READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — June 3, 2014 — LORD AND SON B2 — reading text

Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 62-LORD AND SON B2.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: Start Date: June 9, 2008 Final Completion: December 16, 2009 Owner: Mr. John Bozarth Bay District Schools 1311 Balboa Avenue Panama City, FL 32405 850-767-4205 (P)| 850-747-5378 (F) bozarjl@bay.k12.fl.us Architect: Harvard Jolly, Inc. 2714 Dr. Martin Luther King, Jr. Street N St. Petersburg, FL 33704 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CONSTRUCTION MANAGEMENT EXPERIENCE Gold’s Gym in Fort Walton Beach, FL ——$——— — BC OLD'S Gyy Lord & Son performed a total interior demolition and reconstruction of an existing telecommunications office building to build this 10,000 SF one-story fitness facility with storage loft. All existing non-load bearing walls, finishes, electrical, plumbing, and interior HVAC were removed. All new interior walls were constructed, and new electrical (lights, floor boxes, security, telecommunications, TV, and data) was installed. Restrooms and showers were added, and the existing concrete slabs were saw-cut and removed so new plumbing could be roughed in as required. Interior finishes included high-impact commercial epoxy flooring with integral base in all corridors, changing areas, restrooms, and showers. New plumbing lines, fixtures, and equipment were in- stalled to meet the new requirements of the change of building use and layout. All new HVAC ductwork fans and units were added to provide the necessary air flow and ventilation to many diverse areas (spin rooms, free-weight areas, cardio room, aerobics rooms, restrooms, changing areas/locker rooms, and office areas). Cherry casework with granite countertops were installed in the administrative areas. The existing stucco exterior was steam-cleaned, and all expansion and window frame joints were re-caulked to ensure a watertight envelope. Elastometric paint was applied to all exterior surfaces to complete the exte- rior shell improvements. Extensive site development (new water, sanitary sewer, storm piping, landscaping, irrigation, and parking spaces) was included in the scope of work. The compact site did not allow for traditional retention ponds for surface water run-off collection. To meet these needs, an under drain system was installed beneath the park- ing areas. Changes to Florida DOT right-of-way connections were requested by the owner as an addition to the original scope of work. The project was completed two months earlier than originally scheduled so the owner could meet the dead- line for closing on the construction loan for the project. Failure to meet the deadline would have cost the owner tens of thousands of dollars in fees and interest payments. Page 21 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Project Team: Project Manager: Ryan Chavers Project Superintendent: Darrin Taylor Construction Cost: At Award: $1,123,511.00 Final Cost: $1,152,830.00 Reason for the cost growth: Owner requested upgrades and modifications to finishes and layouts. A Construction Dates: Start Date: July 2007 Final Completion: May 17, 2008 Owner: All-Fitness, Inc. /d.b.a. Gold’s Gym 12200 Emerald Coast Parkway Destin, FL 32541 Mike and Stephanie Lobner 850-863-3222 (P) stephuf@cox.net Architect: Doughtery + Chavez Architects 4300 Legendary Drive Building C, Suite 240 Destin, FL 32541 850-650-5881 (P) Page 22 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CONSTRUCTION MANAGEMENT EXPERIENCE O’Sullivan Creel Office Building in Fort Walton Beach, FL Lord & Son provided Construction Management services for this three story office building with 34,000 SF. The structure is comprised of load bearing masonry with structural steel bar joists and metal deck. Exterior features include standing seam metal roof, stucco, precast concrete, barrel roof, and metal railings. Unique features include an exterior exposed wood roof deck, aluminum eyebrow structure, and a covered porch on the third floor level. Interior features include metal stud and gypsum board walks, wood base and crown moulding, ceramic tile floors, stone flooring, carpet, cabinets, and granite countertops. This project included energy-saving materials and design parameters such as daylight harvesting, occupancy sensors, nighttime HVAC modulation, and green building materials. The mechanical system is a split system with an outside air unit and VAV controls. The electrical work included full data and telecommunications systems along with an automated lighting control system. The sitework included an asphalt parking area, curbs, walks, a storm re- tention pond, and landscaping. This project was accomplished on a fast-track schedule. Project Team: Project Manager: Mike O’Grady Project Superintendent: Dave Burleson Construction Cost: At Award: $5,169,800.00 Final Cost: $5,150,612.00 Reason for the cost growth: The contract included a $300,000 design contingency of which only $280,000 was spent on changes and upgrades. Page 23 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: Scheduled Completion: March 17, 2008 Final Completion: August 28, 2009 Owner: O’Sullivan Creel 45 Eglin Parkway, Suite 301 Fort Walton Beach, FL 32548 Mr. Jody Henderson 850-244-5121 (P) 850-664-2562 (F) joseph.henderson@warrenaverett.com Architect: DAG Architects 1223 Airport Road Destin, FL 32541 850-837-8152 (P) 850-654-4276 (F) STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NeW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CONSTRUCTION MANAGEMENT EXPERIENCE Legendary Offices in Destin, FL Lord & Son provided