June 3, 2014

Okaloosa County BOCC — June 3, 2014 — LORD AND SON B2

Okaloosa County Board of County Commissioners lord and son b2 for the June 3, 2014 meeting. Official document preserved from the county IQM2 public portal, with a searchable OCR text layer.

FILED WITH

About this source

LORD AND SON B2 from the Okaloosa County BOCC meeting of June 3, 2014 (IQM2 meeting #1200). Original portal label: LORD AND SON B2. Preserved as a historical public record; part of the meeting linked as a related source.

Original publication
LORD AND SON B2
Date
June 3, 2014
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Machine produced / unreviewed — machine-extracted, not yet human-corrected
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

LORD AND SON B2 (PDF)

Original PDF as published on the Okaloosa County IQM2 meeting portal.

PDF · 6.7 MB

Download ↓

Machine-extracted text — 62-LORD AND SON B2.pdf

Text extracted on 2026-10-31 from 62-LORD AND SON B2.pdf using optical character recognition (ocrmypdf/tesseract). Not human-corrected; may contain recognition errors. Read alongside the source images.

Text · 23.8 KB

Download ↓

Full text

Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.

STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: Start Date: June 9, 2008 Final Completion: December 16, 2009 Owner: Mr. John Bozarth Bay District Schools 1311 Balboa Avenue Panama City, FL 32405 850-767-4205 (P)| 850-747-5378 (F) bozarjl@bay.k12.fl.us Architect: Harvard Jolly, Inc. 2714 Dr. Martin Luther King, Jr. Street N St. Petersburg, FL 33704 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CONSTRUCTION MANAGEMENT EXPERIENCE Gold’s Gym in Fort Walton Beach, FL ——$——— — BC OLD'S Gyy Lord & Son performed a total interior demolition and reconstruction of an existing telecommunications office building to build this 10,000 SF one-story fitness facility with storage loft. All existing non-load bearing walls, finishes, electrical, plumbing, and interior HVAC were removed. All new interior walls were constructed, and new electrical (lights, floor boxes, security, telecommunications, TV, and data) was installed. Restrooms and showers were added, and the existing concrete slabs were saw-cut and removed so new plumbing could be roughed in as required. Interior finishes included high-impact commercial epoxy flooring with integral base in all corridors, changing areas, restrooms, and showers. New plumbing lines, fixtures, and equipment were in- stalled to meet the new requirements of the change of building use and layout. All new HVAC ductwork fans and units were added to provide the necessary air flow and ventilation to many diverse areas (spin rooms, free-weight areas, cardio room, aerobics rooms, restrooms, changing areas/locker rooms, and office areas). Cherry casework with granite countertops were installed in the administrative areas. The existing stucco exterior was steam-cleaned, and all expansion and window frame joints were re-caulked to ensure a watertight envelope. Elastometric paint was applied to all exterior surfaces to complete the exte- rior shell improvements. Extensive site development (new water, sanitary sewer, storm piping, landscaping, irrigation, and parking spaces) was included in the scope of work. The compact site did not allow for traditional retention ponds for surface water run-off collection. To meet these needs, an under drain system was installed beneath the park- ing areas. Changes to Florida DOT right-of-way connections were requested by the owner as an addition to the original scope of work. The project was completed two months earlier than originally scheduled so the owner could meet the dead- line for closing on the construction loan for the project. Failure to meet the deadline would have cost the owner tens of thousands of dollars in fees and interest payments. Page 21 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: Ryan Chavers Project Superintendent: Darrin Taylor Construction Cost: At Award: $1,123,511.00 Final Cost: $1,152,830.00 Reason for the cost growth: Owner requested upgrades and modifications to finishes and layouts. A Construction Dates: Start Date: July 2007 Final Completion: May 17, 2008 Owner: All-Fitness, Inc. /d.b.a. Gold’s Gym 12200 Emerald Coast Parkway Destin, FL 32541 Mike and Stephanie Lobner 850-863-3222 (P) stephuf@cox.net Architect: Doughtery + Chavez Architects 4300 Legendary Drive Building C, Suite 240 Destin, FL 32541 850-650-5881 (P) Page 22 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CONSTRUCTION MANAGEMENT EXPERIENCE O’Sullivan Creel Office Building in Fort Walton Beach, FL Lord & Son provided Construction Management services for this three story office building with 34,000 SF. The structure is comprised of load bearing