 8/25/08 Chloride 250** 50 mg/L 08S2
MW-11D 8/26/08 Chloride 250** 43 mg/L 08S2
MW-23S 8/26/08 Chloride 250** 27 mg/L 08S2
MW-24D 8/26/08 Chloride 250** 25 mg/L 08S2
MW-26D 8/26/08 Chloride 250** 110 mg/L 08S2
MW-8S 8/26/08 Chloride 250** 100 mg/L 08S2
MW-9S 8/26/08 Chloride 250** 21 mg/L 08S2
MW-10S 8/27/08 Chloride 250** 72 mg/L 08S2
MW-10S 3/11/09 Chloride 250** 70 mg/L 09S1
MW-13S 3/11/09 Chloride 250** 5.5 mg/L 09S1
MW-14S 3/11/09 Chloride 250** 70 mg/L 09S1
MW-15S 3/11/09 Chloride 250** 55 mg/L 09S1
MW-18D 3/11/09 Chloride 250** 45 mg/L 09S1
MW-19D 3/11/09 Chloride 250** 35 mg/L 09S1
MW-21D 3/11/09 Chloride 250** 56 mg/L 09S1
MW-50S 3/11/09 Chloride 250** 85 mg/L 09S1
MW-9S 3/11/09 Chloride 250** 24 mg/L 09S1
MW-11D 3/12/09 Chloride 250** 47 mg/L 09S1
MW-12S 3/12/09 Chloride 250** 36 mg/L 09S1
MW-23S 3/12/09 Chloride 250** 36 mg/L 09S1
MW-24D 3/12/09 Chloride 250** 25 mg/L 09S1
MW-26D 3/12/09 Chloride 250** 120 mg/L 09S1
MW-48S 3/12/09 Chloride 250** 31 mg/L 09S1
MW-56D 3/12/09 Chloride 250** 52 mg/L 09S1
MW-8S 3/12/09 Chloride 250** 52 mg/L 09S1
MW-10S 8/20/09 Chloride 250** 63 mg/L 09S2
MW-11D 8/20/09 Chloride 250** 43 mg/L 09S2
MW-12S 8/20/09 Chloride 250** 34 mg/L 09S2
MW-14S 8/20/09 Chloride 250** 70 mg/L 09S2
MW-15S 8/20/09 Chloride 250** 49 mg/L 09S2
MW-18D 8/20/09 Chloride 250** 44 mg/L 09S2
MW-19D 8/20/09 Chloride 250** 23 mg/L 09S2
MW-21D 8/20/09 Chloride 250** 58 mg/L 09S2
MW-23S 8/20/09 Chloride 250** 26 mg/L 09S2
MW-48S 8/20/09 Chloride 250** 12 mg/L 09S2
MW-50S 8/20/09 Chloride 250** 68 mg/L 09S2
MW-56D 8/20/09 Chloride 250** 49 mg/L 09S2
MW-13S 8/25/09 Chloride 250** 16 mg/L 09S2
MW-24D 8/25/09 Chloride 250** 24 mg/L 09S2
MW-26D 8/25/09 Chloride 250** 76 mg/L 09S2
MW-8S 8/26/09 Chloride 250** 99 mg/L 09S2
MW-9S 8/26/09 Chloride 250** 4 mg/L I 09S2
MW-10S 3/26/10 Chloride 250** 41.8 mg/L J 10S1
MW-26D 3/26/10 Chloride 250** 76.4 mg/L 10S1
MW-8S 3/26/10 Chloride 250** 51 mg/L 10S1
MW-9S 3/26/10 Chloride 250** 60.1 mg/L 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-11D 3/29/10 Chloride 250** 48.1 mg/L 10S1
MW-12S 3/29/10 Chloride 250** 30.2 mg/L 10S1
MW-13S 3/29/10 Chloride 250** 4.2 mg/L I 10S1
MW-14S 3/29/10 Chloride 250** 79.2 mg/L 10S1
MW-15S 3/29/10 Chloride 250** 52 mg/L 10S1
MW-18D 3/29/10 Chloride 250** 44.8 mg/L 10S1
MW-19D 3/29/10 Chloride 250** 30.2 mg/L 10S1
MW-21D 3/29/10 Chloride 250** 63.2 mg/L 10S1
MW-50S 3/29/10 Chloride 250** 68.9 mg/L 10S1
MW-23S 3/30/10 Chloride 250** 30.9 mg/L 10S1
MW-24D 3/30/10 Chloride 250** 24.5 mg/L 10S1
MW-48S 3/30/10 Chloride 250** 17.8 mg/L 10S1
MW-56D 3/30/10 Chloride 250** 54.5 mg/L 10S1
MW-13S 10/7/10 Chloride 250** 4.5 mg/L I 10S2
MW-14S 10/7/10 Chloride 250** 62.7 mg/L 10S2
MW-18D 10/7/10 Chloride 250** 43.8 mg/L 10S2
MW-19D 10/7/10 Chloride 250** 30.3 mg/L 10S2
MW-10S 10/8/10 Chloride 250** 23 mg/L 10S2
MW-26D 10/8/10 Chloride 250** 73.5 mg/L 10S2
MW-8S 10/8/10 Chloride 250** 48.7 mg/L 10S2
MW-9S 10/8/10 Chloride 250** 3.3 mg/L I 10S2
MW-15S 10/11/10 Chloride 250** 35.9 mg/L 10S2
MW-21D 10/11/10 Chloride 250** 51.9 mg/L 10S2
MW-50S 10/11/10 Chloride 250** 48.4 mg/L 10S2
MW-48S 10/12/10 Chloride 250** 10.7 mg/L 10S2
MW-56D 10/12/10 Chloride 250** 46.2 mg/L 10S2
MW-11D 10/13/10 Chloride 250** 42.1 mg/L 10S2
MW-12S 10/13/10 Chloride 250** 32.3 mg/L 10S2
MW-23S 10/13/10 Chloride 250** 25.3 mg/L 10S2
MW-24D 10/13/10 Chloride 250** 21.6 mg/L 10S2
MW-13S 2/18/11 Chloride 250** 11.5 mg/L 11S1
MW-14S 2/18/11 Chloride 250** 50.4 mg/L 11S1
MW-15S 2/18/11 Chloride 250** 34.4 mg/L 11S1
MW-18D 2/18/11 Chloride 250** 43.4 mg/L 11S1
MW-19D 2/18/11 Chloride 250** 28.9 mg/L 11S1
MW-50S 2/18/11 Chloride 250** 83.9 mg/L 11S1
MW-10S 2/21/11 Chloride 250** 13.1 mg/L 11S1
MW-11D 2/21/11 Chloride 250** 38 mg/L 11S1
MW-12S 2/21/11 Chloride 250** 42.6 mg/L 11S1
MW-21D 2/21/11 Chloride 250** 52.5 mg/L 11S1
MW-23S 2/21/11 Chloride 250** 36.9 mg/L 11S1
MW-24D 2/21/11 Chloride 250** 24.7 mg/L 11S1
MW-26D 2/21/11 Chloride 250** 76.3 mg/L 11S1
MW-48S 2/21/11 Chloride 250** 10.3 mg/L 11S1
MW-56D 2/21/11 Chloride 250** 43.4 mg/L 11S1
MW-8S 2/21/11 Chloride 250** 68 mg/L J 11S1
MW-9S 2/21/11 Chloride 250** 6.1 mg/L 11S1
MW-10S 9/22/11 Chloride 250** 31.5 mg/L 11S2
MW-26D 9/22/11 Chloride 250** 79.1 mg/L 11S2
MW-8S 9/22/11 Chloride 250** 74.2 mg/L 11S2
MW-9S 9/22/11 Chloride 250** 13.8 mg/L 11S2
MW-11D 9/23/11 Chloride 250** 44.7 mg/L 11S2
MW-12S 9/23/11 Chloride 250** 34.6 mg/L 11S2
MW-13S 9/23/11 Chloride 250** 21.7 mg/L 11S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-14S 9/23/11 Chloride 250** 61.9 mg/L 11S2
MW-15S 9/23/11 Chloride 250** 36.9 mg/L 11S2
MW-18D 9/23/11 Chloride 250** 43.3 mg/L 11S2
MW-19D 9/23/11 Chloride 250** 26.7 mg/L 11S2
MW-21D 9/23/11 Chloride 250** 53.5 mg/L 11S2
MW-23S 9/23/11 Chloride 250** 40.8 mg/L 11S2
MW-24D 9/23/11 Chloride 250** 23.2 mg/L 11S2
MW-48S 9/23/11 Chloride 250** 5.7 mg/L 11S2
MW-50S 9/23/11 Chloride 250** 74 mg/L 11S2
MW-56D 9/23/11 Chloride 250** 45.6 mg/L 11S2
MW-10S 2/21/12 Chloride 250** 4 mg/L I 12S1
MW-48S 2/21/12 Chloride 250** 6.9 mg/L 12S1
MW-11D 2/22/12 Chloride 250** 46.1 mg/L 12S1
MW-12S 2/22/12 Chloride 250** 30 mg/L 12S1
MW-13S 2/22/12 Chloride 250** 135 mg/L 12S1
MW-14S 2/22/12 Chloride 250** 60.5 mg/L J 12S1
MW-15S 2/22/12 Chloride 250** 56 mg/L 12S1
MW-18D 2/22/12 Chloride 250** 45.8 mg/L 12S1
MW-19D 2/22/12 Chloride 250** 28.5 mg/L 12S1
MW-21D 2/22/12 Chloride 250** 41.4 mg/L 12S1
MW-50S 2/22/12 Chloride 250** 23.4 mg/L 12S1
MW-56D 2/22/12 Chloride 250** 50.6 mg/L 12S1
MW-23S 2/23/12 Chloride 250** 41.8 mg/L 12S1
MW-24D 2/23/12 Chloride 250** 25.1 mg/L 12S1
MW-26D 2/23/12 Chloride 250** 69.8 mg/L 12S1
MW-8S 2/23/12 Chloride 250** 87.7 mg/L 12S1
MW-9S 2/23/12 Chloride 250** 16.7 mg/L 12S1
MW-11D 2/19/08 Chlorobenzene 100* 2.4 µg/L 08S1
MW-12S 2/19/08 Chlorobenzene 100* 2.6 µg/L 08S1
MW-13S 2/20/08 Chlorobenzene 100* 0.91 µg/L 08S1
MW-23S 2/20/08 Chlorobenzene 100* 2.4 µg/L 08S1
MW-14S 2/21/08 Chlorobenzene 100* 1.6 µg/L 08S1
MW-15S 2/21/08 Chlorobenzene 100* 1.8 µg/L 08S1
MW-48S 2/21/08 Chlorobenzene 100* 5.1 µg/L 08S1
MW-50S 2/21/08 Chlorobenzene 100* 5.2 µg/L 08S1
MW-13S 8/21/08 Chlorobenzene 100* 1.7 µg/L 08S2
MW-14S 8/21/08 Chlorobenzene 100* 0.71 µg/L 08S2
MW-23S 8/26/08 Chlorobenzene 100* 3.5 µg/L 08S2
MW-15S 3/11/09 Chlorobenzene 100* 1.6 µg/L 09S1
MW-50S 3/11/09 Chlorobenzene 100* 4.5 µg/L 09S1
MW-11D 3/12/09 Chlorobenzene 100* 1.5 µg/L 09S1
MW-12S 3/12/09 Chlorobenzene 100* 2 µg/L 09S1
MW-23S 3/12/09 Chlorobenzene 100* 2.8 µg/L 09S1
MW-48S 3/12/09 Chlorobenzene 100* 6.8 µg/L 09S1
MW-12S 8/20/09 Chlorobenzene 100* 2 µg/L 09S2
MW-15S 8/20/09 Chlorobenzene 100* 2.6 µg/L 09S2
MW-23S 8/20/09 Chlorobenzene 100* 3.4 µg/L 09S2
MW-48S 8/20/09 Chlorobenzene 100* 0.71 µg/L I 09S2
MW-50S 8/20/09 Chlorobenzene 100* 5.4 µg/L 09S2
MW-13S 8/25/09 Chlorobenzene 100* 2.7 µg/L 09S2
MW-15S 3/29/10 Chlorobenzene 100* 1.7 µg/L 10S1
MW-50S 3/29/10 Chlorobenzene 100* 3 µg/L 10S1
MW-23S 3/30/10 Chlorobenzene 100* 3.7 µg/L 10S1
MW-48S 3/30/10 Chlorobenzene 100* 4.2 µg/L 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-14S 10/7/10 Chlorobenzene 100* 0.84 µg/L I 10S2
MW-15S 10/11/10 Chlorobenzene 100* 0.7 µg/L I 10S2
MW-50S 10/11/10 Chlorobenzene 100* 3.1 µg/L 10S2
MW-48S 10/12/10 Chlorobenzene 100* 3.7 µg/L 10S2
MW-12S 10/13/10 Chlorobenzene 100* 2.1 µg/L 10S2
MW-23S 10/13/10 Chlorobenzene 100* 3.1 µg/L 10S2
MW-50S 2/18/11 Chlorobenzene 100* 6.8 µg/L 11S1
MW-12S 9/23/11 Chlorobenzene 100* 1.9 µg/L 11S2
MW-13S 9/23/11 Chlorobenzene 100* 2.5 µg/L 11S2
MW-14S 9/23/11 Chlorobenzene 100* 12.6 µg/L 11S2
MW-15S 9/23/11 Chlorobenzene 100* 1 µg/L 11S2
MW-23S 9/23/11 Chlorobenzene 100* 2.5 µg/L 11S2
MW-48S 9/23/11 Chlorobenzene 100* 1.4 µg/L 11S2
MW-50S 9/23/11 Chlorobenzene 100* 6.4 µg/L 11S2
MW-13S 2/22/12 Chlorobenzene 100* 7 µg/L 12S1
MW-15S 2/22/12 Chlorobenzene 100* 2.7 µg/L 12S1
MW-50S 2/22/12 Chlorobenzene 100* 4.3 µg/L 12S1
MW-23S 2/23/12 Chlorobenzene 100* 2.2 µg/L 12S1
MW-24D 2/23/12 Chlorobenzene 100* 0.86 µg/L I 12S1
MW-23S 10/16/12 Chlorobenzene 100* 1.6 µg/L 12S2
MW-24D 10/16/12 Chlorobenzene 100* 0.71 µg/L I 12S2
MW-12S 10/17/12 Chlorobenzene 100* 0.81 µg/L I 12S2
MW-48S 10/17/12 Chlorobenzene 100* 4.2 µg/L 12S2
MW-12S 2/27/13 Chlorobenzene 100* 1.4 µg/L 13S1
MW-23S 2/27/13 Chlorobenzene 100* 1.7 µg/L 13S1
MW-24D 2/27/13 Chlorobenzene 100* 0.79 µg/L I 13S1
MW-48S 2/27/13 Chlorobenzene 100* 1.7 µg/L 13S1
MW-48S 9/17/13 Chlorobenzene 100* 3.2 µg/L 13S2
MW-23S 9/19/13 Chlorobenzene 100* 2.7 µg/L 13S2
MW-24D 9/19/13 Chlorobenzene 100* 0.98 µg/L I 13S2
MW-10S 2/7/14 Chlorobenzene 100* <0.5 µg/L 14S1
MW-12S 2/7/14 Chlorobenzene 100* 0.99 µg/L I 14S1
MW-23S 2/7/14 Chlorobenzene 100* 2.4 µg/L 14S1
MW-24D 2/7/14 Chlorobenzene 100* 0.99 µg/L I 14S1
MW-26D 2/7/14 Chlorobenzene 100* <0.5 µg/L 14S1
MW-48S 2/7/14 Chlorobenzene 100* 3.7 µg/L 14S1
MW-56D 2/7/14 Chlorobenzene 100* <0.5 µg/L 14S1
MW-8S 2/7/14 Chlorobenzene 100* <0.5 µg/L 14S1
MW-23S 9/19/13 Chloromethane 2.7*** 3.1 µg/L 13S2
MW-13S 2/20/08 Chromium 100* 6.2 µg/L 08S1
MW-8S 8/26/08 Chromium 100* 13 µg/L 08S2
MW-9S 8/26/08 Chromium 100* 4.4 µg/L 08S2
MW-9S 3/11/09 Chromium 100* 5.8 µg/L 09S1
MW-8S 3/12/09 Chromium 100* 14 µg/L 09S1
MW-10S 3/26/10 Chromium 100* 5.6 µg/L 10S1
MW-8S 3/26/10 Chromium 100* 14.7 µg/L 10S1
MW-13S 3/29/10 Chromium 100* 5.8 µg/L 10S1
MW-13S 10/7/10 Chromium 100* 10.2 µg/L 10S2
MW-10S 10/8/10 Chromium 100* 28.5 µg/L 10S2
MW-8S 10/8/10 Chromium 100* 3.7 µg/L I 10S2
MW-13S 2/18/11 Chromium 100* 3.4 µg/L I 11S1
MW-10S 2/21/11 Chromium 100* 27.5 µg/L 11S1
MW-10S 9/22/11 Chromium 100* 3.7 µg/L 11S2
MW-8S 2/23/12 Chromium 100* 2.9 µg/L I 12S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-11D 2/19/08 cis-1,2-Dichloroethene 70* 2.2 µg/L 08S1
MW-12S 2/19/08 cis-1,2-Dichloroethene 70* 5 µg/L 08S1
MW-23S 2/20/08 cis-1,2-Dichloroethene 70* 1.4 µg/L 08S1
MW-24D 2/20/08 cis-1,2-Dichloroethene 70* 1.2 µg/L 08S1
MW-11D 3/12/09 cis-1,2-Dichloroethene 70* 1.7 µg/L 09S1
MW-12S 3/12/09 cis-1,2-Dichloroethene 70* 2.2 µg/L 09S1
MW-23S 3/12/09 cis-1,2-Dichloroethene 70* 1.6 µg/L 09S1
MW-56D 3/12/09 cis-1,2-Dichloroethene 70* 1.5 µg/L 09S1
MW-12S 8/20/09 cis-1,2-Dichloroethene 70* 2.9 µg/L 09S2
MW-23S 8/20/09 cis-1,2-Dichloroethene 70* 1.4 µg/L 09S2
MW-56D 8/20/09 cis-1,2-Dichloroethene 70* 2 µg/L 09S2
MW-12S 3/29/10 cis-1,2-Dichloroethene 70* 1.3 µg/L 10S1
MW-23S 3/30/10 cis-1,2-Dichloroethene 70* 1.5 µg/L 10S1
MW-56D 3/30/10 cis-1,2-Dichloroethene 70* 0.74 µg/L I 10S1
MW-56D 10/12/10 cis-1,2-Dichloroethene 70* 1.2 µg/L 10S2
MW-12S 10/13/10 cis-1,2-Dichloroethene 70* 3.1 µg/L 10S2
MW-23S 10/13/10 cis-1,2-Dichloroethene 70* 1.4 µg/L 10S2
MW-12S 2/21/11 cis-1,2-Dichloroethene 70* 3.9 µg/L 11S1
MW-23S 2/21/11 cis-1,2-Dichloroethene 70* 2.1 µg/L 11S1
MW-24D 2/21/11 cis-1,2-Dichloroethene 70* 15.8 µg/L 11S1
MW-56D 2/21/11 cis-1,2-Dichloroethene 70* 2.9 µg/L 11S1
MW-12S 9/23/11 cis-1,2-Dichloroethene 70* 3.1 µg/L 11S2
MW-23S 9/23/11 cis-1,2-Dichloroethene 70* 2.6 µg/L 11S2
MW-56D 9/23/11 cis-1,2-Dichloroethene 70* 2.1 µg/L 11S2
MW-12S 2/22/12 cis-1,2-Dichloroethene 70* 3.1 µg/L 12S1
MW-56D 2/22/12 cis-1,2-Dichloroethene 70* 1.6 µg/L 12S1
MW-23S 2/23/12 cis-1,2-Dichloroethene 70* 1.8 µg/L 12S1
MW-24D 2/23/12 cis-1,2-Dichloroethene 70* 13.6 µg/L 12S1
MW-23S 10/16/12 cis-1,2-Dichloroethene 70* 1.6 µg/L 12S2
MW-24D 10/16/12 cis-1,2-Dichloroethene 70* 14.1 µg/L 12S2
MW-12S 10/17/12 cis-1,2-Dichloroethene 70* 2.9 µg/L 12S2
MW-48S 10/17/12 cis-1,2-Dichloroethene 70* 1 µg/L 12S2
MW-56D 10/17/12 cis-1,2-Dichloroethene 70* 1.4 µg/L 12S2
MW-12S 2/27/13 cis-1,2-Dichloroethene 70* 2.9 µg/L 13S1
MW-23S 2/27/13 cis-1,2-Dichloroethene 70* 1.2 µg/L 13S1
MW-24D 2/27/13 cis-1,2-Dichloroethene 70* 13.1 µg/L 13S1
MW-12S 9/17/13 cis-1,2-Dichloroethene 70* 0.87 µg/L I 13S2
MW-48S 9/17/13 cis-1,2-Dichloroethene 70* 0.76 µg/L I 13S2
MW-56D 9/17/13 cis-1,2-Dichloroethene 70* 0.82 µg/L I 13S2
MW-23S 9/19/13 cis-1,2-Dichloroethene 70* 1.5 µg/L 13S2
MW-24D 9/19/13 cis-1,2-Dichloroethene 70* 14.1 µg/L 13S2
MW-10S 2/7/14 cis-1,2-Dichloroethene 70* <0.5 µg/L 14S1
MW-12S 2/7/14 cis-1,2-Dichloroethene 70* 2.5 µg/L 14S1
MW-23S 2/7/14 cis-1,2-Dichloroethene 70* 0.93 µg/L I 14S1
MW-24D 2/7/14 cis-1,2-Dichloroethene 70* 12.1 µg/L 14S1
MW-26D 2/7/14 cis-1,2-Dichloroethene 70* <0.5 µg/L 14S1
MW-48S 2/7/14 cis-1,2-Dichloroethene 70* <0.5 µg/L 14S1
MW-56D 2/7/14 cis-1,2-Dichloroethene 70* 0.65 µg/L I 14S1
MW-8S 2/7/14 cis-1,2-Dichloroethene 70* <0.5 µg/L 14S1
MW-18D 2/18/11 Cobalt 140*** 13.8 µg/L 11S1
MW-18D 9/23/11 Cobalt 140*** 12.9 µg/L 11S2
MW-18D 2/22/12 Cobalt 140*** 12.7 µg/L 12S1
MW-8S 8/26/08 Copper 1000** 6 µg/L 08S2
MW-10S 3/11/09 Copper 1000** 4 µg/L 09S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-9S 3/11/09 Copper 1000** 4.6 µg/L 09S1
MW-8S 3/12/09 Copper 1000** 6.3 µg/L 09S1
MW-10S 8/20/09 Copper 1000** 3.9 µg/L I 09S2
MW-10S 3/26/10 Copper 1000** 5.7 µg/L 10S1
MW-8S 3/26/10 Copper 1000** 7.2 µg/L 10S1
MW-9S 3/26/10 Copper 1000** 2.5 µg/L I 10S1
MW-13S 3/29/10 Copper 1000** 4.3 µg/L I 10S1
MW-19D 3/29/10 Copper 1000** 3.6 µg/L I 10S1
MW-48S 3/30/10 Copper 1000** 2.5 µg/L I 10S1
MW-56D 3/30/10 Copper 1000** 2.5 µg/L I 10S1
MW-13S 10/7/10 Copper 1000** 3.1 µg/L I 10S2
MW-10S 10/8/10 Copper 1000** 14.3 µg/L 10S2
MW-8S 10/8/10 Copper 1000** 3 µg/L I 10S2
MW-13S 2/18/11 Copper 1000** 6.6 µg/L 11S1
MW-10S 2/21/11 Copper 1000** 15 µg/L 11S1
MW-26D 2/21/11 Copper 1000** 3 µg/L I 11S1
MW-8S 2/21/11 Copper 1000** 4 µg/L I 11S1
MW-10S 9/22/11 Copper 1000** 5 µg/L 11S2
MW-26D 9/22/11 Copper 1000** 2.8 µg/L 11S2
MW-8S 9/22/11 Copper 1000** 3.2 µg/L 11S2
MW-9S 9/22/11 Copper 1000** 2.7 µg/L 11S2
MW-19D 9/23/11 Copper 1000** 3.6 µg/L 11S2
MW-12S 2/22/12 Copper 1000** 2.9 µg/L I 12S1
MW-13S 2/22/12 Copper 1000** 3.3 µg/L I 12S1
MW-10S 2/19/08 Dissolved Oxygen NS 0.41 mg/L D 08S1
MW-11D 2/19/08 Dissolved Oxygen NS 0.13 mg/L D 08S1
MW-12S 2/19/08 Dissolved Oxygen NS 0.03 mg/L D 08S1
MW-26D 2/19/08 Dissolved Oxygen NS 1.16 mg/L D 08S1
MW-8S 2/19/08 Dissolved Oxygen NS 0.51 mg/L D 08S1
MW-9S 2/19/08 Dissolved Oxygen NS 8.32 mg/L D 08S1
MW-13S 2/20/08 Dissolved Oxygen NS 0.16 mg/L D 08S1
MW-18D 2/20/08 Dissolved Oxygen NS 1.76 mg/L D 08S1
MW-19D 2/20/08 Dissolved Oxygen NS 0.24 mg/L D 08S1
MW-21D 2/20/08 Dissolved Oxygen NS 0.4 mg/L D 08S1
MW-23S 2/20/08 Dissolved Oxygen NS 0.13 mg/L D 08S1
MW-24D 2/20/08 Dissolved Oxygen NS 0.33 mg/L D 08S1
MW-14S 2/21/08 Dissolved Oxygen NS 0.15 mg/L D 08S1
MW-15S 2/21/08 Dissolved Oxygen NS 0.11 mg/L D 08S1
MW-48S 2/21/08 Dissolved Oxygen NS 0.93 mg/L D 08S1
MW-50S 2/21/08 Dissolved Oxygen NS 0.18 mg/L D 08S1
MW-56D 2/21/08 Dissolved Oxygen NS 1.04 mg/L D 08S1
MW-13S 8/21/08 Dissolved Oxygen NS 0.36 mg/L D 08S2
MW-14S 8/21/08 Dissolved Oxygen NS 0.6 mg/L D 08S2
MW-18D 8/21/08 Dissolved Oxygen NS 0.71 mg/L D 08S2
MW-19D 8/21/08 Dissolved Oxygen NS 0.75 mg/L D 08S2
MW-21D 8/21/08 Dissolved Oxygen NS 2.51 mg/L D 08S2
MW-12S 8/25/08 Dissolved Oxygen NS 0.51 mg/L D 08S2
MW-15S 8/25/08 Dissolved Oxygen NS 0.67 mg/L D 08S2
MW-48S 8/25/08 Dissolved Oxygen NS 2.29 mg/L D 08S2
MW-50S 8/25/08 Dissolved Oxygen NS 0.49 mg/L D 08S2
MW-56D 8/25/08 Dissolved Oxygen NS 2.09 mg/L D 08S2
MW-11D 8/26/08 Dissolved Oxygen NS 1.44 mg/L D 08S2
MW-23S 8/26/08 Dissolved Oxygen NS 1.02 mg/L D 08S2
MW-24D 8/26/08 Dissolved Oxygen NS 6.19 mg/L D 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-26D 8/26/08 Dissolved Oxygen NS 3.53 mg/L D 08S2
MW-8S 8/26/08 Dissolved Oxygen NS 5.41 mg/L D 08S2
MW-9S 8/26/08 Dissolved Oxygen NS 7.12 mg/L D 08S2
MW-10S 8/27/08 Dissolved Oxygen NS 7.15 mg/L D 08S2
MW-10S 3/11/09 Dissolved Oxygen NS 3.8 mg/L D 09S1
MW-13S 3/11/09 Dissolved Oxygen NS 1.22 mg/L D 09S1
MW-14S 3/11/09 Dissolved Oxygen NS 0.08 mg/L D 09S1
MW-15S 3/11/09 Dissolved Oxygen NS 0.09 mg/L D 09S1
MW-18D 3/11/09 Dissolved Oxygen NS 3.2 mg/L D 09S1
MW-19D 3/11/09 Dissolved Oxygen NS 0.15 mg/L D 09S1
MW-21D 3/11/09 Dissolved Oxygen NS 0.14 mg/L D 09S1
MW-50S 3/11/09 Dissolved Oxygen NS 0.16 mg/L D 09S1
MW-9S 3/11/09 Dissolved Oxygen NS 7.47 mg/L D 09S1
MW-11D 3/12/09 Dissolved Oxygen NS 0.27 mg/L D 09S1
MW-12S 3/12/09 Dissolved Oxygen NS 0.1 mg/L D 09S1
MW-23S 3/12/09 Dissolved Oxygen NS 0.1 mg/L D 09S1
MW-24D 3/12/09 Dissolved Oxygen NS 5.95 mg/L D 09S1
MW-26D 3/12/09 Dissolved Oxygen NS 1.61 mg/L D 09S1
MW-48S 3/12/09 Dissolved Oxygen NS 0.07 mg/L D 09S1
MW-56D 3/12/09 Dissolved Oxygen NS 0.15 mg/L D 09S1
MW-8S 3/12/09 Dissolved Oxygen NS 1.35 mg/L D 09S1
MW-10S 8/20/09 Dissolved Oxygen NS 2.62 mg/L D 09S2
MW-11D 8/20/09 Dissolved Oxygen NS 0.61 mg/L D 09S2
MW-12S 8/20/09 Dissolved Oxygen NS 0.02 mg/L D 09S2
MW-14S 8/20/09 Dissolved Oxygen NS 0.19 mg/L D 09S2
MW-15S 8/20/09 Dissolved Oxygen NS 0.41 mg/L D 09S2
MW-18D 8/20/09 Dissolved Oxygen NS 0.06 mg/L D 09S2
MW-19D 8/20/09 Dissolved Oxygen NS 0.04 mg/L D 09S2
MW-21D 8/20/09 Dissolved Oxygen NS 0.16 mg/L D 09S2
MW-23S 8/20/09 Dissolved Oxygen NS 0.26 mg/L D 09S2
MW-48S 8/20/09 Dissolved Oxygen NS 1.09 mg/L D 09S2
MW-50S 8/20/09 Dissolved Oxygen NS 0.21 mg/L D 09S2
MW-56D 8/20/09 Dissolved Oxygen NS 0.99 mg/L D 09S2
MW-13S 8/25/09 Dissolved Oxygen NS 0.25 mg/L D 09S2
MW-24D 8/25/09 Dissolved Oxygen NS 5.3 mg/L D 09S2
MW-26D 8/25/09 Dissolved Oxygen NS 0.61 mg/L D 09S2
MW-8S 8/26/09 Dissolved Oxygen NS 0.64 mg/L D 09S2
MW-9S 8/26/09 Dissolved Oxygen NS 7.37 mg/L D 09S2
MW-10S 3/26/10 Dissolved Oxygen NS 0.87 mg/L D 10S1
MW-26D 3/26/10 Dissolved Oxygen NS 1.6 mg/L D 10S1
MW-8S 3/26/10 Dissolved Oxygen NS 0.15 mg/L D 10S1
MW-9S 3/26/10 Dissolved Oxygen NS 5.48 mg/L D 10S1
MW-11D 3/29/10 Dissolved Oxygen NS 0.09 mg/L D 10S1
MW-12S 3/29/10 Dissolved Oxygen NS 0.09 mg/L D 10S1
MW-13S 3/29/10 Dissolved Oxygen NS 0.3 mg/L D 10S1
MW-14S 3/29/10 Dissolved Oxygen NS 0.05 mg/L D 10S1
MW-15S 3/29/10 Dissolved Oxygen NS 0.03 mg/L D 10S1
MW-18D 3/29/10 Dissolved Oxygen NS 3.31 mg/L D 10S1
MW-19D 3/29/10 Dissolved Oxygen NS 0.14 mg/L D 10S1
MW-21D 3/29/10 Dissolved Oxygen NS 0.2 mg/L D 10S1
MW-50S 3/29/10 Dissolved Oxygen NS 0.11 mg/L D 10S1
MW-23S 3/30/10 Dissolved Oxygen NS 0.45 mg/L D 10S1
MW-24D 3/30/10 Dissolved Oxygen NS 6.1 mg/L D 10S1
MW-48S 3/30/10 Dissolved Oxygen NS 0.02 mg/L D 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-56D 3/30/10 Dissolved Oxygen NS 0.32 mg/L D 10S1
MW-13S 10/7/10 Dissolved Oxygen NS 0.02 mg/L D 10S2
MW-14S 10/7/10 Dissolved Oxygen NS 0.01 mg/L D 10S2
MW-18D 10/7/10 Dissolved Oxygen NS 0.33 mg/L D 10S2
MW-19D 10/7/10 Dissolved Oxygen NS 0.11 mg/L D 10S2
MW-10S 10/8/10 Dissolved Oxygen NS 2.58 mg/L D 10S2
MW-26D 10/8/10 Dissolved Oxygen NS 0.05 mg/L D 10S2
MW-8S 10/8/10 Dissolved Oxygen NS 0.14 mg/L D 10S2
MW-9S 10/8/10 Dissolved Oxygen NS 6.88 mg/L D 10S2
MW-15S 10/11/10 Dissolved Oxygen NS 0.17 mg/L D 10S2
MW-21D 10/11/10 Dissolved Oxygen NS 0.47 mg/L D 10S2
MW-50S 10/11/10 Dissolved Oxygen NS 0.2 mg/L D 10S2
MW-48S 10/12/10 Dissolved Oxygen NS 0.26 mg/L D 10S2
MW-56D 10/12/10 Dissolved Oxygen NS 0.16 mg/L D 10S2
MW-11D 10/13/10 Dissolved Oxygen NS 0.62 mg/L D 10S2
MW-12S 10/13/10 Dissolved Oxygen NS 0.42 mg/L D 10S2
MW-23S 10/13/10 Dissolved Oxygen NS 0.61 mg/L D 10S2
MW-24D 10/13/10 Dissolved Oxygen NS 4.92 mg/L D 10S2
MW-13S 2/18/11 Dissolved Oxygen NS 0.16 mg/L D 11S1
MW-14S 2/18/11 Dissolved Oxygen NS 0.17 mg/L D 11S1
MW-15S 2/18/11 Dissolved Oxygen NS 0.19 mg/L D 11S1
MW-18D 2/18/11 Dissolved Oxygen NS 0.11 mg/L D 11S1
MW-19D 2/18/11 Dissolved Oxygen NS 0.15 mg/L D 11S1
MW-50S 2/18/11 Dissolved Oxygen NS 0.18 mg/L D 11S1
