READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — June 3, 2014 — LORD AND SON B2 — reading text

Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 62-LORD AND SON B2.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

pleted hundreds of local projects. The map below shows just a few of the projects Lord & Son has completed in the Fort Walton Beach/Shalimar area, but Lord & Son projects can be found all over the county, all the way from Crestview to Destin. ) NWF Regional Airport Eastside Development wot a? yenis Tumer Blvd OF (ies) [Garpiier Bayou May flow. (hus) Cinco Bayou ie (1838) |} Fort Walton Beach ugh: Emerald Coast Conference : [ ; Center Calvary Baptist Church ) (as Community Building) i ¢ & if = y indian Temple ound Museum Pomme FWB Recreation / Center Jobsite / Page 29 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Renovations to Building 810 (Gym) at Eglin AFB, FL Lord & Son provided Design/Build services for the renovation of Building 810, the main fitness center for Eglin Air Force Base. The building had to remain open to the public at all times during construction, so renovation had to be performed in phases. The renovations to the 1970s building included minor demolition of finishes in the lobby area, as well as offices and locker rooms. All new finishes (flooring, ceilings, painting) were installed, as well as much improved sound attenuation, surveillance system, fire alarm, and sauna duress alarms. Some new penetrations were required at masonry exterior walls that took advantage of a strong concrete structural system. Selective interior demolition involved non- load bearing interior partition in administrative office areas and the men’s locker room. Several new Openings were made through existing block walls. A new mechanical room with exterior doors was built on the west side of the building, occupying approximately 11’-0” x 20’ to house new mechanical equipment and upgrades. The new utility systems were designed around energy efficient equipment. All light fixtures had energy efficient ballasts and bulbs, and the HVAC system was chilled water with DDC controls. Plumbing _ fixtures were replaced with low flow models, and the hot water system balances flow and temperature to maximize economy. All common areas were equipped with emergency lighting, TV monitors, and oscillating fans. The entire interior was renovated to modern standards and was designed with high strength - low maintenance materials to provide lasting service. Project Team: Project Manager: Ryan Chavers Project Superintendent: Todd Powell Page 30 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEw OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Cost: At Award: $1,505,100.00 Final Cost: $1,597,368.00 Reason for the cost growth: Owner requested modifications. Construction Dates: Start Date: September 26, 2011 Final Completion: April 1, 2013 Owner: 96 AAC/PKOA, Department of the Air Force 308 West D Avenue Eglin AFB, FL 32542 Ms. Marina Hobson 850-882-0245 (P) 850-882-1680 (F) marina.hobson @eglin.af.mil Architect: DC Architects, Inc. 139 Beal Parkway, Suite 101 Fort Walton Beach, FL 32548 850-433-8632 (P) 850-226-8565 (F) dchavez@dcarchitects.com Page 31 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Additions and Renovations to Crestview High School in Crestview, FL we be. &, _ Lord & Son was the General Contractor for the new construction of a 28,000 square foot five classroom addition and 12,500 square foot addition and new construction to the existing Field House to include a new weight room, locker room, team rooms, and coach offices. The classroom addition also included the renovation of the existing weight room that was converted into three new classrooms and office space for teachers. The project included typical school interior and exterior finishes (painted CMU, gyp board, ceramic tile and epoxy flooring in the bathroos, VCT floors throughout the balance). The exterior was a mixture of brick over load-bearing masonry, painted exposed CMU, and metal framing with EIFS. The roofing system was composed of standing seam metal roofing on all new construction with Tremco roofing products on all existing and connecting construction. The mechanical systems were DX HVAC systems with 100% Outside Air Units—package rooftop units for the Field House and split ground systems for the five classroom addition. The work began in November and had to be complete and ready for the start of the next school year. The work was phased. Equipment/material deliveries had to be scheduled around the arrival and departure of the buses each day because the site was within the bus loop, and we could not block the loop in the mornings from 6:45 am to 7:30 am or in the afternoons from 2:00 pm to 2:30 pm. We had to schedule out concrete deliveries to coincide with the school traffic. We were able to complete the various phases and had all the rooms ready for occupancy prior to the start of the school year—four days ahead of schedule. Page 32 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: Ryan Chavers Project Superintendent: Hiram Atwell Construction Cost: At Award: $1,685,100.00 Final Cost: $1,742,522.00 Reason for the cost growth: Owner requested changes. Construction Dates: Start Date: October 26, 2007 Final Completion: July 25, 2008 Owner: Okaloosa County School Board, Represented by Jacobs/Titan 120 Lowery Place Fort Walton Beach, FL 32548 Mr. Joel Lindner 850-897-6199 (P) 850--897-0123 (F) joel.lindner@jacobs.com Architect: Jacobs/Titan 1501 Merchants Way Niceville, FL 32578 850-897-6199 Page 33 