April 1, 2014

Okaloosa County BOCC — April 1, 2014 — Cost Estimate

Okaloosa County Board of County Commissioners cost estimate for the April 1, 2014 meeting. Official document preserved from the county IQM2 public portal, with a searchable OCR text layer.

FILED WITH

About this source

Cost Estimate from the Okaloosa County BOCC meeting of April 1, 2014 (IQM2 meeting #1196). Original portal label: Cost Estimate. Preserved as a historical public record; part of the meeting linked as a related source.

Original publication
Cost Estimate
Date
April 1, 2014
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Machine produced / unreviewed — machine-extracted, not yet human-corrected
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Cost Estimate (PDF)

Original PDF as published on the Okaloosa County IQM2 meeting portal.

PDF · 497.7 KB

Download ↓

Machine-extracted text — 92-Cost Estimate.pdf

Text extracted on 2026-10-31 from 92-Cost Estimate.pdf using optical character recognition (ocrmypdf/tesseract). Not human-corrected; may contain recognition errors. Read alongside the source images.

Text · 4.6 KB

Download ↓

Full text

Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.

INNERLIGHT ENGINEERING CORPORATION P.O. Box 459 © Fort Walton Beach, Florida ® 32549 Phone: (850) 333-4370 or (850) 333-4372 Think ° Solve ° Serve - QUANTITY TAKEOFFS — Nature Lake - Phase 1 Minor Development Order CG Olson, LLC Friday, November 22, 2013 item No. Description Unit Quantity Unit Cost Total Cost GENERAL CATEGORIES & EROSION CONTROL 1 __ | CONSTRUCTION ENTRANCE/EXIT - | ea | 100 | $2,500.00 | $2,500.00 2 |CLEARING & GRUBBING - | ac | 10.86 $3,500.00 $38,010.00 3 [STANDARD DUTYSILTFENCE - - uF | 24,666.00 $2.00 $49,332.00 4 __|HEAVY DUTY SILT FENCE ur | 0.00 $3.00 $0.00 5 _|INLET SEDIMENT TRAP (ON PAVEMENT) ea | 57.00 $42.71 $2,434.47 6 __ | TEMPORARY STABILIZATION (MULCH) ac | 138 $4,600.00 $6,348.00 7___|PERMANENT STABILIZATION (GRASS OR SOD) [as | 1.00 $53,000.00 $53,000.00 8 —_[6'CHAINLINKFENCE & GATE is | 1.00 $21,000.00 $21,000.00 ROADWAY SYSTEM & SITE WORK 1 |PARTHWORK - CUT AND FILL-ONSITE (IN PLACE VOLUME) cy | 55,770.00; $3.00 $167,310.00 2___|SUBGRADE STABILIZATION sy | 27,696.00 $2.00 "$55,392.00 3 _|8" MINIMUM GRADED AGGREGATE BASE COURSE OR APPROVED EQUAL sy | 22,590.00 $3.00 $67,770.00 | 4 _|ASPHALTIC CONCRETE PAVEMENTS | is | 100 $180,000.00 $180,000.00 5 24" CONCRETE ROLL CURB ur | 14,319.00 | $10.00 $143,190.00 6 _|18" STANDARD CURB AND GUTTER up | 234.00 $2,340.00 7 | STRIPING is 1.00 $3,500.00 | 8 |siGns [ts | 1.00 $10,000.00 7 $629,502.00 ce STORMWATER MANAGEMENT AND DRAINAGE SYSTEM y 1 |18X 20 £2648 W/TITE SLD HOPE PIPE. tr | 3,530.00 $15.49 $54,679.70 2 [24X20 F2648 W/TITE SLD HOPE PIPE | ur | 1,857.00 $22.59 $41,949.63 3 |30.X 20 F2648 W/TITE SLD HDPE PIPE ur | 87.00 | $28.75 $2,501.25 4 |36X 20 F2648 W/TITE SLO HOPE PIPE ; 7 Lp | 1,412.00 | $36.44 | $51,453.28 | 5 [42X20 F2648 W/TITE SLO HDPE PIPE 7 ir | 4700 | ~—-$47.98 | $2,255.06 6 —_|48X 20 F2648 W/TITE SLD HOPE PIPE ur | 290.00 $53.64 $15,555.60 7__|TYPE"C" INLET (0'-4") W/USF 6210 cA | 2.00 | $1,126.14 $2,252.28 8 TYPE "C” INLET (6'-8') W/USF 6211 FA | 3.00 $1,409.98 $4,229.94 | | 9 TYPE "D" OUTFALL (14"-16') W/USF 6607, NO SKIMMER | ea | 1.00 $2,750.34 $2,750.34 10 _TYPE"D" MODIFIED (12'-14') W/6" TOP, USF 6607 ca | 1.00 $2,531.16 $2,531.16 11__|TYPE"D" MODIFIED (18'-20') W/6" TOP, USF 6607 bea | 1.00 $3,193.71 $3,193.71 12 TYPE "D" INLET (4'-6') W/USF 6607 ea | 1100 | $1,651.06 $18,161.66 13 TYPED" INLET (6'-8") W/USF 6607 7 FA | 11.00 $1,819.22 $20,011.42 14 _|TYPE"D" INLET (8'-10') W/USF 6607 7 ; [ca | 1.00 $2,266.52 $2,266.52 15 TYPE "D" INLET (14'-16') W/USF 6607 - - lea | 200 | $2,735.87 $5,471.74 | 16 TYPED" INLET ('-10") W/USF 6607, 72" DIA. J-BOTTOM 7 ca | 2.00 $2,830.42 $5,660.84 17__|TYPE"D" INLET (6'-8') W/USF 6607, 60" DIA. J-BOTTOM - FA | 2.00 $2,256.22 $4,512.44 18 TYPE "D" INLET (4'-6') W/USF 6607 7 | ca | 9.00 $1,699.06 "$15,291.54 | 19 | TYPE "D" INLET (6'-8') W/USF 6607 cA | 5.00 $1,907.81 $9,539.05 | 20 TYPE "D" INLET (8'-10') W/USF 6607 - EA 100 | $2,117.81 7 $2,117.81 21 TYPE "D" INLET (4'-6') W/60" DIA. J-BOTTOM, USF 6607 | ea | 1.00 $2,045.02 | $2,045.02 22__|48" DIAMETER JUNCTION BOX (4'-6') W/USF 170 _ ca | 4.00 | $1,237.54 | $4,950.16 23 48" DIAMETER JUNCTION BOX (6'-8') W/USF 171 EA | 3.00 | $1,368.79 $4,106.37 24 48" DIAMETER JUNCTION BOX (8'-10') W/USF 172 EA 4.00 | $1,568.33 | $6,273.32 25 72" DIAMETER JUNCTION BOX (14'-16') W/USF 173 EA 1.00 $3,722.99 $3,722.99 26 72" DIAMETER JUNCTION BOX (10'-12') W/USF 174 EA | 1.00 $3,003.26 $3,003.26 | 27 MITERED END SECTION (12" PIPE) - EA | 1.00 $545.48 $545.48 | 28 MITERED END SECTION (18" PIPE) EA 3.00 | $787.23 $2,361.69 29 _|MITERED END SECTION (36" PIPE) : EA 0.00 $0.00 $0.00 30 MITERED END SECTION (42" PIPE) EA 1.00 $1,416.37 $1,416.37 31 MITERED END SECTION (48" PIPE) EA 2.00 $2,446.76 $4,893.52 32 36" FDOT INDEX 264 "U" ENDWALL _ EA 1.00 $1,864.89 $1,864.89 33/10" ADS-N-12 PERFORATED PIPE (BOTTOM FILTERS) - uF | 2,452.00 _ $18.00 $44,136.00 34 12" ADS-N-12 CIRCULAR DRAIN PIPE (OUTFALL) _ LF 154.00 $12.56 | $1,934.24 35 TYPE "D" OUTFALL (14'-16') W/USF 6607, NO SKIMMER EA 1.00 $2,750.34 $2,750.34 36 TYPE "D" MODIFIED (12'-14') W/6" TOP, USF 6607 ; FA | 1.00 $2,531.16 $2,531.16 37 _|TYPE"D" MODIFIED (18'-20') W/6" TOP, USF 6608 EA 1.00 $3,193.71 $3,193.71 38 [BEDDING STONE TN | 182.00 $68.75 $12,512.50 _| 39 CLEANOUTS FOR BOTTOM FILTER EA 26.00 $169.81 $4,415.06 40 [SAND FILTER MEDIA FOR FILTERS TN 2,413.00 $30.00 $72,390.00 41 |RIP-Rap | TN 206.00 $76.72 $15,804.32 - $461,235.37 $1,263,361.84 Notes: 1. Material costs for stormwater were determined based on bids from Southeastern Pipe and Precast, Inc. and HD Supply Waterworks. 2. Stormwater System item cost includes item cost and appurtenances. 3. Labor Costs were provided by Contractor

Related sources

Citation & reuse

“Okaloosa County BOCC — April 1, 2014 — Cost Estimate.” April 1, 2014. Cost Estimate. Crypt of Echoes evidence ID LED-2026-38d5e00294b54731bb81069593437579. https://cryptofechoes.com/evidence/LED-2026-38d5e00294b54731bb81069593437579. Accessed [date].

Public record of Okaloosa County, Florida.

Technical archive record ↓