MW-10S 2/21/11 Dissolved Oxygen NS 4.11 mg/L D 11S1
MW-11D 2/21/11 Dissolved Oxygen NS 0.28 mg/L D 11S1
MW-12S 2/21/11 Dissolved Oxygen NS 0.31 mg/L D 11S1
MW-21D 2/21/11 Dissolved Oxygen NS 0.44 mg/L D 11S1
MW-23S 2/21/11 Dissolved Oxygen NS 0.07 mg/L D 11S1
MW-24D 2/21/11 Dissolved Oxygen NS 0.29 mg/L D 11S1
MW-26D 2/21/11 Dissolved Oxygen NS 0.13 mg/L D 11S1
MW-48S 2/21/11 Dissolved Oxygen NS 0.6 mg/L D 11S1
MW-56D 2/21/11 Dissolved Oxygen NS 0.46 mg/L D 11S1
MW-8S 2/21/11 Dissolved Oxygen NS 0.48 mg/L D 11S1
MW-9S 2/21/11 Dissolved Oxygen NS 7.44 mg/L D 11S1
MW-10S 9/22/11 Dissolved Oxygen NS 1.18 mg/L 11S2
MW-26D 9/22/11 Dissolved Oxygen NS 0.6 mg/L 11S2
MW-8S 9/22/11 Dissolved Oxygen NS 0.02 mg/L 11S2
MW-9S 9/22/11 Dissolved Oxygen NS 5.91 mg/L 11S2
MW-11D 9/23/11 Dissolved Oxygen NS 0.11 mg/L 11S2
MW-12S 9/23/11 Dissolved Oxygen NS 0.38 mg/L 11S2
MW-13S 9/23/11 Dissolved Oxygen NS 0.7 mg/L 11S2
MW-14S 9/23/11 Dissolved Oxygen NS 0.17 mg/L 11S2
MW-15S 9/23/11 Dissolved Oxygen NS 0.32 mg/L 11S2
MW-18D 9/23/11 Dissolved Oxygen NS 0.26 mg/L 11S2
MW-19D 9/23/11 Dissolved Oxygen NS 0.15 mg/L 11S2
MW-21D 9/23/11 Dissolved Oxygen NS 1.56 mg/L 11S2
MW-23S 9/23/11 Dissolved Oxygen NS 0.28 mg/L 11S2
MW-24D 9/23/11 Dissolved Oxygen NS 4.94 mg/L 11S2
MW-48S 9/23/11 Dissolved Oxygen NS 0.17 mg/L 11S2
MW-50S 9/23/11 Dissolved Oxygen NS 0.5 mg/L 11S2
MW-56D 9/23/11 Dissolved Oxygen NS 0.17 mg/L 11S2
MW-10S 2/21/12 Dissolved Oxygen NS 0.31 mg/L D 12S1
MW-48S 2/21/12 Dissolved Oxygen NS 0.25 mg/L D 12S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-11D 2/22/12 Dissolved Oxygen NS 0.2 mg/L D 12S1
MW-12S 2/22/12 Dissolved Oxygen NS 0.2 mg/L D 12S1
MW-13S 2/22/12 Dissolved Oxygen NS 0.2 mg/L D 12S1
MW-14S 2/22/12 Dissolved Oxygen NS 0.09 mg/L D 12S1
MW-15S 2/22/12 Dissolved Oxygen NS 0.33 mg/L D 12S1
MW-18D 2/22/12 Dissolved Oxygen NS 0.16 mg/L D 12S1
MW-19D 2/22/12 Dissolved Oxygen NS 0.12 mg/L D 12S1
MW-21D 2/22/12 Dissolved Oxygen NS 0.15 mg/L D 12S1
MW-50S 2/22/12 Dissolved Oxygen NS 0.28 mg/L D 12S1
MW-56D 2/22/12 Dissolved Oxygen NS 0.15 mg/L D 12S1
MW-23S 2/23/12 Dissolved Oxygen NS 0.19 mg/L D 12S1
MW-24D 2/23/12 Dissolved Oxygen NS 1.02 mg/L D 12S1
MW-26D 2/23/12 Dissolved Oxygen NS 1.02 mg/L D 12S1
MW-8S 2/23/12 Dissolved Oxygen NS 0.44 mg/L D 12S1
MW-9S 2/23/12 Dissolved Oxygen NS 2.99 mg/L D 12S1
MW-10S 10/16/12 Dissolved Oxygen NS 0.11 mg/L D 12S2
MW-14S 10/16/12 Dissolved Oxygen NS 0.08 mg/L D 12S2
MW-15S 10/16/12 Dissolved Oxygen NS 0.14 mg/L D 12S2
MW-18D 10/16/12 Dissolved Oxygen NS 1.78 mg/L D 12S2
MW-19D 10/16/12 Dissolved Oxygen NS 0.15 mg/L D 12S2
MW-23S 10/16/12 Dissolved Oxygen NS 0.18 mg/L D 12S2
MW-24D 10/16/12 Dissolved Oxygen NS 0.12 mg/L D 12S2
MW-26D 10/16/12 Dissolved Oxygen NS 0.08 mg/L D 12S2
MW-50S 10/16/12 Dissolved Oxygen NS 0.09 mg/L D 12S2
MW-8S 10/16/12 Dissolved Oxygen NS 0.08 mg/L D 12S2
MW-9S 10/16/12 Dissolved Oxygen NS 4.19 mg/L D 12S2
MW-11D 10/17/12 Dissolved Oxygen NS 0.09 mg/L D 12S2
MW-12S 10/17/12 Dissolved Oxygen NS 0.15 mg/L D 12S2
MW-13S 10/17/12 Dissolved Oxygen NS 0.08 mg/L D 12S2
MW-21D 10/17/12 Dissolved Oxygen NS 0.12 mg/L D 12S2
MW-48S 10/17/12 Dissolved Oxygen NS 0.08 mg/L D 12S2
MW-56D 10/17/12 Dissolved Oxygen NS 0.07 mg/L D 12S2
MW-13S 2/26/13 Dissolved Oxygen NS 0.47 mg/L D 13S1
MW-14S 2/26/13 Dissolved Oxygen NS 0.93 mg/L D 13S1
MW-15S 2/26/13 Dissolved Oxygen NS 0.68 mg/L D 13S1
MW-18D 2/26/13 Dissolved Oxygen NS 3.91 mg/L D 13S1
MW-19D 2/26/13 Dissolved Oxygen NS 1.4 mg/L D 13S1
MW-50S 2/26/13 Dissolved Oxygen NS 0.49 mg/L D 13S1
MW-10S 2/27/13 Dissolved Oxygen NS 4.64 mg/L D 13S1
MW-11D 2/27/13 Dissolved Oxygen NS 1.22 mg/L D 13S1
MW-12S 2/27/13 Dissolved Oxygen NS 0.16 mg/L D 13S1
MW-21D 2/27/13 Dissolved Oxygen NS 1.5 mg/L D 13S1
MW-23S 2/27/13 Dissolved Oxygen NS 0.12 mg/L D 13S1
MW-24D 2/27/13 Dissolved Oxygen NS 1.27 mg/L D 13S1
MW-26D 2/27/13 Dissolved Oxygen NS 1.43 mg/L D 13S1
MW-48S 2/27/13 Dissolved Oxygen NS 0.83 mg/L D 13S1
MW-56D 2/27/13 Dissolved Oxygen NS 1.11 mg/L D 13S1
MW-8S 2/27/13 Dissolved Oxygen NS 1.3 mg/L D 13S1
MW-9S 2/27/13 Dissolved Oxygen NS 6.87 mg/L D 13S1
MW-12S 9/17/13 Dissolved Oxygen NS 0.34 mg/L D 13S2
MW-21D 9/17/13 Dissolved Oxygen NS 0.16 mg/L D 13S2
MW-26D 9/17/13 Dissolved Oxygen NS 0.28 mg/L D 13S2
MW-48S 9/17/13 Dissolved Oxygen NS 0.22 mg/L D 13S2
MW-56D 9/17/13 Dissolved Oxygen NS 0.16 mg/L D 13S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-8S 9/17/13 Dissolved Oxygen NS 0.24 mg/L D 13S2
MW-10S 9/18/13 Dissolved Oxygen NS 0.34 mg/L D 13S2
MW-11D 9/18/13 Dissolved Oxygen NS 0.19 mg/L D 13S2
MW-13S 9/18/13 Dissolved Oxygen NS 0.11 mg/L D 13S2
MW-15S 9/18/13 Dissolved Oxygen NS 0.28 mg/L D 13S2
MW-50S 9/18/13 Dissolved Oxygen NS 0.11 mg/L D 13S2
MW-9S 9/18/13 Dissolved Oxygen NS 3.94 mg/L D 13S2
MW-14S 9/19/13 Dissolved Oxygen NS 0.2 mg/L D 13S2
MW-18D 9/19/13 Dissolved Oxygen NS 1.29 mg/L D 13S2
MW-19D 9/19/13 Dissolved Oxygen NS 0.23 mg/L D 13S2
MW-23S 9/19/13 Dissolved Oxygen NS 0.18 mg/L D 13S2
MW-24D 9/19/13 Dissolved Oxygen NS 0.26 mg/L D 13S2
MW-10S 2/7/14 Dissolved Oxygen NS 2.13 mg/L D 14S1
MW-11D 2/7/14 Dissolved Oxygen NS 0.15 mg/L D 14S1
MW-12S 2/7/14 Dissolved Oxygen NS 0.14 mg/L D 14S1
MW-13S 2/7/14 Dissolved Oxygen NS 2.82 mg/L D 14S1
MW-14S 2/7/14 Dissolved Oxygen NS 0.28 mg/L D 14S1
MW-15S 2/7/14 Dissolved Oxygen NS 0.2 mg/L D 14S1
MW-18D 2/7/14 Dissolved Oxygen NS 2.7 mg/L D 14S1
MW-19D 2/7/14 Dissolved Oxygen NS 0.53 mg/L D 14S1
MW-21D 2/7/14 Dissolved Oxygen NS 0.45 mg/L D 14S1
MW-23S 2/7/14 Dissolved Oxygen NS 0.18 mg/L D 14S1
MW-24D 2/7/14 Dissolved Oxygen NS 0.22 mg/L D 14S1
MW-26D 2/7/14 Dissolved Oxygen NS 0.12 mg/L D 14S1
MW-48S 2/7/14 Dissolved Oxygen NS 0.12 mg/L D 14S1
MW-50S 2/7/14 Dissolved Oxygen NS 0.21 mg/L D 14S1
MW-56D 2/7/14 Dissolved Oxygen NS 0.1 mg/L D 14S1
MW-8S 2/7/14 Dissolved Oxygen NS 0.57 mg/L D 14S1
MW-9S 2/7/14 Dissolved Oxygen NS 5.8 mg/L D 14S1
MW-13S 3/11/09 Ethylbenzene 30** 1.5 µg/L 09S1
MW-21D 3/11/09 Ethylbenzene 30** 1.6 µg/L 09S1
MW-50S 3/11/09 Ethylbenzene 30** 1.3 µg/L 09S1
MW-10S 2/19/08 Field Temperature NS 21.8 Deg C D 08S1
MW-11D 2/19/08 Field Temperature NS 22 Deg C D 08S1
MW-12S 2/19/08 Field Temperature NS 22.2 Deg C D 08S1
MW-26D 2/19/08 Field Temperature NS 20.9 Deg C D 08S1
MW-8S 2/19/08 Field Temperature NS 21.4 Deg C D 08S1
MW-9S 2/19/08 Field Temperature NS 22.1 Deg C D 08S1
MW-13S 2/20/08 Field Temperature NS 21.9 Deg C D 08S1
MW-18D 2/20/08 Field Temperature NS 20.2 Deg C D 08S1
MW-19D 2/20/08 Field Temperature NS 19.8 Deg C D 08S1
MW-21D 2/20/08 Field Temperature NS 22.8 Deg C D 08S1
MW-23S 2/20/08 Field Temperature NS 23.2 Deg C D 08S1
MW-24D 2/20/08 Field Temperature NS 23.8 Deg C D 08S1
MW-14S 2/21/08 Field Temperature NS 19.1 Deg C D 08S1
MW-15S 2/21/08 Field Temperature NS 22 Deg C D 08S1
MW-48S 2/21/08 Field Temperature NS 20.4 Deg C D 08S1
MW-50S 2/21/08 Field Temperature NS 21.4 Deg C D 08S1
MW-56D 2/21/08 Field Temperature NS 20.8 Deg C D 08S1
MW-13S 8/21/08 Field Temperature NS 23.1 Deg C D 08S2
MW-14S 8/21/08 Field Temperature NS 22.7 Deg C D 08S2
MW-18D 8/21/08 Field Temperature NS 22.6 Deg C D 08S2
MW-19D 8/21/08 Field Temperature NS 22.5 Deg C D 08S2
MW-21D 8/21/08 Field Temperature NS 25.9 Deg C D 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-12S 8/25/08 Field Temperature NS 24.3 Deg C D 08S2
MW-15S 8/25/08 Field Temperature NS 23.8 Deg C D 08S2
MW-48S 8/25/08 Field Temperature NS 23 Deg C D 08S2
MW-50S 8/25/08 Field Temperature NS 22.5 Deg C D 08S2
MW-56D 8/25/08 Field Temperature NS 23.2 Deg C D 08S2
MW-11D 8/26/08 Field Temperature NS 25.1 Deg C D 08S2
MW-23S 8/26/08 Field Temperature NS 24 Deg C D 08S2
MW-24D 8/26/08 Field Temperature NS 25.1 Deg C D 08S2
MW-26D 8/26/08 Field Temperature NS 25.2 Deg C D 08S2
MW-8S 8/26/08 Field Temperature NS 23.1 Deg C D 08S2
MW-9S 8/26/08 Field Temperature NS 23.7 Deg C D 08S2
MW-10S 8/27/08 Field Temperature NS 22.8 Deg C D 08S2
MW-10S 3/11/09 Field Temperature NS 22.4 Deg C D 09S1
MW-13S 3/11/09 Field Temperature NS 21.4 Deg C D 09S1
MW-14S 3/11/09 Field Temperature NS 19.9 Deg C D 09S1
MW-15S 3/11/09 Field Temperature NS 22.7 Deg C D 09S1
MW-18D 3/11/09 Field Temperature NS 18.8 Deg C D 09S1
MW-19D 3/11/09 Field Temperature NS 19.5 Deg C D 09S1
MW-21D 3/11/09 Field Temperature NS 22 Deg C D 09S1
MW-50S 3/11/09 Field Temperature NS 22.5 Deg C D 09S1
MW-9S 3/11/09 Field Temperature NS 22.7 Deg C D 09S1
MW-11D 3/12/09 Field Temperature NS 22.3 Deg C D 09S1
MW-12S 3/12/09 Field Temperature NS 22.3 Deg C D 09S1
MW-23S 3/12/09 Field Temperature NS 22.9 Deg C D 09S1
MW-24D 3/12/09 Field Temperature NS 22.7 Deg C D 09S1
MW-26D 3/12/09 Field Temperature NS 22.1 Deg C D 09S1
MW-48S 3/12/09 Field Temperature NS 21.1 Deg C D 09S1
MW-56D 3/12/09 Field Temperature NS 20.9 Deg C D 09S1
MW-8S 3/12/09 Field Temperature NS 21.5 Deg C D 09S1
MW-10S 8/20/09 Field Temperature NS 24.2 Deg C D 09S2
MW-11D 8/20/09 Field Temperature NS 23 Deg C D 09S2
MW-12S 8/20/09 Field Temperature NS 23.9 Deg C D 09S2
MW-14S 8/20/09 Field Temperature NS 22.29 Deg C D 09S2
MW-15S 8/20/09 Field Temperature NS 23.38 Deg C D 09S2
MW-18D 8/20/09 Field Temperature NS 24.1 Deg C D 09S2
MW-19D 8/20/09 Field Temperature NS 24.2 Deg C D 09S2
MW-21D 8/20/09 Field Temperature NS 24.8 Deg C D 09S2
MW-23S 8/20/09 Field Temperature NS 25.2 Deg C D 09S2
MW-48S 8/20/09 Field Temperature NS 23.06 Deg C D 09S2
MW-50S 8/20/09 Field Temperature NS 22.89 Deg C D 09S2
MW-56D 8/20/09 Field Temperature NS 23.46 Deg C D 09S2
MW-13S 8/25/09 Field Temperature NS 22.7 Deg C D 09S2
MW-24D 8/25/09 Field Temperature NS 25.6 Deg C D 09S2
MW-26D 8/25/09 Field Temperature NS 22.5 Deg C D 09S2
MW-8S 8/26/09 Field Temperature NS 21.1 Deg C D 09S2
MW-9S 8/26/09 Field Temperature NS 21.8 Deg C D 09S2
MW-10S 3/26/10 Field Temperature NS 22.2 Deg C D 10S1
MW-26D 3/26/10 Field Temperature NS 17.4 Deg C D 10S1
MW-8S 3/26/10 Field Temperature NS 19.4 Deg C D 10S1
MW-9S 3/26/10 Field Temperature NS 20.1 Deg C D 10S1
MW-11D 3/29/10 Field Temperature NS 21.7 Deg C D 10S1
MW-12S 3/29/10 Field Temperature NS 21.7 Deg C D 10S1
MW-13S 3/29/10 Field Temperature NS 19.9 Deg C D 10S1
MW-14S 3/29/10 Field Temperature NS 18.1 Deg C D 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-15S 3/29/10 Field Temperature NS 21.1 Deg C D 10S1
MW-18D 3/29/10 Field Temperature NS 17.8 Deg C D 10S1
MW-19D 3/29/10 Field Temperature NS 18.1 Deg C D 10S1
MW-21D 3/29/10 Field Temperature NS 21.8 Deg C D 10S1
MW-50S 3/29/10 Field Temperature NS 20.5 Deg C D 10S1
MW-23S 3/30/10 Field Temperature NS 22.8 Deg C D 10S1
MW-24D 3/30/10 Field Temperature NS 24.5 Deg C D 10S1
MW-48S 3/30/10 Field Temperature NS 21.1 Deg C D 10S1
MW-56D 3/30/10 Field Temperature NS 21.5 Deg C D 10S1
MW-13S 10/7/10 Field Temperature NS 23 Deg C D 10S2
MW-14S 10/7/10 Field Temperature NS 20.5 Deg C D 10S2
MW-18D 10/7/10 Field Temperature NS 20.6 Deg C D 10S2
MW-19D 10/7/10 Field Temperature NS 22.4 Deg C D 10S2
MW-10S 10/8/10 Field Temperature NS 23.3 Deg C D 10S2
MW-26D 10/8/10 Field Temperature NS 20.8 Deg C D 10S2
MW-8S 10/8/10 Field Temperature NS 21 Deg C D 10S2
MW-9S 10/8/10 Field Temperature NS 23 Deg C D 10S2
MW-15S 10/11/10 Field Temperature NS 23.7 Deg C D 10S2
MW-21D 10/11/10 Field Temperature NS 23.9 Deg C D 10S2
MW-50S 10/11/10 Field Temperature NS 22.9 Deg C D 10S2
MW-48S 10/12/10 Field Temperature NS 23.2 Deg C D 10S2
MW-56D 10/12/10 Field Temperature NS 22.5 Deg C D 10S2
MW-11D 10/13/10 Field Temperature NS 23.2 Deg C D 10S2
MW-12S 10/13/10 Field Temperature NS 22.8 Deg C D 10S2
MW-23S 10/13/10 Field Temperature NS 24.8 Deg C D 10S2
MW-24D 10/13/10 Field Temperature NS 24.1 Deg C D 10S2
MW-13S 2/18/11 Field Temperature NS 21.3 Deg C D 11S1
MW-14S 2/18/11 Field Temperature NS 18.9 Deg C D 11S1
MW-15S 2/18/11 Field Temperature NS 22.2 Deg C D 11S1
MW-18D 2/18/11 Field Temperature NS 21.1 Deg C D 11S1
MW-19D 2/18/11 Field Temperature NS 19.8 Deg C D 11S1
MW-50S 2/18/11 Field Temperature NS 22.1 Deg C D 11S1
MW-10S 2/21/11 Field Temperature NS 22.2 Deg C D 11S1
MW-11D 2/21/11 Field Temperature NS 21.9 Deg C D 11S1
MW-12S 2/21/11 Field Temperature NS 22 Deg C D 11S1
MW-21D 2/21/11 Field Temperature NS 22.4 Deg C D 11S1
MW-23S 2/21/11 Field Temperature NS 24.4 Deg C D 11S1
MW-24D 2/21/11 Field Temperature NS 24.9 Deg C D 11S1
MW-26D 2/21/11 Field Temperature NS 20.7 Deg C D 11S1
MW-48S 2/21/11 Field Temperature NS 21.7 Deg C D 11S1
MW-56D 2/21/11 Field Temperature NS 22 Deg C D 11S1
MW-8S 2/21/11 Field Temperature NS 21.1 Deg C D 11S1
MW-9S 2/21/11 Field Temperature NS 22.4 Deg C D 11S1
MW-10S 9/22/11 Field Temperature NS 22.6 Deg C 11S2
MW-26D 9/22/11 Field Temperature NS 23.7 Deg C 11S2
MW-8S 9/22/11 Field Temperature NS 23.3 Deg C 11S2
MW-9S 9/22/11 Field Temperature NS 23.3 Deg C 11S2
MW-11D 9/23/11 Field Temperature NS 23.3 Deg C 11S2
MW-12S 9/23/11 Field Temperature NS 22.7 Deg C 11S2
MW-13S 9/23/11 Field Temperature NS 21.7 Deg C 11S2
MW-14S 9/23/11 Field Temperature NS 22.8 Deg C 11S2
MW-15S 9/23/11 Field Temperature NS 23.7 Deg C 11S2
MW-18D 9/23/11 Field Temperature NS 22.9 Deg C 11S2
MW-19D 9/23/11 Field Temperature NS 22.3 Deg C 11S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-21D 9/23/11 Field Temperature NS 22.3 Deg C 11S2
MW-23S 9/23/11 Field Temperature NS 25 Deg C 11S2
MW-24D 9/23/11 Field Temperature NS 25.6 Deg C 11S2
MW-48S 9/23/11 Field Temperature NS 21.8 Deg C 11S2
MW-50S 9/23/11 Field Temperature NS 22.1 Deg C 11S2
MW-56D 9/23/11 Field Temperature NS 22.1 Deg C 11S2
MW-10S 2/21/12 Field Temperature NS 21.8 Deg C D 12S1
MW-48S 2/21/12 Field Temperature NS 21.6 Deg C D 12S1
MW-11D 2/22/12 Field Temperature NS 21.3 Deg C D 12S1
MW-12S 2/22/12 Field Temperature NS 21.3 Deg C D 12S1
MW-13S 2/22/12 Field Temperature NS 21.3 Deg C D 12S1
MW-14S 2/22/12 Field Temperature NS 21.5 Deg C D 12S1
MW-15S 2/22/12 Field Temperature NS 21.3 Deg C D 12S1
MW-18D 2/22/12 Field Temperature NS 20.9 Deg C D 12S1
MW-19D 2/22/12 Field Temperature NS 20 Deg C D 12S1
MW-21D 2/22/12 Field Temperature NS 21.7 Deg C D 12S1
MW-50S 2/22/12 Field Temperature NS 20.8 Deg C D 12S1
MW-56D 2/22/12 Field Temperature NS 21.3 Deg C D 12S1
MW-23S 2/23/12 Field Temperature NS 22.6 Deg C D 12S1
MW-24D 2/23/12 Field Temperature NS 21.5 Deg C D 12S1
MW-26D 2/23/12 Field Temperature NS 21.5 Deg C D 12S1
MW-8S 2/23/12 Field Temperature NS 21.2 Deg C D 12S1
MW-9S 2/23/12 Field Temperature NS 21.8 Deg C D 12S1
MW-10S 10/16/12 Field Temperature NS 23.8 Deg C D 12S2
MW-14S 10/16/12 Field Temperature NS 22.7 Deg C D 12S2
MW-15S 10/16/12 Field Temperature NS 24.4 Deg C D 12S2
MW-18D 10/16/12 Field Temperature NS 22.1 Deg C D 12S2
MW-19D 10/16/12 Field Temperature NS 21.7 Deg C D 12S2
MW-23S 10/16/12 Field Temperature NS 24.4 Deg C D 12S2
MW-24D 10/16/12 Field Temperature NS 25.4 Deg C D 12S2
MW-26D 10/16/12 Field Temperature NS 22.8 Deg C D 12S2
MW-50S 10/16/12 Field Temperature NS 22.4 Deg C D 12S2
MW-8S 10/16/12 Field Temperature NS 21.2 Deg C D 12S2
MW-9S 10/16/12 Field Temperature NS 24.1 Deg C D 12S2
MW-11D 10/17/12 Field Temperature NS 22.9 Deg C D 12S2
MW-12S 10/17/12 Field Temperature NS 22.2 Deg C D 12S2
MW-13S 10/17/12 Field Temperature NS 23 Deg C D 12S2
MW-21D 10/17/12 Field Temperature NS 22.4 Deg C D 12S2
MW-48S 10/17/12 Field Temperature NS 23.5 Deg C D 12S2
MW-56D 10/17/12 Field Temperature NS 22.9 Deg C D 12S2
MW-13S 2/26/13 Field Temperature NS 21.3 Deg C D 13S1
MW-14S 2/26/13 Field Temperature NS 19.9 Deg C D 13S1
MW-15S 2/26/13 Field Temperature NS 21.8 Deg C D 13S1
MW-18D 2/26/13 Field Temperature NS 20.4 Deg C D 13S1
MW-19D 2/26/13 Field Temperature NS 20 Deg C D 13S1
MW-50S 2/26/13 Field Temperature NS 21.1 Deg C D 13S1
MW-10S 2/27/13 Field Temperature NS 228 Deg C D 13S1
MW-11D 2/27/13 Field Temperature NS 20.8 Deg C D 13S1
MW-12S 2/27/13 Field Temperature NS 21.7 Deg C D 13S1
MW-21D 2/27/13 Field Temperature NS 21.1 Deg C D 13S1
MW-23S 2/27/13 Field Temperature NS 23.4 Deg C D 13S1
MW-24D 2/27/13 Field Temperature NS 23.2 Deg C D 13S1
MW-26D 2/27/13 Field Temperature NS 21 Deg C D 13S1
MW-48S 2/27/13 Field Temperature NS 20.1 Deg C D 13S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-56D 2/27/13 Field Temperature NS 19.1 Deg C D 13S1
MW-8S 2/27/13 Field Temperature NS 20.7 Deg C D 13S1
MW-9S 2/27/13 Field Temperature NS 21.3 Deg C D 13S1
MW-12S 9/17/13 Field Temperature NS 24.6 Deg C D 13S2
MW-21D 9/17/13 Field Temperature NS 24.5 Deg C D 13S2
MW-26D 9/17/13 Field Temperature NS 23.2 Deg C D 13S2
MW-48S 9/17/13 Field Temperature NS 24.1 Deg C D 13S2
MW-56D 9/17/13 Field Temperature NS 23.7 Deg C D 13S2
MW-8S 9/17/13 Field Temperature NS 21.9 Deg C D 13S2
MW-10S 9/18/13 Field Temperature NS 22.7 Deg C D 13S2
MW-11D 9/18/13 Field Temperature NS 23.4 Deg C D 13S2
MW-13S 9/18/13 Field Temperature NS 23.2 Deg C D 13S2
MW-15S 9/18/13 Field Temperature NS 24.4 Deg C D 13S2
MW-50S 9/18/13 Field Temperature NS 23.4 Deg C D 13S2
MW-9S 9/18/13 Field Temperature NS 23.7 Deg C D 13S2
MW-14S 9/19/13 Field Temperature NS 21.5 Deg C D 13S2
MW-18D 9/19/13 Field Temperature NS 21.9 Deg C D 13S2
MW-19D 9/19/13 Field Temperature NS 22.5 Deg C D 13S2
MW-23S 9/19/13 Field Temperature NS 25.3 Deg C D 13S2
MW-24D 9/19/13 Field Temperature NS 25 Deg C D 13S2
MW-10S 2/7/14 Field Temperature NS 20.8 Deg C D 14S1
MW-11D 2/7/14 Field Temperature NS 21.2 Deg C D 14S1
MW-12S 2/7/14 Field Temperature NS 22 Deg C D 14S1
MW-13S 2/7/14 Field Temperature NS 21.1 Deg C D 14S1
MW-14S 2/7/14 Field Temperature NS 19 Deg C D 14S1
MW-15S 2/7/14 Field Temperature NS 22.6 Deg C D 14S1
MW-18D 2/7/14 Field Temperature NS 19.1 Deg C D 14S1
MW-19D 2/7/14 Field Temperature NS 18.6 Deg C D 14S1
MW-21D 2/7/14 Field Temperature NS 20.8 Deg C D 14S1
MW-23S 2/7/14 Field Temperature NS 23.2 Deg C D 14S1
MW-24D 2/7/14 Field Temperature NS 22.1 Deg C D 14S1
MW-26D 2/7/14 Field Temperature NS 21.2 Deg C D 14S1
MW-48S 2/7/14 Field Temperature NS 21.5 Deg C D 14S1
MW-50S 2/7/14 Field Temperature NS 22.2 Deg C D 14S1
MW-56D 2/7/14 Field Temperature NS 21.6 Deg C D 14S1
MW-8S 2/7/14 Field Temperature NS 18.7 Deg C D 14S1
MW-9S 2/7/14 Field Temperature NS 21.5 Deg C D 14S1
MW-10S 2/19/08 Iron 300** 120 µg/L 08S1
MW-11D 2/19/08 Iron 300** 38000 µg/L 08S1
MW-12S 2/19/08 Iron 300** 49000 µg/L 08S1
MW-26D 2/19/08 Iron 300** 84 µg/L 08S1
MW-8S 2/19/08 Iron 300** 68 µg/L 08S1
MW-9S 2/19/08 Iron 300** 430 µg/L 08S1
MW-13S 2/20/08 Iron 300** 20000 µg/L 08S1
MW-18D 2/20/08 Iron 300** 540 µg/L 08S1
MW-19D 2/20/08 Iron 300** 3300 µg/L 08S1
MW-21D 2/20/08 Iron 300** 560 µg/L 08S1
MW-23S 2/20/08 Iron 300** 47000 µg/L 08S1
MW-24D 2/20/08 Iron 300** 350 µg/L 08S1
MW-14S 2/21/08 Iron 300** 19000 µg/L 08S1
MW-15S 2/21/08 Iron 300** 15000 µg/L 08S1
MW-48S 2/21/08 Iron 300** 42000 µg/L 08S1
MW-50S 2/21/08 Iron 300** 23000 µg/L 08S1
MW-56D 2/21/08 Iron 300** 22000 µg/L 08S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-13S 8/21/08 Iron 300** 22000 µg/L 08S2
MW-14S 8/21/08 Iron 300** 930 µg/L 08S2
MW-18D 8/21/08 Iron 300** 660 µg/L 08S2
MW-19D 8/21/08 Iron 300** 3000 µg/L 08S2
MW-21D 8/21/08 Iron 300** 350 µg/L 08S2
MW-12S 8/25/08 Iron 300** 26000 µg/L 08S2
MW-15S 8/25/08 Iron 300** 13000 µg/L 08S2
MW-48S 8/25/08 Iron 300** 43000 µg/L 08S2
MW-50S 8/25/08 Iron 300** 26000 µg/L 08S2
MW-56D 8/25/08 Iron 300** 25000 µg/L 08S2
MW-11D 8/26/08 Iron 300** 350 µg/L 08S2
MW-23S 8/26/08 Iron 300** 42000 µg/L 08S2
MW-24D 8/26/08 Iron 300** 320 µg/L 08S2
MW-26D 8/26/08 Iron 300** 100 µg/L 08S2
MW-8S 8/26/08 Iron 300** 5000 µg/L 08S2