masonry with structural steel bar joists and metal deck. Exterior features include standing seam metal roof, stucco, precast concrete, barrel roof, and metal railings. Unique features include an exterior exposed wood roof deck, aluminum eyebrow structure, and a covered porch on the third floor level. Interior features include metal stud and gypsum board walks, wood base and crown moulding, ceramic tile floors, stone flooring, carpet, cabinets, and granite countertops. This project included energy-saving materials and design parameters such as daylight harvesting, occupancy sensors, nighttime HVAC modulation, and green building materials. The mechanical system is a split system with an outside air unit and VAV controls. The electrical work included full data and telecommunications systems along with an automated lighting control system. The sitework included an asphalt parking area, curbs, walks, a storm re- tention pond, and landscaping. This project was accomplished on a fast-track schedule. Project Team: Project Manager: Mike O’Grady Project Superintendent: Dave Burleson Construction Cost: At Award: $5,169,800.00 Final Cost: $5,150,612.00 Reason for the cost growth: The contract included a $300,000 design contingency of which only $280,000 was spent on changes and upgrades. Page 23 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: Scheduled Completion: March 17, 2008 Final Completion: August 28, 2009 Owner: O’Sullivan Creel 45 Eglin Parkway, Suite 301 Fort Walton Beach, FL 32548 Mr. Jody Henderson 850-244-5121 (P) 850-664-2562 (F) joseph.henderson@warrenaverett.com Architect: DAG Architects 1223 Airport Road Destin, FL 32541 850-837-8152 (P) 850-654-4276 (F) STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NeW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CONSTRUCTION MANAGEMENT EXPERIENCE Legendary Offices in Destin, FL Lord & Son provided Construction Management services for the construction of two four story office buildings - the first being 34,000 square feet and the second being 22,728 square feet. The buildings consisted of structural steel frames with engineered light-gauge metal stud walls with concrete slabs on metal decking. The exterior of the two buildings consisted of Exterior Insulation and Finish System (EIFS) and concrete roof tiles. Inside, the units were finished with various wall coverings, ceramic tile, custom cabinetry, and wood trim. Legendary Office Building, Inc. selected Lord & Son to construct the second building based on their performance on the first building. Project Team: Building One: Project Manager: Jeff Neidigh Project Superintendent: Ed Davidson Page 25 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Building Two: Project Manager: Leven D. Lord, II Project Superintendent: Ricky Thompson Construction Cost: Building One: At Award: $1,982,225 Final Cost: $3,000,000.00 Building Two: At Award: $2,974,300.00 Final Cost: $3,055,800.00 Construction Dates: Building One: Start Date: 2000 Final Completion: March 2001 Building Two: Start Date: 2005 Final Completion: November 27, 2006 Owner: Legendary Office Building, Inc. 385 E. Highway 98, Suite 60 Destin, FL 32541 Architect: Building One: Prescott Architects 625 E. Highway 98 Destin, FL 32541 Mr. Jeff Prescott (850) 837-6494 Building Two: Dougherty + Chavez Architects 4300 Legendary Drive Building C, Suite 240 Destin, FL 32541 (850) 650-5881 Page 26 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CURRENT WORKLOAD AND CAPACITY - LORD & SON Surfside Owners Assoc. neers Attention: CESAM-CD-GH P.O. Box 9217 Hurlburt Field, FL 32544 850-884-6491 (P) Surfside Resort DC Architects, Inc. $0.3M Prime 60 days after start Second Floor Build-Out | 1096 Scenic Gulf Dr., Ste C 54 Beal Pkwy NW date (TBD - 101 Fort Walton Beach, FL Project has just Miramar Beach, FL 32548 32548 started) 850-226-8565 (P) 850-362-6570 (F) Air Force Enlisted Air Force Enlisted Village | Noelker and Hull Assoc. Not yet | Prime - CM @ Risk | TBD - Project has Village 5 92 Sunset Lane 30 West King Street finalized just started Shalimar, FL 32579 Chambersburg, PA James Binnicker, President 17201 850-651-3766 (P) 717-263-8464 (P) 850-651-4461 (F) 717-263-6031 (F) binnicker@afev.us Michael Hull mhull@noelkerhull.com Airport Police Station | Okaloosa County Airports LPA Group $0.08 M Prime April 21, 2014 State Road 85 1320 Executive Center Eglin AFB, FL 32542 Suite 100 Tracy Stage Tallahassee, FL 32301 850-651-7160 ext. 4 (P) 850-205-0460 (P) 850-651-7164 (F) 850-205-0461 (F) Surf Hut Restaurant Driftwood on the Gulf Prescott Architects, Inc. $1.3M Prime-Negotiated May 04, 2014 988 Airport Road 625 Harbor Blvd., Ste 6 Destin, FL 32541 Destin, FL 32541 Mr. Robert Bonezzi 850-837-6494 (P) 850-650-4725 (P) Hangar 71 AFTC/PZIOC Same as Owner $1.4M