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF’S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE First United Methodist Church Children’s Education Building in Niceville, FL Lord & Son provided General Contractor services to construct this two-story 32,000 square foot building to house the church’s preschool and Sunday School programs. The building includes 25 classrooms, 10 re- strooms, children’s worship area, theater/stage, three separate lobby areas, indoor playground, and support spaces. Exterior construction is concrete block with steel beams and columns, metal roof panels with steel roof beam system, and brick veneer. Interior finishes include gypsum sheetrock, bamboo wainscoting/chair rail, fabric awnings, thatched roofing, and carpet and ceramic tiles. Additional unique interior finishes feature porthole wood doors and extensive wall coverings by Wacky World of Orlando. The underwater —themed first floor depicts a lifelike submarine, dolphins, and sharks swimming overhead, while the dockside-themed theater and classrooms are on the sec- ond floor. Hydraulic elevator, fire sprinkler, alarm systems, HVAC system, covered driveway and walkways, landscaping, and sprinkler system round out the project. The entire building was built to provide a safe and secure place to grow and learn. Security cameras, entrance and exit monitoring, and computerized sign-in/dismissal program allow children to move throughout the building while maintaining a high level of safety. Page 34 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: John Klumpp Project Superintendent: Ronnie Jordan Construction Cost: At Award: $5,736,600.00 Final Cost: $5,986,026.00 Reason for the cost growth: Owner requested changes Construction Dates: Start Date: July 3, 2008 Final Completion: August 23, 2009 Owner: First United Methodist Church 214 S. Partin Drive Niceville, FL 32578 Mr. John Macon 850-443-4411 (P) 850--678-2222 (F) jmacon@nicevilleumc.com Architect: Quina Grundhoefer Royal Architects 400 West Romana Street Pensacola, FL 32501 850-433-5575 (P) 850-433-5366 (F) STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Northwest Florida Regional Airport Eastside Development at Eglin AFB, FL Lord & Son provided General Contracting services (Prime Contractor) for this 22 acre development which included a 130,000 gallon fuel farm, five buildings (a 38,000 square foot rental car administrative/ maintenance building, fuel islands and tenant storage building, a 5000 square foot 5-bay automatic car wash, a fuel operator shed and fuel tank storage area, a 12,800 square foot cargo and maintenance facility with 10 car lifts), parking lots, public and private roads, extensive site utilities, landscaping, security cameras, and access control systems. This project was the recipient of the 2009 ABC Eagle Award for Excellence in Construction in the GC/CM Insti- tutional $10 - $20 Million category and ABC Gold Level STEP (Safety Training and Evaluation Process) Award. Project Team: Project Manager: John Klumpp Project Superintendent: Jack Harris Construction Cost: At Award: $14,728,600.00 Final Cost: $15,037.560.00 Reason for the cost growth: Owner requested changes. Page 36 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: Start Date: January 7, 2008 Final Completion: July 6, 2009 Note: Final changes were issued for revisions to the fuel farm late in the schedule, which required waiting for County Board approval, delaying start and completion of these extensive changes. Owner: NWF Regional Airport State Road 85 Eglin AFB, FL 32542 Mr. Tracy Stage, Airports Project Manager 850-651-7160, ext. 4 (P) 850-651-7164 (F) tstage@co.okaloosa.fl.us Architect: LPA Group 1320 Executive Center Drive, Suite 100 Tallahassee, FL 32301 850-205-0460 (P) 850-205-0451 (F) STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Beach Community Bank in Crestview, FL Lord & Son provided General Contractor services for this one-story, 6,159 square foot banking facility. Con- struction consisted of load bearing masonry with metal bar joists, standing seam metal and single-ply roof, and stucco and hardiboard lap siding exterior finish. Interior finishes included carpet, ceramic tile, VCT, gran- ite countertops, gypboard, and tongue and groove wood paneling. This project required coordination of own- er-provided bank equipment, which included bank teller trays, pneumatic tube system, vault, ATM, and secu- rity system. Complete site development and landscaping was required. Work included the installation of cast-in place concrete retaining wall, lift station and force main, installation of new traffic signal and turning/deceleration lane. Irrigation system included installation of new pump and well. Special features included a force main with grinder pump and jack/bore utilities under State Highway 85. Bid documents called for the building pad to be prepared by the owner’s forces; however, the work was found to be substandard and had to be removed and reinstalled. Lord & Son completed the remedial work in a fast-track method in order to minimize impact to the project schedule and reduce costs to the owner. The project was completed six days ahead of schedule. Attention to detail during the construction process result- ed in a minimal punch list that was completed and signed off by the owner within one week. Page 38 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: Mike O’Grady Project Superintendent: Todd Powell Construction Cost: At Award: $1,865,200.00 Final Cost: $2,150,132.00 Reason for the cost growth:

Download this text file with its original spacing ↓