MW-9S 8/26/08 Iron 300** 2100 µg/L 08S2
MW-10S 8/27/08 Iron 300** 200 µg/L 08S2
MW-10S 3/11/09 Iron 300** 1300 µg/L 09S1
MW-13S 3/11/09 Iron 300** 7400 µg/L 09S1
MW-14S 3/11/09 Iron 300** 600 µg/L 09S1
MW-15S 3/11/09 Iron 300** 12000 µg/L 09S1
MW-18D 3/11/09 Iron 300** 420 µg/L 09S1
MW-19D 3/11/09 Iron 300** 2100 µg/L 09S1
MW-21D 3/11/09 Iron 300** 480 µg/L 09S1
MW-50S 3/11/09 Iron 300** 21000 µg/L 09S1
MW-9S 3/11/09 Iron 300** 4400 µg/L 09S1
MW-11D 3/12/09 Iron 300** 37000 µg/L 09S1
MW-12S 3/12/09 Iron 300** 28000 µg/L 09S1
MW-23S 3/12/09 Iron 300** 55000 µg/L 09S1
MW-24D 3/12/09 Iron 300** 260 µg/L 09S1
MW-26D 3/12/09 Iron 300** 260 µg/L 09S1
MW-48S 3/12/09 Iron 300** 52000 µg/L 09S1
MW-56D 3/12/09 Iron 300** 25000 µg/L 09S1
MW-8S 3/12/09 Iron 300** 5900 µg/L 09S1
MW-10S 8/20/09 Iron 300** 870 µg/L 09S2
MW-11D 8/20/09 Iron 300** 110 µg/L 09S2
MW-12S 8/20/09 Iron 300** 38000 µg/L 09S2
MW-14S 8/20/09 Iron 300** 2400 µg/L 09S2
MW-15S 8/20/09 Iron 300** 17000 µg/L 09S2
MW-18D 8/20/09 Iron 300** 390 µg/L 09S2
MW-19D 8/20/09 Iron 300** 4800 µg/L 09S2
MW-21D 8/20/09 Iron 300** 180 µg/L 09S2
MW-23S 8/20/09 Iron 300** 50000 µg/L 09S2
MW-48S 8/20/09 Iron 300** 41000 µg/L 09S2
MW-50S 8/20/09 Iron 300** 24000 µg/L 09S2
MW-56D 8/20/09 Iron 300** 25000 µg/L 09S2
MW-13S 8/25/09 Iron 300** 24000 µg/L 09S2
MW-26D 8/25/09 Iron 300** 27 µg/L I 09S2
MW-8S 8/26/09 Iron 300** 350 µg/L 09S2
MW-9S 8/26/09 Iron 300** 210 µg/L 09S2
MW-10S 3/26/10 Iron 300** 2940 µg/L 10S1
MW-26D 3/26/10 Iron 300** 265 µg/L 10S1
MW-8S 3/26/10 Iron 300** 6200 µg/L 10S1
MW-9S 3/26/10 Iron 300** 563 µg/L 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-11D 3/29/10 Iron 300** 176 µg/L 10S1
MW-12S 3/29/10 Iron 300** 1850 µg/L 10S1
MW-13S 3/29/10 Iron 300** 4280 µg/L 10S1
MW-14S 3/29/10 Iron 300** 314 µg/L 10S1
MW-15S 3/29/10 Iron 300** 13700 µg/L 10S1
MW-18D 3/29/10 Iron 300** 892 µg/L 10S1
MW-19D 3/29/10 Iron 300** 878 µg/L 10S1
MW-21D 3/29/10 Iron 300** 432 µg/L 10S1
MW-50S 3/29/10 Iron 300** 12700 µg/L 10S1
MW-23S 3/30/10 Iron 300** 46100 µg/L 10S1
MW-24D 3/30/10 Iron 300** 96.2 µg/L 10S1
MW-48S 3/30/10 Iron 300** 39300 µg/L 10S1
MW-56D 3/30/10 Iron 300** 19200 µg/L 10S1
MW-13S 10/7/10 Iron 300** 13900 µg/L 10S2
MW-14S 10/7/10 Iron 300** 1110 µg/L 10S2
MW-18D 10/7/10 Iron 300** 605 µg/L 10S2
MW-19D 10/7/10 Iron 300** 3820 µg/L 10S2
MW-10S 10/8/10 Iron 300** 23000 µg/L 10S2
MW-26D 10/8/10 Iron 300** 224 µg/L 10S2
MW-8S 10/8/10 Iron 300** 1420 µg/L 10S2
MW-9S 10/8/10 Iron 300** 360 µg/L 10S2
MW-15S 10/11/10 Iron 300** 12100 µg/L 10S2
MW-21D 10/11/10 Iron 300** 404 µg/L 10S2
MW-50S 10/11/10 Iron 300** 17300 µg/L 10S2
MW-48S 10/12/10 Iron 300** 44200 µg/L 10S2
MW-56D 10/12/10 Iron 300** 22400 µg/L 10S2
MW-11D 10/13/10 Iron 300** 133 µg/L 10S2
MW-12S 10/13/10 Iron 300** 34700 µg/L 10S2
MW-23S 10/13/10 Iron 300** 47800 µg/L 10S2
MW-24D 10/13/10 Iron 300** 90.6 µg/L 10S2
MW-13S 2/18/11 Iron 300** 25100 µg/L 11S1
MW-14S 2/18/11 Iron 300** 381 µg/L 11S1
MW-15S 2/18/11 Iron 300** 8010 µg/L 11S1
MW-18D 2/18/11 Iron 300** 254 µg/L 11S1
MW-19D 2/18/11 Iron 300** 2890 µg/L 11S1
MW-50S 2/18/11 Iron 300** 21800 µg/L 11S1
MW-10S 2/21/11 Iron 300** 23100 µg/L 11S1
MW-11D 2/21/11 Iron 300** 36800 µg/L 11S1
MW-12S 2/21/11 Iron 300** 31500 µg/L 11S1
MW-21D 2/21/11 Iron 300** 120 µg/L 11S1
MW-23S 2/21/11 Iron 300** 40200 µg/L 11S1
MW-24D 2/21/11 Iron 300** 10500 µg/L 11S1
MW-26D 2/21/11 Iron 300** 158 µg/L 11S1
MW-48S 2/21/11 Iron 300** 29300 µg/L 11S1
MW-56D 2/21/11 Iron 300** 25400 µg/L 11S1
MW-8S 2/21/11 Iron 300** 716 µg/L 11S1
MW-9S 2/21/11 Iron 300** 272 µg/L 11S1
MW-10S 9/22/11 Iron 300** 2880 µg/L 11S2
MW-26D 9/22/11 Iron 300** 172 µg/L 11S2
MW-8S 9/22/11 Iron 300** 470 µg/L 11S2
MW-9S 9/22/11 Iron 300** 508 µg/L 11S2
MW-11D 9/23/11 Iron 300** 231 µg/L 11S2
MW-12S 9/23/11 Iron 300** 43000 µg/L 11S2
MW-13S 9/23/11 Iron 300** 19400 µg/L 11S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-14S 9/23/11 Iron 300** 11300 µg/L 11S2
MW-15S 9/23/11 Iron 300** 11100 µg/L 11S2
MW-18D 9/23/11 Iron 300** 232 µg/L 11S2
MW-19D 9/23/11 Iron 300** 2590 µg/L 11S2
MW-21D 9/23/11 Iron 300** 130 µg/L 11S2
MW-23S 9/23/11 Iron 300** 44400 µg/L 11S2
MW-24D 9/23/11 Iron 300** 31.5 µg/L 11S2
MW-48S 9/23/11 Iron 300** 24000 µg/L 11S2
MW-50S 9/23/11 Iron 300** 21700 µg/L 11S2
MW-56D 9/23/11 Iron 300** 23300 µg/L 11S2
MW-10S 2/21/12 Iron 300** 37.8 µg/L I 12S1
MW-48S 2/21/12 Iron 300** 20700 µg/L 12S1
MW-11D 2/22/12 Iron 300** 387 µg/L 12S1
MW-12S 2/22/12 Iron 300** 36600 µg/L 12S1
MW-13S 2/22/12 Iron 300** 36300 µg/L 12S1
MW-14S 2/22/12 Iron 300** 7390 µg/L 12S1
MW-15S 2/22/12 Iron 300** 9340 µg/L 12S1
MW-18D 2/22/12 Iron 300** 98.8 µg/L 12S1
MW-19D 2/22/12 Iron 300** 2010 µg/L J 12S1
MW-21D 2/22/12 Iron 300** 99.2 µg/L 12S1
MW-50S 2/22/12 Iron 300** 11000 µg/L 12S1
MW-56D 2/22/12 Iron 300** 23600 µg/L 12S1
MW-23S 2/23/12 Iron 300** 30400 µg/L 12S1
MW-24D 2/23/12 Iron 300** 3650 µg/L 12S1
MW-26D 2/23/12 Iron 300** 212 µg/L 12S1
MW-8S 2/23/12 Iron 300** 692 µg/L 12S1
MW-9S 2/23/12 Iron 300** 548 µg/L 12S1
MW-10S 10/16/12 Iron 300** 34.6 µg/L I 12S2
MW-14S 10/16/12 Iron 300** 902 µg/L 12S2
MW-15S 10/16/12 Iron 300** 12800 µg/L 12S2
MW-18D 10/16/12 Iron 300** 162 µg/L 12S2
MW-19D 10/16/12 Iron 300** 2880 µg/L 12S2
MW-23S 10/16/12 Iron 300** 41600 µg/L 12S2
MW-24D 10/16/12 Iron 300** 4220 µg/L 12S2
MW-26D 10/16/12 Iron 300** 181 µg/L 12S2
MW-50S 10/16/12 Iron 300** 21700 µg/L 12S2
MW-8S 10/16/12 Iron 300** 691 µg/L 12S2
MW-9S 10/16/12 Iron 300** 25.5 µg/L I 12S2
MW-11D 10/17/12 Iron 300** 29900 µg/L 12S2
MW-12S 10/17/12 Iron 300** 39500 µg/L 12S2
MW-13S 10/17/12 Iron 300** 5580 µg/L 12S2
MW-21D 10/17/12 Iron 300** 262 µg/L 12S2
MW-48S 10/17/12 Iron 300** 29300 µg/L 12S2
MW-56D 10/17/12 Iron 300** 21800 µg/L 12S2
MW-13S 2/26/13 Iron 300** 33500 µg/L 13S1
MW-14S 2/26/13 Iron 300** 396 µg/L 13S1
MW-15S 2/26/13 Iron 300** 10800 µg/L 13S1
MW-18D 2/26/13 Iron 300** 115 µg/L 13S1
MW-19D 2/26/13 Iron 300** 3490 µg/L 13S1
MW-50S 2/26/13 Iron 300** 13100 µg/L 13S1
MW-10S 2/27/13 Iron 300** 54.6 µg/L 13S1
MW-11D 2/27/13 Iron 300** 4080 µg/L 13S1
MW-12S 2/27/13 Iron 300** 36900 µg/L 13S1
MW-21D 2/27/13 Iron 300** 93.1 µg/L 13S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-23S 2/27/13 Iron 300** 32200 µg/L 13S1
MW-24D 2/27/13 Iron 300** 5820 µg/L 13S1
MW-26D 2/27/13 Iron 300** 245 µg/L 13S1
MW-48S 2/27/13 Iron 300** 27100 µg/L 13S1
MW-56D 2/27/13 Iron 300** 1600 µg/L 13S1
MW-8S 2/27/13 Iron 300** 850 µg/L 13S1
MW-12S 9/17/13 Iron 300** 1210 µg/L 13S2
MW-21D 9/17/13 Iron 300** 117 µg/L 13S2
MW-26D 9/17/13 Iron 300** 276 µg/L 13S2
MW-48S 9/17/13 Iron 300** 27500 µg/L 13S2
MW-56D 9/17/13 Iron 300** 22100 µg/L 13S2
MW-8S 9/17/13 Iron 300** 1560 µg/L 13S2
MW-10S 9/18/13 Iron 300** 31.7 µg/L I 13S2
MW-11D 9/18/13 Iron 300** 28200 µg/L 13S2
MW-13S 9/18/13 Iron 300** 3370 µg/L 13S2
MW-15S 9/18/13 Iron 300** 13100 µg/L 13S2
MW-50S 9/18/13 Iron 300** 19900 µg/L 13S2
MW-14S 9/19/13 Iron 300** 5920 µg/L 13S2
MW-18D 9/19/13 Iron 300** 133 µg/L 13S2
MW-19D 9/19/13 Iron 300** 4080 µg/L 13S2
MW-23S 9/19/13 Iron 300** 43100 µg/L J 13S2
MW-24D 9/19/13 Iron 300** 8640 µg/L 13S2
MW-10S 2/7/14 Iron 300** <20 µg/L 14S1
MW-11D 2/7/14 Iron 300** 25000 µg/L 14S1
MW-12S 2/7/14 Iron 300** 33300 µg/L 14S1
MW-13S 2/7/14 Iron 300** 2730 µg/L 14S1
MW-14S 2/7/14 Iron 300** 1140 µg/L 14S1
MW-15S 2/7/14 Iron 300** 11900 µg/L 14S1
MW-18D 2/7/14 Iron 300** 172 µg/L 14S1
MW-19D 2/7/14 Iron 300** 3210 µg/L 14S1
MW-21D 2/7/14 Iron 300** 196 µg/L 14S1
MW-23S 2/7/14 Iron 300** 39200 µg/L 14S1
MW-24D 2/7/14 Iron 300** 11800 µg/L 14S1
MW-26D 2/7/14 Iron 300** 278 µg/L 14S1
MW-48S 2/7/14 Iron 300** 26000 µg/L 14S1
MW-50S 2/7/14 Iron 300** 24800 µg/L 14S1
MW-56D 2/7/14 Iron 300** 20000 µg/L 14S1
MW-8S 2/7/14 Iron 300** 1870 µg/L 14S1
MW-9S 2/7/14 Iron 300** 20 µg/L I 14S1
MW-48S 2/21/08 Lead 300** 7.6 µg/L 08S1
MW-15S 8/25/08 Lead 300** 5.6 µg/L 08S2
MW-8S 8/26/08 Lead 300** 5.1 µg/L 08S2
MW-8S 3/26/10 Lead 300** 5.2 µg/L I 10S1
MW-13S 10/7/10 Lead 300** 5.4 µg/L I 10S2
MW-10S 10/8/10 Lead 300** 11 µg/L 10S2
MW-10S 2/21/11 Lead 300** 16.2 µg/L 11S1
MW-50S 8/25/08 Mercury 2* 0.047 µg/L 08S2
MW-8S 8/26/08 Mercury 2* 0.17 µg/L 08S2
MW-10S 3/11/09 Mercury 2* 0.12 µg/L 09S1
MW-13S 3/11/09 Mercury 2* 0.11 µg/L 09S1
MW-9S 3/11/09 Mercury 2* 0.063 µg/L 09S1
MW-11D 3/12/09 Mercury 2* 0.46 µg/L 09S1
MW-12S 3/12/09 Mercury 2* 0.18 µg/L 09S1
MW-23S 3/12/09 Mercury 2* 0.19 µg/L 09S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-24D 3/12/09 Mercury 2* 0.18 µg/L 09S1
MW-26D 3/12/09 Mercury 2* 0.17 µg/L 09S1
MW-48S 3/12/09 Mercury 2* 0.25 µg/L 09S1
MW-56D 3/12/09 Mercury 2* 0.16 µg/L 09S1
MW-8S 3/12/09 Mercury 2* 0.63 µg/L 09S1
MW-8S 3/26/10 Mercury 2* 0.23 µg/L 10S1
MW-15S 10/11/10 Mercury 2* 0.11 µg/L I 10S2
MW-21D 10/11/10 Mercury 2* 0.19 µg/L I 10S2
MW-50S 10/11/10 Mercury 2* 0.11 µg/L I 10S2
MW-10S 2/21/11 Mercury 2* 0.16 µg/L I 11S1
MW-10S 2/21/12 Mercury 2* 1.2 µg/L 12S1
MW-12S 2/19/08 Methylene chloride 5* 0.38 µg/L 08S1
MW-23S 2/20/08 Methylene chloride 5* 0.35 µg/L 08S1
MW-50S 2/21/08 Methylene chloride 5* 0.41 µg/L 08S1
MW-56D 2/21/08 Methylene chloride 5* 0.42 µg/L 08S1
MW-24D 2/23/12 Methylene Chloride 5* 15 µg/L 12S1
MW-24D 2/20/08 Nickel 100* 2.9 µg/L 08S1
MW-50S 2/21/08 Nickel 100* 2.7 µg/L 08S1
MW-50S 8/25/08 Nickel 100* 3.3 µg/L 08S2
MW-8S 8/26/08 Nickel 100* 5.6 µg/L 08S2
MW-9S 3/11/09 Nickel 100* 4.9 µg/L 09S1
MW-8S 3/12/09 Nickel 100* 5.8 µg/L 09S1
MW-10S 8/20/09 Nickel 100* 3.8 µg/L I 09S2
MW-11D 8/20/09 Nickel 100* 2.9 µg/L I 09S2
MW-26D 8/25/09 Nickel 100* 3.5 µg/L I 09S2
MW-10S 3/26/10 Nickel 100* 4.5 µg/L I 10S1
MW-8S 3/26/10 Nickel 100* 7 µg/L 10S1
MW-9S 3/26/10 Nickel 100* 3.1 µg/L I 10S1
MW-13S 3/29/10 Nickel 100* 2.9 µg/L I 10S1
MW-15S 3/29/10 Nickel 100* 5.6 µg/L 10S1
MW-50S 3/29/10 Nickel 100* 5.5 µg/L 10S1
MW-13S 10/7/10 Nickel 100* 4 µg/L I 10S2
MW-10S 10/8/10 Nickel 100* 16.1 µg/L 10S2
MW-26D 10/8/10 Nickel 100* 2.7 µg/L I 10S2
MW-8S 10/8/10 Nickel 100* 2.7 µg/L I 10S2
MW-11D 10/13/10 Nickel 100* 3.7 µg/L I 10S2
MW-13S 2/18/11 Nickel 100* 30.6 µg/L 11S1
MW-19D 2/18/11 Nickel 100* 3.4 µg/L I 11S1
MW-50S 2/18/11 Nickel 100* 3.8 µg/L I 11S1
MW-10S 2/21/11 Nickel 100* 13.9 µg/L 11S1
MW-10S 2/19/08 Nitrate as N 10* 7.4 mg/L 08S1
MW-11D 2/19/08 Nitrate as N 10* 0.037 mg/L 08S1
MW-26D 2/19/08 Nitrate as N 10* 6 mg/L 08S1
MW-8S 2/19/08 Nitrate as N 10* 16 mg/L 08S1
MW-9S 2/19/08 Nitrate as N 10* 3.2 mg/L 08S1
MW-18D 2/20/08 Nitrate as N 10* 0.28 mg/L 08S1
MW-21D 2/20/08 Nitrate as N 10* 3.3 mg/L 08S1
MW-24D 2/20/08 Nitrate as N 10* 2 mg/L 08S1
MW-14S 8/21/08 Nitrate as N 10* 0.42 mg/L 08S2
MW-18D 8/21/08 Nitrate as N 10* 0.21 mg/L 08S2
MW-21D 8/21/08 Nitrate as N 10* 2 mg/L 08S2
MW-11D 8/26/08 Nitrate as N 10* 5.5 mg/L 08S2
MW-24D 8/26/08 Nitrate as N 10* 2 mg/L 08S2
MW-26D 8/26/08 Nitrate as N 10* 14 mg/L 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-8S 8/26/08 Nitrate as N 10* 6.5 mg/L 08S2
MW-9S 8/26/08 Nitrate as N 10* 4.5 mg/L 08S2
MW-10S 8/27/08 Nitrate as N 10* 4.1 mg/L 08S2
MW-10S 3/11/09 Nitrate as N 10* 9.7 mg/L 09S1
MW-13S 3/11/09 Nitrate as N 10* 0.54 mg/L 09S1
MW-14S 3/11/09 Nitrate as N 10* 2.4 mg/L 09S1
MW-15S 3/11/09 Nitrate as N 10* 0.083 mg/L 09S1
MW-18D 3/11/09 Nitrate as N 10* 0.25 mg/L 09S1
MW-19D 3/11/09 Nitrate as N 10* 0.074 mg/L 09S1
MW-21D 3/11/09 Nitrate as N 10* 1.8 mg/L 09S1
MW-9S 3/11/09 Nitrate as N 10* 2.8 mg/L 09S1
MW-11D 3/12/09 Nitrate as N 10* 0.083 mg/L 09S1
MW-12S 3/12/09 Nitrate as N 10* 0.089 mg/L 09S1
MW-24D 3/12/09 Nitrate as N 10* 1.9 mg/L 09S1
MW-26D 3/12/09 Nitrate as N 10* 9.9 mg/L 09S1
MW-8S 3/12/09 Nitrate as N 10* 1.5 mg/L 09S1
MW-10S 8/20/09 Nitrate as N 10* 11 mg/L Q 09S2
MW-11D 8/20/09 Nitrate as N 10* 5.1 mg/L 09S2
MW-14S 8/20/09 Nitrate as N 10* 0.4 mg/L 09S2
MW-18D 8/20/09 Nitrate as N 10* 0.22 mg/L 09S2
MW-21D 8/20/09 Nitrate as N 10* 3.5 mg/L 09S2
MW-23S 8/20/09 Nitrate as N 10* 0.11 mg/L 09S2
MW-56D 8/20/09 Nitrate as N 10* 0.14 mg/L 09S2
MW-24D 8/25/09 Nitrate as N 10* 2 mg/L 09S2
MW-26D 8/25/09 Nitrate as N 10* 5.2 mg/L 09S2
MW-8S 8/26/09 Nitrate as N 10* 6.1 mg/L 09S2
MW-9S 8/26/09 Nitrate as N 10* 0.68 mg/L 09S2
MW-10S 3/26/10 Nitrate as N 10* 4.9 mg/L 10S1
MW-26D 3/26/10 Nitrate as N 10* 5.2 mg/L 10S1
MW-8S 3/26/10 Nitrate as N 10* 4.4 mg/L 10S1
MW-9S 3/26/10 Nitrate as N 10* 7.1 mg/L 10S1
MW-11D 3/29/10 Nitrate as N 10* 5.3 mg/L 10S1
MW-12S 3/29/10 Nitrate as N 10* 0.47 mg/L 10S1
MW-13S 3/29/10 Nitrate as N 10* 2.1 mg/L 10S1
MW-14S 3/29/10 Nitrate as N 10* 3 mg/L 10S1
MW-18D 3/29/10 Nitrate as N 10* 0.4 mg/L 10S1
MW-19D 3/29/10 Nitrate as N 10* 1.3 mg/L 10S1
MW-21D 3/29/10 Nitrate as N 10* 4 mg/L 10S1
MW-50S 3/29/10 Nitrate as N 10* 0.11 mg/L 10S1
MW-24D 3/30/10 Nitrate as N 10* 2.1 mg/L 10S1
MW-56D 3/30/10 Nitrate as N 10* 0.14 mg/L 10S1
MW-13S 10/7/10 Nitrate as N 10* 0.1 mg/L 10S2
MW-14S 10/7/10 Nitrate as N 10* 0.19 mg/L 10S2
MW-18D 10/7/10 Nitrate as N 10* 0.36 mg/L 10S2
MW-10S 10/8/10 Nitrate as N 10* 2.2 mg/L Q 10S2
MW-26D 10/8/10 Nitrate as N 10* 4.9 mg/L Q 10S2
MW-8S 10/8/10 Nitrate as N 10* 7.5 mg/L Q 10S2
MW-9S 10/8/10 Nitrate as N 10* 0.55 mg/L Q 10S2
MW-21D 10/11/10 Nitrate as N 10* 3.4 mg/L 10S2
MW-48S 10/12/10 Nitrate as N 10* 0.11 mg/L 10S2
MW-56D 10/12/10 Nitrate as N 10* 0.11 mg/L 10S2
MW-11D 10/13/10 Nitrate as N 10* 3.9 mg/L 10S2
MW-24D 10/13/10 Nitrate as N 10* 1.9 mg/L 10S2
MW-14S 2/18/11 Nitrate as N 10* 2.3 mg/L 11S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-15S 2/18/11 Nitrate as N 10* 0.12 mg/L 11S1
MW-18D 2/18/11 Nitrate as N 10* 0.5 mg/L 11S1
MW-10S 2/21/11 Nitrate as N 10* 1.6 mg/L 11S1
MW-21D 2/21/11 Nitrate as N 10* 2.7 mg/L 11S1
MW-24D 2/21/11 Nitrate as N 10* 0.12 mg/L 11S1
MW-26D 2/21/11 Nitrate as N 10* 4.1 mg/L 11S1
MW-8S 2/21/11 Nitrate as N 10* 6.7 mg/L J 11S1
MW-9S 2/21/11 Nitrate as N 10* 1.4 mg/L 11S1
MW-10S 9/22/11 Nitrate as N 10* 3.8 mg/L 11S2
MW-26D 9/22/11 Nitrate as N 10* 5.4 mg/L 11S2
MW-8S 9/22/11 Nitrate as N 10* 5.9 mg/L 11S2
MW-9S 9/22/11 Nitrate as N 10* 2.8 mg/L 11S2
MW-11D 9/23/11 Nitrate as N 10* 3.4 mg/L 11S2
MW-12S 9/23/11 Nitrate as N 10* 0.11 mg/L 11S2
MW-14S 9/23/11 Nitrate as N 10* 0.17 mg/L 11S2
MW-18D 9/23/11 Nitrate as N 10* 0.23 mg/L 11S2
MW-21D 9/23/11 Nitrate as N 10* 3.4 mg/L 11S2
MW-23S 9/23/11 Nitrate as N 10* 0.12 mg/L 11S2
MW-24D 9/23/11 Nitrate as N 10* 2.4 mg/L 11S2
MW-56D 9/23/11 Nitrate as N 10* 0.11 mg/L 11S2
MW-10S 2/21/12 Nitrate as N 10* 0.26 mg/L 12S1
MW-11D 2/22/12 Nitrate as N 10* 1.3 mg/L 12S1
MW-14S 2/22/12 Nitrate as N 10* 0.19 mg/L 12S1
MW-15S 2/22/12 Nitrate as N 10* 2.1 mg/L Q 12S1
MW-18D 2/22/12 Nitrate as N 10* 0.23 mg/L 12S1
MW-24D 2/23/12 Nitrate as N 10* 0.19 mg/L 12S1
MW-26D 2/23/12 Nitrate as N 10* 3.8 mg/L 12S1
MW-8S 2/23/12 Nitrate as N 10* 4.6 mg/L 12S1
MW-9S 2/23/12 Nitrate as N 10* 3 mg/L 12S1
MW-10S 2/19/08 ORP NS 143 mV D 08S1
MW-26D 2/19/08 ORP NS 202 mV D 08S1
MW-8S 2/19/08 ORP NS 119 mV D 08S1
MW-9S 2/19/08 ORP NS 177 mV D 08S1
MW-18D 2/20/08 ORP NS 120 mV D 08S1
MW-21D 2/20/08 ORP NS 85 mV D 08S1
MW-24D 2/20/08 ORP NS 49 mV D 08S1
MW-18D 8/21/08 ORP NS 127 mV D 08S2
MW-21D 8/21/08 ORP NS 131 mV D 08S2
MW-11D 8/26/08 ORP NS 16 mV D 08S2
MW-24D 8/26/08 ORP NS 58 mV D 08S2
MW-26D 8/26/08 ORP NS 124 mV D 08S2
MW-8S 8/26/08 ORP NS 125 mV D 08S2
MW-9S 8/26/08 ORP NS 174 mV D 08S2
MW-10S 8/27/08 ORP NS 87 mV D 08S2
MW-10S 3/11/09 ORP NS 125 mV D 09S1
MW-14S 3/11/09 ORP NS 1 mV D 09S1
MW-18D 3/11/09 ORP NS 154 mV D 09S1
MW-21D 3/11/09 ORP NS 66 mV D 09S1
MW-9S 3/11/09 ORP NS 119 mV D 09S1
MW-26D 3/12/09 ORP NS 115 mV D 09S1
MW-8S 3/12/09 ORP NS 100 mV D 09S1
MW-10S 3/26/10 ORP NS 93 mV D 10S1
MW-26D 3/26/10 ORP NS 170 mV D 10S1
MW-8S 3/26/10 ORP NS 144 mV D 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-9S 3/26/10 ORP NS 127 mV D 10S1
MW-11D 3/29/10 ORP NS 62 mV D 10S1
MW-12S 3/29/10 ORP NS 75 mV D 10S1
MW-13S 3/29/10 ORP NS 190 mV D 10S1
MW-14S 3/29/10 ORP NS 43 mV D 10S1
MW-15S 3/29/10 ORP NS -136 mV D 10S1
MW-18D 3/29/10 ORP NS 169 mV D 10S1
MW-19D 3/29/10 ORP NS -12 mV D 10S1
MW-21D 3/29/10 ORP NS 133 mV D 10S1
MW-50S 3/29/10 ORP NS 72 mV D 10S1
MW-23S 3/30/10 ORP NS -91 mV D 10S1
MW-24D 3/30/10 ORP NS 70 mV D 10S1
MW-48S 3/30/10 ORP NS -101 mV D 10S1
MW-56D 3/30/10 ORP NS -52 mV D 10S1
MW-13S 10/7/10 ORP NS -3 mV D 10S2
MW-14S 10/7/10 ORP NS 9 mV D 10S2
MW-18D 10/7/10 ORP NS 17 mV D 10S2
MW-19D 10/7/10 ORP NS -74 mV D 10S2
MW-10S 10/8/10 ORP NS -4 mV D 10S2
MW-26D 10/8/10 ORP NS 150 mV D 10S2
MW-8S 10/8/10 ORP NS -14 mV D 10S2
MW-9S 10/8/10 ORP NS 200 mV D 10S2
MW-15S 10/11/10 ORP NS -92 mV D 10S2
MW-21D 10/11/10 ORP NS -19 mV D 10S2
MW-50S 10/11/10 ORP NS -70 mV D 10S2
MW-48S 10/12/10 ORP NS -54 mV D 10S2
MW-56D 10/12/10 ORP NS -84 mV D 10S2
MW-11D 10/13/10 ORP NS 9 mV D 10S2
MW-12S 10/13/10 ORP NS -50 mV D 10S2
MW-23S 10/13/10 ORP NS -54 mV D 10S2
MW-24D 10/13/10 ORP NS 56 mV D 10S2
MW-13S 2/18/11 ORP NS -22 mV D 11S1
MW-14S 2/18/11 ORP NS 30 mV D 11S1
MW-15S 2/18/11 ORP NS -98 mV D 11S1
MW-18D 2/18/11 ORP NS 156 mV D 11S1
MW-19D 2/18/11 ORP NS -126 mV D 11S1
MW-50S 2/18/11 ORP NS -88 mV D 11S1
MW-10S 2/21/11 ORP NS 152 mV D 11S1
MW-11D 2/21/11 ORP NS -63.8 mV D 11S1
MW-12S 2/21/11 ORP NS -68.3 mV D 11S1
MW-21D 2/21/11 ORP NS -81 mV D 11S1
MW-23S 2/21/11 ORP NS -87 mV D 11S1
MW-24D 2/21/11 ORP NS -19 mV D 11S1
MW-26D 2/21/11 ORP NS 150 mV D 11S1
MW-48S 2/21/11 ORP NS -71.3 mV D 11S1
MW-56D 2/21/11 ORP NS -19 mV D 11S1
MW-8S 2/21/11 ORP NS 154 mV D 11S1
MW-9S 2/21/11 ORP NS 180 mV D 11S1
MW-10S 9/22/11 ORP NS 117 mV D 11S2
MW-26D 9/22/11 ORP NS 164 mV D 11S2
MW-8S 9/22/11 ORP NS 142 mV D 11S2
MW-9S 9/22/11 ORP NS 183 mV D 11S2
MW-11D 9/23/11 ORP NS 7 mV D 11S2
MW-13S 9/23/11 ORP NS 18 mV D 11S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-18D 9/23/11 ORP NS 22 mV D 11S2
MW-21D 9/23/11 ORP NS 62 mV D 11S2
MW-24D 9/23/11 ORP NS 39 mV D 11S2
MW-50S 9/23/11 ORP NS 2 mV D 11S2
MW-10S 2/21/12 ORP NS 164 mV D 12S1
MW-48S 2/21/12 ORP NS -149 mV D 12S1
MW-11D 2/22/12 ORP NS 95 mV D 12S1
MW-12S 2/22/12 ORP NS -84 mV D 12S1
MW-13S 2/22/12 ORP NS -135 mV D 12S1
MW-14S 2/22/12 ORP NS -70 mV D 12S1
MW-15S 2/22/12 ORP NS -144 mV D 12S1
MW-18D 2/22/12 ORP NS 130 mV D 12S1
MW-19D 2/22/12 ORP NS -147 mV D 12S1
MW-21D 2/22/12 ORP NS -138 mV D 12S1
MW-50S 2/22/12 ORP NS -136 mV D 12S1
MW-56D 2/22/12 ORP NS -138 mV D 12S1
MW-23S 2/23/12 ORP NS -73 mV D 12S1
MW-24D 2/23/12 ORP NS 85 mV D 12S1
MW-26D 2/23/12 ORP NS 85 mV D 12S1
MW-8S 2/23/12 ORP NS 133 mV D 12S1
MW-9S 2/23/12 ORP NS 141 mV D 12S1
MW-10S 10/16/12 ORP NS 117 mV D 12S2
MW-14S 10/16/12 ORP NS 52 mV D 12S2
MW-15S 10/16/12 ORP NS -90 mV D 12S2
MW-18D 10/16/12 ORP NS 170 mV D 12S2
MW-19D 10/16/12 ORP NS -125 mV D 12S2
MW-23S 10/16/12 ORP NS -86 mV D 12S2
MW-24D 10/16/12 ORP NS -54 mV D 12S2
MW-26D 10/16/12 ORP NS 285 mV D 12S2
MW-50S 10/16/12 ORP NS -59 mV D 12S2
MW-8S 10/16/12 ORP NS 231 mV D 12S2
MW-9S 10/16/12 ORP NS 361 mV D 12S2
MW-11D 10/17/12 ORP NS -64 mV D 12S2
MW-12S 10/17/12 ORP NS -68 mV D 12S2
MW-13S 10/17/12 ORP NS 22 mV D 12S2
MW-21D 10/17/12 ORP NS 277 mV D 12S2
MW-48S 10/17/12 ORP NS -50 mV D 12S2
MW-56D 10/17/12 ORP NS -106 mV D 12S2
MW-13S 2/26/13 ORP NS -48 mV D 13S1
MW-14S 2/26/13 ORP NS 176 mV D 13S1
MW-15S 2/26/13 ORP NS -96 mV D 13S1
MW-18D 2/26/13 ORP NS 225 mV D 13S1
MW-19D 2/26/13 ORP NS -84 mV D 13S1
MW-50S 2/26/13 ORP NS -44 mV D 13S1
MW-10S 2/27/13 ORP NS 323 mV D 13S1
MW-11D 2/27/13 ORP NS -33 mV D 13S1
MW-12S 2/27/13 ORP NS -60 mV D 13S1
MW-21D 2/27/13 ORP NS 311 mV D 13S1