Prime March 23, 2015 308 West D Ave, Ste 130 Eglin AFB, FL 32542 Christine Young 850-882-9120 (P) 850-882-9442 (F) christine.young@eglin.af.mil Hurlburt Fuel Cell Department of the Army Same as Owner $0.6 M Sub to September 23, Renovation U.S. Army Corps of Engi- Nova Group, Inc. 2014 185 Devlin Road P.O. Box 4050 Napa, CA 94558 Chris Mathies 707-257-3200 (P) 707-265-1199 (F) cmathies@novagrp.com Page 27 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CURRENT WORKLOAD AND CAPACITY “Walton Middle | Elliot Marshall Innes, PA Prime - CM @ Risk Pre-Construction Walton County School Board $27M School Pre- 145 S. Park Street, Suite 3 251 E 7th Avenue In Design Construction DeFuniak Springs, FL 32435 Tallahassee, FL 32303 Mark Gardner 850-892-1100 x 1810 (P) 850-892-1198 (F) gardnerm @walton.k12.fl.us Rosemary Beach Rosemary Beach Property DAG Architects $3.8M Prime October 1, 2014 Owner’s Center Owners Association, Inc. 1223 Airport Rd. 200 W. Water Street Destin, FL 32541 Rosemary Beach, FL 32461 850-837-8152 (P) 850-231-1861 (P) 850-654-4276 (F) 850-231-1211 (F) marie@rosemarybeachfl.org Shalimar Admin- Okaloosa County BCC DAG Architects $6.0M Prime- CM @ Risk | Pre-Construction istration Building - 1804 Lewis Turner Blvd 1223 Airport Rd. In Design Preconstruction Fort Walton Beach, FL 32547 Destin, FL 32541 Jim Curry 850-837-8152 (P) 850-651-7515 (P) 850-654-4276 (F) 850-651-7551 (F) managerinfo@co.okaloosa.fl Fort Walton Beach City of Fort Walton Beach DC Architects, Inc. $8.1M Prime - CM @ Risk | July 28, 2014 Recreation Center 107 Miracle Strip Pkwy 139 Beal Pkwy, Ste 101 Fort Walton Beach, FL 32547 Fort Walton Beach, FL Michael Beedie 32548 850-833-9504 (P) 850-433-8632 (P) 850-833-9640 (F) 850-226-8565 (F) fwbcmgr@fwb.org dchavez@dcarchitectsinc.com CURRENT WORKLOAD AND CAPACITY - PROJECT TEAM Dave Burleson, our proposed Project Manager, has recently completed a remodeling project for the Club Intrawest resort in Sandestin, FL. He is also working on a renovation project for the Walton County TDC in Santa Rosa Beach, FL, but this project was substantially completed in March. Dave will also be working on the upcoming renovation and asbestos abatement project for the Okaloosa County Administration Building in Shalimar, FL. Jack Harris, our proposed Project Superintendent, has recently completed the construction of a new Sherwin Williams building in Destin, FL. Jack will also be working on the upcoming Air Force Enlisted Village V (Independent Living Facility and Clubhouse) project. "FBon Page 28 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR As a leader in the construction industry in Okaloosa County for over 37 years, Lord & Son Construction has com- pleted hundreds of local projects. The map below shows just a few of the projects Lord & Son has completed in the Fort Walton Beach/Shalimar area, but Lord & Son projects can be found all over the county, all the way from Crestview to Destin. ) NWF Regional Airport Eastside Development wot a? yenis Tumer Blvd OF (ies) [Garpiier Bayou May flow. (hus) Cinco Bayou ie (1838) |} Fort Walton Beach ugh: Emerald Coast Conference : [ ; Center Calvary Baptist Church ) (as Community Building) i ¢ & if = y indian Temple ound Museum Pomme FWB Recreation / Center Jobsite / Page 29 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Renovations to Building 810 (Gym) at Eglin AFB, FL Lord & Son provided Design/Build services for the renovation of Building 810, the main fitness center for Eglin Air Force Base. The building had to remain open to the public at all times during construction, so renovation had to be performed in phases. The renovations to the 1970s building included minor demolition of finishes in the lobby area, as well as offices and locker rooms. All new finishes (flooring, ceilings, painting) were installed, as well as much improved sound attenuation, surveillance system, fire alarm, and sauna duress alarms. Some new penetrations were required at masonry exterior walls that took advantage of a strong concrete structural system. Selective interior demolition involved non- load bearing interior partition in administrative office areas and the men’s locker room. Several new Openings were made through existing block walls. A new mechanical room with exterior doors was built on the west side of the building, occupying approximately 11’-0” x 20’ to house new mechanical equipment and upgrades. The new utility systems were designed around energy efficient equipment. All light fixtures had energy efficient ballasts and bulbs, and the HVAC system was chilled water with DDC controls. Plumbing _ fixtures were replaced with low flow models, and the hot water system balances flow and temperature to maximize economy. All common areas were equipped with