Construction Management services for the construction of two four story office buildings - the first being 34,000 square feet and the second being 22,728 square feet. The buildings consisted of structural steel frames with engineered light-gauge metal stud walls with concrete slabs on metal decking. The exterior of the two buildings consisted of Exterior Insulation and Finish System (EIFS) and concrete roof tiles. Inside, the units were finished with various wall coverings, ceramic tile, custom cabinetry, and wood trim. Legendary Office Building, Inc. selected Lord & Son to construct the second building based on their performance on the first building. Project Team: Building One: Project Manager: Jeff Neidigh Project Superintendent: Ed Davidson Page 25 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Building Two: Project Manager: Leven D. Lord, II Project Superintendent: Ricky Thompson Construction Cost: Building One: At Award: $1,982,225 Final Cost: $3,000,000.00 Building Two: At Award: $2,974,300.00 Final Cost: $3,055,800.00 Construction Dates: Building One: Start Date: 2000 Final Completion: March 2001 Building Two: Start Date: 2005 Final Completion: November 27, 2006 Owner: Legendary Office Building, Inc. 385 E. Highway 98, Suite 60 Destin, FL 32541 Architect: Building One: Prescott Architects 625 E. Highway 98 Destin, FL 32541 Mr. Jeff Prescott (850) 837-6494 Building Two: Dougherty + Chavez Architects 4300 Legendary Drive Building C, Suite 240 Destin, FL 32541 (850) 650-5881 Page 26 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CURRENT WORKLOAD AND CAPACITY - LORD & SON Surfside Owners Assoc. neers Attention: CESAM-CD-GH P.O. Box 9217 Hurlburt Field, FL 32544 850-884-6491 (P) Surfside Resort DC Architects, Inc. $0.3M Prime 60 days after start Second Floor Build-Out | 1096 Scenic Gulf Dr., Ste C 54 Beal Pkwy NW date (TBD - 101 Fort Walton Beach, FL Project has just Miramar Beach, FL 32548 32548 started) 850-226-8565 (P) 850-362-6570 (F) Air Force Enlisted Air Force Enlisted Village | Noelker and Hull Assoc. Not yet | Prime - CM @ Risk | TBD - Project has Village 5 92 Sunset Lane 30 West King Street finalized just started Shalimar, FL 32579 Chambersburg, PA James Binnicker, President 17201 850-651-3766 (P) 717-263-8464 (P) 850-651-4461 (F) 717-263-6031 (F) binnicker@afev.us Michael Hull mhull@noelkerhull.com Airport Police Station | Okaloosa County Airports LPA Group $0.08 M Prime April 21, 2014 State Road 85 1320 Executive Center Eglin AFB, FL 32542 Suite 100 Tracy Stage Tallahassee, FL 32301 850-651-7160 ext. 4 (P) 850-205-0460 (P) 850-651-7164 (F) 850-205-0461 (F) Surf Hut Restaurant Driftwood on the Gulf Prescott Architects, Inc. $1.3M Prime-Negotiated May 04, 2014 988 Airport Road 625 Harbor Blvd., Ste 6 Destin, FL 32541 Destin, FL 32541 Mr. Robert Bonezzi 850-837-6494 (P) 850-650-4725 (P) Hangar 71 AFTC/PZIOC Same as Owner $1.4M Prime March 23, 2015 308 West D Ave, Ste 130 Eglin AFB, FL 32542 Christine Young 850-882-9120 (P) 850-882-9442 (F) christine.young@eglin.af.mil Hurlburt Fuel Cell Department of the Army Same as Owner $0.6 M Sub to September 23, Renovation U.S. Army Corps of Engi- Nova Group, Inc. 2014 185 Devlin Road P.O. Box 4050 Napa, CA 94558 Chris Mathies 707-257-3200 (P) 707-265-1199 (F) cmathies@novagrp.com Page 27 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR CURRENT WORKLOAD AND CAPACITY “Walton Middle | Elliot Marshall Innes, PA Prime - CM @ Risk Pre-Construction Walton County School Board $27M School Pre- 145 S. Park Street, Suite 3 251 E 7th Avenue In Design Construction DeFuniak Springs, FL 32435 Tallahassee, FL 32303 Mark Gardner 850-892-1100 x 1810 (P) 850-892-1198 (F) gardnerm @walton.k12.fl.us Rosemary Beach Rosemary Beach Property DAG Architects $3.8M Prime October 1, 2014 Owner’s Center Owners Association, Inc. 1223 Airport Rd. 200 W. Water Street Destin, FL 32541 Rosemary Beach, FL 32461 850-837-8152 (P) 850-231-1861 (P) 850-654-4276 (F) 850-231-1211 (F) marie@rosemarybeachfl.org Shalimar Admin- Okaloosa County BCC DAG Architects $6.0M Prime- CM @ Risk | Pre-Construction istration Building - 1804 Lewis Turner Blvd 1223 Airport Rd. In Design Preconstruction Fort Walton Beach, FL 32547 Destin, FL 32541 Jim Curry 850-837-8152 (P) 850-651-7515 (P) 850-654-4276 (F) 850-651-7551 (F) managerinfo@co.okaloosa.fl Fort Walton Beach City of Fort Walton Beach DC Architects, Inc. $8.1M Prime - CM @ Risk | July 28, 2014 Recreation Center 107 Miracle Strip Pkwy 139 Beal Pkwy, Ste 101 Fort Walton Beach, FL 32547 Fort Walton Beach, FL Michael Beedie 32548 850-833-9504 (P) 850-433-8632 (P) 850-833-9640 (F) 850-226-8565 (F) fwbcmgr@fwb.org dchavez@dcarchitectsinc.com CURRENT WORKLOAD AND CAPACITY - PROJECT TEAM Dave Burleson, our proposed Project Manager, has recently completed a remodeling project for the Club Intrawest resort in Sandestin, FL. He is also working on a renovation project for the Walton County TDC in Santa Rosa Beach, FL, but this project was substantially completed in March. Dave will also be working on the upcoming renovation and asbestos abatement project for the Okaloosa County Administration Building in Shalimar, FL. Jack Harris, our proposed Project Superintendent, has recently completed the construction of a new Sherwin Williams building in Destin, FL. Jack will also be working on the upcoming Air Force Enlisted Village V (Independent Living Facility and Clubhouse) project. "FBon Page 28 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR As a leader in the construction industry in Okaloosa County for over 37 years, Lord & Son Construction has com-

Download this text file with its original spacing ↓