MW-23S 2/27/13 ORP NS -61 mV D 13S1
MW-24D 2/27/13 ORP NS -38 mV D 13S1
MW-26D 2/27/13 ORP NS 118 mV D 13S1
MW-48S 2/27/13 ORP NS -40 mV D 13S1
MW-56D 2/27/13 ORP NS 237 mV D 13S1
MW-8S 2/27/13 ORP NS 158 mV D 13S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-9S 2/27/13 ORP NS 315 mV D 13S1
MW-12S 9/17/13 ORP NS -27 mV D 13S2
MW-21D 9/17/13 ORP NS 97 mV D 13S2
MW-26D 9/17/13 ORP NS 126 mV D 13S2
MW-48S 9/17/13 ORP NS -72 mV D 13S2
MW-56D 9/17/13 ORP NS -84 mV D 13S2
MW-8S 9/17/13 ORP NS 140 mV D 13S2
MW-10S 9/18/13 ORP NS 142 mV D 13S2
MW-11D 9/18/13 ORP NS -97 mV D 13S2
MW-13S 9/18/13 ORP NS 89 mV D 13S2
MW-15S 9/18/13 ORP NS -106 mV D 13S2
MW-50S 9/18/13 ORP NS -98 mV D 13S2
MW-9S 9/18/13 ORP NS 151 mV D 13S2
MW-14S 9/19/13 ORP NS -57 mV D 13S2
MW-18D 9/19/13 ORP NS 177 mV D 13S2
MW-19D 9/19/13 ORP NS -138 mV D 13S2
MW-23S 9/19/13 ORP NS -79 mV D 13S2
MW-24D 9/19/13 ORP NS -61 mV D 13S2
MW-10S 2/7/14 ORP NS 172 mV D 14S1
MW-11D 2/7/14 ORP NS -80 mV D 14S1
MW-12S 2/7/14 ORP NS -71 mV D 14S1
MW-13S 2/7/14 ORP NS 170 mV D 14S1
MW-14S 2/7/14 ORP NS 46 mV D 14S1
MW-15S 2/7/14 ORP NS -59 mV D 14S1
MW-18D 2/7/14 ORP NS 129 mV D 14S1
MW-19D 2/7/14 ORP NS -129 mV D 14S1
MW-21D 2/7/14 ORP NS 107 mV D 14S1
MW-23S 2/7/14 ORP NS -92 mV D 14S1
MW-24D 2/7/14 ORP NS -67 mV D 14S1
MW-26D 2/7/14 ORP NS 155 mV D 14S1
MW-48S 2/7/14 ORP NS -56 mV D 14S1
MW-50S 2/7/14 ORP NS -88 mV D 14S1
MW-56D 2/7/14 ORP NS -114 mV D 14S1
MW-8S 2/7/14 ORP NS 175 mV D 14S1
MW-9S 2/7/14 ORP NS 156 mV D 14S1
MW-10S 2/19/08 pH (FIELD) 6.5-8.5** 5.93 S.U. D 08S1
MW-11D 2/19/08 pH (FIELD) 6.5-8.5** 5.69 S.U. D 08S1
MW-12S 2/19/08 pH (FIELD) 6.5-8.5** 5.59 S.U. D 08S1
MW-26D 2/19/08 pH (FIELD) 6.5-8.5** 5.19 S.U. D 08S1
MW-8S 2/19/08 pH (FIELD) 6.5-8.5** 5.62 S.U. D 08S1
MW-9S 2/19/08 pH (FIELD) 6.5-8.5** 5.89 S.U. D 08S1
MW-13S 2/20/08 pH (FIELD) 6.5-8.5** 5.98 S.U. D 08S1
MW-18D 2/20/08 pH (FIELD) 6.5-8.5** 5.96 S.U. D 08S1
MW-19D 2/20/08 pH (FIELD) 6.5-8.5** 7 S.U. D 08S1
MW-21D 2/20/08 pH (FIELD) 6.5-8.5** 6.21 S.U. D 08S1
MW-23S 2/20/08 pH (FIELD) 6.5-8.5** 5.76 S.U. D 08S1
MW-24D 2/20/08 pH (FIELD) 6.5-8.5** 6.32 S.U. D 08S1
MW-14S 2/21/08 pH (FIELD) 6.5-8.5** 6.63 S.U. D 08S1
MW-15S 2/21/08 pH (FIELD) 6.5-8.5** 6.56 S.U. D 08S1
MW-48S 2/21/08 pH (FIELD) 6.5-8.5** 5.91 S.U. D 08S1
MW-50S 2/21/08 pH (FIELD) 6.5-8.5** 6.01 S.U. D 08S1
MW-56D 2/21/08 pH (FIELD) 6.5-8.5** 6.27 S.U. D 08S1
MW-13S 8/21/08 pH (FIELD) 6.5-8.5** 5.8 S.U. D 08S2
MW-14S 8/21/08 pH (FIELD) 6.5-8.5** 6.42 S.U. D 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-18D 8/21/08 pH (FIELD) 6.5-8.5** 5.65 S.U. D 08S2
MW-19D 8/21/08 pH (FIELD) 6.5-8.5** 6.8 S.U. D 08S2
MW-21D 8/21/08 pH (FIELD) 6.5-8.5** 6.31 S.U. D 08S2
MW-12S 8/25/08 pH (FIELD) 6.5-8.5** 6.1 S.U. D 08S2
MW-15S 8/25/08 pH (FIELD) 6.5-8.5** 6.46 S.U. D 08S2
MW-48S 8/25/08 pH (FIELD) 6.5-8.5** 6.01 S.U. D 08S2
MW-50S 8/25/08 pH (FIELD) 6.5-8.5** 6.17 S.U. D 08S2
MW-56D 8/25/08 pH (FIELD) 6.5-8.5** 6.24 S.U. D 08S2
MW-11D 8/26/08 pH (FIELD) 6.5-8.5** 6.78 S.U. D 08S2
MW-23S 8/26/08 pH (FIELD) 6.5-8.5** 6.16 S.U. D 08S2
MW-24D 8/26/08 pH (FIELD) 6.5-8.5** 7.35 S.U. D 08S2
MW-26D 8/26/08 pH (FIELD) 6.5-8.5** 5.94 S.U. D 08S2
MW-8S 8/26/08 pH (FIELD) 6.5-8.5** 6.04 S.U. D 08S2
MW-9S 8/26/08 pH (FIELD) 6.5-8.5** 5.64 S.U. D 08S2
MW-10S 8/27/08 pH (FIELD) 6.5-8.5** 6.29 S.U. D 08S2
MW-10S 3/11/09 pH (FIELD) 6.5-8.5** 6.51 S.U. D 09S1
MW-13S 3/11/09 pH (FIELD) 6.5-8.5** 5.72 S.U. D 09S1
MW-14S 3/11/09 pH (FIELD) 6.5-8.5** 6.36 S.U. D 09S1
MW-15S 3/11/09 pH (FIELD) 6.5-8.5** 6.31 S.U. D 09S1
MW-18D 3/11/09 pH (FIELD) 6.5-8.5** 5.61 S.U. D 09S1
MW-19D 3/11/09 pH (FIELD) 6.5-8.5** 6.68 S.U. D 09S1
MW-21D 3/11/09 pH (FIELD) 6.5-8.5** 5.91 S.U. D 09S1
MW-50S 3/11/09 pH (FIELD) 6.5-8.5** 6.22 S.U. D 09S1
MW-9S 3/11/09 pH (FIELD) 6.5-8.5** 6.33 S.U. D 09S1
MW-11D 3/12/09 pH (FIELD) 6.5-8.5** 5.91 S.U. D 09S1
MW-12S 3/12/09 pH (FIELD) 6.5-8.5** 5.98 S.U. D 09S1
MW-23S 3/12/09 pH (FIELD) 6.5-8.5** 5.87 S.U. D 09S1
MW-24D 3/12/09 pH (FIELD) 6.5-8.5** 7.06 S.U. D 09S1
MW-26D 3/12/09 pH (FIELD) 6.5-8.5** 5.64 S.U. D 09S1
MW-48S 3/12/09 pH (FIELD) 6.5-8.5** 5.68 S.U. D 09S1
MW-56D 3/12/09 pH (FIELD) 6.5-8.5** 6.04 S.U. D 09S1
MW-8S 3/12/09 pH (FIELD) 6.5-8.5** 5.86 S.U. D 09S1
MW-10S 8/20/09 pH (FIELD) 6.5-8.5** 6.2 S.U. D 09S2
MW-11D 8/20/09 pH (FIELD) 6.5-8.5** 6.62 S.U. D 09S2
MW-12S 8/20/09 pH (FIELD) 6.5-8.5** 6.13 S.U. D 09S2
MW-14S 8/20/09 pH (FIELD) 6.5-8.5** 6.98 S.U. D 09S2
MW-15S 8/20/09 pH (FIELD) 6.5-8.5** 6.61 S.U. D 09S2
MW-18D 8/20/09 pH (FIELD) 6.5-8.5** 5.55 S.U. D 09S2
MW-19D 8/20/09 pH (FIELD) 6.5-8.5** 6.64 S.U. D 09S2
MW-21D 8/20/09 pH (FIELD) 6.5-8.5** 6.24 S.U. D 09S2
MW-23S 8/20/09 pH (FIELD) 6.5-8.5** 6 S.U. D 09S2
MW-48S 8/20/09 pH (FIELD) 6.5-8.5** 6.21 S.U. D 09S2
MW-50S 8/20/09 pH (FIELD) 6.5-8.5** 6.62 S.U. D 09S2
MW-56D 8/20/09 pH (FIELD) 6.5-8.5** 6.31 S.U. D 09S2
MW-13S 8/25/09 pH (FIELD) 6.5-8.5** 5.96 S.U. D 09S2
MW-24D 8/25/09 pH (FIELD) 6.5-8.5** 7.32 S.U. D 09S2
MW-26D 8/25/09 pH (FIELD) 6.5-8.5** 5.91 S.U. D 09S2
MW-8S 8/26/09 pH (FIELD) 6.5-8.5** 6.05 S.U. D 09S2
MW-9S 8/26/09 pH (FIELD) 6.5-8.5** 5.85 S.U. D 09S2
MW-10S 3/26/10 pH (FIELD) 6.5-8.5** 6.94 S.U. D 10S1
MW-26D 3/26/10 pH (FIELD) 6.5-8.5** 6.26 S.U. D 10S1
MW-8S 3/26/10 pH (FIELD) 6.5-8.5** 6.42 S.U. D 10S1
MW-9S 3/26/10 pH (FIELD) 6.5-8.5** 6.76 S.U. D 10S1
MW-11D 3/29/10 pH (FIELD) 6.5-8.5** 6.99 S.U. D 10S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-12S 3/29/10 pH (FIELD) 6.5-8.5** 6.58 S.U. D 10S1
MW-13S 3/29/10 pH (FIELD) 6.5-8.5** 5.63 S.U. D 10S1
MW-14S 3/29/10 pH (FIELD) 6.5-8.5** 6.94 S.U. D 10S1
MW-15S 3/29/10 pH (FIELD) 6.5-8.5** 6.78 S.U. D 10S1
MW-18D 3/29/10 pH (FIELD) 6.5-8.5** 6.27 S.U. D 10S1
MW-19D 3/29/10 pH (FIELD) 6.5-8.5** 7.34 S.U. D 10S1
MW-21D 3/29/10 pH (FIELD) 6.5-8.5** 6.41 S.U. D 10S1
MW-50S 3/29/10 pH (FIELD) 6.5-8.5** 6.43 S.U. D 10S1
MW-23S 3/30/10 pH (FIELD) 6.5-8.5** 6.46 S.U. D 10S1
MW-24D 3/30/10 pH (FIELD) 6.5-8.5** 7.49 S.U. D 10S1
MW-48S 3/30/10 pH (FIELD) 6.5-8.5** 6.35 S.U. D 10S1
MW-56D 3/30/10 pH (FIELD) 6.5-8.5** 6.63 S.U. D 10S1
MW-13S 10/7/10 pH (FIELD) 6.5-8.5** 6.54 S.U. D 10S2
MW-14S 10/7/10 pH (FIELD) 6.5-8.5** 7.21 S.U. D 10S2
MW-18D 10/7/10 pH (FIELD) 6.5-8.5** 6.38 S.U. D 10S2
MW-19D 10/7/10 pH (FIELD) 6.5-8.5** 7.2 S.U. D 10S2
MW-10S 10/8/10 pH (FIELD) 6.5-8.5** 6.97 S.U. D 10S2
MW-26D 10/8/10 pH (FIELD) 6.5-8.5** 6.26 S.U. D 10S2
MW-8S 10/8/10 pH (FIELD) 6.5-8.5** 6.47 S.U. D 10S2
MW-9S 10/8/10 pH (FIELD) 6.5-8.5** 6.53 S.U. D 10S2
MW-15S 10/11/10 pH (FIELD) 6.5-8.5** 6.81 S.U. D 10S2
MW-21D 10/11/10 pH (FIELD) 6.5-8.5** 6.64 S.U. D 10S2
MW-50S 10/11/10 pH (FIELD) 6.5-8.5** 6.51 S.U. D 10S2
MW-48S 10/12/10 pH (FIELD) 6.5-8.5** 6.37 S.U. D 10S2
MW-56D 10/12/10 pH (FIELD) 6.5-8.5** 6.77 S.U. D 10S2
MW-11D 10/13/10 pH (FIELD) 6.5-8.5** 6.75 S.U. D 10S2
MW-12S 10/13/10 pH (FIELD) 6.5-8.5** 6.26 S.U. D 10S2
MW-23S 10/13/10 pH (FIELD) 6.5-8.5** 6.26 S.U. D 10S2
MW-24D 10/13/10 pH (FIELD) 6.5-8.5** 6.92 S.U. D 10S2
MW-13S 2/18/11 pH (FIELD) 6.5-8.5** 6.03 S.U. D 11S1
MW-14S 2/18/11 pH (FIELD) 6.5-8.5** 6.85 S.U. D 11S1
MW-15S 2/18/11 pH (FIELD) 6.5-8.5** 6.71 S.U. D 11S1
MW-18D 2/18/11 pH (FIELD) 6.5-8.5** 5.88 S.U. D 11S1
MW-19D 2/18/11 pH (FIELD) 6.5-8.5** 6.78 S.U. D 11S1
MW-50S 2/18/11 pH (FIELD) 6.5-8.5** 6.45 S.U. D 11S1
MW-10S 2/21/11 pH (FIELD) 6.5-8.5** 6.66 S.U. D 11S1
MW-11D 2/21/11 pH (FIELD) 6.5-8.5** 6.42 S.U. D 11S1
MW-12S 2/21/11 pH (FIELD) 6.5-8.5** 6.31 S.U. D 11S1
MW-21D 2/21/11 pH (FIELD) 6.5-8.5** 6.48 S.U. D 11S1
MW-23S 2/21/11 pH (FIELD) 6.5-8.5** 6.31 S.U. D 11S1
MW-24D 2/21/11 pH (FIELD) 6.5-8.5** 6.35 S.U. D 11S1
MW-26D 2/21/11 pH (FIELD) 6.5-8.5** 5.97 S.U. D 11S1
MW-48S 2/21/11 pH (FIELD) 6.5-8.5** 6.3 S.U. D 11S1
MW-56D 2/21/11 pH (FIELD) 6.5-8.5** 6.47 S.U. D 11S1
MW-8S 2/21/11 pH (FIELD) 6.5-8.5** 6.21 S.U. D 11S1
MW-9S 2/21/11 pH (FIELD) 6.5-8.5** 5.95 S.U. D 11S1
MW-10S 9/22/11 pH (FIELD) 6.5-8.5** 6.62 S.U. D 11S2
MW-26D 9/22/11 pH (FIELD) 6.5-8.5** 6.15 S.U. D 11S2
MW-8S 9/22/11 pH (FIELD) 6.5-8.5** 6.35 S.U. D 11S2
MW-9S 9/22/11 pH (FIELD) 6.5-8.5** 6.05 S.U. D 11S2
MW-11D 9/23/11 pH (FIELD) 6.5-8.5** 6.92 S.U. D 11S2
MW-12S 9/23/11 pH (FIELD) 6.5-8.5** 6.48 S.U. D 11S2
MW-13S 9/23/11 pH (FIELD) 6.5-8.5** 6.2 S.U. D 11S2
MW-14S 9/23/11 pH (FIELD) 6.5-8.5** 6.59 S.U. D 11S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-15S 9/23/11 pH (FIELD) 6.5-8.5** 6.81 S.U. D 11S2
MW-18D 9/23/11 pH (FIELD) 6.5-8.5** 5.84 S.U. D 11S2
MW-19D 9/23/11 pH (FIELD) 6.5-8.5** 7.27 S.U. D 11S2
MW-21D 9/23/11 pH (FIELD) 6.5-8.5** 6.5 S.U. D 11S2
MW-23S 9/23/11 pH (FIELD) 6.5-8.5** 6.54 S.U. D 11S2
MW-24D 9/23/11 pH (FIELD) 6.5-8.5** 7.19 S.U. D 11S2
MW-48S 9/23/11 pH (FIELD) 6.5-8.5** 6.2 S.U. D 11S2
MW-50S 9/23/11 pH (FIELD) 6.5-8.5** 6.32 S.U. D 11S2
MW-56D 9/23/11 pH (FIELD) 6.5-8.5** 6.67 S.U. D 11S2
MW-10S 2/21/12 pH (FIELD) 6.5-8.5** 5.7 S.U. D 12S1
MW-48S 2/21/12 pH (FIELD) 6.5-8.5** 6.45 S.U. D 12S1
MW-11D 2/22/12 pH (FIELD) 6.5-8.5** 6.57 S.U. D 12S1
MW-12S 2/22/12 pH (FIELD) 6.5-8.5** 6.43 S.U. D 12S1
MW-13S 2/22/12 pH (FIELD) 6.5-8.5** 6.25 S.U. D 12S1
MW-14S 2/22/12 pH (FIELD) 6.5-8.5** 6.51 S.U. D 12S1
MW-15S 2/22/12 pH (FIELD) 6.5-8.5** 6.97 S.U. D 12S1
MW-18D 2/22/12 pH (FIELD) 6.5-8.5** 6.04 S.U. D 12S1
MW-19D 2/22/12 pH (FIELD) 6.5-8.5** 7.31 S.U. D 12S1
MW-21D 2/22/12 pH (FIELD) 6.5-8.5** 6.38 S.U. D 12S1
MW-50S 2/22/12 pH (FIELD) 6.5-8.5** 6.31 S.U. D 12S1
MW-56D 2/22/12 pH (FIELD) 6.5-8.5** 6.62 S.U. D 12S1
MW-23S 2/23/12 pH (FIELD) 6.5-8.5** 6.31 S.U. D 12S1
MW-24D 2/23/12 pH (FIELD) 6.5-8.5** 6.38 S.U. D 12S1
MW-26D 2/23/12 pH (FIELD) 6.5-8.5** 6.18 S.U. D 12S1
MW-8S 2/23/12 pH (FIELD) 6.5-8.5** 6.29 S.U. D 12S1
MW-9S 2/23/12 pH (FIELD) 6.5-8.5** 6.46 S.U. D 12S1
MW-10S 10/16/12 pH (FIELD) 6.5-8.5** 6.04 S.U. D 12S2
MW-14S 10/16/12 pH (FIELD) 6.5-8.5** 6.77 S.U. D 12S2
MW-15S 10/16/12 pH (FIELD) 6.5-8.5** 6.63 S.U. D 12S2
MW-18D 10/16/12 pH (FIELD) 6.5-8.5** 6.13 S.U. D 12S2
MW-19D 10/16/12 pH (FIELD) 6.5-8.5** 7.2 S.U. D 12S2
MW-23S 10/16/12 pH (FIELD) 6.5-8.5** 6.31 S.U. D 12S2
MW-24D 10/16/12 pH (FIELD) 6.5-8.5** 6.45 S.U. D 12S2
MW-26D 10/16/12 pH (FIELD) 6.5-8.5** 6.05 S.U. D 12S2
MW-50S 10/16/12 pH (FIELD) 6.5-8.5** 6.26 S.U. D 12S2
MW-8S 10/16/12 pH (FIELD) 6.5-8.5** 6.26 S.U. D 12S2
MW-9S 10/16/12 pH (FIELD) 6.5-8.5** 6.26 S.U. D 12S2
MW-11D 10/17/12 pH (FIELD) 6.5-8.5** 6.28 S.U. D 12S2
MW-12S 10/17/12 pH (FIELD) 6.5-8.5** 6.23 S.U. D 12S2
MW-13S 10/17/12 pH (FIELD) 6.5-8.5** 6.06 S.U. D 12S2
MW-21D 10/17/12 pH (FIELD) 6.5-8.5** 6.43 S.U. D 12S2
MW-48S 10/17/12 pH (FIELD) 6.5-8.5** 6.14 S.U. D 12S2
MW-56D 10/17/12 pH (FIELD) 6.5-8.5** 6.46 S.U. D 12S2
MW-13S 2/26/13 pH (FIELD) 6.5-8.5** 6.42 S.U. D 13S1
MW-14S 2/26/13 pH (FIELD) 6.5-8.5** 6.72 S.U. D 13S1
MW-15S 2/26/13 pH (FIELD) 6.5-8.5** 6.54 S.U. D 13S1
MW-18D 2/26/13 pH (FIELD) 6.5-8.5** 6.16 S.U. D 13S1
MW-19D 2/26/13 pH (FIELD) 6.5-8.5** 6.87 S.U. D 13S1
MW-50S 2/26/13 pH (FIELD) 6.5-8.5** 6.23 S.U. D 13S1
MW-10S 2/27/13 pH (FIELD) 6.5-8.5** 6.31 S.U. D 13S1
MW-11D 2/27/13 pH (FIELD) 6.5-8.5** 6.35 S.U. D 13S1
MW-12S 2/27/13 pH (FIELD) 6.5-8.5** 6.18 S.U. D 13S1
MW-21D 2/27/13 pH (FIELD) 6.5-8.5** 6.24 S.U. D 13S1
MW-23S 2/27/13 pH (FIELD) 6.5-8.5** 6.19 S.U. D 13S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-24D 2/27/13 pH (FIELD) 6.5-8.5** 6.33 S.U. D 13S1
MW-26D 2/27/13 pH (FIELD) 6.5-8.5** 6.09 S.U. D 13S1
MW-48S 2/27/13 pH (FIELD) 6.5-8.5** 6.07 S.U. D 13S1
MW-56D 2/27/13 pH (FIELD) 6.5-8.5** 6.16 S.U. D 13S1
MW-8S 2/27/13 pH (FIELD) 6.5-8.5** 6.15 S.U. D 13S1
MW-9S 2/27/13 pH (FIELD) 6.5-8.5** 6.42 S.U. D 13S1
MW-12S 9/17/13 pH (FIELD) 6.5-8.5** 6.47 S.U. D 13S2
MW-21D 9/17/13 pH (FIELD) 6.5-8.5** 6.09 S.U. D 13S2
MW-26D 9/17/13 pH (FIELD) 6.5-8.5** 5.94 S.U. D 13S2
MW-48S 9/17/13 pH (FIELD) 6.5-8.5** 6.08 S.U. D 13S2
MW-56D 9/17/13 pH (FIELD) 6.5-8.5** 6.37 S.U. D 13S2
MW-8S 9/17/13 pH (FIELD) 6.5-8.5** 6.07 S.U. D 13S2
MW-10S 9/18/13 pH (FIELD) 6.5-8.5** 6 S.U. D 13S2
MW-11D 9/18/13 pH (FIELD) 6.5-8.5** 6.3 S.U. D 13S2
MW-13S 9/18/13 pH (FIELD) 6.5-8.5** 5.71 S.U. D 13S2
MW-15S 9/18/13 pH (FIELD) 6.5-8.5** 6.4 S.U. D 13S2
MW-50S 9/18/13 pH (FIELD) 6.5-8.5** 6.18 S.U. D 13S2
MW-9S 9/18/13 pH (FIELD) 6.5-8.5** 6.13 S.U. D 13S2
MW-14S 9/19/13 pH (FIELD) 6.5-8.5** 6.39 S.U. D 13S2
MW-18D 9/19/13 pH (FIELD) 6.5-8.5** 5.93 S.U. D 13S2
MW-19D 9/19/13 pH (FIELD) 6.5-8.5** 6.81 S.U. D 13S2
MW-23S 9/19/13 pH (FIELD) 6.5-8.5** 6.11 S.U. D 13S2
MW-24D 9/19/13 pH (FIELD) 6.5-8.5** 6.24 S.U. D 13S2
MW-10S 2/7/14 pH (FIELD) 6.5-8.5** 6.09 S.U. D 14S1
MW-11D 2/7/14 pH (FIELD) 6.5-8.5** 6.31 S.U. D 14S1
MW-12S 2/7/14 pH (FIELD) 6.5-8.5** 6.27 S.U. D 14S1
MW-13S 2/7/14 pH (FIELD) 6.5-8.5** 5.97 S.U. D 14S1
MW-14S 2/7/14 pH (FIELD) 6.5-8.5** 6.57 S.U. D 14S1
MW-15S 2/7/14 pH (FIELD) 6.5-8.5** 6.46 S.U. D 14S1
MW-18D 2/7/14 pH (FIELD) 6.5-8.5** 6.27 S.U. D 14S1
MW-19D 2/7/14 pH (FIELD) 6.5-8.5** 7.17 S.U. D 14S1
MW-21D 2/7/14 pH (FIELD) 6.5-8.5** 6.35 S.U. D 14S1
MW-23S 2/7/14 pH (FIELD) 6.5-8.5** 6.34 S.U. D 14S1
MW-24D 2/7/14 pH (FIELD) 6.5-8.5** 6.41 S.U. D 14S1
MW-26D 2/7/14 pH (FIELD) 6.5-8.5** 5.81 S.U. D 14S1
MW-48S 2/7/14 pH (FIELD) 6.5-8.5** 6.1 S.U. D 14S1
MW-50S 2/7/14 pH (FIELD) 6.5-8.5** 6.29 S.U. D 14S1
MW-56D 2/7/14 pH (FIELD) 6.5-8.5** 6.46 S.U. D 14S1
MW-8S 2/7/14 pH (FIELD) 6.5-8.5** 6.12 S.U. D 14S1
MW-9S 2/7/14 pH (FIELD) 6.5-8.5** 5.57 S.U. D 14S1
MW-10S 2/19/08 Sodium 250* 55 mg/L 08S1
MW-11D 2/19/08 Sodium 250* 48 mg/L 08S1
MW-12S 2/19/08 Sodium 250* 33 mg/L 08S1
MW-26D 2/19/08 Sodium 250* 77 mg/L 08S1
MW-8S 2/19/08 Sodium 250* 120 mg/L 08S1
MW-9S 2/19/08 Sodium 250* 39 mg/L 08S1
MW-13S 2/20/08 Sodium 250* 4 mg/L 08S1
MW-18D 2/20/08 Sodium 250* 56 mg/L 08S1
MW-19D 2/20/08 Sodium 250* 42 mg/L 08S1
MW-21D 2/20/08 Sodium 250* 75 mg/L 08S1
MW-23S 2/20/08 Sodium 250* 23 mg/L 08S1
MW-24D 2/20/08 Sodium 250* 23 mg/L 08S1
MW-14S 2/21/08 Sodium 250* 74 mg/L 08S1
MW-15S 2/21/08 Sodium 250* 47 mg/L 08S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-48S 2/21/08 Sodium 250* 29 mg/L 08S1
MW-50S 2/21/08 Sodium 250* 82 mg/L 08S1
MW-56D 2/21/08 Sodium 250* 62 mg/L 08S1
MW-13S 8/21/08 Sodium 250* 10 mg/L 08S2
MW-14S 8/21/08 Sodium 250* 73 mg/L 08S2
MW-18D 8/21/08 Sodium 250* 52 mg/L 08S2
MW-19D 8/21/08 Sodium 250* 45 mg/L 08S2
MW-21D 8/21/08 Sodium 250* 68 mg/L 08S2
MW-12S 8/25/08 Sodium 250* 41 mg/L 08S2
MW-15S 8/25/08 Sodium 250* 60 mg/L 08S2
MW-48S 8/25/08 Sodium 250* 46 mg/L 08S2
MW-50S 8/25/08 Sodium 250* 82 mg/L 08S2
MW-56D 8/25/08 Sodium 250* 52 mg/L 08S2
MW-11D 8/26/08 Sodium 250* 36 mg/L 08S2
MW-23S 8/26/08 Sodium 250* 18 mg/L 08S2
MW-24D 8/26/08 Sodium 250* 19 mg/L 08S2
MW-26D 8/26/08 Sodium 250* 120 mg/L 08S2
MW-8S 8/26/08 Sodium 250* 120 mg/L 08S2
MW-9S 8/26/08 Sodium 250* 25 mg/L 08S2
MW-10S 8/27/08 Sodium 250* 80 mg/L 08S2
MW-10S 3/11/09 Sodium 250* 89 mg/L 09S1
MW-13S 3/11/09 Sodium 250* 4.4 mg/L 09S1
MW-14S 3/11/09 Sodium 250* 79 mg/L 09S1
MW-15S 3/11/09 Sodium 250* 50 mg/L 09S1
MW-18D 3/11/09 Sodium 250* 54 mg/L 09S1
MW-19D 3/11/09 Sodium 250* 36 mg/L 09S1
MW-21D 3/11/09 Sodium 250* 72 mg/L 09S1
MW-50S 3/11/09 Sodium 250* 92 mg/L 09S1
MW-9S 3/11/09 Sodium 250* 35 mg/L 09S1
MW-11D 3/12/09 Sodium 250* 48 mg/L 09S1
MW-12S 3/12/09 Sodium 250* 37 mg/L 09S1
MW-23S 3/12/09 Sodium 250* 20 mg/L 09S1
MW-24D 3/12/09 Sodium 250* 20 mg/L 09S1
MW-26D 3/12/09 Sodium 250* 120 mg/L 09S1
MW-48S 3/12/09 Sodium 250* 35 mg/L 09S1
MW-56D 3/12/09 Sodium 250* 59 mg/L 09S1
MW-8S 3/12/09 Sodium 250* 72 mg/L 09S1
MW-10S 8/20/09 Sodium 250* 77 mg/L 09S2
MW-11D 8/20/09 Sodium 250* 39 mg/L 09S2
MW-12S 8/20/09 Sodium 250* 36 mg/L 09S2
MW-14S 8/20/09 Sodium 250* 84 mg/L 09S2
MW-15S 8/20/09 Sodium 250* 46 mg/L 09S2
MW-18D 8/20/09 Sodium 250* 57 mg/L 09S2
MW-19D 8/20/09 Sodium 250* 25 mg/L 09S2
MW-21D 8/20/09 Sodium 250* 80 mg/L 09S2
MW-23S 8/20/09 Sodium 250* 17 mg/L 09S2
MW-48S 8/20/09 Sodium 250* 11 mg/L 09S2
MW-50S 8/20/09 Sodium 250* 80 mg/L 09S2
MW-56D 8/20/09 Sodium 250* 54 mg/L 09S2
MW-13S 8/25/09 Sodium 250* 13 mg/L 09S2
MW-24D 8/25/09 Sodium 250* 19 mg/L 09S2
MW-26D 8/25/09 Sodium 250* 8.8 mg/L 09S2
MW-8S 8/26/09 Sodium 250* 94 mg/L 09S2
MW-9S 8/26/09 Sodium 250* 4.4 mg/L 09S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-10S 3/26/10 Sodium 250* 69.3 mg/L 10S1
MW-26D 3/26/10 Sodium 250* 82 mg/L 10S1
MW-8S 3/26/10 Sodium 250* 70 mg/L 10S1
MW-9S 3/26/10 Sodium 250* 76.3 mg/L 10S1
MW-11D 3/29/10 Sodium 250* 42.1 mg/L 10S1
MW-12S 3/29/10 Sodium 250* 31.8 mg/L 10S1
MW-13S 3/29/10 Sodium 250* 3.4 mg/L 10S1
MW-14S 3/29/10 Sodium 250* 90.4 mg/L 10S1
MW-15S 3/29/10 Sodium 250* 51.1 mg/L 10S1
MW-18D 3/29/10 Sodium 250* 56.9 mg/L 10S1
MW-19D 3/29/10 Sodium 250* 28.8 mg/L 10S1
MW-21D 3/29/10 Sodium 250* 86.4 mg/L 10S1
MW-50S 3/29/10 Sodium 250* 83.8 mg/L 10S1
MW-23S 3/30/10 Sodium 250* 18.7 mg/L 10S1
MW-24D 3/30/10 Sodium 250* 19.7 mg/L 10S1
MW-48S 3/30/10 Sodium 250* 21.1 mg/L 10S1
MW-56D 3/30/10 Sodium 250* 61.6 mg/L 10S1
MW-13S 10/7/10 Sodium 250* 3.8 mg/L 10S2
MW-14S 10/7/10 Sodium 250* 74 mg/L 10S2
MW-18D 10/7/10 Sodium 250* 54.2 mg/L 10S2
MW-19D 10/7/10 Sodium 250* 31.1 mg/L 10S2
MW-10S 10/8/10 Sodium 250* 52.9 mg/L 10S2
MW-26D 10/8/10 Sodium 250* 83.8 mg/L 10S2
MW-8S 10/8/10 Sodium 250* 71 mg/L 10S2
MW-9S 10/8/10 Sodium 250* 10 mg/L 10S2
MW-15S 10/11/10 Sodium 250* 38.2 mg/L 10S2
MW-21D 10/11/10 Sodium 250* 76.7 mg/L 10S2
MW-50S 10/11/10 Sodium 250* 65.7 mg/L 10S2
MW-48S 10/12/10 Sodium 250* 13.6 mg/L 10S2
MW-56D 10/12/10 Sodium 250* 56 mg/L 10S2
MW-11D 10/13/10 Sodium 250* 40 mg/L 10S2
MW-12S 10/13/10 Sodium 250* 37.2 mg/L 10S2
MW-23S 10/13/10 Sodium 250* 16.5 mg/L 10S2
MW-24D 10/13/10 Sodium 250* 18.8 mg/L 10S2
MW-13S 2/18/11 Sodium 250* 11.5 mg/L 11S1
MW-14S 2/18/11 Sodium 250* 64.6 mg/L 11S1
MW-15S 2/18/11 Sodium 250* 36.7 mg/L 11S1
MW-18D 2/18/11 Sodium 250* 60.3 mg/L 11S1
MW-19D 2/18/11 Sodium 250* 30.6 mg/L 11S1
MW-50S 2/18/11 Sodium 250* 100 mg/L 11S1
MW-10S 2/21/11 Sodium 250* 38.8 mg/L 11S1
MW-11D 2/21/11 Sodium 250* 50.4 mg/L 11S1
MW-12S 2/21/11 Sodium 250* 47.8 mg/L 11S1
MW-21D 2/21/11 Sodium 250* 77.3 mg/L 11S1
MW-23S 2/21/11 Sodium 250* 26.6 mg/L 11S1
MW-24D 2/21/11 Sodium 250* 23.3 mg/L 11S1
MW-26D 2/21/11 Sodium 250* 87.4 mg/L 11S1
MW-48S 2/21/11 Sodium 250* 11.8 mg/L 11S1
MW-56D 2/21/11 Sodium 250* 54.6 mg/L 11S1
MW-8S 2/21/11 Sodium 250* 89.2 mg/L 11S1
MW-9S 2/21/11 Sodium 250* 9.3 mg/L 11S1
MW-10S 9/22/11 Sodium 250* 52 mg/L 11S2
MW-26D 9/22/11 Sodium 250* 88.9 mg/L 11S2
MW-8S 9/22/11 Sodium 250* 83.6 mg/L 11S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-9S 9/22/11 Sodium 250* 20.7 mg/L 11S2
MW-11D 9/23/11 Sodium 250* 40.8 mg/L 11S2
MW-12S 9/23/11 Sodium 250* 38.1 mg/L 11S2
MW-13S 9/23/11 Sodium 250* 25.4 mg/L 11S2
MW-14S 9/23/11 Sodium 250* 74.9 mg/L 11S2
MW-15S 9/23/11 Sodium 250* 36.5 mg/L 11S2
MW-18D 9/23/11 Sodium 250* 59.3 mg/L 11S2
MW-19D 9/23/11 Sodium 250* 28.3 mg/L 11S2
MW-21D 9/23/11 Sodium 250* 76.1 mg/L 11S2
MW-23S 9/23/11 Sodium 250* 30.4 mg/L 11S2
MW-24D 9/23/11 Sodium 250* 19.6 mg/L 11S2
MW-48S 9/23/11 Sodium 250* 6 mg/L 11S2
MW-50S 9/23/11 Sodium 250* 83.4 mg/L 11S2
MW-56D 9/23/11 Sodium 250* 55.6 mg/L 11S2
MW-10S 2/21/12 Sodium 250* 6 mg/L 12S1
MW-48S 2/21/12 Sodium 250* 6.9 mg/L 12S1
MW-11D 2/22/12 Sodium 250* 41.5 mg/L 12S1
MW-12S 2/22/12 Sodium 250* 23.8 mg/L 12S1
MW-13S 2/22/12 Sodium 250* 49.6 mg/L 12S1
MW-14S 2/22/12 Sodium 250* 65.9 mg/L 12S1
MW-15S 2/22/12 Sodium 250* 34.4 mg/L 12S1
MW-18D 2/22/12 Sodium 250* 57.8 mg/L 12S1
MW-19D 2/22/12 Sodium 250* 27.7 mg/L J 12S1
