STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Construction Dates:
Start Date: June 9, 2008
Final Completion: December 16, 2009
Owner:
Mr. John Bozarth
Bay District Schools
1311 Balboa Avenue
Panama City, FL 32405
850-767-4205 (P)| 850-747-5378 (F)
bozarjl@bay.k12.fl.us
Architect:
Harvard Jolly, Inc.
2714 Dr. Martin Luther King, Jr. Street N
St. Petersburg, FL 33704
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
CONSTRUCTION MANAGEMENT EXPERIENCE
Gold’s Gym in Fort Walton Beach, FL
——$———
—
BC OLD'S Gyy
Lord & Son performed a total interior demolition and reconstruction of an existing telecommunications office
building to build this 10,000 SF one-story fitness facility with storage loft. All existing non-load bearing walls,
finishes, electrical, plumbing, and interior HVAC were removed. All new interior walls were constructed, and
new electrical (lights, floor boxes, security, telecommunications, TV, and data) was installed. Restrooms and
showers were added, and the existing concrete slabs were saw-cut and removed so new plumbing could be
roughed in as required. Interior finishes included high-impact commercial epoxy flooring with integral base in
all corridors, changing areas, restrooms, and showers. New plumbing lines, fixtures, and equipment were in-
stalled to meet the new requirements of the change of building use and layout. All new HVAC ductwork fans
and units were added to provide the necessary air flow and ventilation to many diverse areas (spin rooms,
free-weight areas, cardio room, aerobics rooms, restrooms, changing areas/locker rooms, and office areas).
Cherry casework with granite countertops were installed in the administrative areas.
The existing stucco exterior was steam-cleaned, and all expansion and window frame joints were re-caulked
to ensure a watertight envelope. Elastometric paint was applied to all exterior surfaces to complete the exte-
rior shell improvements.
Extensive site development (new water, sanitary sewer, storm piping, landscaping, irrigation, and parking
spaces) was included in the scope of work. The compact site did not allow for traditional retention ponds for
surface water run-off collection. To meet these needs, an under drain system was installed beneath the park-
ing areas. Changes to Florida DOT right-of-way connections were requested by the owner as an addition to
the original scope of work.
The project was completed two months earlier than originally scheduled so the owner could meet the dead-
line for closing on the construction loan for the project. Failure to meet the deadline would have cost the
owner tens of thousands of dollars in fees and interest payments.
Page 21
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Project Team:
Project Manager: Ryan Chavers
Project Superintendent: Darrin Taylor
Construction Cost:
At Award: $1,123,511.00
Final Cost: $1,152,830.00
Reason for the cost growth: Owner requested upgrades and modifications to finishes and layouts.
A
Construction Dates:
Start Date: July 2007
Final Completion: May 17, 2008
Owner:
All-Fitness, Inc. /d.b.a. Gold’s Gym
12200 Emerald Coast Parkway
Destin, FL 32541
Mike and Stephanie Lobner
850-863-3222 (P)
stephuf@cox.net
Architect:
Doughtery + Chavez Architects
4300 Legendary Drive
Building C, Suite 240
Destin, FL 32541
850-650-5881 (P)
Page 22
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
CONSTRUCTION MANAGEMENT EXPERIENCE
O’Sullivan Creel Office Building in Fort Walton Beach, FL
Lord & Son provided Construction Management services for this three story office building with 34,000 SF.
The structure is comprised of load bearing masonry with structural steel bar joists and metal deck. Exterior
features include standing seam metal roof, stucco, precast concrete, barrel roof, and metal railings. Unique
features include an exterior exposed wood roof deck, aluminum eyebrow structure, and a covered porch on
the third floor level. Interior features include metal stud and gypsum board walks, wood base and crown
moulding, ceramic tile floors, stone flooring, carpet, cabinets, and granite countertops. This project included
energy-saving materials and design parameters such as daylight harvesting, occupancy sensors, nighttime
HVAC modulation, and green building materials. The mechanical system is a split system with an outside air
unit and VAV controls. The electrical work included full data and telecommunications systems along with an
automated lighting control system. The sitework included an asphalt parking area, curbs, walks, a storm re-
tention pond, and landscaping. This project was accomplished on a fast-track schedule.
