Members of the Board
FROM: Elliot Kampert
SUBJECT: Bluewater Bay Curacao Bay/Southwind Drive HMGP Application
DEPARTMENT: Growth Management
BCC DISTRICT: District 5 - Commissioner Windes
STATEMENT OF ISSUE: The Bluewater Bay Municipal Service Benefit Unit seeks to
submit an application to the Florida Division of Emergency Management to receive federal
Hazard Mitigation Grant Program (HMGP) funds to repair a stormwater system damaged during
the April 2014 flooding, and to enhance the system to the extent possible to alleviate future
flooding. However, because the HMGP limits applicants to local governments, Indian tribes,
and non-profit agencies, the application must be submitted by the County. The application
deadline is January 6, 2015. If the FDEM approves the application, a subsequent contract will be
brought back to the Board of County Commissioners for approval. It will take several weeks
following the application deadline before the County knows whether the application will be
approved.
BACKGROUND: The Florida Division of Emergency Management administers the Hazard
Mitigation Grant Program which is funded through the Robert T. Stafford Disaster Relief and
Emergency Assistance Act. The objectives of the Hazard Mitigation Grant Program are: 1) To
prevent future losses of lives and damage to property due to disasters; 2) To implement state or
local hazard mitigation plans; 3) To enable mitigation measures to be implemented during
immediate recovery from a disaster; and 4) To provide funding for previously identified
mitigation measures that benefit the disaster area. The current funds come as the result of the
April 2014 storm event.
The proposed Bluewater Bay MSBU project, as described more fully in the attached documents,
includes 4 phases: 1) conducting a topographic survey and hydraulic study of an approximately
350 acre portion of the Bluewater community to confirm the boundaries of the affected drainage
basin, locate the infrastructure, detail the drainage features, and identify the necessary repairs; 2)
design and obtain permits for repairs and improvements to the system; 3) bid and retain
qualified contractors to perform the required work; and 4) actual construction and completion of
the project. To ensure conformity with County requirements, the MSBU proposes to use County
staff to assist with the preparation of bidding and construction documents; the value of staff time
would be in-kind service and used as part of the local match required as discussed, below.
The total project cost through completion is estimated at $399,465 for which there is a 25% local
match requirement. To provide this match, the MSBU proposes to provide $6,500 which, along
with $5,000 each from the Bluewater Bay Resort and Homeowners Association, will be added to
the estimated $83,366.25 worth of staff time anticipated for this project (see HMGP Application
Attachment C).
As shown in the application, the MSBU will serve as the point of contact for this project which
will be managed by a private contractor retained by the MSBU who will serve as the agent.
Packet Pg. 293
However, because the County is the applicant, it will be necessary to enter into an agreement to
formalize the relationship and responsibilities of the County and MSBU in administering the
grant as the project proceeds. Fortunately, though the deadline is January 6, it will take several
weeks for the application to go through the review process; it is during this time that such an
agreement would be developed.
It should be noted that the proposed project includes work in County rights-of-way and
easements maintained by the County. Since public property is involved, it is necessary for the
Chairman to sign the Maintenance Agreement which is included as Section V of the attached
application.
In addition to the various maps and other attachments, the application must be accompanied by a
letter from the Local Mitigation Strategy (LMS) Committee endorsing the project and verifying
that the project is consistent with the LMS and included on the LMS project list. During its
regular meeting of December 10, 2014, the LMS Committee added the project to the project list
and authorized the sending of the attached letter.
Finally, though the application and accompanying materials attached to this agenda summary are
complete, some minor modifications may be necessary prior to submittal to FDEM. For this
reason, staff recommends that the project as submitted to FDEM be placed on the January 6,
2015 BCC agenda for re-approval.
RECOMMENDATIONS: Staff recommends that the Board of County Commissioners
authorize the Bluewater Bay MSBU to submit the attached Bluewater Bay MSBU Curacao
Way/Southwind Drive Drainage Project HMGP Application to the Florida Division of
Emergency Management, and authorize the Chairman of the Board of County Commissioners to
sign the Maintenance Agreement which is Section V of application as well as the attached
transmittal letter. Staff also recommends that acceptance of a contract with the FDEM resulting
from this application be conditioned upon the County and Bluewater Bay MSBU entering into a
written agreement which specifies the duties and responsibilities of the MSBU and County in the
administration of the grant and execution of the project. Finally, staff recommends that this
application be approved with the condition that it be brought back to the Board of County
Commissioners during its meeting of January 6, 2015, so that any modifications may be noted
and approved.