MW-21D 2/22/12 Sodium 250* 73.2 mg/L 12S1
MW-50S 2/22/12 Sodium 250* 63.4 mg/L 12S1
MW-56D 2/22/12 Sodium 250* 56.3 mg/L 12S1
MW-23S 2/23/12 Sodium 250* 31.3 mg/L 12S1
MW-24D 2/23/12 Sodium 250* 20.5 mg/L 12S1
MW-26D 2/23/12 Sodium 250* 77.7 mg/L 12S1
MW-8S 2/23/12 Sodium 250* 97 mg/L 12S1
MW-9S 2/23/12 Sodium 250* 35.7 mg/L 12S1
MW-26D 10/16/12 Sodium 250* 78.9 mg/L 12S2
MW-50S 10/16/12 Sodium 250* 64 mg/L 12S2
MW-8S 10/16/12 Sodium 250* 85.4 mg/L 12S2
MW-19D 2/26/13 Sodium 250* 30.8 mg/L 13S1
MW-50S 2/26/13 Sodium 250* 64.2 mg/L 13S1
MW-21D 2/27/13 Sodium 250* 77.5 mg/L 13S1
MW-26D 2/27/13 Sodium 250* 81.7 mg/L 13S1
MW-8S 2/27/13 Sodium 250* 91.7 mg/L 13S1
MW-26D 9/17/13 Sodium 250* 92.6 mg/L 13S2
MW-8S 9/17/13 Sodium 250* 86.1 mg/L 13S2
MW-50S 9/18/13 Sodium 250* 56 mg/L 13S2
MW-23S 9/19/13 Sodium 250* 27.7 mg/L 13S2
MW-19D 2/7/14 Sodium 250* 37.7 mg/L 14S1
MW-26D 2/7/14 Sodium 250* 87.9 mg/L 14S1
MW-50S 2/7/14 Sodium 250* 83.4 mg/L 14S1
MW-8S 2/7/14 Sodium 250* 84.1 mg/L 14S1
MW-10S 2/19/08 Specific Conductance NS 370 µmhos/cm D 08S1
MW-11D 2/19/08 Specific Conductance NS 920 µmhos/cm D 08S1
MW-12S 2/19/08 Specific Conductance NS 712 µmhos/cm D 08S1
MW-26D 2/19/08 Specific Conductance NS 450 µmhos/cm D 08S1
MW-8S 2/19/08 Specific Conductance NS 684 µmhos/cm D 08S1
MW-9S 2/19/08 Specific Conductance NS 254 µmhos/cm D 08S1
MW-13S 2/20/08 Specific Conductance NS 149 µmhos/cm D 08S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-18D 2/20/08 Specific Conductance NS 294 µmhos/cm D 08S1
MW-19D 2/20/08 Specific Conductance NS 484 µmhos/cm D 08S1
MW-21D 2/20/08 Specific Conductance NS 399 µmhos/cm D 08S1
MW-23S 2/20/08 Specific Conductance NS 840 µmhos/cm D 08S1
MW-24D 2/20/08 Specific Conductance NS 527 µmhos/cm D 08S1
MW-14S 2/21/08 Specific Conductance NS 613 µmhos/cm D 08S1
MW-15S 2/21/08 Specific Conductance NS 628 µmhos/cm D 08S1
MW-48S 2/21/08 Specific Conductance NS 458 µmhos/cm D 08S1
MW-50S 2/21/08 Specific Conductance NS 837 µmhos/cm D 08S1
MW-56D 2/21/08 Specific Conductance NS 431 µmhos/cm D 08S1
MW-13S 8/21/08 Specific Conductance NS 298 µmhos/cm D 08S2
MW-14S 8/21/08 Specific Conductance NS 603 µmhos/cm D 08S2
MW-18D 8/21/08 Specific Conductance NS 304 µmhos/cm D 08S2
MW-19D 8/21/08 Specific Conductance NS 517 µmhos/cm D 08S2
MW-21D 8/21/08 Specific Conductance NS 422 µmhos/cm D 08S2
MW-12S 8/25/08 Specific Conductance NS 824 µmhos/cm D 08S2
MW-15S 8/25/08 Specific Conductance NS 767 µmhos/cm D 08S2
MW-48S 8/25/08 Specific Conductance NS 607 µmhos/cm D 08S2
MW-50S 8/25/08 Specific Conductance NS 1066 µmhos/cm D 08S2
MW-56D 8/25/08 Specific Conductance NS 448 µmhos/cm D 08S2
MW-11D 8/26/08 Specific Conductance NS 742 µmhos/cm D 08S2
MW-23S 8/26/08 Specific Conductance NS 890 µmhos/cm D 08S2
MW-24D 8/26/08 Specific Conductance NS 458 µmhos/cm D 08S2
MW-26D 8/26/08 Specific Conductance NS 732 µmhos/cm D 08S2
MW-8S 8/26/08 Specific Conductance NS 710 µmhos/cm D 08S2
MW-9S 8/26/08 Specific Conductance NS 187 µmhos/cm D 08S2
MW-10S 8/27/08 Specific Conductance NS 547 µmhos/cm D 08S2
MW-10S 3/11/09 Specific Conductance NS 513 µmhos/cm D 09S1
MW-13S 3/11/09 Specific Conductance NS 170 µmhos/cm D 09S1
MW-14S 3/11/09 Specific Conductance NS 633 µmhos/cm D 09S1
MW-15S 3/11/09 Specific Conductance NS 737 µmhos/cm D 09S1
MW-18D 3/11/09 Specific Conductance NS 298 µmhos/cm D 09S1
MW-19D 3/11/09 Specific Conductance NS 510 µmhos/cm D 09S1
MW-21D 3/11/09 Specific Conductance NS 434 µmhos/cm D 09S1
MW-50S 3/11/09 Specific Conductance NS 907 µmhos/cm D 09S1
MW-9S 3/11/09 Specific Conductance NS 99 µmhos/cm D 09S1
MW-11D 3/12/09 Specific Conductance NS 889 µmhos/cm D 09S1
MW-12S 3/12/09 Specific Conductance NS 777 µmhos/cm D 09S1
MW-23S 3/12/09 Specific Conductance NS 801 µmhos/cm D 09S1
MW-24D 3/12/09 Specific Conductance NS 459 µmhos/cm D 09S1
MW-26D 3/12/09 Specific Conductance NS 662 µmhos/cm D 09S1
MW-48S 3/12/09 Specific Conductance NS 545 µmhos/cm D 09S1
MW-56D 3/12/09 Specific Conductance NS 439 µmhos/cm D 09S1
MW-8S 3/12/09 Specific Conductance NS 386 µmhos/cm D 09S1
MW-10S 8/20/09 Specific Conductance NS 509 umhos/cm D 09S2
MW-11D 8/20/09 Specific Conductance NS 756 umhos/cm D 09S2
MW-12S 8/20/09 Specific Conductance NS 821 umhos/cm D 09S2
MW-14S 8/20/09 Specific Conductance NS 655 umhos/cm D 09S2
MW-15S 8/20/09 Specific Conductance NS 829 umhos/cm D 09S2
MW-18D 8/20/09 Specific Conductance NS 315 umhos/cm D 09S2
MW-19D 8/20/09 Specific Conductance NS 417 umhos/cm D 09S2
MW-21D 8/20/09 Specific Conductance NS 466 umhos/cm D 09S2
MW-23S 8/20/09 Specific Conductance NS 819 umhos/cm D 09S2
MW-48S 8/20/09 Specific Conductance NS 380 umhos/cm D 09S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-50S 8/20/09 Specific Conductance NS 870 umhos/cm D 09S2
MW-56D 8/20/09 Specific Conductance NS 446 umhos/cm D 09S2
MW-13S 8/25/09 Specific Conductance NS 316 umhos/cm D 09S2
MW-24D 8/25/09 Specific Conductance NS 462 umhos/cm D 09S2
MW-26D 8/25/09 Specific Conductance NS 478 umhos/cm D 09S2
MW-8S 8/26/09 Specific Conductance NS 562 umhos/cm D 09S2
MW-9S 8/26/09 Specific Conductance NS 70 umhos/cm D 09S2
MW-10S 3/26/10 Specific Conductance NS 389 umhos/cm D 10S1
MW-26D 3/26/10 Specific Conductance NS 461 umhos/cm D 10S1
MW-8S 3/26/10 Specific Conductance NS 390 umhos/cm D 10S1
MW-9S 3/26/10 Specific Conductance NS 437 umhos/cm D 10S1
MW-11D 3/29/10 Specific Conductance NS 787 umhos/cm D 10S1
MW-12S 3/29/10 Specific Conductance NS 632 umhos/cm D 10S1
MW-13S 3/29/10 Specific Conductance NS 95 umhos/cm D 10S1
MW-14S 3/29/10 Specific Conductance NS 705 umhos/cm D 10S1
MW-15S 3/29/10 Specific Conductance NS 773 umhos/cm D 10S1
MW-18D 3/29/10 Specific Conductance NS 309 umhos/cm D 10S1
MW-19D 3/29/10 Specific Conductance NS 437 umhos/cm D 10S1
MW-21D 3/29/10 Specific Conductance NS 418 umhos/cm D 10S1
MW-50S 3/29/10 Specific Conductance NS 662 umhos/cm D 10S1
MW-23S 3/30/10 Specific Conductance NS 841 umhos/cm D 10S1
MW-24D 3/30/10 Specific Conductance NS 507 umhos/cm D 10S1
MW-48S 3/30/10 Specific Conductance NS 467 umhos/cm D 10S1
MW-56D 3/30/10 Specific Conductance NS 398 umhos/cm D 10S1
MW-13S 10/7/10 Specific Conductance NS 142 umhos/cm D 10S2
MW-14S 10/7/10 Specific Conductance NS 654 umhos/cm D 10S2
MW-18D 10/7/10 Specific Conductance NS 316 umhos/cm D 10S2
MW-19D 10/7/10 Specific Conductance NS 474 umhos/cm D 10S2
MW-10S 10/8/10 Specific Conductance NS 290 umhos/cm D 10S2
MW-26D 10/8/10 Specific Conductance NS 502 umhos/cm D 10S2
MW-8S 10/8/10 Specific Conductance NS 436 umhos/cm D 10S2
MW-9S 10/8/10 Specific Conductance NS 90 umhos/cm D 10S2
MW-15S 10/11/10 Specific Conductance NS 582 umhos/cm D 10S2
MW-21D 10/11/10 Specific Conductance NS 456 umhos/cm D 10S2
MW-50S 10/11/10 Specific Conductance NS 642 umhos/cm D 10S2
MW-48S 10/12/10 Specific Conductance NS 368 umhos/cm D 10S2
MW-56D 10/12/10 Specific Conductance NS 426 umhos/cm D 10S2
MW-11D 10/13/10 Specific Conductance NS 757 umhos/cm D 10S2
MW-12S 10/13/10 Specific Conductance NS 783 umhos/cm D 10S2
MW-23S 10/13/10 Specific Conductance NS 772 umhos/cm D 10S2
MW-24D 10/13/10 Specific Conductance NS 492 umhos/cm D 10S2
MW-13S 2/18/11 Specific Conductance NS 322 umhos/cm D 11S1
MW-14S 2/18/11 Specific Conductance NS 581 umhos/cm D 11S1
MW-15S 2/18/11 Specific Conductance NS 607 umhos/cm D 11S1
MW-18D 2/18/11 Specific Conductance NS 337 umhos/cm D 11S1
MW-19D 2/18/11 Specific Conductance NS 510 umhos/cm D 11S1
MW-50S 2/18/11 Specific Conductance NS 1240 umhos/cm D 11S1
MW-10S 2/21/11 Specific Conductance NS 206 umhos/cm D 11S1
MW-11D 2/21/11 Specific Conductance NS 1046 umhos/cm D 11S1
MW-12S 2/21/11 Specific Conductance NS 825 umhos/cm D 11S1
MW-21D 2/21/11 Specific Conductance NS 448 umhos/cm D 11S1
MW-23S 2/21/11 Specific Conductance NS 896 umhos/cm D 11S1
MW-24D 2/21/11 Specific Conductance NS 662 umhos/cm D 11S1
MW-26D 2/21/11 Specific Conductance NS 488 umhos/cm D 11S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-48S 2/21/11 Specific Conductance NS 297 umhos/cm D 11S1
MW-56D 2/21/11 Specific Conductance NS 419 umhos/cm D 11S1
MW-8S 2/21/11 Specific Conductance NS 514 umhos/cm D 11S1
MW-9S 2/21/11 Specific Conductance NS 91 umhos/cm D 11S1
MW-10S 9/22/11 Specific Conductance NS 307 µmhos/cm D 11S2
MW-26D 9/22/11 Specific Conductance NS 460 µmhos/cm D 11S2
MW-8S 9/22/11 Specific Conductance NS 480 µmhos/cm D 11S2
MW-9S 9/22/11 Specific Conductance NS 143 µmhos/cm D 11S2
MW-11D 9/23/11 Specific Conductance NS 824 µmhos/cm D 11S2
MW-12S 9/23/11 Specific Conductance NS 872 µmhos/cm D 11S2
MW-13S 9/23/11 Specific Conductance NS 419 µmhos/cm D 11S2
MW-14S 9/23/11 Specific Conductance NS 627 µmhos/cm D 11S2
MW-15S 9/23/11 Specific Conductance NS 621 µmhos/cm D 11S2
MW-18D 9/23/11 Specific Conductance NS 319 µmhos/cm D 11S2
MW-19D 9/23/11 Specific Conductance NS 509 µmhos/cm D 11S2
MW-21D 9/23/11 Specific Conductance NS 442 µmhos/cm D 11S2
MW-23S 9/23/11 Specific Conductance NS 941 µmhos/cm D 11S2
MW-24D 9/23/11 Specific Conductance NS 498 µmhos/cm D 11S2
MW-48S 9/23/11 Specific Conductance NS 200 µmhos/cm D 11S2
MW-50S 9/23/11 Specific Conductance NS 904 µmhos/cm D 11S2
MW-56D 9/23/11 Specific Conductance NS 422 µmhos/cm D 11S2
MW-10S 2/21/12 Specific Conductance NS 223 umhos/cm D 12S1
MW-48S 2/21/12 Specific Conductance NS 194 umhos/cm D 12S1
MW-11D 2/22/12 Specific Conductance NS 835 umhos/cm D 12S1
MW-12S 2/22/12 Specific Conductance NS 765 umhos/cm D 12S1
MW-13S 2/22/12 Specific Conductance NS 857 umhos/cm D 12S1
MW-14S 2/22/12 Specific Conductance NS 554 umhos/cm D 12S1
MW-15S 2/22/12 Specific Conductance NS 672 umhos/cm D 12S1
MW-18D 2/22/12 Specific Conductance NS 303 umhos/cm D 12S1
MW-19D 2/22/12 Specific Conductance NS 479 umhos/cm D 12S1
MW-21D 2/22/12 Specific Conductance NS 448 umhos/cm D 12S1
MW-50S 2/22/12 Specific Conductance NS 729 umhos/cm D 12S1
MW-56D 2/22/12 Specific Conductance NS 439 umhos/cm D 12S1
MW-23S 2/23/12 Specific Conductance NS 821 umhos/cm D 12S1
MW-24D 2/23/12 Specific Conductance NS 393 umhos/cm D 12S1
MW-26D 2/23/12 Specific Conductance NS 393 umhos/cm D 12S1
MW-8S 2/23/12 Specific Conductance NS 507 umhos/cm D 12S1
MW-9S 2/23/12 Specific Conductance NS 202 umhos/cm D 12S1
MW-10S 10/16/12 Specific Conductance NS 238 umhos/cm D 12S2
MW-14S 10/16/12 Specific Conductance NS 501 umhos/cm D 12S2
MW-15S 10/16/12 Specific Conductance NS 650 umhos/cm D 12S2
MW-18D 10/16/12 Specific Conductance NS 312 umhos/cm D 12S2
MW-19D 10/16/12 Specific Conductance NS 611 umhos/cm D 12S2
MW-23S 10/16/12 Specific Conductance NS 783 umhos/cm D 12S2
MW-24D 10/16/12 Specific Conductance NS 622 umhos/cm D 12S2
MW-26D 10/16/12 Specific Conductance NS 444 umhos/cm D 12S2
MW-50S 10/16/12 Specific Conductance NS 772 umhos/cm D 12S2
MW-8S 10/16/12 Specific Conductance NS 469 umhos/cm D 12S2
MW-9S 10/16/12 Specific Conductance NS 159 umhos/cm D 12S2
MW-11D 10/17/12 Specific Conductance NS 1055 umhos/cm D 12S2
MW-12S 10/17/12 Specific Conductance NS 758 umhos/cm D 12S2
MW-13S 10/17/12 Specific Conductance NS 296 umhos/cm D 12S2
MW-21D 10/17/12 Specific Conductance NS 418 umhos/cm D 12S2
MW-48S 10/17/12 Specific Conductance NS 425 umhos/cm D 12S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-56D 10/17/12 Specific Conductance NS 452 umhos/cm D 12S2
MW-13S 2/26/13 Specific Conductance NS 791 umhos/cm D 13S1
MW-14S 2/26/13 Specific Conductance NS 488 umhos/cm D 13S1
MW-15S 2/26/13 Specific Conductance NS 597 umhos/cm D 13S1
MW-18D 2/26/13 Specific Conductance NS 305 umhos/cm D 13S1
MW-19D 2/26/13 Specific Conductance NS 602 umhos/cm D 13S1
MW-50S 2/26/13 Specific Conductance NS 583 umhos/cm D 13S1
MW-10S 2/27/13 Specific Conductance NS 228 umhos/cm D 13S1
MW-11D 2/27/13 Specific Conductance NS 903 umhos/cm D 13S1
MW-12S 2/27/13 Specific Conductance NS 793 umhos/cm D 13S1
MW-21D 2/27/13 Specific Conductance NS 411 umhos/cm D 13S1
MW-23S 2/27/13 Specific Conductance NS 789 umhos/cm D 13S1
MW-24D 2/27/13 Specific Conductance NS 688 umhos/cm D 13S1
MW-26D 2/27/13 Specific Conductance NS 368 umhos/cm D 13S1
MW-48S 2/27/13 Specific Conductance NS 216 umhos/cm D 13S1
MW-56D 2/27/13 Specific Conductance NS 339 umhos/cm D 13S1
MW-8S 2/27/13 Specific Conductance NS 476 umhos/cm D 13S1
MW-9S 2/27/13 Specific Conductance NS 162 umhos/cm D 13S1
MW-12S 9/17/13 Specific Conductance NS 638 umhos/cm D 13S2
MW-21D 9/17/13 Specific Conductance NS 455 umhos/cm D 13S2
MW-26D 9/17/13 Specific Conductance NS 547 umhos/cm D 13S2
MW-48S 9/17/13 Specific Conductance NS 441 umhos/cm D 13S2
MW-56D 9/17/13 Specific Conductance NS 469 umhos/cm D 13S2
MW-8S 9/17/13 Specific Conductance NS 518 umhos/cm D 13S2
MW-10S 9/18/13 Specific Conductance NS 240 umhos/cm D 13S2
MW-11D 9/18/13 Specific Conductance NS 794 umhos/cm D 13S2
MW-13S 9/18/13 Specific Conductance NS 189 umhos/cm D 13S2
MW-15S 9/18/13 Specific Conductance NS 697 umhos/cm D 13S2
MW-50S 9/18/13 Specific Conductance NS 502 umhos/cm D 13S2
MW-9S 9/18/13 Specific Conductance NS 154 umhos/cm D 13S2
MW-14S 9/19/13 Specific Conductance NS 486 umhos/cm D 13S2
MW-18D 9/19/13 Specific Conductance NS 334 umhos/cm D 13S2
MW-19D 9/19/13 Specific Conductance NS 600 umhos/cm D 13S2
MW-23S 9/19/13 Specific Conductance NS 805 umhos/cm D 13S2
MW-24D 9/19/13 Specific Conductance NS 724 umhos/cm D 13S2
MW-10S 2/7/14 Specific Conductance NS 185 umhos/cm D 14S1
MW-11D 2/7/14 Specific Conductance NS 1005 umhos/cm D 14S1
MW-12S 2/7/14 Specific Conductance NS 733 umhos/cm D 14S1
MW-13S 2/7/14 Specific Conductance NS 130 umhos/cm D 14S1
MW-14S 2/7/14 Specific Conductance NS 499 umhos/cm D 14S1
MW-15S 2/7/14 Specific Conductance NS 575 umhos/cm D 14S1
MW-18D 2/7/14 Specific Conductance NS 303 umhos/cm D 14S1
MW-19D 2/7/14 Specific Conductance NS 536 umhos/cm D 14S1
MW-21D 2/7/14 Specific Conductance NS 418 umhos/cm D 14S1
MW-23S 2/7/14 Specific Conductance NS 790 umhos/cm D 14S1
MW-24D 2/7/14 Specific Conductance NS 761 umhos/cm D 14S1
MW-26D 2/7/14 Specific Conductance NS 457 umhos/cm D 14S1
MW-48S 2/7/14 Specific Conductance NS 475 umhos/cm D 14S1
MW-50S 2/7/14 Specific Conductance NS 1056 umhos/cm D 14S1
MW-56D 2/7/14 Specific Conductance NS 428 umhos/cm D 14S1
MW-8S 2/7/14 Specific Conductance NS 450 umhos/cm D 14S1
MW-9S 2/7/14 Specific Conductance NS 90 umhos/cm D 14S1
MW-10S 2/19/08 TDS 500** 230 mg/L 08S1
MW-11D 2/19/08 TDS 500** 450 mg/L 08S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-12S 2/19/08 TDS 500** 320 mg/L 08S1
MW-26D 2/19/08 TDS 500** 230 mg/L 08S1
MW-8S 2/19/08 TDS 500** 380 mg/L 08S1
MW-9S 2/19/08 TDS 500** 140 mg/L 08S1
MW-13S 2/20/08 TDS 500** 100 mg/L 08S1
MW-18D 2/20/08 TDS 500** 180 mg/L 08S1
MW-19D 2/20/08 TDS 500** 270 mg/L 08S1
MW-21D 2/20/08 TDS 500** 230 mg/L 08S1
MW-23S 2/20/08 TDS 500** 400 mg/L 08S1
MW-24D 2/20/08 TDS 500** 310 mg/L 08S1
MW-14S 2/21/08 TDS 500** 290 mg/L 08S1
MW-15S 2/21/08 TDS 500** 290 mg/L 08S1
MW-48S 2/21/08 TDS 500** 180 mg/L 08S1
MW-50S 2/21/08 TDS 500** 360 mg/L 08S1
MW-56D 2/21/08 TDS 500** 200 mg/L 08S1
MW-13S 8/21/08 TDS 500** 130 mg/L 08S2
MW-14S 8/21/08 TDS 500** 330 mg/L 08S2
MW-18D 8/21/08 TDS 500** 170 mg/L 08S2
MW-19D 8/21/08 TDS 500** 300 mg/L 08S2
MW-21D 8/21/08 TDS 500** 250 mg/L 08S2
MW-12S 8/25/08 TDS 500** 390 mg/L 08S2
MW-15S 8/25/08 TDS 500** 340 mg/L 08S2
MW-48S 8/25/08 TDS 500** 220 mg/L 08S2
MW-50S 8/25/08 TDS 500** 410 mg/L 08S2
MW-56D 8/25/08 TDS 500** 180 mg/L 08S2
MW-11D 8/26/08 TDS 500** 410 mg/L 08S2
MW-23S 8/26/08 TDS 500** 400 mg/L 08S2
MW-24D 8/26/08 TDS 500** 230 mg/L 08S2
MW-26D 8/26/08 TDS 500** 400 mg/L 08S2
MW-8S 8/26/08 TDS 500** 490 mg/L 08S2
MW-9S 8/26/08 TDS 500** 140 mg/L 08S2
MW-10S 8/27/08 TDS 500** 310 mg/L 08S2
MW-10S 3/11/09 TDS 500** 320 mg/L 09S1
MW-13S 3/11/09 TDS 500** 85 mg/L 09S1
MW-14S 3/11/09 TDS 500** 320 mg/L 09S1
MW-15S 3/11/09 TDS 500** 320 mg/L 09S1
MW-18D 3/11/09 TDS 500** 160 mg/L 09S1
MW-19D 3/11/09 TDS 500** 260 mg/L 09S1
MW-21D 3/11/09 TDS 500** 220 mg/L 09S1
MW-50S 3/11/09 TDS 500** 380 mg/L 09S1
MW-9S 3/11/09 TDS 500** 170 mg/L 09S1
MW-11D 3/12/09 TDS 500** 390 mg/L 09S1
MW-12S 3/12/09 TDS 500** 370 mg/L 09S1
MW-23S 3/12/09 TDS 500** 340 mg/L 09S1
MW-24D 3/12/09 TDS 500** 240 mg/L 09S1
MW-26D 3/12/09 TDS 500** 360 mg/L 09S1
MW-48S 3/12/09 TDS 500** 220 mg/L 09S1
MW-56D 3/12/09 TDS 500** 190 mg/L 09S1
MW-8S 3/12/09 TDS 500** 300 mg/L 09S1
MW-10S 8/20/09 TDS 500** 300 mg/L 09S2
MW-11D 8/20/09 TDS 500** 410 mg/L 09S2
MW-12S 8/20/09 TDS 500** 370 mg/L 09S2
MW-14S 8/20/09 TDS 500** 310 mg/L 09S2
MW-15S 8/20/09 TDS 500** 360 mg/L 09S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-18D 8/20/09 TDS 500** 160 mg/L 09S2
MW-19D 8/20/09 TDS 500** 220 mg/L 09S2
MW-21D 8/20/09 TDS 500** 250 mg/L 09S2
MW-23S 8/20/09 TDS 500** 350 mg/L 09S2
MW-48S 8/20/09 TDS 500** 150 mg/L 09S2
MW-50S 8/20/09 TDS 500** 350 mg/L 09S2
MW-56D 8/20/09 TDS 500** 180 mg/L 09S2
MW-13S 8/25/09 TDS 500** 140 mg/L 09S2
MW-24D 8/25/09 TDS 500** 250 mg/L 09S2
MW-26D 8/25/09 TDS 500** 240 mg/L 09S2
MW-8S 8/26/09 TDS 500** 310 mg/L 09S2
MW-9S 8/26/09 TDS 500** 39 mg/L 09S2
MW-10S 3/26/10 TDS 500** 231 mg/L 10S1
MW-26D 3/26/10 TDS 500** 235 mg/L 10S1
MW-8S 3/26/10 TDS 500** 300 mg/L 10S1
MW-9S 3/26/10 TDS 500** 226 mg/L 10S1
MW-11D 3/29/10 TDS 500** 415 mg/L 10S1
MW-12S 3/29/10 TDS 500** 305 mg/L 10S1
MW-13S 3/29/10 TDS 500** 103 mg/L 10S1
MW-14S 3/29/10 TDS 500** 340 mg/L 10S1
MW-15S 3/29/10 TDS 500** 312 mg/L 10S1
MW-18D 3/29/10 TDS 500** 157 mg/L 10S1
MW-19D 3/29/10 TDS 500** 201 mg/L 10S1
MW-21D 3/29/10 TDS 500** 255 mg/L 10S1
MW-50S 3/29/10 TDS 500** 317 mg/L 10S1
MW-23S 3/30/10 TDS 500** 364 mg/L 10S1
MW-24D 3/30/10 TDS 500** 263 mg/L 10S1
MW-48S 3/30/10 TDS 500** 196 mg/L 10S1
MW-56D 3/30/10 TDS 500** 225 mg/L 10S1
MW-13S 10/7/10 TDS 500** 141 mg/L 10S2
MW-14S 10/7/10 TDS 500** 325 mg/L 10S2
MW-18D 10/7/10 TDS 500** 172 mg/L 10S2
MW-19D 10/7/10 TDS 500** 243 mg/L 10S2
MW-10S 10/8/10 TDS 500** 403 mg/L 10S2
MW-26D 10/8/10 TDS 500** 279 mg/L 10S2
MW-8S 10/8/10 TDS 500** 280 mg/L 10S2
MW-9S 10/8/10 TDS 500** 55 mg/L 10S2
MW-15S 10/11/10 TDS 500** 266 mg/L 10S2
MW-21D 10/11/10 TDS 500** 242 mg/L 10S2
MW-50S 10/11/10 TDS 500** 288 mg/L 10S2
MW-48S 10/12/10 TDS 500** 158 mg/L 10S2
MW-56D 10/12/10 TDS 500** 200 mg/L 10S2
MW-11D 10/13/10 TDS 500** 437 mg/L 10S2
MW-12S 10/13/10 TDS 500** 392 mg/L 10S2
MW-23S 10/13/10 TDS 500** 353 mg/L 10S2
MW-24D 10/13/10 TDS 500** 272 mg/L 10S2
MW-13S 2/18/11 TDS 500** 140 mg/L 11S1
MW-14S 2/18/11 TDS 500** 300 mg/L 11S1
MW-15S 2/18/11 TDS 500** 272 mg/L 11S1
MW-18D 2/18/11 TDS 500** 171 mg/L 11S1
MW-19D 2/18/11 TDS 500** 255 mg/L 11S1
MW-50S 2/18/11 TDS 500** 446 mg/L 11S1
MW-10S 2/21/11 TDS 500** 373 mg/L 11S1
MW-11D 2/21/11 TDS 500** 521 mg/L 11S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-12S 2/21/11 TDS 500** 407 mg/L 11S1
MW-21D 2/21/11 TDS 500** 243 mg/L 11S1
MW-23S 2/21/11 TDS 500** 411 mg/L 11S1
MW-24D 2/21/11 TDS 500** 349 mg/L 11S1
MW-26D 2/21/11 TDS 500** 253 mg/L 11S1
MW-48S 2/21/11 TDS 500** 111 mg/L 11S1
MW-56D 2/21/11 TDS 500** 187 mg/L 11S1
MW-8S 2/21/11 TDS 500** 292 mg/L 11S1
MW-9S 2/21/11 TDS 500** 54 mg/L 11S1
MW-10S 9/22/11 TDS 500** 192 mg/L 11S2
MW-26D 9/22/11 TDS 500** 230 mg/L 11S2
MW-8S 9/22/11 TDS 500** 260 mg/L 11S2
MW-9S 9/22/11 TDS 500** 74 mg/L 11S2
MW-11D 9/23/11 TDS 500** 426 mg/L 11S2
MW-12S 9/23/11 TDS 500** 398 mg/L 11S2
MW-13S 9/23/11 TDS 500** 177 mg/L 11S2
MW-14S 9/23/11 TDS 500** 287 mg/L 11S2
MW-15S 9/23/11 TDS 500** 259 mg/L 11S2
MW-18D 9/23/11 TDS 500** 150 mg/L 11S2
MW-19D 9/23/11 TDS 500** 254 mg/L 11S2