Project Team:
Project Manager: Mike O’Grady
Project Superintendent: Dave Burleson
Construction Cost:
At Award: $5,169,800.00
Final Cost: $5,150,612.00
Reason for the cost growth: The contract included a $300,000 design contingency of which only
$280,000 was spent on changes and upgrades.
Page 23
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Construction Dates:
Scheduled Completion: March 17, 2008
Final Completion: August 28, 2009
Owner:
O’Sullivan Creel
45 Eglin Parkway, Suite 301
Fort Walton Beach, FL 32548
Mr. Jody Henderson
850-244-5121 (P)
850-664-2562 (F)
joseph.henderson@warrenaverett.com
Architect:
DAG Architects
1223 Airport Road
Destin, FL 32541
850-837-8152 (P)
850-654-4276 (F)
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NeW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
CONSTRUCTION MANAGEMENT EXPERIENCE
Legendary Offices in Destin, FL
Lord & Son provided Construction Management services for the construction of two four story office
buildings - the first being 34,000 square feet and the second being 22,728 square feet. The buildings
consisted of structural steel frames with engineered light-gauge metal stud walls with concrete slabs on
metal decking. The exterior of the two buildings consisted of Exterior Insulation and Finish System (EIFS) and
concrete roof tiles. Inside, the units were finished with various wall coverings, ceramic tile, custom cabinetry,
and wood trim.
Legendary Office Building, Inc. selected Lord & Son to construct the second building based on their
performance on the first building.
Project Team:
Building One:
Project Manager: Jeff Neidigh
Project Superintendent: Ed Davidson
Page 25
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Building Two:
Project Manager: Leven D. Lord, II
Project Superintendent: Ricky Thompson
Construction Cost:
Building One:
At Award: $1,982,225
Final Cost: $3,000,000.00
Building Two:
At Award: $2,974,300.00
Final Cost: $3,055,800.00
Construction Dates:
Building One:
Start Date: 2000
Final Completion: March 2001
Building Two:
Start Date: 2005
Final Completion: November 27, 2006
Owner:
Legendary Office Building, Inc.
385 E. Highway 98, Suite 60
Destin, FL 32541
Architect:
Building One:
Prescott Architects
625 E. Highway 98
Destin, FL 32541
Mr. Jeff Prescott
(850) 837-6494
Building Two:
Dougherty + Chavez Architects
4300 Legendary Drive
Building C, Suite 240
Destin, FL 32541
(850) 650-5881
Page 26
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
CURRENT WORKLOAD AND CAPACITY - LORD & SON
Surfside Owners Assoc.