emergency lighting, TV monitors, and oscillating fans. The entire interior was renovated to modern standards and was designed with high strength - low maintenance materials to provide lasting service. Project Team: Project Manager: Ryan Chavers Project Superintendent: Todd Powell Page 30 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEw OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Cost: At Award: $1,505,100.00 Final Cost: $1,597,368.00 Reason for the cost growth: Owner requested modifications. Construction Dates: Start Date: September 26, 2011 Final Completion: April 1, 2013 Owner: 96 AAC/PKOA, Department of the Air Force 308 West D Avenue Eglin AFB, FL 32542 Ms. Marina Hobson 850-882-0245 (P) 850-882-1680 (F) marina.hobson @eglin.af.mil Architect: DC Architects, Inc. 139 Beal Parkway, Suite 101 Fort Walton Beach, FL 32548 850-433-8632 (P) 850-226-8565 (F) dchavez@dcarchitects.com Page 31 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Additions and Renovations to Crestview High School in Crestview, FL we be. &, _ Lord & Son was the General Contractor for the new construction of a 28,000 square foot five classroom addition and 12,500 square foot addition and new construction to the existing Field House to include a new weight room, locker room, team rooms, and coach offices. The classroom addition also included the renovation of the existing weight room that was converted into three new classrooms and office space for teachers. The project included typical school interior and exterior finishes (painted CMU, gyp board, ceramic tile and epoxy flooring in the bathroos, VCT floors throughout the balance). The exterior was a mixture of brick over load-bearing masonry, painted exposed CMU, and metal framing with EIFS. The roofing system was composed of standing seam metal roofing on all new construction with Tremco roofing products on all existing and connecting construction. The mechanical systems were DX HVAC systems with 100% Outside Air Units—package rooftop units for the Field House and split ground systems for the five classroom addition. The work began in November and had to be complete and ready for the start of the next school year. The work was phased. Equipment/material deliveries had to be scheduled around the arrival and departure of the buses each day because the site was within the bus loop, and we could not block the loop in the mornings from 6:45 am to 7:30 am or in the afternoons from 2:00 pm to 2:30 pm. We had to schedule out concrete deliveries to coincide with the school traffic. We were able to complete the various phases and had all the rooms ready for occupancy prior to the start of the school year—four days ahead of schedule. Page 32 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: Ryan Chavers Project Superintendent: Hiram Atwell Construction Cost: At Award: $1,685,100.00 Final Cost: $1,742,522.00 Reason for the cost growth: Owner requested changes. Construction Dates: Start Date: October 26, 2007 Final Completion: July 25, 2008 Owner: Okaloosa County School Board, Represented by Jacobs/Titan 120 Lowery Place Fort Walton Beach, FL 32548 Mr. Joel Lindner 850-897-6199 (P) 850--897-0123 (F) joel.lindner@jacobs.com Architect: Jacobs/Titan 1501 Merchants Way Niceville, FL 32578 850-897-6199 Page 33 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF’S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE First United Methodist Church Children’s Education Building in Niceville, FL Lord & Son provided General Contractor services to construct this two-story 32,000 square foot building to house the church’s preschool and Sunday School programs. The building includes 25 classrooms, 10 re- strooms, children’s worship area, theater/stage, three separate lobby areas, indoor playground, and support spaces. Exterior construction is concrete block with steel beams and columns, metal roof panels with steel roof beam system, and brick veneer. Interior finishes include gypsum sheetrock, bamboo wainscoting/chair rail, fabric awnings, thatched roofing, and carpet and ceramic tiles. Additional unique interior finishes feature porthole wood doors and extensive wall coverings by Wacky World of Orlando. The underwater —themed first floor depicts a lifelike submarine, dolphins, and sharks swimming overhead, while the dockside-themed theater and classrooms are on the sec- ond floor. Hydraulic elevator, fire sprinkler, alarm systems, HVAC system, covered driveway and walkways, landscaping, and sprinkler system round out the project. The entire building was built to provide a safe and secure place to grow and learn. Security cameras, entrance and exit monitoring, and computerized sign-in/dismissal program allow children to move throughout the building while maintaining a high level of