MW-21D 9/23/11 TDS 500** 212 mg/L 11S2
MW-23S 9/23/11 TDS 500** 396 mg/L 11S2
MW-24D 9/23/11 TDS 500** 259 mg/L 11S2
MW-48S 9/23/11 TDS 500** 50 mg/L 11S2
MW-50S 9/23/11 TDS 500** 334 mg/L 11S2
MW-56D 9/23/11 TDS 500** 164 mg/L 11S2
MW-10S 2/21/12 TDS 500** 109 mg/L 12S1
MW-48S 2/21/12 TDS 500** 71 mg/L 12S1
MW-11D 2/22/12 TDS 500** 470 mg/L 12S1
MW-12S 2/22/12 TDS 500** 398 mg/L 12S1
MW-13S 2/22/12 TDS 500** 357 mg/L 12S1
MW-14S 2/22/12 TDS 500** 280 mg/L 12S1
MW-15S 2/22/12 TDS 500** 297 mg/L 12S1
MW-18D 2/22/12 TDS 500** 167 mg/L 12S1
MW-19D 2/22/12 TDS 500** 264 mg/L 12S1
MW-21D 2/22/12 TDS 500** 234 mg/L 12S1
MW-50S 2/22/12 TDS 500** 310 mg/L 12S1
MW-56D 2/22/12 TDS 500** 187 mg/L 12S1
MW-23S 2/23/12 TDS 500** 400 mg/L 12S1
MW-24D 2/23/12 TDS 500** 366 mg/L 12S1
MW-26D 2/23/12 TDS 500** 237 mg/L 12S1
MW-8S 2/23/12 TDS 500** 307 mg/L 12S1
MW-9S 2/23/12 TDS 500** 108 mg/L 12S1
MW-10S 10/16/12 TDS 500** 126 mg/L 12S2
MW-14S 10/16/12 TDS 500** 253 mg/L 12S2
MW-15S 10/16/12 TDS 500** 286 mg/L 12S2
MW-19D 10/16/12 TDS 500** 306 mg/L 12S2
MW-23S 10/16/12 TDS 500** 378 mg/L 12S2
MW-24D 10/16/12 TDS 500** 357 mg/L 12S2
MW-26D 10/16/12 TDS 500** 247 mg/L 12S2
MW-50S 10/16/12 TDS 500** 301 mg/L 12S2
MW-8S 10/16/12 TDS 500** 262 mg/L 12S2
MW-11D 10/17/12 TDS 500** 533 mg/L 12S2
MW-12S 10/17/12 TDS 500** 407 mg/L 12S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-13S 10/17/12 TDS 500** 159 mg/L 12S2
MW-48S 10/17/12 TDS 500** 162 mg/L 12S2
MW-56D 10/17/12 TDS 500** 185 mg/L 12S2
MW-13S 2/26/13 TDS 500** 307 mg/L 13S1
MW-14S 2/26/13 TDS 500** 277 mg/L 13S1
MW-15S 2/26/13 TDS 500** 242 mg/L 13S1
MW-19D 2/26/13 TDS 500** 335 mg/L 13S1
MW-50S 2/26/13 TDS 500** 218 mg/L 13S1
MW-10S 2/27/13 TDS 500** 127 mg/L 13S1
MW-11D 2/27/13 TDS 500** 497 mg/L 13S1
MW-12S 2/27/13 TDS 500** 380 mg/L 13S1
MW-23S 2/27/13 TDS 500** 384 mg/L 13S1
MW-24D 2/27/13 TDS 500** 376 mg/L 13S1
MW-26D 2/27/13 TDS 500** 216 mg/L 13S1
MW-48S 2/27/13 TDS 500** 96 mg/L 13S1
MW-56D 2/27/13 TDS 500** 184 mg/L 13S1
MW-8S 2/27/13 TDS 500** 304 mg/L 13S1
MW-12S 9/17/13 TDS 500** 368 mg/L 13S2
MW-26D 9/17/13 TDS 500** 291 mg/L 13S2
MW-48S 9/17/13 TDS 500** 184 mg/L 13S2
MW-56D 9/17/13 TDS 500** 209 mg/L 13S2
MW-8S 9/17/13 TDS 500** 312 mg/L 13S2
MW-10S 9/18/13 TDS 500** 123 mg/L 13S2
MW-11D 9/18/13 TDS 500** 542 mg/L 13S2
MW-13S 9/18/13 TDS 500** 152 mg/L 13S2
MW-15S 9/18/13 TDS 500** 316 mg/L 13S2
MW-50S 9/18/13 TDS 500** 274 mg/L 13S2
MW-14S 9/19/13 TDS 500** 278 mg/L 13S2
MW-19D 9/19/13 TDS 500** 333 mg/L 13S2
MW-23S 9/19/13 TDS 500** 385 mg/L 13S2
MW-24D 9/19/13 TDS 500** 403 mg/L 13S2
MW-10S 2/7/14 TDS 500** 117 mg/L 14S1
MW-11D 2/7/14 TDS 500** 496 mg/L 14S1
MW-12S 2/7/14 TDS 500** 364 mg/L 14S1
MW-13S 2/7/14 TDS 500** 81 mg/L 14S1
MW-14S 2/7/14 TDS 500** 273 mg/L 14S1
MW-15S 2/7/14 TDS 500** 312 mg/L 14S1
MW-19D 2/7/14 TDS 500** 275 mg/L 14S1
MW-23S 2/7/14 TDS 500** 359 mg/L 14S1
MW-24D 2/7/14 TDS 500** 415 mg/L 14S1
MW-26D 2/7/14 TDS 500** 289 mg/L 14S1
MW-48S 2/7/14 TDS 500** 202 mg/L 14S1
MW-50S 2/7/14 TDS 500** 411 mg/L 14S1
MW-56D 2/7/14 TDS 500** 210 mg/L 14S1
MW-8S 2/7/14 TDS 500** 319 mg/L 14S1
MW-48S 9/23/11 Tetrachloroethene 3* 1.8 µg/L 11S2
MW-26D 9/17/13 Tetrachloroethene 3* 0.63 µg/L I 13S2
MW-48S 9/17/13 Tetrachloroethene 3* 2.8 µg/L 13S2
MW-56D 9/17/13 Tetrachloroethene 3* 0.57 µg/L I 13S2
MW-8S 9/17/13 Tetrachloroethene 3* 0.63 µg/L I 13S2
MW-24D 3/12/09 Thallium 2* 0.54 µg/L 09S1
MW-26D 8/25/09 Thallium 2* 0.76 µg/L I 09S2
MW-10S 2/19/08 Toluene 40** 2.4 µg/L 08S1
MW-11D 2/19/08 Toluene 40** 1.9 µg/L 08S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-12S 2/19/08 Toluene 40** 3.1 µg/L 08S1
MW-26D 2/19/08 Toluene 40** 1.6 µg/L 08S1
MW-8S 2/19/08 Toluene 40** 1.5 µg/L 08S1
MW-9S 2/19/08 Toluene 40** 1.7 µg/L 08S1
MW-13S 2/20/08 Toluene 40** 1 µg/L 08S1
MW-18D 2/20/08 Toluene 40** 1.9 µg/L 08S1
MW-19D 2/20/08 Toluene 40** 1.5 µg/L 08S1
MW-21D 2/20/08 Toluene 40** 1.4 µg/L 08S1
MW-23S 2/20/08 Toluene 40** 1.8 µg/L 08S1
MW-24D 2/20/08 Toluene 40** 1.7 µg/L 08S1
MW-14S 2/21/08 Toluene 40** 2 µg/L 08S1
MW-15S 2/21/08 Toluene 40** 1.5 µg/L 08S1
MW-48S 2/21/08 Toluene 40** 2.6 µg/L 08S1
MW-50S 2/21/08 Toluene 40** 2.2 µg/L 08S1
MW-56D 2/21/08 Toluene 40** 2.7 µg/L 08S1
MW-13S 8/21/08 Toluene 40** 0.52 µg/L 08S2
MW-18D 8/21/08 Toluene 40** 0.62 µg/L 08S2
MW-15S 8/25/08 Toluene 40** 0.53 µg/L 08S2
MW-9S 8/26/08 Toluene 40** 0.78 µg/L 08S2
MW-13S 3/11/09 Toluene 40** 3.5 µg/L 09S1
MW-21D 3/11/09 Toluene 40** 4.3 µg/L 09S1
MW-13S 10/7/10 Toluene 40** 0.79 µg/L I 10S2
MW-14S 10/7/10 Toluene 40** 1 µg/L 10S2
MW-18D 10/7/10 Toluene 40** 0.73 µg/L I 10S2
MW-19D 10/7/10 Toluene 40** 0.63 µg/L I 10S2
MW-10S 10/8/10 Toluene 40** 1.1 µg/L 10S2
MW-26D 10/8/10 Toluene 40** 1.6 µg/L 10S2
MW-8S 10/8/10 Toluene 40** 0.51 µg/L I 10S2
MW-50S 10/11/10 Toluene 40** 0.57 µg/L I 10S2
MW-48S 10/12/10 Toluene 40** 0.8 µg/L I 10S2
MW-56D 10/12/10 Toluene 40** 0.55 µg/L I 10S2
MW-11D 10/13/10 Toluene 40** 0.54 µg/L I 10S2
MW-15S 2/22/12 Toluene 40** 1.1 µg/L 12S1
MW-50S 2/22/12 Toluene 40** 0.99 µg/L I 12S1
MW-26D 2/23/12 Toluene 40** 0.51 µg/L I 12S1
MW-48S 9/23/11 Trichloroethene 3* 3.3 µg/L 11S2
MW-48S 2/21/12 Trichloroethene 3* 0.57 µg/L I 12S1
MW-48S 9/17/13 Trichloroethene 3* 3.3 µg/L 13S2
MW-10S 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-12S 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-23S 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-24D 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-26D 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-48S 2/7/14 Trichloroethene 3* 1.3 µg/L 14S1
MW-56D 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-8S 2/7/14 Trichloroethene 3* <0.5 µg/L 14S1
MW-10S 2/19/08 Turbidity NS 4.55 NTU 08S1
MW-11D 2/19/08 Turbidity NS 5.11 NTU 08S1
MW-12S 2/19/08 Turbidity NS 33 NTU 08S1
MW-26D 2/19/08 Turbidity NS 3.4 NTU 08S1
MW-8S 2/19/08 Turbidity NS 3.74 NTU 08S1
MW-9S 2/19/08 Turbidity NS 9.87 NTU 08S1
MW-13S 2/20/08 Turbidity NS 51.8 NTU 08S1
MW-18D 2/20/08 Turbidity NS 3.33 NTU 08S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-19D 2/20/08 Turbidity NS 0.26 NTU 08S1
MW-21D 2/20/08 Turbidity NS 7.67 NTU 08S1
MW-23S 2/20/08 Turbidity NS 9.4 NTU 08S1
MW-24D 2/20/08 Turbidity NS 3.56 NTU 08S1
MW-14S 2/21/08 Turbidity NS 7.8 NTU 08S1
MW-15S 2/21/08 Turbidity NS 2.27 NTU 08S1
MW-48S 2/21/08 Turbidity NS 8.77 NTU 08S1
MW-50S 2/21/08 Turbidity NS 4.34 NTU 08S1
MW-56D 2/21/08 Turbidity NS 9.44 NTU 08S1
MW-13S 8/21/08 Turbidity NS 18.8 NTU 08S2
MW-14S 8/21/08 Turbidity NS 8.49 NTU 08S2
MW-18D 8/21/08 Turbidity NS 8.77 NTU 08S2
MW-19D 8/21/08 Turbidity NS 9.41 NTU 08S2
MW-21D 8/21/08 Turbidity NS 6.46 NTU 08S2
MW-12S 8/25/08 Turbidity NS 9.89 NTU 08S2
MW-15S 8/25/08 Turbidity NS 4.33 NTU 08S2
MW-48S 8/25/08 Turbidity NS 5.35 NTU 08S2
MW-50S 8/25/08 Turbidity NS 2.06 NTU 08S2
MW-56D 8/25/08 Turbidity NS 9.94 NTU 08S2
MW-11D 8/26/08 Turbidity NS 9.74 NTU 08S2
MW-23S 8/26/08 Turbidity NS 6.95 NTU 08S2
MW-24D 8/26/08 Turbidity NS 7.6 NTU 08S2
MW-26D 8/26/08 Turbidity NS 5.67 NTU 08S2
MW-8S 8/26/08 Turbidity NS 93.4 NTU 08S2
MW-9S 8/26/08 Turbidity NS 37.3 NTU 08S2
MW-10S 8/27/08 Turbidity NS 3.22 NTU 08S2
MW-10S 3/11/09 Turbidity NS 15.4 NTU 09S1
MW-13S 3/11/09 Turbidity NS 26.8 NTU 09S1
MW-14S 3/11/09 Turbidity NS 4.51 NTU 09S1
MW-15S 3/11/09 Turbidity NS 4.29 NTU 09S1
MW-18D 3/11/09 Turbidity NS 7.42 NTU 09S1
MW-19D 3/11/09 Turbidity NS 1.17 NTU 09S1
MW-21D 3/11/09 Turbidity NS 6.94 NTU 09S1
MW-50S 3/11/09 Turbidity NS 1.97 NTU 09S1
MW-9S 3/11/09 Turbidity NS 16.4 NTU 09S1
MW-11D 3/12/09 Turbidity NS 3.91 NTU 09S1
MW-12S 3/12/09 Turbidity NS 18.6 NTU 09S1
MW-23S 3/12/09 Turbidity NS 16.9 NTU 09S1
MW-24D 3/12/09 Turbidity NS 3.57 NTU 09S1
MW-26D 3/12/09 Turbidity NS 6.97 NTU 09S1
MW-48S 3/12/09 Turbidity NS 6.94 NTU 09S1
MW-56D 3/12/09 Turbidity NS 3.07 NTU 09S1
MW-8S 3/12/09 Turbidity NS 74.9 NTU 09S1
MW-10S 8/20/09 Turbidity NS 14.4 NTU D 09S2
MW-11D 8/20/09 Turbidity NS 0.74 NTU D 09S2
MW-12S 8/20/09 Turbidity NS 9.86 NTU D 09S2
MW-14S 8/20/09 Turbidity NS 7.58 NTU D 09S2
MW-15S 8/20/09 Turbidity NS 2.63 NTU D 09S2
MW-18D 8/20/09 Turbidity NS 3.51 NTU D 09S2
MW-19D 8/20/09 Turbidity NS 6.14 NTU D 09S2
MW-21D 8/20/09 Turbidity NS 1.64 NTU D 09S2
MW-23S 8/20/09 Turbidity NS 3.71 NTU D 09S2
MW-48S 8/20/09 Turbidity NS 4.25 NTU D 09S2
MW-50S 8/20/09 Turbidity NS 4.35 NTU D 09S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-56D 8/20/09 Turbidity NS 5 NTU D 09S2
MW-13S 8/25/09 Turbidity NS 9.41 NTU D 09S2
MW-24D 8/25/09 Turbidity NS 0.62 NTU D 09S2
MW-26D 8/25/09 Turbidity NS 16.5 NTU D 09S2
MW-8S 8/26/09 Turbidity NS 12 NTU D 09S2
MW-9S 8/26/09 Turbidity NS 5.73 NTU D 09S2
MW-10S 3/26/10 Turbidity NS 47.1 NTU D 10S1
MW-26D 3/26/10 Turbidity NS 7.11 NTU D 10S1
MW-8S 3/26/10 Turbidity NS 91.7 NTU D 10S1
MW-9S 3/26/10 Turbidity NS 10.2 NTU D 10S1
MW-11D 3/29/10 Turbidity NS 1.03 NTU D 10S1
MW-12S 3/29/10 Turbidity NS 12.4 NTU D 10S1
MW-13S 3/29/10 Turbidity NS 50.5 NTU D 10S1
MW-14S 3/29/10 Turbidity NS 1.71 NTU D 10S1
MW-15S 3/29/10 Turbidity NS 4.84 NTU D 10S1
MW-18D 3/29/10 Turbidity NS 4.37 NTU D 10S1
MW-19D 3/29/10 Turbidity NS 4.56 NTU D 10S1
MW-21D 3/29/10 Turbidity NS 4.76 NTU D 10S1
MW-50S 3/29/10 Turbidity NS 4.87 NTU D 10S1
MW-23S 3/30/10 Turbidity NS 9.83 NTU D 10S1
MW-24D 3/30/10 Turbidity NS 2.33 NTU D 10S1
MW-48S 3/30/10 Turbidity NS 19.3 NTU D 10S1
MW-56D 3/30/10 Turbidity NS 4.92 NTU D 10S1
MW-13S 10/7/10 Turbidity NS 98.7 NTU D 10S2
MW-14S 10/7/10 Turbidity NS 4.91 NTU D 10S2
MW-18D 10/7/10 Turbidity NS 3.77 NTU D 10S2
MW-19D 10/7/10 Turbidity NS 2.29 NTU D 10S2
MW-10S 10/8/10 Turbidity NS 240 NTU D 10S2
MW-26D 10/8/10 Turbidity NS 4.87 NTU D 10S2
MW-8S 10/8/10 Turbidity NS 26.1 NTU D 10S2
MW-9S 10/8/10 Turbidity NS 10.1 NTU D 10S2
MW-15S 10/11/10 Turbidity NS 2.43 NTU D 10S2
MW-21D 10/11/10 Turbidity NS 3.28 NTU D 10S2
MW-50S 10/11/10 Turbidity NS 0.62 NTU D 10S2
MW-48S 10/12/10 Turbidity NS 1.89 NTU D 10S2
MW-56D 10/12/10 Turbidity NS 4.14 NTU D 10S2
MW-11D 10/13/10 Turbidity NS 1.19 NTU D 10S2
MW-12S 10/13/10 Turbidity NS 4.37 NTU D 10S2
MW-23S 10/13/10 Turbidity NS 2.08 NTU D 10S2
MW-24D 10/13/10 Turbidity NS 1.92 NTU D 10S2
MW-13S 2/18/11 Turbidity NS 17.9 NTU D 11S1
MW-14S 2/18/11 Turbidity NS 1.87 NTU D 11S1
MW-15S 2/18/11 Turbidity NS 4.45 NTU D 11S1
MW-18D 2/18/11 Turbidity NS 2.54 NTU D 11S1
MW-19D 2/18/11 Turbidity NS 1.97 NTU D 11S1
MW-50S 2/18/11 Turbidity NS 4.19 NTU D 11S1
MW-10S 2/21/11 Turbidity NS 219 NTU D 11S1
MW-11D 2/21/11 Turbidity NS 3.58 NTU D 11S1
MW-12S 2/21/11 Turbidity NS 13.3 NTU D 11S1
MW-21D 2/21/11 Turbidity NS 2.01 NTU D 11S1
MW-23S 2/21/11 Turbidity NS 3.96 NTU D 11S1
MW-24D 2/21/11 Turbidity NS 2.13 NTU D 11S1
MW-26D 2/21/11 Turbidity NS 4.86 NTU D 11S1
MW-48S 2/21/11 Turbidity NS 3.03 NTU D 11S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-56D 2/21/11 Turbidity NS 1.72 NTU D 11S1
MW-8S 2/21/11 Turbidity NS 18.3 NTU D 11S1
MW-9S 2/21/11 Turbidity NS 6.71 NTU D 11S1
MW-10S 9/22/11 Turbidity NS 51.2 NTU D 11S2
MW-26D 9/22/11 Turbidity NS 4.32 NTU D 11S2
MW-8S 9/22/11 Turbidity NS 13.2 NTU D 11S2
MW-9S 9/22/11 Turbidity NS 9.9 NTU D 11S2
MW-11D 9/23/11 Turbidity NS 0.92 NTU D 11S2
MW-12S 9/23/11 Turbidity NS 4.22 NTU D 11S2
MW-13S 9/23/11 Turbidity NS 15.8 NTU D 11S2
MW-14S 9/23/11 Turbidity NS 3.54 NTU D 11S2
MW-15S 9/23/11 Turbidity NS 5.23 NTU D 11S2
MW-18D 9/23/11 Turbidity NS 4.63 NTU D 11S2
MW-19D 9/23/11 Turbidity NS 1.32 NTU D 11S2
MW-21D 9/23/11 Turbidity NS 2.11 NTU D 11S2
MW-23S 9/23/11 Turbidity NS 1.04 NTU D 11S2
MW-24D 9/23/11 Turbidity NS 2 NTU D 11S2
MW-48S 9/23/11 Turbidity NS 3.41 NTU D 11S2
MW-50S 9/23/11 Turbidity NS 0.77 NTU D 11S2
MW-56D 9/23/11 Turbidity NS 2.74 NTU D 11S2
MW-10S 2/21/12 Turbidity NS 1.07 NTU D 12S1
MW-48S 2/21/12 Turbidity NS 6.5 NTU D 12S1
MW-11D 2/22/12 Turbidity NS 4.66 NTU D 12S1
MW-12S 2/22/12 Turbidity NS 7.03 NTU D 12S1
MW-13S 2/22/12 Turbidity NS 4.43 NTU D 12S1
MW-14S 2/22/12 Turbidity NS 6.88 NTU D 12S1
MW-15S 2/22/12 Turbidity NS 2.73 NTU D 12S1
MW-18D 2/22/12 Turbidity NS 1.03 NTU D 12S1
MW-19D 2/22/12 Turbidity NS 0.77 NTU D 12S1
MW-21D 2/22/12 Turbidity NS 3.26 NTU D 12S1
MW-50S 2/22/12 Turbidity NS 3.83 NTU D 12S1
MW-56D 2/22/12 Turbidity NS 1.71 NTU D 12S1
MW-23S 2/23/12 Turbidity NS 31.5 NTU D 12S1
MW-24D 2/23/12 Turbidity NS 4.44 NTU D 12S1
MW-26D 2/23/12 Turbidity NS 4.44 NTU D 12S1
MW-8S 2/23/12 Turbidity NS 25.8 NTU D 12S1
MW-9S 2/23/12 Turbidity NS 8.59 NTU D 12S1
MW-10S 10/16/12 Turbidity NS 1.12 NTU D 12S2
MW-14S 10/16/12 Turbidity NS 2.97 NTU D 12S2
MW-15S 10/16/12 Turbidity NS 2.28 NTU D 12S2
MW-18D 10/16/12 Turbidity NS 1.31 NTU D 12S2
MW-19D 10/16/12 Turbidity NS 0.64 NTU D 12S2
MW-23S 10/16/12 Turbidity NS 4.22 NTU D 12S2
MW-24D 10/16/12 Turbidity NS 0.37 NTU D 12S2
MW-26D 10/16/12 Turbidity NS 4.81 NTU D 12S2
MW-50S 10/16/12 Turbidity NS 1.6 NTU D 12S2
MW-8S 10/16/12 Turbidity NS 19.9 NTU D 12S2
MW-9S 10/16/12 Turbidity NS 0.92 NTU D 12S2
MW-11D 10/17/12 Turbidity NS 4.62 NTU D 12S2
MW-12S 10/17/12 Turbidity NS 9.57 NTU D 12S2
MW-13S 10/17/12 Turbidity NS 13.2 NTU D 12S2
MW-21D 10/17/12 Turbidity NS 1.97 NTU D 12S2
MW-48S 10/17/12 Turbidity NS 2.31 NTU D 12S2
MW-56D 10/17/12 Turbidity NS 3.14 NTU D 12S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-13S 2/26/13 Turbidity NS 2.94 NTU D 13S1
MW-14S 2/26/13 Turbidity NS 2.61 NTU D 13S1
MW-15S 2/26/13 Turbidity NS 7.49 NTU D 13S1
MW-18D 2/26/13 Turbidity NS 1.33 NTU D 13S1
MW-19D 2/26/13 Turbidity NS 0.86 NTU D 13S1
MW-50S 2/26/13 Turbidity NS 15.2 NTU D 13S1
MW-10S 2/27/13 Turbidity NS 0.9 NTU D 13S1
MW-11D 2/27/13 Turbidity NS 2.88 NTU D 13S1
MW-12S 2/27/13 Turbidity NS 7.33 NTU D 13S1
MW-21D 2/27/13 Turbidity NS 2.4 NTU D 13S1
MW-23S 2/27/13 Turbidity NS 19.7 NTU D 13S1
MW-24D 2/27/13 Turbidity NS 0.75 NTU D 13S1
MW-26D 2/27/13 Turbidity NS 7.96 NTU D 13S1
MW-48S 2/27/13 Turbidity NS 7.76 NTU D 13S1
MW-56D 2/27/13 Turbidity NS 3.7 NTU D 13S1
MW-8S 2/27/13 Turbidity NS 31.6 NTU D 13S1
MW-9S 2/27/13 Turbidity NS 0.97 NTU D 13S1
MW-12S 9/17/13 Turbidity NS 8.18 NTU D 13S2
MW-21D 9/17/13 Turbidity NS 1.9 NTU D 13S2
MW-26D 9/17/13 Turbidity NS 9.77 NTU D 13S2
MW-48S 9/17/13 Turbidity NS 8.8 NTU D 13S2
MW-56D 9/17/13 Turbidity NS 1.07 NTU D 13S2
MW-8S 9/17/13 Turbidity NS 41.3 NTU D 13S2
MW-10S 9/18/13 Turbidity NS 1.27 NTU D 13S2
MW-11D 9/18/13 Turbidity NS 3.48 NTU D 13S2
MW-13S 9/18/13 Turbidity NS 50.3 NTU D 13S2
MW-15S 9/18/13 Turbidity NS 4.89 NTU D 13S2
MW-50S 9/18/13 Turbidity NS 5.26 NTU D 13S2
MW-9S 9/18/13 Turbidity NS 0.92 NTU D 13S2
MW-14S 9/19/13 Turbidity NS 2.99 NTU D 13S2
MW-18D 9/19/13 Turbidity NS 2.28 NTU D 13S2
MW-19D 9/19/13 Turbidity NS 1.36 NTU D 13S2
MW-23S 9/19/13 Turbidity NS 3.7 NTU D 13S2
MW-24D 9/19/13 Turbidity NS 1.48 NTU D 13S2
MW-10S 2/7/14 Turbidity NS 0.96 NTU 14S1
MW-11D 2/7/14 Turbidity NS 1.08 NTU 14S1
MW-12S 2/7/14 Turbidity NS 4.29 NTU 14S1
MW-13S 2/7/14 Turbidity NS 34.3 NTU 14S1
MW-14S 2/7/14 Turbidity NS 19.1 NTU 14S1
MW-15S 2/7/14 Turbidity NS 12.1 NTU 14S1
MW-18D 2/7/14 Turbidity NS 1.77 NTU 14S1
MW-19D 2/7/14 Turbidity NS 1.69 NTU 14S1
MW-21D 2/7/14 Turbidity NS 4.94 NTU 14S1
MW-23S 2/7/14 Turbidity NS 2.73 NTU 14S1
MW-24D 2/7/14 Turbidity NS 0.79 NTU 14S1
MW-26D 2/7/14 Turbidity NS 12.8 NTU 14S1
MW-48S 2/7/14 Turbidity NS 3.1 NTU 14S1
MW-50S 2/7/14 Turbidity NS 5.18 NTU 14S1
MW-56D 2/7/14 Turbidity NS 3.02 NTU 14S1
MW-8S 2/7/14 Turbidity NS 48.7 NTU 14S1
MW-9S 2/7/14 Turbidity NS 0.69 NTU 14S1
MW-26D 2/19/08 Vanadium NS 5.5 µg/L 08S1
MW-13S 2/20/08 Vanadium NS 6.4 µg/L 08S1
MW-26D 8/26/08 Vanadium NS 13 µg/L 08S2
Well ID Date Parameter Limit Result Units Qualifier Period
MW-8S 8/26/08 Vanadium NS 26 µg/L 08S2
MW-9S 8/26/08 Vanadium NS 7.2 µg/L 08S2
MW-10S 3/11/09 Vanadium NS 6.2 µg/L 09S1
MW-9S 3/11/09 Vanadium NS 10 µg/L 09S1
MW-26D 3/12/09 Vanadium NS 14 µg/L 09S1
MW-8S 3/12/09 Vanadium NS 24 µg/L 09S1
MW-10S 8/20/09 Vanadium NS 6.1 µg/L I 09S2
MW-26D 8/25/09 Vanadium NS 5.7 µg/L I 09S2
MW-10S 3/26/10 Vanadium NS 9.4 µg/L I 10S1
MW-26D 3/26/10 Vanadium NS 10.8 µg/L 10S1
MW-8S 3/26/10 Vanadium NS 21.5 µg/L 10S1
MW-13S 3/29/10 Vanadium NS 6.3 µg/L I 10S1
MW-13S 10/7/10 Vanadium NS 13.7 µg/L 10S2
MW-10S 10/8/10 Vanadium NS 48 µg/L 10S2
MW-26D 10/8/10 Vanadium NS 9.5 µg/L I 10S2
MW-8S 10/8/10 Vanadium NS 6.2 µg/L I 10S2
MW-10S 2/21/11 Vanadium NS 48 µg/L 11S1
MW-26D 2/21/11 Vanadium NS 7.4 µg/L I 11S1
MW-10S 9/22/11 Vanadium NS 7 µg/L 11S2
MW-26D 9/22/11 Vanadium NS 7.2 µg/L 11S2
MW-26D 2/23/12 Vanadium NS 8.3 µg/L I 12S1
MW-8S 2/23/12 Vanadium NS 5.2 µg/L I 12S1
MW-8S 2/21/11 Vinyl Acetate NS 1.7 µg/L I 11S1
MW-10S 2/21/12 Vinyl Acetate NS 1.7 µg/L I 12S1
MW-12S 2/19/08 Vinyl chloride NS 0.65 µg/L 08S1
MW-23S 2/20/08 Vinyl chloride NS 1.4 µg/L 08S1
MW-48S 2/21/08 Vinyl chloride NS 0.44 µg/L 08S1
MW-56D 2/21/08 Vinyl chloride NS 0.7 µg/L 08S1
MW-23S 3/12/09 Vinyl chloride NS 2.4 µg/L 09S1
MW-56D 3/12/09 Vinyl chloride NS 0.88 µg/L 09S1
MW-23S 8/20/09 Vinyl chloride NS 1.6 µg/L 09S2
MW-56D 8/20/09 Vinyl chloride NS 1.3 µg/L 09S2
MW-23S 3/30/10 Vinyl chloride NS 1.9 µg/L 10S1
MW-56D 3/30/10 Vinyl chloride NS 0.6 µg/L I 10S1
MW-56D 10/12/10 Vinyl chloride NS 1.3 µg/L 10S2
MW-12S 10/13/10 Vinyl chloride NS 0.54 µg/L I 10S2
MW-23S 10/13/10 Vinyl chloride NS 1.7 µg/L 10S2
MW-23S 2/21/11 Vinyl chloride NS 1.2 µg/L 11S1
MW-24D 2/21/11 Vinyl chloride NS 1.6 µg/L 11S1
MW-56D 2/21/11 Vinyl chloride NS 1.2 µg/L 11S1
MW-23S 9/23/11 Vinyl chloride NS 1.3 µg/L 11S2
MW-56D 9/23/11 Vinyl chloride NS 0.71 µg/L 11S2
MW-12S 2/22/12 Vinyl chloride NS 0.55 µg/L I 12S1
MW-23S 2/23/12 Vinyl chloride NS 1.2 µg/L 12S1
MW-24D 2/23/12 Vinyl chloride NS 1.4 µg/L 12S1
MW-23S 10/16/12 Vinyl chloride NS 1.1 µg/L 12S2
MW-24D 10/16/12 Vinyl chloride NS 1.1 µg/L 12S2
MW-56D 10/17/12 Vinyl chloride NS 0.61 µg/L I 12S2
MW-23S 2/27/13 Vinyl chloride NS 0.83 µg/L I 13S1
MW-24D 2/27/13 Vinyl chloride NS 1.6 µg/L 13S1
MW-56D 9/17/13 Vinyl chloride NS 0.5 µg/L I 13S2
MW-23S 9/19/13 Vinyl chloride NS 1.3 µg/L 13S2
MW-24D 9/19/13 Vinyl chloride NS 1.9 µg/L 13S2
MW-10S 2/7/14 Vinyl chloride NS <0.5 µg/L 14S1
Well ID Date Parameter Limit Result Units Qualifier Period
MW-12S 2/7/14 Vinyl chloride NS <0.5 µg/L 14S1
MW-23S 2/7/14 Vinyl chloride NS 0.74 µg/L I 14S1
MW-24D 2/7/14 Vinyl chloride NS 1.9 µg/L 14S1
MW-26D 2/7/14 Vinyl chloride NS <0.5 µg/L 14S1
MW-48S 2/7/14 Vinyl chloride NS <0.5 µg/L 14S1
MW-56D 2/7/14 Vinyl chloride NS <0.5 µg/L 14S1
MW-8S 2/7/14 Vinyl chloride NS <0.5 µg/L 14S1
MW-13S 3/11/09 XYLENES 20** 5.2 µg/L 09S1
MW-21D 3/11/09 XYLENES 20** 5.7 µg/L 09S1
MW-50S 3/11/09 XYLENES 20** 2.9 µg/L 09S1
MW-24D 3/12/09 XYLENES 20** 3 µg/L 09S1
MW-10S 2/21/12 XYLENES 20** 1.8 µg/L 12S1
MW-48S 2/21/12 XYLENES 20** 1.6 µg/L 12S1
MW-11D 2/22/12 XYLENES 20** 1.7 µg/L 12S1
MW-12S 2/22/12 XYLENES 20** 1.7 µg/L 12S1
MW-18D 2/22/12 XYLENES 20** 1.7 µg/L 12S1
MW-19D 2/22/12 XYLENES 20** 1.7 µg/L 12S1
MW-48S 2/21/08 Zinc 5000** 21 µg/L 08S1
MW-13S 8/21/08 Zinc 5000** 12 µg/L 08S2
MW-48S 8/25/08 Zinc 5000** 14 µg/L 08S2
MW-8S 8/26/08 Zinc 5000** 12 µg/L 08S2
MW-9S 8/26/08 Zinc 5000** 28 µg/L 08S2
MW-8S 3/12/09 Zinc 5000** 12 µg/L 09S1
MW-13S 10/7/10 Zinc 5000** 12.6 µg/L I 10S2
MW-10S 10/8/10 Zinc 5000** 32.4 µg/L 10S2
MW-11D 10/13/10 Zinc 5000** 11.3 µg/L I 10S2
MW-13S 2/18/11 Zinc 5000** 22.5 µg/L 11S1
MW-10S 2/21/11 Zinc 5000** 28 µg/L 11S1
Note: I ‐ Detected between Detection Limit and the Reporting Limit;
D ‐ Field Measurement;
Q ‐ Held Beyond the Holding Time.