RECOMMENDED BY:
APPROVED BY:
John Hofstad, County Administrator
Packet Pg. 294
Packet Pg. 295
Packet Pg. 296
Packet Pg. 297
Packet Pg. 298
Packet Pg. 299
Packet Pg. 300
Packet Pg. 301
Packet Pg. 302
Packet Pg. 303
Packet Pg. 304
Packet Pg. 305
Packet Pg. 306
Packet Pg. 307
ATTACHMENT A
Curacoa Way/Southwind Drive Flood Mitigation Program
Bluewater Bay Municipal Services Benefit Unit (MSBU)
Okaloosa County, Florida
December 2014
PROJECT NARRATIVE
On the night of April 29, 2014 and extending into the next morning, northwest Florida experienced a
rare storm event resulting in significant flood damage. Some areas received well over one‐foot of rain
and many roads and other infrastructure improvements were compromised by the resulting stormwater
runoff. A federal emergency declaration was issued for the region: FEMA‐4177‐DR‐FL.
Okaloosa County experienced widespread damage, including significant flooding in the Bluewater Bay
neighborhood. Bluewater Bay is an unincorporated residential development located in Okaloosa County
east of the Niceville city limits. The Bluewater Bay Municipal Services Benefit Unit (MSBU) is a local
subdivision of Okaloosa County formed to facilitate maintenance of common areas within the MSBU
limits.
A portion of an approximately 350‐acre stormwater drainage basin within the Bluewater Bay MSBU
limits includes a stormwater pond that rose to unprecedented levels during that storm event and
flooded many of the 23 single‐family homes surrounding the pond. The stormwater pond is bordered by
Southwind Drive, Dominica Way, Aruba Way and Curacao Way.
Upstream from the pond was an existing earth berm adjacent to Hole #7 on the Bluewater Bay Lake
Course. The earth berm was breached and failed during the storm and the existing pipes below Curacao
Way appeared to be inadequate for discharging the volumes of water in the pond. These factors may
have contributed to unprecedented stormwater volume in the pond and the possible compromise of the
pavement at the Southwind Drive pipe crossing. Flood waters touched 20 of the 22 homes bordering the
pond, with the first floor living areas of two of these homes becoming completely submerged. Following
the storm event of April 29/30, many of the homes have continued to be threatened with similar
recurring flooding during storms of much less intensity. It is clear the stormwater drainage system no
longer provides the same performance as originally designed.
Flood waters touched 20 of the 22 homes bordering the pond. The first floor living areas of two of
these homes were completely submerged.
1
Packet Pg. 308
To repair the stormwater drainage system and to mitigate the possibility for future flooding, Okaloosa
County is considering the following four‐phase approach:
1. Topographic Survey and Hydraulic Study: A topographic survey of the drainage basin is
necessary to confirm the basin boundaries, pipe invert elevations, inlet top elevations, and other
drainage features. The drainage basin contributing to the pond is estimated to measure
approximately 350 acres.
The hydraulic study will include a complete inventory of the drainage basin, identification of
stormwater runoff characteristics from high‐intensity storm events, and modeling of the
drainage basin using AdICPR software. The study will result in a comprehensive assessment of
the drainage basin, including the identification of deficiencies associated with the assumed
storm events. The model will also consider any tailwater impacts on the system resulting from
the water levels at the basin outfall, just south of Curacao Way. The study will culminate in
recommended improvements to the drainage system to mitigate future flooding.
2. Design and Permitting Services: Based on the recommendations of the hydraulic study, design
phase services will include the development of professionally certified bidding/construction
documents to implement infrastructure repairs with hazard mitigation improvements as
needed. These services will also include coordination and applicable permitting with the
Northwest Florida Water Management District (NWFWMD) and the Florida Department of
Environmental Protection (FDEP). In addition, the permitting services are anticipated to include
the services of a certified biologist to consider the removal of existing beaver dams downstream
from the outfall location if needed. It is commonly assumed that the tailwater conditions could
be improved with the elimination of the dams constructed in upper reaches of Grass Lake.
3. Bidding and Construction Phase Services: The bidding phase services will include professional
assistance to the County in procuring qualified suppliers through applicable County and federal
procurement processes to provide the construction materials. Construction phase services will
include independent administration of the construction work to monitor compliance with the
construction documents and to professionally certify the work completed. Limited inspection
services are proposed to monitor the installation of pipes and other underground improvements
prior to backfilling.
4. Construction: The construction activities are expected to include a series of pipe replacement
improvements in four separate locations. The work will include removal of existing pipe and
drainage structures as necessary, followed by the installation of new reinforced concrete pipes
and inlets consistent with the recommendations of the hydraulic study. The work will include
three road crossings (i.e. Southwind Drive,