neers
Attention: CESAM-CD-GH
P.O. Box 9217
Hurlburt Field, FL 32544
850-884-6491 (P)
Surfside Resort DC Architects, Inc. $0.3M Prime 60 days after start
Second Floor Build-Out | 1096 Scenic Gulf Dr., Ste C 54 Beal Pkwy NW date (TBD -
101 Fort Walton Beach, FL Project has just
Miramar Beach, FL 32548 32548 started)
850-226-8565 (P)
850-362-6570 (F)
Air Force Enlisted Air Force Enlisted Village | Noelker and Hull Assoc. Not yet | Prime - CM @ Risk | TBD - Project has
Village 5 92 Sunset Lane 30 West King Street finalized just started
Shalimar, FL 32579 Chambersburg, PA
James Binnicker, President 17201
850-651-3766 (P) 717-263-8464 (P)
850-651-4461 (F) 717-263-6031 (F)
binnicker@afev.us Michael Hull
mhull@noelkerhull.com
Airport Police Station | Okaloosa County Airports LPA Group $0.08 M Prime April 21, 2014
State Road 85 1320 Executive Center
Eglin AFB, FL 32542 Suite 100
Tracy Stage Tallahassee, FL 32301
850-651-7160 ext. 4 (P) 850-205-0460 (P)
850-651-7164 (F) 850-205-0461 (F)
Surf Hut Restaurant Driftwood on the Gulf Prescott Architects, Inc. $1.3M Prime-Negotiated May 04, 2014
988 Airport Road 625 Harbor Blvd., Ste 6
Destin, FL 32541 Destin, FL 32541
Mr. Robert Bonezzi 850-837-6494 (P)
850-650-4725 (P)
Hangar 71 AFTC/PZIOC Same as Owner $1.4M Prime March 23, 2015
308 West D Ave, Ste 130
Eglin AFB, FL 32542
Christine Young
850-882-9120 (P)
850-882-9442 (F)
christine.young@eglin.af.mil
Hurlburt Fuel Cell Department of the Army Same as Owner $0.6 M Sub to September 23,
Renovation U.S. Army Corps of Engi- Nova Group, Inc. 2014
185 Devlin Road
P.O. Box 4050
Napa, CA 94558
Chris Mathies
707-257-3200 (P)
707-265-1199 (F)
cmathies@novagrp.com
Page 27
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
CURRENT WORKLOAD AND CAPACITY
“Walton Middle |
Elliot Marshall Innes, PA
Prime - CM @ Risk
Pre-Construction
Walton County School Board $27M
School Pre- 145 S. Park Street, Suite 3 251 E 7th Avenue In Design
Construction DeFuniak Springs, FL 32435 Tallahassee, FL 32303
Mark Gardner
850-892-1100 x 1810 (P)
850-892-1198 (F)
gardnerm @walton.k12.fl.us
Rosemary Beach Rosemary Beach Property DAG Architects $3.8M Prime October 1, 2014
Owner’s Center Owners Association, Inc. 1223 Airport Rd.
200 W. Water Street Destin, FL 32541
Rosemary Beach, FL 32461 850-837-8152 (P)
850-231-1861 (P) 850-654-4276 (F)
850-231-1211 (F)
marie@rosemarybeachfl.org
Shalimar Admin- Okaloosa County BCC DAG Architects $6.0M Prime- CM @ Risk | Pre-Construction
istration Building - 1804 Lewis Turner Blvd 1223 Airport Rd. In Design
Preconstruction Fort Walton Beach, FL 32547 Destin, FL 32541
Jim Curry 850-837-8152 (P)
850-651-7515 (P) 850-654-4276 (F)
850-651-7551 (F)
managerinfo@co.okaloosa.fl
Fort Walton Beach City of Fort Walton Beach DC Architects, Inc. $8.1M Prime - CM @ Risk | July 28, 2014
Recreation Center 107 Miracle Strip Pkwy 139 Beal Pkwy, Ste 101
Fort Walton Beach, FL 32547 Fort Walton Beach, FL
Michael Beedie 32548
850-833-9504 (P) 850-433-8632 (P)
850-833-9640 (F) 850-226-8565 (F)
fwbcmgr@fwb.org dchavez@dcarchitectsinc.com
CURRENT WORKLOAD AND CAPACITY - PROJECT TEAM
Dave Burleson, our proposed Project Manager, has recently completed a remodeling project for the Club
Intrawest resort in Sandestin, FL. He is also working on a renovation project for the Walton County TDC in
Santa Rosa Beach, FL, but this project was substantially completed in March. Dave will also be working on the
upcoming renovation and asbestos abatement project for the Okaloosa County Administration Building in
Shalimar, FL.
Jack Harris, our proposed Project Superintendent, has recently completed the construction of a new Sherwin
Williams building in Destin, FL. Jack will also be working on the upcoming Air Force Enlisted Village V
(Independent Living Facility and Clubhouse) project.
"FBon
Page 28
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
As a leader in the construction industry in Okaloosa County for over 37 years, Lord & Son Construction has com-