* ‐ Primary Drinking Water Standard (62‐520 F.A.C.);
** ‐ Secondary Drinking Water Standard (620‐520 F.A.C.);
*** ‐ Groundwater Cleanup Tatrget Level (62‐777 F.A.C.);
Bold number indicated the result is above the respective standard.
Figure 1
Time Series Plots of Groundwater Dissolved Oxygen Concentrations
Wright Landfill ‐ Compliance Monitoring
9
8
MW‐10S
7 MW‐11D
MW‐12S
Dissolved Oxygen Concenyrations (mg/L)
MW‐13S
6
MW‐14S
MW‐15S
5 MW‐18D
MW‐19D
4 MW‐21D
MW‐23S
MW‐24D
3
MW‐26D
MW‐48S
2 MW‐50S
MW‐56D
1 MW‐8S
MW‐9S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Monitoring Date
Figure 2
Time Series Plots of Groundwater pH
Wright Landfill ‐ Compliance Monitoring
8
7
MW‐10S
MW‐11D
6 MW‐12S
MW‐13S
MW‐14S
5
MW‐15S
MW‐18D
pH (S.U.)
4 MW‐19D
MW‐21D
MW‐23S
3
MW‐24D
MW‐26D
2 MW‐48S
MW‐50S
MW‐56D
1
MW‐8S
MW‐9S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 3
Time Series Plots of Groundwater Specific Conductance
Wright Landfill ‐ Compliance Monitoring
1400
1200
MW‐10S
MW‐11D
MW‐12S
1000
MW‐13S
Specific Conductance (µmhos/cm)
MW‐14S
MW‐15S
800
MW‐18D
MW‐19D
MW‐21D
600
MW‐23S
MW‐24D
MW‐26D
400
MW‐48S
MW‐50S
MW‐56D
200
MW‐8S
MW‐9S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 4
Time Series Plots of Groundwater Turbidity
Wright Landfill ‐ Compliance Monitoring
300
250 MW‐10S
MW‐11D
MW‐12S
MW‐13S
200
MW‐14S
MW‐15S
Turbidity (NTU)
MW‐18D
150 MW‐19D
MW‐21D
MW‐23S
MW‐24D
100
MW‐26D
MW‐48S
MW‐50S
50 MW‐56D
MW‐8S
MW‐9S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 5
Time Series Plots of Groundwater Ammonia‐N Concentrations
Wright Landfill ‐ Compliance Monitoring
80
70
MW‐10S
MW‐11D
60
MW‐12S
Ammonia‐N Concentration (mg/L)
MW‐13S
50 MW‐14S
MW‐15S
MW‐18D
40
MW‐19D
MW‐21D
30 MW‐23S
MW‐24D
MW‐26D
20 MW‐48S
MW‐50S
MW‐56D
10
MW‐8S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 6
Time Series Plots of Groundwater Chloride Concentrations
Wright Landfill ‐ Compliance Monitoring
160
140
MW‐10S
MW‐11D
120 MW‐12S
MW‐13S
Chloride Concentration (mg/L)
MW‐14S
100
MW‐15S
MW‐18D
80 MW‐19D
MW‐21D
MW‐23S
60
MW‐24D
MW‐26D
40 MW‐48S
MW‐50S
MW‐56D
20 MW‐8S
MW‐9S
0
11/14/07 6/1/08 12/18/08 7/6/09 1/22/10 8/10/10 2/26/11 9/14/11 4/1/12 10/18/12
Sampling Date
Figure 7
Time Series Plots of Groundwater Nitrate‐N Concentrations
Wright Landfill ‐ Compliance Monitoring
18
16
MW‐10S
14 MW‐11D
MW‐12S
MW‐13S
12
Nitrate Concentration (mg/L)
MW‐14S
MW‐15S
10 MW‐18D
MW‐19D
8 MW‐21D
MW‐23S
MW‐24D
6
MW‐26D
MW‐48S
4 MW‐50S
MW‐56D
MW‐8S
2
MW‐9S
0
11/14/07 6/1/08 12/18/08 7/6/09 1/22/10 8/10/10 2/26/11 9/14/11 4/1/12 10/18/12
Sampling Date
Figure 8
Time Series Plots of Groundwater Sodium Concentrations
Wright Landfill ‐ Compliance Monitoring
140
120
MW‐10S
MW‐11D
MW‐12S
100
MW‐13S
Sodium Concentration (mg/L)
MW‐14S
MW‐15S
80
MW‐18D
MW‐19D
MW‐21D
60
MW‐23S
MW‐24D
MW‐26D
40
MW‐48S
MW‐50S
MW‐56D
20
MW‐8S
MW‐9S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 9
Time Series Plot of Groundwater TDS Concentrations
Wright Landfill ‐ Compliance Monitoring
600
MW‐10S
500
MW‐11D
MW‐12S
MW‐13S
400
MW‐14S
TDS Concentration (mg/L)
MW‐15S
MW‐18D
300 MW‐19D
MW‐21D
MW‐23S
MW‐24D
200
MW‐26D
MW‐48S
MW‐50S
100
MW‐56D
MW‐8S
MW‐9S
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 10
Time Series Plots of Groundwater Arsenic Concentrations
Wright Landfill ‐ Compliance Monitoring
40
35
30
MW‐10S
MW‐11D
Arsenic Concentration (µg/L)
25 MW‐12S
MW‐13S
MW‐14S
20
MW‐15S
MW‐19D
15 MW‐23S
MW‐24D
MW‐48S
10 MW‐50S
MW‐56D
5
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 11
Time Series Plots of Groundwater Barium Concentrations
Wright Landfill ‐ Compliance Monitoring
180
160
MW‐10S
140 MW‐11D
MW‐12S
MW‐13S
120
MW‐14S
Barium Concentration (µg/L)
MW‐15S
100 MW‐18D
MW‐19D
80 MW‐21D
MW‐23S
MW‐24D
60
MW‐26D
MW‐48S
40 MW‐50S
MW‐56D
20 MW‐8S
MW‐9S
0
9/25/07 4/12/08 10/29/08 5/17/09 12/3/09 6/21/10 1/7/11 7/26/11 2/11/12
Sampling Date
Figure 12
Time Series Plots of Groundwater Iron Concentrations
Wright Landfill ‐ Compliance Monitoring
60000
50000 MW‐10S
MW‐11D
MW‐12S
MW‐13S
40000
MW‐14S
Iron Concentration (µg/L)
MW‐15S
MW‐18D
30000 MW‐19D
MW‐21D
MW‐23S
MW‐24D
20000
MW‐26D
MW‐48S
MW‐50S
10000 MW‐56D
MW‐8S
MW‐9S
0
4/28/07 9/9/08 1/22/10 6/6/11 10/18/12 3/2/14
Sampling Date
Figure 13
Time Series Plots of Groundwater Benzene Concentrations
Wright Landfill ‐ Compliance Monitoring
1.8
1.6
1.4
1.2
Benzene Concentration (µg/L)
MW‐11D
1
MW‐12S
MW‐23S
0.8
MW‐24D
MW‐48S
0.6 MW‐50S
0.4
0.2
0
4/28/07 9/9/08 1/22/10 6/6/11 10/18/12 3/2/14
Sampling Date
Figure 14
Time Series Plots of Groundwater Chlorobenzene Concentrations
Wright Landfill ‐ Compliance Monitoring
14
12
10
Chlorobenzene Concentration (µg/L)
MW‐11D
MW‐12S
8
MW‐13S
MW‐14S
MW‐15S
6
MW‐23S
MW‐24D
MW‐48S
4
MW‐50S
2
0
10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14
Sampling Date
Figure 15
Time Series Plots of Groundwater Vinyl Chloride Concentrations
Wright Landfill Compliance Monitoring
3
2.5
Vinyl Chloride Concentration (µg/L)
2
MW‐12S
1.5 MW‐23S
MW‐24D
MW‐48S
MW‐56D
1
0.5
0
4/28/07 9/9/08 1/22/10 6/6/11 10/18/12 3/2/14
Sampling Date
ATTACHMENT D
LONG-TERM CARE PLAN
LONG-TERM CARE MAINTENANCE PLAN
WRIGHT LANDFILL
Okaloosa County
WACS ID Number 9064/Permit No. 0070768-003
April 2014
Prepared for:
Environmental Services Division
Public Works Department
Okaloosa County
1759 South Ferdon Blvd.
Crestview Florida 32536
Phone: 850-689-5772
Prepared by:
HDR Engineering, Inc.
200 W. Forsyth Street, Suite 800
Jacksonville, Florida 32202
904-598-8900
LONG-TERM CARE MAINTENANCE PLAN
LONG-TERM CARE MAINTENANCE PLAN
The Okaloosa County Wright Landfill official closure date and implementation of the Long-Term Care
Period was December 19, 1994. During the long-term care period, the County has continued to maintain
the integrity and effectiveness of the final cover as well as other appurtenances of the facility, control
erosion, fill subsidence areas, comply with the groundwater monitoring plan, and maintain the stormwater
system in accordance with the approved 30 year closure plan (Chapter 62-701.620). Closed landfill areas,
if disturbed, can be a potential hazard to public health, groundwater, and the environment. Therefore, the
FDEP retains regulatory authority over any activities that may affect the integrity of environmental
protection measures, such as the landfill cover, drainage, monitoring systems, or stormwater controls.
Consultation with the FDEP is required prior to conducting or allowing any activities at a closed landfill.
Final Cover System
The County is responsible for inspection and maintenance of the final cover system. Routine inspections
are conducted with the primary objective to monitor the condition of the surface vegetation, cap, and
monitoring wells. Seeding, mulching, and filling are conducted as needed. The height of grass on the cap
will be maintained at less than 18 inches. Any observed bare spots will be seeded or sodded as necessary.
Erosion Control
Erosion control is an effective way to maintain the integrity of the final cover. Inspections will be
conducted after storm events to check for indications of erosion side walls and stormwater conveyances
or accumulation of excessive silt in low lying areas. If rutting, rills, gullies, or dead grass are observed,
repairs will be implemented as soon as possible to avoid additional damage. Drainage swales and ditches
will be kept clean and free of silt build-up to avoid stormwater overflow and backflow and reduce the risk
of erosion. Any repairs to the final cover will be monitored and maintained after the corrective action to
ensure that control efforts are working properly.
Groundwater Monitoring Plan
The water quality monitoring plan review was submitted to the FDEP as the October 2013 Water Quality
Technical Report (WQTR). The WQTR is being submitted by reference as Part L of the 2014 LTC permit
renewal application. The groundwater monitoring plan, as described in the WQTR currently consists of
two background wells (MW-8S, MW-26D), two up-gradient wells (MW-9S, MW-10S), seven detection
wells (MW-11D, MW-13S, MW-15S, MW-21D, MW-23S, MW-50S), and six compliance wells (MW-
12S, MW- 14S, MW- 18D, MW-19D, MW-48S, MW-56D). Water levels only are monitored in four
additional wells (MW-16S, MW-20D, MW-22D, MW-25S). Surface water is monitored at one
compliance point (SW-1). The water quality monitoring system will be operated and maintained in
accordance with 62-701.510 FAC through the long-term care period. Damaged monitoring wells will be
replaced in accordance with Chapter 62-701.510(8). It should be noted that a remediation system that
includes two recovery wells and several assessment wells is also operating at the site. Okaloosa operates
the remediation system in accordance with the Remedial Action Plan.
The “high rise” portion of the landfill contains a leachate collection system. Leachate from Cells 1 and 2
are collected into a tank for ultimate treatment and disposal offsite at the nearby Ft. Walton Beach Waste
Water Treatment Plant. County staff routinely check levels in the tank and arrange for removal as
needed. We note that this portion of the landfill has been effectively closed to incoming waste since 1991
2
LONG-TERM CARE MAINTENANCE PLAN
and was officially closed in 1994. Since that time leachate generation has substantially decreased to the
point where leachate generation is minimal.
Gas Monitoring Plan
The County will maintain the gas monitoring system as required by Chapter 62-701.620(4)(f) through the
long-term care period. The landfill gas system consists of a series of passive gas vents designed to reduce
gas pressure in the interior of the landfill. These vents are distributed across the landfill cover. Landfill
gas is monitored and reported annually from 31 monitoring probes installed around the perimeter of the
property and in the office, scale house, and storage shed. Although explosive gases have not been
detected in the past 10 years and the landfill appears to have stabilized to the point where explosive gases
and objectionable odors are not being produced, in the event that detections warrant it, the County will
implement a Gas Remediation Plan in accordance with Chapter 62-701.530(3)(a) FAC.
Landfill Stabilization
Chapter 62-701.620(6) FAC requires inspecting the landfill cover and submitting a stabilization report
every five years through the long-term care period. Wright Landfill was inspected October 2013, and a
stabilization report was submitted in conjunction with the WQTR submitted on October 30, 2013. The
October 2013 stabilization report addresses subsidence, the barrier layer effectiveness, leachate quality
and leachate quantity.
Right of Access
In accordance with 62-701.620(7), the County will maintain the right to use the property for which the
permit is issued, including the access route onto the property to carry out the requirements of the permit.
The County will accomplish this by maintaining a lease agreement with Eglin Air Force Base through the
long-term care period.
Replacement of Monitoring Devices
If any monitoring device (groundwater well, landfill gas probe, etc.) is destroyed or damaged and
becomes non-functional, the County will immediately upon discovery, notify the FDEP in writing. All
inoperative monitoring devices will be replaced with functioning devices within 60 days of the discovery
of the malfunctioning unit unless the County is notified otherwise by the FDEP (Chapter 62-701.620(8).
Completion of Long-term Care
Following completion of the long-term care period, Okaloosa Count will notify the FDEP that a
certification, signed and sealed by a professional engineer, verifying that long-term care has been
completed in accordance with the closure plan has been placed in the operating record (Chapter 62-
701.620(9).
3
ATTACHMENT E
FINANCIAL ASSURANCE
ATTACHMENT R-1
Financial Assurance Responsibility – Long-term Care Cost Estimates
Wright Landfill, Okaloosa County, Florida
April 2014
Long-term care cost estimates for the Wight Landfill are being re-calculated according to 62-
701.630(3)(a), FAC. The basis for cost estimates include current pricing, closure design and
regulations contained in Chapter 62-701 of the Florida Administrative Code (FAC).
The updated FDEP Form 62-701.900(28) is provided in this report as Appendix A. Quotes from
third-party sources are provided in Appendix B. The 2014 RSMeans Heavy Construction Cost
Data (Online Version) was used to estimate some unit costs. The online version of RSMeans
corrected the national average unit cost based on the Pensacola, FL city factor. Moreover, some
costs are based on Florida Department of Transportation (FDOT) cost estimates and some are
based on HDR’s experience on similar projects. The RS Means and FDOT estimate used in the
present cost estimate report are provided in Appendix B.
LONG-TERM CARE COSTS
Total long-term care area = 210 AC
Ground Water Monitoring (Item 1)
There are 21 groundwater (GW) monitoring wells which require semi-annual sampling
(parameters listed in Section 3.7 (H) of the solid waste permit (0070768-007-SF).
Quotes were collected from RDH (for Sampling) and Pace Analytical (for Lab Analysis). Total of
the two quotes have been used to estimate groundwater monitoring cost. The two quotes have
been included in Appendix B.
Sampling Cost per GW & Surfacewater (SW) sampling event = $3,400
As there are 21 GW wells and 3 SW monitoring locations, the cost has been distributed per
location equally
Thus, sampling cost for GW wells = $3,400 *21 / 24 = $2,975 per sampling event
Lab Analysis Cost per GW sampling event = $1,281
Total semiannual cost per sampling event per groundwater monitoring location = ($4,257 / 21) =
$202.72 per event/per monitoring well.
Surface Water Monitoring (Item 2)
There are 4 surface water monitoring locations associated with the semiannual monitoring. The
semi-annual sampling parameters are listed in Section 3.7 (J) of the solid waste permit
(0070768-007-SF).
Quotes were collected from RDH (for Sampling) and Pace Analytical (for Lab Analysis). Total of
the two quotes have been used to estimate surfacewater monitoring cost. The two quotes have
been included in Appendix B.
April 2014 1 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
Sampling Cost per SW sampling event = $425
Lab Analysis Cost per SW sampling event = $696
Total semiannual cost per sampling event per surfacewater monitoring location = ($1,121 / 3) =
$373.67 per event/per monitoring well.
Gas Monitoring (Item 3)
There are 31 gas monitoring probes as along the perimeter of the landfill. These required to be
monitored annually per Section 3.6 (A) (3) of the solid waste permit (0070768-007-SF).
It is estimated that it takes approximately 2 days (10 hours per day) to perform monitoring, travel
to the site and submit results to the FDEP for both probe monitoring and surface monitoring. The
field technician charge is estimated to be $65/hour. Equipment rental for a GEM2000 monitor is
$150/day (see daily rental sheet from Field Environmental Instruments, Inc. in Appendix B) and
miscellaneous expenses are estimated to be $250. A 15% profit and contingency fee was added to
the sum. Assuming monitoring will be performed in 2 days (10 hours per day), the cost estimate
per annual monitoring event is $2,127.50 =115% * ($65*20 + $150*2 + $250).
Leachate Monitoring (Item 4)
Per Chapter 62-701 of the Florida Administrative Code (FAC), annual leachate monitoring is no
longer required and therefore, no included as part of this long-term care cost estimates.
Leachate Collection & Treatment System (Item 5)
Note that the landfill has lined Cells 1 and 2 (high rise) with leachate collection system – 30
Acres footprint of the 210 Acres footprint under Long Term Care. The leachate generation is
minimal because of stabilized waste and effectiveness of final cover system that includes a 20-mil
PVC liner along with soil barrier layer and top vegetative soil. In past 5-years the average annual
leachate generation is found to be 2,286 gallons. It is anticipated that the leachate generation rate
will further drop as the waste will stabilized further. The underground leachate storage tank
requires minimal maintenance due to low leachate generation. Collected leachate is treated at the
County’s wastewater treatment plant at no additional cost.
For the financial assurance purposes, a lumpsum amount of $2,000 per year is allocated for
leachate collection system maintenance and leachate disposal.
Groundwater Monitoring Well Maintenance (Item 6)
Assume a lump sum amount of $500 per year for well maintenance and replacement.
Gas System Maintenance (Item 7)
Assume a lump sum amount of $500 per year for passive vent maintenance and replacement.
Note that the historical results for perimeter gas probe monitoring indicate that the waste is
relatively stabilized and gas generation is minimal.
Landscaping (Item 8)
It is anticipated the landfill cap will need landscaping/mowing four times a year.
April 2014 2 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
Cost of mowing from 2014 RS Means= $0.60 per 1000 SF = $26.14 per AC (refer to Appendix
B)
Total annual mowing cost = $26.14 per AC * 4 = $104.56 per AC
Erosion Control and Cover Maintenance (Item 9)
To account for erosion control and cover maintenance in the post closure care period,
reconstruction of the final cover (including sod, liner and soil fill material) and re-grading were
considered. An annual average soil loss of 1,588 CY was calculated using the United Soil Loss
Equation (USLE). This is a conservative assumption since it is assumed that 60% of the ground
is covered by vegetation. Please refer to Appendix C for further explanation of the USLE
equation.
For financial assurance estimation, it is assumed that soil will erode in channels that will cut an
average of six inches deep into the final cover.
• Sodding: 1,588 CY * 27 CF/CY / (0.5 FT average depth) = 9,528 SY
• Liner Repair: 1,588 CY * 44% * 25% * 27 CF/CY / 0.5 FT = 1,048 SY
• Soil: 1,588 CY
Note that the 2”PVC liner is only installed in 93 AC of 210 AC area (44% of total area).
Moreover it was assumed that 25% of the disturbed area will require liner repairs. Replacement
soil (installed) will include cover soil and top soil (including regarding).
Please refer to Appendix B for unit price of sodding (cost based on FDOT Estimates). The typical
cost for 40-mil LLDPE liner (installed) ranges from $4.00 to $7.00 per SY based on HDR
experience in landfill closure projects. Assuming 20-mil PVC liner to be cheaper product, $7.00
per SY cost for liner repair has been used conservatively for financial assurance purpose.
Offsite soils costs typically vary from $10 per CY to $18 per CY (installed) based on HDR
experience in landfill closure projects. For financial assurance purpose, $18 per CY was used
conservatively.
Stormwater Maintenance (Item 10)
A lump sum amount of $1,000 has been allocated for annual storm water management system
maintenance.
Security System Maintenance (Item 11)
A lump sum amount of $500 is assumed as cost associated with fence repairs and other security
management.
Utilities (Item 12)
Estimated power requirement for site equipment = $150/month = $1,800/year
Leachate Collection/Treatment Systems Operation (Item 13)
It is assumed that a technician will be needed for an average of eight hours every two months to
monitor, inspect, and maintain the system. Note that leachate generation rates are minimal as
described in Item 5 above.
April 2014 3 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
Administrative Costs (Item 14)
Professional engineering services expected during the long-term care period include semiannual
water quality monitoring, water quality technical reports, ten-year long-term care permit renewal
applications, stabilization reports and other miscellaneous reporting requirements. Time was
added for inspections of the stormwater and landfill cap systems.
April 2014 4 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
Appendix A
FDEP From 62-701.900(28)
April 2014 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
Print Form Reset Form
DEP Form # 62-701.900(28), F.A.C.
Florida Department of Form Title: Closure Cost Estimating Form
Environmental Protection For Solid Waste Facilities
Effective Date: January 6, 2010
Bob Martinez Center
2600 Blair Stone Road Incorporated in Rule 62-701.630(3), F.A.C.
Tallahassee, Florida 32399-2400
CLOSURE COST ESTIMATING FORM FOR SOLID WASTE FACILITIES
Date of DEP Approval:
I. GENERAL INFORMATION:
Facility Name: Wright Landfill WACS ID: 4600009064
Permit Application or Consent Order No.: 0070768-001-SF Expiration Date: 7/28/2014
Facility Address: 1671 North Beal Parkway Extension, FWB, Florida 32547
Permittee or Owner/Operator: Okaloosa County Board of County Commissioners
Mailing Address: 1759 South Ferdon Boulevard, Crestview, Florida 32536
Latitude: 30 ° 28 ' 17 " Longitude: 86 ° 38 ' 19 "
Coordinate Method: DMS Datum: WGS84
Collected by: Scott Henson Company/Affiliation: Okaloosa County Public Works
Solid Waste Disposal Units Included in Estimate:
Date Unit Active Life of If closed: If closed:
Began Unit From Date If active: Date last Official
Accepting of Initial Receipt Remaining waste date of
Phase / Cell Acres Waste of Waste life of unit received closing
Area Fill Class III 117 1964 22 years NA 1986 12/19/94
High Rise Cells 1 and 2 30 1986 4 years NA 1990 12/19/94
Trench Cells through 8 63 1964 22 years NA 1986 12/19/94
Total disposal unit acreage included in this estimate: Closure: Long-Term Care: 210
Facility type: Class I Class III C&D Debris Disposal
(Check all that apply) Other:
II. TYPE OF FINANCIAL ASSURANCE DOCUMENT (Check type)
Letter of Credit* Insurance Certificate Escrow Account
Performance Bond* Financial Test Form 29 (FA Deferral)
Guarantee Bond* Trust Fund Agreement
* - Indicates mechanisms that require the use of a Standby Trust Fund Agreement
Northwest District Northeast District Central District Southwest District South District Southeast District
160 Government Center 7825 Baymeadows Way, Ste. B200 3319 Maguire Blvd., Ste. 232 13051 N. Telecom Pky. 2295 Victoria Ave., Ste. 364 400 N. Congress Ave., Ste. 200
Pensacola, FL 32502-5794 Jacksonville, FL 32256-7590 Orlando, FL 32803-3767 Temple Terrace, FL 33637 Fort Myers, FL 33901-3881 West Palm Beach, FL 33401
850-595-8360 904-807-3300 407-894-7555 813-632-7600 239-332-6975 561-681-6600
III. ESTIMATE ADJUSTMENT
40 CFR Part 264 Subpart H as adopted by reference in Rule 62-701.630, Florida Administrative Code, (F.A.C.) sets forth the method of
annual cost estimate adjustment. Cost estimates may be adjusted by using an inflation factor or by recalculating the maximum costs of
closure in current dollars. Select one of the methods of cost estimate ajustment below.
(a) Inflation Factor Adjustment (b) Recalculated or New Cost Estimates
Inflation adjustment using an inflation factor may only be made when a Department approved closure cost estimate exists and no changes
have occurred in the facility operation which would necessitate modification to the closure plan. The inflation factor is derived from the most
recent Implicit Price Deflator for Gross National Product published by the U.S. Department of Commerce in its survey of Current Business.
The inflation factor is the result of dividing the latest published annual Deflatory by the Deflator for the previous year. The inflation factor may
also be obtained from the Solid Waste website www.dep.state.fl.us/waste/categories/swfr or call the Financial Coordinator at (850) 245-8706.
This adjustment is based on the Department approved closing cost estimate dated:
Latest Department Approved Current Year Inflation Inflation Adjusted Closing
Closing Cost Estimate: Factor, e.g. 1.02 Cost Estimate:
× ______ =
This adjustment is based on the Department approved long-term care cost estimate dated:
Latest Department Approved Inflation Adjusted Annual
Annual Long-Term Care Current Year Inflation Long-Term Care Cost
Cost Estimate: Factor, e.g. 1.02 Estimate:
× ______ =
Number of Years of Long Term Care Remaining: ×
Inflation Adjusted Long-Term Care Cost Estimate: =
Signature by: Owner/Operator Engineer (check what applies)
Signature Address
Name & Title City, State, Zip Code
Date E-Mail Address
Telephone Number
DEP FORM 62-701.900(28)
Effective January 6, 2010 2 of 9
NOT APPLICABLE
IV. ESTIMATED CLOSING COST (check what applies)
Recalculated Cost Estimate New Facility Cost Estimate
Notes: 1. Cost estimates for the time period when the extent and manner of landfill operation makes closing most exp
2. Cost estimate must be certified by a professional engineer.
3. Cost estimates based on third party suppliers of material, equipment and labor at fair market value.
4. In some cases, a price quote in support of individual item estimates may be required.
Number
Description Unit of Units
Cost / Unit Total Cost
1. Proposed Monitoring Wells (Do not include wells already in existence.)
EA _____
Subtotal Proposed Monitoring Wells:
2. Slope and Fill (bedding layer between waste and barrier layer):
Excavation CY _____
Placement and Spreading CY _____
Compaction CY _____
Off-Site Material CY _____
Delivery CY _____
Subtotal Slope and Fill:
3. Cover Material (Barrier Layer):
Off-Site Clay CY _____
Synthetics - 40 mil SY _____
Synthetics - GCL SY _____
Synthetics - Geonet SY _____
Synthetics - Other (explain) _____ _____
Subtotal Cover Material:
4. Top Soil Cover:
Off-Site Material CY _____
Delivery CY _____
Spread CY _____
Subtotal Top Soil Cover:
5. Vegetative Layer
Sodding SY _____
Hydroseeding AC _____
Fertilizer AC _____
Mulch AC _____
Other (explain) ____________ _____ _____
Subtotal Vegetative Layer:
6. Stormwater Control System:
Earthwork CY _____
Grading SY _____
Piping LF _____
Ditches LF _____
Berms LF _____
Control Structures EA _____
Other (explain)____________ _____ _____
Subtotal Stormwater Control System:
DEP FORM 62-701.900(28)
Effective January 6, 2010 3 of 9
NOT APPLICABLE
Number
Description Unit of Units Cost / Unit Total Cost
7. Passive Gas Control:
Wells EA _____
Pipe and Fittings LF _____
Monitoring Probes EA _____
NSPS/Title V requirements LS 1
_____
Subtotal Passive Gas Control:
8. Active Gas Extraction Control:
Traps EA _____
Sumps EA _____
Flare Assembly EA _____
Flame Arrestor EA _____
Mist Eliminator EA _____
Flow Meter EA _____
Blowers EA _____
Collection System LF _____
Other (explain) ____________ _____ _____
Subtotal Active Gas Extraction Control:
9. Security System:
Fencing LF _____
Gate(s) EA _____
Sign(s) EA _____
Subtotal Security System:
10. Engineering:
Closure Plan Report LS _____
1
Certified Engineering Drawings LS _____
1
NSPS/Title V Air Permit LS _____
1
Final Survey LS 1
_____
Certification of Closure LS 1
_____
Other (explain) ____________ _____ _____
Subtotal Engineering:
Description Hours Cost / Hour Hours Cost / Hour Total Cost
11. Professional Services
Contract Management Quality Assurance
P.E. Supervisor _____ _____ _____ _____
On-Site Engineer _____ _____ _____ _____
Office Engineer _____ _____ _____ _____
On-Site Technician _____ _____ _____ _____
Other (explain) _____ _____ _____ _____
Number
Description Unit of Units Cost / Unit Total Cost
Quality Assurance Testing LS _____
1
Subtotal Professional Services:
DEP FORM 62-701.900(28)
Effective January 6, 2010 4 of 9
NOT APPLICABLE
Subtotal of 1-11 Above:
12. Contingency _____ % of Subtotal of 1-11 Above
Subtotal Contingency:
Estimated Closing Cost Subtotal:
Description Total Cost
13. Site Specific Costs
Mobilization
Waste Tire Facility
Materials Recovery Facility
Special Wastes
Leachate Management System Modification
Other (explain)
Subtotal Site Specific Costs:
TOTAL ESTIMATED CLOSING COSTS ($):
DEP FORM 62-701.900(28)
Effective January 6, 2010 5 of 9
V. ANNUAL COST FOR LONG-TERM CARE
See 62-701.600(1)a.1., 62-701.620(1), 62-701.630(3)a. and 62-701.730(11)b. F.A.C. for required term length. For landfills
certified closed and Department accepted, enter the remaining long-term care length as "Other" and provide years remaining.