safety. Page 34 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: John Klumpp Project Superintendent: Ronnie Jordan Construction Cost: At Award: $5,736,600.00 Final Cost: $5,986,026.00 Reason for the cost growth: Owner requested changes Construction Dates: Start Date: July 3, 2008 Final Completion: August 23, 2009 Owner: First United Methodist Church 214 S. Partin Drive Niceville, FL 32578 Mr. John Macon 850-443-4411 (P) 850--678-2222 (F) jmacon@nicevilleumc.com Architect: Quina Grundhoefer Royal Architects 400 West Romana Street Pensacola, FL 32501 850-433-5575 (P) 850-433-5366 (F) STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Northwest Florida Regional Airport Eastside Development at Eglin AFB, FL Lord & Son provided General Contracting services (Prime Contractor) for this 22 acre development which included a 130,000 gallon fuel farm, five buildings (a 38,000 square foot rental car administrative/ maintenance building, fuel islands and tenant storage building, a 5000 square foot 5-bay automatic car wash, a fuel operator shed and fuel tank storage area, a 12,800 square foot cargo and maintenance facility with 10 car lifts), parking lots, public and private roads, extensive site utilities, landscaping, security cameras, and access control systems. This project was the recipient of the 2009 ABC Eagle Award for Excellence in Construction in the GC/CM Insti- tutional $10 - $20 Million category and ABC Gold Level STEP (Safety Training and Evaluation Process) Award. Project Team: Project Manager: John Klumpp Project Superintendent: Jack Harris Construction Cost: At Award: $14,728,600.00 Final Cost: $15,037.560.00 Reason for the cost growth: Owner requested changes. Page 36 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: Start Date: January 7, 2008 Final Completion: July 6, 2009 Note: Final changes were issued for revisions to the fuel farm late in the schedule, which required waiting for County Board approval, delaying start and completion of these extensive changes. Owner: NWF Regional Airport State Road 85 Eglin AFB, FL 32542 Mr. Tracy Stage, Airports Project Manager 850-651-7160, ext. 4 (P) 850-651-7164 (F) tstage@co.okaloosa.fl.us Architect: LPA Group 1320 Executive Center Drive, Suite 100 Tallahassee, FL 32301 850-205-0460 (P) 850-205-0451 (F) STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR LOCAL PROJECT EXPERIENCE Beach Community Bank in Crestview, FL Lord & Son provided General Contractor services for this one-story, 6,159 square foot banking facility. Con- struction consisted of load bearing masonry with metal bar joists, standing seam metal and single-ply roof, and stucco and hardiboard lap siding exterior finish. Interior finishes included carpet, ceramic tile, VCT, gran- ite countertops, gypboard, and tongue and groove wood paneling. This project required coordination of own- er-provided bank equipment, which included bank teller trays, pneumatic tube system, vault, ATM, and secu- rity system. Complete site development and landscaping was required. Work included the installation of cast-in place concrete retaining wall, lift station and force main, installation of new traffic signal and turning/deceleration lane. Irrigation system included installation of new pump and well. Special features included a force main with grinder pump and jack/bore utilities under State Highway 85. Bid documents called for the building pad to be prepared by the owner’s forces; however, the work was found to be substandard and had to be removed and reinstalled. Lord & Son completed the remedial work in a fast-track method in order to minimize impact to the project schedule and reduce costs to the owner. The project was completed six days ahead of schedule. Attention to detail during the construction process result- ed in a minimal punch list that was completed and signed off by the owner within one week. Page 38 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: Mike O’Grady Project Superintendent: Todd Powell Construction Cost: At Award: $1,865,200.00 Final Cost: $2,150,132.00 Reason for the cost growth: Owner requested changes | Construction Dates: Start Date: January 7, 2008 Final Completion: February 5, 2009 Owner: Beach Community Bank 17 SE Eglin Parkway Fort Walton Beach, FL 32548 Mr. Gary Pelham 850-259-6728 (P) 850--315-3501 (F) Architect: DAG Architects 1223 Airport Road Destin, FL 32541 850-837-8152 (P) 850-654-4276 (F) Page 39

Related sources

Citation & reuse

“Okaloosa County BOCC — June 3, 2014 — LORD AND SON B2.” June 3, 2014. LORD AND SON B2. Crypt of Echoes evidence ID LED-2026-377b82608aaa4e9080860aa0249b02ec. https://cryptofechoes.com/evidence/LED-2026-377b82608aaa4e9080860aa0249b02ec. Accessed [date].

Public record of Okaloosa County, Florida.

Technical archive record ↓