(Check Term Length) 5 Years 20 Years 30 Years Other, ___
10 Years
Notes: 1. Cost estimates must be certified by a professional engineer.
2. Cost estimates based on third party suppliers of material, equipment and labor at fair market value.
3. In some cases, a price quote in support of individual item estimates may be required.
All items must be addressed. Attach a detailed explanation for all entries left blank.
Sampling
Frequency Number of (Cost / Well) /
Description (Events / Year) Wells Event Annual Cost
1. Groundwater Monitoring [62-701.510(6), and (8)(a)]
Monthly 12 _____
Quarterly 4 _____
Semi-Annually 2 21
_____ $202.72 $8,514.24
Annually 1 _____
Subtotal Groundwater Monitoring: $8,514.24
2. Surface Water Monitoring [62-701.510(4), and (8)(b)]
Monthly 12 _____
Quarterly 4 _____
Semi-Annually 2 _____
3 $373.67 $2,242.02
Annually 1 _____
Subtotal Surface Water Monitoring: $2,242.02
3. Gas Monitoring [62-701.400(10)]
Monthly 12 _____
Quarterly 4 _____
Semi-Annually 2 _____
Annually 1 _____
31 $68.63 $2,127.53
Subtotal Gas Monitoring: $2,127.53
4. Leachate Monitoring [62-701.510(5), (6)(b) and 62-701.510(8)c]
Monthly 12 _____
Quarterly 4 _____
Semi-Annually 2 _____
Annually 1 _____
Other (explain) _________
N/A _____ _____
Subtotal Leachate Monitoring:
Number of
Description Unit Units / Year Cost / Unit Annual Cost
5. Leachate Collection/Treatment Systems Maintenance
Maintenance
Collection Pipes LF _____
Sumps, Traps EA _____
Lift Stations EA _____
Cleaning LS _____
1 $2,000.00 $2,000.00
Tanks EA _____
DEP FORM 62-701.900(28)
Effective January 6, 2010 6 of 9
Number of
Description Unit Units / Year Cost / Unit Annual Cost
5. (continued)
Impoundments
Liner Repair SY _____
Sludge Removal CY _____
Aeration Systems
Floating Aerators EA _____
Spray Aerators EA _____
Disposal
Off-site (Includes 1000 gallon _____
transportation and disposal) Subtotal Leachate Collection / Treatment
Systems Maintenance: $2,000.00
6. Groundwater Monitoring Well Maintenance
Monitoring Wells LF _____
1 $500.00 $500.00
Replacement EA _____
Abandonment EA _____
Subtotal Groundwater Monitoring Well Maintenance: $500.00
7. Gas System Maintenance
Piping, Vents LF _____
1 $500.00 $500.00
Blowers EA _____
Flaring Units EA _____
Meters, Valves EA _____
Compressors EA _____
Flame Arrestors EA _____
Operation LS _____
1
Subtotal Gas System Maintenance: $500.00
8. Landscape Maintenance
Mowing AC _____
210 $104.56 $21,957.60
Fertilizer AC _____
Subtotal Landscape Maintenance: $21,957.60
9. Erosion Control and Cover Maintenance
Sodding SY _____
9,528 $2.04 $19,437.12
Regrading AC _____
Liner Repair SY _____
1,048 $7.00 $7,336.00
Clay CY _____
1,588 $18.00 $28,584.00
Subtotal Erosion Control and Cover Maintenance: $55,357.12
10. Storm Water Management System Maintenance
Conveyance Maintenance LS _____
1 $1,000.00 $1,000.00
Subtotal Storm Water Management System Maintenance: $1,000.00
11. Security System Maintenance
Fences LS _____
1 $500.00 $500.00
Gate(s) EA _____
Sign(s) EA _____
Subtotal Security System Maintenance: $500.00
DEP FORM 62-701.900(28)
Effective January 6, 2010 7 of 9
Number of
Description Unit Units / Year Cost / Unit Annual Cost
12. Utilities LS _____
1 $1,800.00 $1,800.00
Subtotal Utilities: $1,800.00
13. Leachate Collection/Treatment Systems Operation
Operation
P.E. Supervisor HR _____
On-Site Engineer HR _____
Office Engineer HR _____
OnSite Technician HR 48
_____ $65.00 $3,120.00
Materials LS _____
1
Subtotal Leachate Collection/Treatment Systems Operation: $3,120.00
14. Administrative
P.E. Supervisor HR 35
_____ $135.00 $4,725.00
On-Site Engineer HR 48
_____ $75.00 $3,600.00
Office Engineer HR 80
_____ $75.00 $6,000.00
OnSite Technician HR _____
Other ________________ _____
HR _____
40 $50.00 $2,000.00
Administrative Assistant Subtotal Administrative: $16,325.00
Subtotal of 1-14 Above: $115,943.51
15. Contingency _____
5 % of Subtotal of 1-14 Above $5,797.18
Subtotal Contingency: $5,797.18
Number of
Description Unit Units / Year Cost / Unit Annual Cost
16. Site Specific Costs
_____ _____
_____ _____
_____ _____
Subtotal Site Specific Costs:
ANNUAL LONG-TERM CARE COST ($ / YEAR): $121,740.69
Number of Years of Long-Term Care: _____
10
TOTAL LONG-TERM CARE COST ($): $1,217,406.86
DEP FORM 62-701.900(28)
Effective January 6, 2010 8 of 9
VI. CERTIFICATION BY ENGINEER
This is to certify that the Cost Estimates pertaining to the engineering features of this solid waste management
facility have been examined by me and found to conform to engineering principles applicable to such facilities. In my
professional judgment, the Cost Estimates are a true, correct and complete representation of the financial liabilities
for closing and/or long-term care of the facility and comply with the requirements of Rule 62-701.630 F.A.C. and all
other Department of Environmental Protection rules, and statutes of the State of Florida. It is understood that the
Cost Estimates shall be submitted to the Department annually, revised or adjusted as required by Rule 62-
701.630(4), F.A.C.
200 W Forsyth Street, Suite 800
Signature Mailing Address
Brad Stone, Vice President Jacksonville, FL, 32202
Name and Title (please type) City, State, Zip Code
Brad.Stone@hdrinc.com
Date E-Mail address (if available)
P.E. Licence No. 53110 (904) 598 8900
Florida Registration Number Telephone Number
(please affix seal)
VII. SIGNATURE BY OWNER/OPERATOR
1759 South Ferdon Boulevard
Signature of Applicant Mailing Address
John Hofstad
Okaloosa County Public Works Director Crestview, Florida 32536
Name and Title (please type) City, State, Zip Code
(850) 689-5770
E-Mail address (if available) Telephone Number
DEP FORM 62-701.900(28)
Effective January 6, 2010 9 of 9
Appendix B
Third Party Quotes
April 2014 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
RDH Environmental, Inc.
5720 Dove Dr.
Pace, FL. 32571
850-336-0192
April 14, 2014,
Dear Karamjit Singh,
Here is the price estimate that you have requested for sampling 21 wells and 3 surface waters at Wright
Landfill located in Okaloosa County, FL. The following price estimate is based on the second (fall) event.
The low flow equipment purge method can be used or we can purge three to five well volumes. All
sampling techniques will be in accordance with the SOPS listed in FDEP-SOP-001/01 (Field Procedures).
The estimate does not include field filters. If field filters are needed they will be billed out at cost plus
fifteen percent. The estimate does include disposable bladders for the QED pump. If we use the QED
pumps then the bladders will be billed out at cost plus 15%.
RDH Environmental will supply all the sampling supplies needed.
Cost per Semi-Annual Event:
Sampling Charge per Hour…………………$50.00
No. of Hours……………………………..…44
Sampling Charge…………….......................$2200.00
Field Filters (if needed)………………..…...Cost plus 15%
Disposable Bladders (QED Pumps)………..Cost plus 15%
Mileage Charge per Mile…………………..N/A
Mileage Charge…………………………….N/A
No. of Miles………………………………...N/A
Tubing per foot ………….………………....$0.35
Tubing Cost (if needed)……………..…..….$350.00
Equipment Usage per Day (per set)..……….$75.00
Equipment Usage……………………..…….$225.00
Per Diem per Day…………………………..$120.00
Per Diem……………………………………$360.00
Total Price (excluding bladders and filters)...$3135.00
Comments: This is an estimated cost only. The actual cost may very but in no event shall the cost exceed
$3400.00 (excluding bladders, tubing, and filters).
If you have any questions please feel free to call me.
Thank you,
Rick Hagendorfer
Vice President
RDH Environmental
5720 Dove Dr. 32571
850-336-0192
PACE ANALYTICAL
SERVICES, INC.
COST PROPOSAL
Contact Name: Karamjit Singh PROPOSAL NO.: 14-0089
Company: HDR Engineering PROPOSAL DATE: April 7, 2014
Address: 200 West Forsyth Street, Suite 800 Turnaround Time: 10 working days
Jacksonville, FL 32202 Sample Arrival Date:
Phone No.: 904-598-8930 Schedule: Firm: Tentative:
Fax No.: 904-598-8988
Project Name/Description: Wright Assessment Monitoring Semiannual
PARAMETERS Methods Matrix No. of Samples Unit Cost Subtotal
Sample Field QC Total
SEMIANNUAL
APPENDIX I VOC 8260 GW 8 2 10 $ 60.00 $ 600.00
AMMONIA 350.1 GW 11 2 13 $ 10.00 $ 130.00
FE, AS 6010 GW 10 0 10 $ 22.00 $ 220.00
TDS 6010 GW 14 2 16 $ 8.00 $ 128.00
FE, NA 6010 GW 2 0 2 $ 22.00 $ 44.00
FE 6010 GW 4 0 4 $ 15.00 $ 60.00
FE, AS, NA 6010 GW 1 2 3 $ 33.00 $ 99.00
SEMIANNUAL SAMPLES
CD, CR, CU, FE, PB, NI, ZN 6010/6020 SW 4 2 6 $ 84.00 $ 504.00
TOTAL HARDNESS CALCULATION SW 4 2 6 $ 22.00 $ 132.00
UNIONIZED AMMONIA 350.1 + CALC SW 4 2 6 $ 10.00 $ 60.00
$ - $ -
$ - $ -
Sample Kit Charge N/C
Kit Shipping Charge N/C
Rapid Turnaround Charge ( %)
TOTAL $ 1,977.00
Bottle Kits will be shipped to the client by Pace Courier or Ground shippment by FedEx. Any over night
Comments: shipping will be billed to the client.
Please provide the field ph and temp for the calculation of the UNIONIZED AMMONIA
Prepared by: Mike Valder (mike.valder@pacelabs.com)
Florida: Tampa Lab & Service Center
8 East Tower Circle 5948 Benjamin Road
Ormond Beach, FL 32174 Tampa, FL 33634
phone: 386-672-5668 phone: 813-390-8540
fax: 386-673-4001
Date: April 7, 2014 Page 2 of 4
Pace Analytical Services, Inc.
Proposal Notes
General Notes:
z Standard turnaround time (TAT) for results is 10 working days starting from when
samples are received. Should there be the need for rush services, Pace Analytical Services, Inc. (PASI)
will require notification before the samples are sent. PASI will perform analyses with a shorter TAT
with rush service charges providing that: the shorter TAT has been pre-approved by
PASI's Project Manager and the fast TAT is feasible for the requested analyses.
z Standard TAT for any subcontracted analysis, if required, will be quoted on page 1 of this quote.
z Reports will reflect PASI's standard reporting format. Should the client require a customized
report or specific reporting requirements (such as non-standard Reporting Limits), PASI requires
notification prior to sampling. If notification is made after start of services, PASI reserves the right
to charge an additional 10% of the total cost of services.
z This proposal will be valid for 45 calendar days from date of issue.
z Payment Terms: Net due within 30 days of invoice date; a late fee of 1.5% per month will be
assessed on balances owed beyond 30 days. New clients are required to complete a New
Account Application. Payment Terms will be prepay until the credit application has been approved.
z PASI’s liability is limited to the actual cost of re-sampling and re-analysis or $5,000.00,
whichever is less.
z For those samples containing hazardous wastes, PASI reserves the right to return the samples
to the client and/or charge the client for any transfer or appropriate disposal fees.
z PASI will provide and ship sample kits (which include cooler and sample bottles) at no
charge to the client provided that the kits are ordered at least four (4) working days prior to
the requested delivery date of the kits. If notice is less than four (4) working days, PASI has
the right to bill the client for any additional shipping costs
z Receipt of samples covered in this Proposal acknowledges acceptance of all terms and
conditions included in this Proposal.
z Client assumes any and all liability for delays or accidents caused by common carrier (such as, but
not limited to, UPS or FedEx) during the course of shipping samples to the laboratory; if PASI
includes the cost of shipping samples in its price for analysis, client agrees to pay shipping costs
associated with any re-sampling events.
Pace Analytical Services, Inc.
TERMS & CONDITIONS
I. SCOPE. Pace Analytical Services, Inc. (Pace) agrees to perform the services (the “Services”) requested by Client. Said Services may
be described in a fee schedule, proposal, agreement, or other document, which shall be incorporated herein by reference and referred
to as the “Proposal.” Unless modified in writing by the parties hereto, the duties of Pace shall not be construed to exceed those
services specifically set forth in the Proposal. Nothing herein shall prevent Pace from employing independent contractors or
subcontractors in assisting with performance of the Services. Initiation of the Services shall constitute agreement and acceptance of
the Proposal and these Terms and Conditions.
II. COMPENSATION. In consideration for the performance of the Services, Client agrees to pay for the Services in accordance with
compensation provisions set forth by the Proposal and these Terms and Conditions. If not otherwise specified in the Proposal, compensation for
laboratory analyses will be based on Pace’s then current published analytical fee schedule. Fees for Rush Analyses, Suspension, Termination,
and additional storage or return of samples are discussed under Articles III, VI X, and XI herein.
Payment to Pace shall be made within thirty (30) days after the date of billing. If Client objects to any portion of an invoice, it shall notify Pace in
writing within fifteen (15) days after receipt of said invoice and shall timely pay that portion of the invoice not in dispute. Past due invoices and
any sums improperly withheld by Client shall accrue interest thereon at a rate of 1.5 percent per month or the maximum interest rate permitted by
law, whichever is less. Such interest is due and payable when the overdue payment is made. Payments shall be applied first to any accrued
interest.
In the event Pace, as a nonparty, is required to respond to any subpoena, provide testimony or otherwise assist with litigation related to the
Services, Client agrees to reimburse Pace on a time-and-expenses basis, wherein time-related charges will be billed at employee’s salary rate
times an overhead factor of 3.5. Direct expenses will be billed at cost plus a 10 percent service charge.
III. RUSH ANALYSES AND HOLDING TIMES. A surcharge is normally added to the analytical cost if rush analysis is requested. The
surcharge will depend upon the analysis to be performed. Rush analysis must be requested in writing and is offered contingent upon
availability and prearrangement with Pace’s testing coordinator/Project Manager.
Client understands samples may become unusable if applicable holding times are exceeded and agrees Pace shall not be responsible for
expenses related to resampling or disposition of unusable samples, given Pace was not negligent in exceeding said holding times.
IV. HAZARD COMMUNICATION. The Client shall inform Pace of any hazardous characteristics known or suspected about any sample
provided to Pace by Client, its agent, employee, contractor or other representative prior to performance of the Services.
V. DELIVERY OF SAMPLES. Upon timely delivery of samples, Pace will use reasonable efforts consistent with standard industry
practice in meeting mutually agreed upon turnaround times. The Client shall be responsible for the proper shipment, delivery,
preservation and chain-of-custody documents (including specifying analytical method) of any samples provided to Pace.
The Client represents and warrants that any sample to be delivered to Pace and known or suspected to contain any hazardous substance shall
be labeled, packaged, manifested, transported, and delivered to Pace in accordance with the then current state and federal regulations.
VI. SAMPLE DISPOSITION. All samples and portions thereof shall remain the property of Client at all times. Unless otherwise requested of
Pace in writing by the Client, Pace will properly dispose of samples thirty (30) days after Pace’s analytical report is issued or other termination of
the Services. If requested in writing by the Client prior to submission of the analytical report, Pace can retain said samples longer than 30 days
for an additional monthly storage charge based upon Pace’s then current fee schedule.
If Client requests in writing prior to submission of the analytical report, Pace will retain unused samples or portions thereof for return to Client.
Pace, at its sole option, reserves the right to return samples or portions thereof to the Client if found or suspected to be hazardous according to
state or federal guidelines, or charge the Client a disposal fee . If said samples contain hazardous substances, Client shall provide the method
and choice of transporter and execute transport documents. Client agrees to pay for any and all costs associated with returning samples or
portions thereof and further agrees to indemnify, defend and hold harmless Pace for any allegations that Pace is a transporter, arranger,
generator, or disposer of said substances or samples.
Page 3 of 4
Pace Analytical Services, Inc. TERMS & CONDITIONS, continued
VII. WARRANTY AND LIABILITY. Recognizing that the nature of many samples is unknown and that some may contain potentially hazardous
components, Pace warrants only that it will perform testing services, obtain findings, and prepare reports in accordance with generally acceptable
analytical laboratory principles and practices. In recognition of the relative risks, rewards and benefits of the Services to both the Client and
Pace, the risks have been allocated such that the Client agrees, to the fullest extent permitted by law, that Pace’s aggregate liability to the Client
for any and all injuries, claims, losses, expenses, damages or claim expenses arising out of the Services from any cause or causes, shall not
exceed $5,000. Such causes may include, but are not limited to, Pace’s negligence, errors, omissions, strict liability, breach of contract or
breach of warranty.
The parties hereunder agree they shall not be liable to each other for special, incidental, exemplary, punitive or consequences damages.
The exclusive remedy of any breach of this warranty will be, at Pace’s discretion, a rerun of the sample or a similar sample or a refund of the
analytical fee for the implicated sample(s). This warranty is in lieu of all other warranties expressed or implied.
VIII. DISPUTE RESOLUTION. Any claims or disputes between the Pace and the Client, made either before, during or after the Services, shall
be submitted to non-binding mediation within a reasonable time. Client and Pace agree to require a similar mediation agreement of all
contractors, subcontractors, subconsultants, suppliers, and fabricators, thereby providing for meditation as the primary method for dispute
resolution between all parties.
IX. INSURANCE. Pace will maintain in force during the performance of Services, Workers’ Compensation and Employer’s Liability insurance (in
accordance with the laws of the states having jurisdiction over our employees who are engaged in the performance of the Services),
Comprehensive General and Liability (limit of $1,000,000 per occurrence), Comprehensive Automobile Liability, owned and hired, (limit of
$1,000,000 for bodily injury and Professional Liability insurance (limit of $1,000,000 per occurrence).
X. DELAYS AND SUSPENSION. Client may suspend all or a portion of the Services with 24 hours verbal notice to be confirmed in writing with
proof of delivery. Pace may suspend the Services by notifying Client of circumstances that are interfering with the normal progress of Services.
Pace may suspend the Services in the event the Client does not pay invoices when due. In the event of suspension, Client shall pay for costs
incurred to the date of suspension in accordance with Article II.
XI. TERMINATION. Either party may terminate the Services in the event the other party fails to perform in accordance with the Proposal or
these Terms and Conditions. Termination of the Services is accomplished by immediate verbal notice and 48 hours prior written notice from the
party initiating termination to the other. with proof of delivery.
In the event of termination, Pace shall be compensated for Services actually performed prior to the effective date of termination plus any costs
incurred by Pace for the orderly termination of the Services.
XII. APPLICABLE LAW. The Services, Proposal and these Terms and Conditions shall be governed by and construed according to the laws of
the State of Florida. Venue for any legal action hereunder shall be in the county where Pace is officed.
XIII. INVALIDITY. In the event a provision herein shall for any reason be held invalid, illegal or unenforceable in any respect, such finding shall
not affect the enforceability of any other provision herein.
XIV. NONWAIVER AND COUNTERPARTS. Failure or delay in exercising any right, power, or remedy herein shall not impair any right, power or
remedy which any party hereto may have, nor shall any such failure or delay be construed to be a waiver of any such right, power or remedy or
an acquiescence in any breach or default hereunder absent an express, written waiver or acquiescence, nor shall any waiver of any breach or
default be deemed a waiver of any default or breach subsequently occurring. All documents related to the Services (including change orders)
may be executed via facsimile or by transmitting originals; any number of executed counterparts constitute one and the same instrument.
XV. ENTIRE AGREEMENT. These Terms and Conditions and the Proposal (as defined hereunder) represent the entire understanding of Client
and Pace as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with respect to those
matters covered herein.
XVI. AMENDMENTS. The Proposal “Pace Analytical Services, Inc. ANALYTICAL SERVICE COST PROPOSAL” or “Pace, Inc. Terms
and Conditions” herein may not be modified except in writing signed by both parties.
Page 4 of 4
Welcome Karamjit Singh Quick Tour Help Product Overview
Version 5.0.4
Search Data Custom Cost Data Manage Estimates Square Foot Estimator Manage Accounts Reference Items
Cost Data .....Heavy Construction Type Unit Labor Type Open Shop PENSACOLA(325) Release Year 2014 Quarter 1
What are you searching for? Include m y Custom Data
Adv anced Search
Measurement System : English
MasterFormat 2 0 1 0 320190.19 Mowing Page 1 of 1 Lines 1 - 21 of 21
26 Electrical
Line Num ber Description Unit Crew Daily Output Labor Hours Bare Material Bare Labor Bare Equipm ent Bare Total Total O&P
27 Communications
320190190010 MOWING
31 Earthwork
32 Exterior Improvements 320190191650 Mowing brush, tractor with rotary mower
3201 Operation And Mainte 320190191660 Light density M.S.F. B84 22.00 0.364 12.18 16.30 28.48 37.93
320113 Flexible Paving 320190191670 Medium density M.S.F. B84 13.00 0.615 20.45 27.58 48.03 64.77
320116 Flexible Paving 320190191680 Heavy density M.S.F. B84 9.00 0.889 29.78 39.89 69.67 93.17
320117 Flexible Paving 320190192000 Mowing, brush/grass, tractor, rotary mower, highway/airport median M.S.F. B84 13.00 0.615 20.45 27.58 48.03 64.77
320129 Rigid Paving Re
320190192010 Traffic safety flashing truck for highway/airport median mowing Day A2B 1.00 8.000 205.36 265.95 471.31 634.82
320130 Operation And M
320190194050 Lawn mowing, power mower, 18" - 22" M.S.F. 1 Clab 65.00 0.123 3.08 3.08 5.20
320190 Operation And M
320190.13 Fertilizing 320190194100 22" - 30" M.S.F. 1 Clab 110.00 0.073 1.82 1.82 3.07
320190.19 Mowing 320190194150 30" - 32" M.S.F. 1 Clab 140.00 0.057 1.43 1.43 2.41
320190.23 Pruning 320190194160 Riding mower, 36" - 44" M.S.F. B66 300.00 0.027 0.86 0.86 1.72 2.36
320190.24 Shrub Pru 320190194170 48" - 58" M.S.F. B66 480.00 0.017 0.53 0.53 1.06 1.48
320190.26 Watering
320190194175 Mowing with tractor & attachments
320190.29 Topsoil P
320190194180 3 gang reel, 7' M.S.F. B66 930.00 0.009 0.28 0.28 0.56 0.77
3206 Schedules For Exterio
320190194190 5 gang reel, 12' M.S.F. B66 1200.00 0.007 0.21 0.22 0.43 0.60
3211 Base Courses
3212 Flexible Paving 320190194200 Cutter or sickle-bar, 5', rough terrain M.S.F. B66 210.00 0.038 1.23 1.22 2.45 3.38
3213 Rigid Paving 320190194210 Cutter or sickle-bar, 5', smooth terrain M.S.F. B66 340.00 0.024 0.76 0.75 1.51 2.08
3214 Unit Paving 320190194220 Drainage channel, 5' sickle bar Mile B66 5.00 1.600 51.56 51.22 102.78 141.49
3216 Curbs, Gutters, Sidew 320190194250 Lawnmower, rotary type, sharpen (all sizes) Ea. 1 Clab 10.00 0.800 20.00 20.00 33.78
3217 Paving Specialties
320190194260 Repair or replace part Ea. 1 Clab 7.00 1.143 28.45 28.45 48.01
3218 Athletic And Recreatio
Page 1 of 1 Lines 1 - 21 of 21
® 2014 Reed Construction Data Inc. Terms and Conditions | Sales Help: 1-800-334-3509 CustomerRelations@rsmeans.com
CESPO05 04/08/2013-12.12.35 Page: 26
Florida Department of Transportation
Item Average Unit Cost
From 2012/01/01 to 2012/12/31
Contract Type: ALL Statewide
Displaying: VALID ITEMS WITH HITS
From: 0101 1 To: 9999999999
No. of Weighted Total Total Unit
Item Conts Average Amount Quantity Meas Obs? Description
0556 1 5 7 $323.75 $715,480.24 2,210.000 LF N JACK AND BORE, CASE DIA 24"TO<36"
0556 1 6 3 $548.04 $780,404.12 1,424.000 LF N JACK AND BORE, CASE DIA, 36"TO<48"
0556 1 7 2 $931.28 $393,930.00 423.000 LF N JACK AND BORE, CASE DIA 48"TO<60"
0556 1 8 FDOT
2 Inflation Factor = 1.017
$1,067.06 $306,246.00 287.000 LF N JACK AND BORE, CASE DIA 60"TO<72"
0556 1 9 Sodding
1 Cost = $2.00 * 1.017
$2,090.99 = $2.04 per SY (approx)
$177,734.15 85.000 LF N JACK AND BORE, CASE DIA 72"TO<84"
0556 1 10 1 $2,090.99 $219,553.95 105.000 LF N JACK AND BORE, CASE DIA 84"TO<96"
0561 1 19 $1,025.63 $16,676,571.29 16,259.800 TN N COATING EXISTING STRUCTURAL STEEL
0563 3 3 $.28 $21,815.00 77,094.000 SF N ANTI-GRAFFITI COATING, SACRIFICIAL
0563 4 1 $.79 $72,550.44 91,836.000 SF N ANTI-GRAFFITI COATING, NON-SACRIFICIAL
0570 1 1 48 $.49 $1,072,112.03 2,185,238.900 SY N PERFORMANCE TURF
0570 1 2 233 $2.00 $12,198,020.61 6,112,021.890 SY N PERFORMANCE TURF, SOD
0571 1 11 15 $3.71 $136,750.48 36,871.000 SY N PLASTIC EROSION MAT, TRM, TYPE 1
0571 1 12 5 $4.16 $54,133.41 13,018.000 SY N PLASTIC EROSION MAT, TRM, TYPE 2
0571 1 13 2 $2.24 $342,750.80 152,794.000 SY N PLASTIC EROSION MAT, TRM, TYPE 3
0580 1 1 26 $65,652.19 $1,838,261.29 28.000 LS N LANDSCAPE COMPLETE- SMALL PLANTS
0580 1 2 39 $144,396.60 $6,209,053.69 43.000 LS N LANDSCAPE COMPLETE- LARGE PLANTS
0590 70 14 $42,509.42 $637,641.37 15.000 LS N IRRIGATION SYSTEM
0590 70 1 2 $8,480.34 $16,960.68 2.000 LS N IRRIGATION SYSTEM REPAIRS
0591 1 2 1 $39.00 $9,750.00 250.000 LF N IRRIGATION SLEEVE, 4" DIAMETER
0604 3 1 1 $1,430.00 $5,720.00 4.000 PI N TIMING IMPLEMENTATION, CONTROLLER
0604 3 2 1 $1,500.00 $4,500.00 3.000 PI N TIMING IMPLEMENTATION,CNTL&COORD
0630 1 11 30 $15.61 $28,738.20 1,841.000 LF N CONDUIT, F& I, ABOVEGROUND
0630 1 12 114 $4.40 $1,076,758.77 244,875.100 LF N CONDUIT, F& I, UNDERGROUND
0630 1 13 91 $16.02 $1,084,073.88 67,658.000 LF N CONDUIT, F&I, UNDER EXIST PAVT
0630 1 14 43 $11.92 $692,263.94 58,067.800 LF N CONDUIT,F& I, UG JACKED
0630 1 15 5 $25.70 $49,207.20 1,915.000 LF N CONDUIT,F& I, BRIDGE MOUNT
0632 6 1 17 $5.31 $163,768.75 30,837.000 LF N CABLE, FURNISH & INSTALL
0632 6 3 1 $4.55 $3,640.00 800.000 LF N CABLE, INSTALL
0632 7 1 113 $3,582.24 $1,676,488.25 468.000 PI N SIGNAL CABLE- NEW OR RECO, FUR & INSTALL
0632 7 4 2 $1,083.50 $4,334.00 4.000 PI N SIGNAL CABLE, ADJUST
0632 8140 1 $1.25 $5,000.00 4,000.000 LF N CABLE, INTERCONNECT,TBD, RELOCATE
0632 8211 7 $3.04 $15,279.50 5,021.000 LF N CABLE, INTERCONNECT, 1-25, F&I, AERIAL
0632 8212 11 $3.32 $70,154.39 21,112.000 LF N CABLE, INTERCONNECT, 1-25, F&I, UG
0632 8232 1 $3.20 $6,400.00 2,000.000 LF N CABLE, INTERCONNECT, 1-25, INS, UG
0632 8311 1 $4.95 $5,940.00 1,200.000 LF N CABLE, INTERCONNECT, 26-50, F&I, AERIAL
Appendix C
USLE Calculation
April 2014 Wright Landfill
Financial Assurance Cost Estimates Okaloosa County
Wright Landfill
April 2014
Soil Erosion using the Universal Soil Loss Equation (USLE)
The Universal Soil Loss Equation A = R * K * LS * C * P
Name Value Reference*
Rainfall Factor
R = 400 Figure 1 of USDA "Predicting Rainfall Loss Handbook"
Soil Erodibility Factor
K = 0.08 Figure 3 of USDA "Predicting Rainfall Loss Handbook"; assuming 10% silt and
very fine sand (.15 to .075 mm), 90% sand (0.1 to 2 mm), 2% organic matter, fine
granular structure, and moderate permeability
Topographic Factor
LS = 7.21 Table 3 USDA "Predicting Rainfall Loss Handbook"; 150 ft slope, 25% slope
(Assumed)
Cover and Management Factor
C = 0.042 Assuming 60% of the ground is covered by vegetation.
Support Practice Factor
P= 1 support practice factor, assumed for slope with no farming
Assumptions:
density 95 lb/ft^3 dry density for silty sand
acreage 210 acres
Table of Soil Loss
A tons/
C CF/ year CY/ year
(tons/year) year
0.042 10 2,036 42,863 1,588
*reference United States Department of Agriculture. "Predicting Rainfall Erosion Losses."
Agriculture Handbook No. 537, December 1978.
R=400
K=0.08
LS