READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — December 16, 2014 — reading text

Part 18 of 34. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

DEPARTMENT OF TRANSPORTATION 525-010-40 PRODUCTION SUPPORT LOCAL AGENCY PROGRAM AGREEMENT 08/06 Page 15 EXHIBIT “A” PROJECT DESCRIPTION AND RESPONSIBILITIES FPN: 430038-2-38-01 This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and Okaloosa County B.O.C.C. PROJECT LOCATION: The project is X is not on the National Highway System. The project is X is not on the State Highway System. PROJECT DESCRIPTION: This project is for the design of the Crestview Sidewalk Project. The areas included in this project are as follows: 1) Aplin Road - From State Road 85 to Rayburn Street, 2) North Avenue - From Anderson Street to Medley Drive 3) Long Drive – From State Road 85 to Bent Creek Road SPECIAL CONSIDERATIONS BY AGENCY: The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the Department’s contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and the funding action from any other source with respect to the project. The Agency is required to provide a copy of the design plans for the Department’s review and approval to coordinate permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. The Agency will upload all relevant documentation related to this project into the Department’s Local Agency Program Information Tool (LAPIT) System. The Agency shall commence the project’s activities subsequent to the execution of this Agreement and shall perform in accordance with the following schedule: a) Plans Submittal of 60% by June 2015. b) Plans Submittal of 90% by August 2015. c) Design (plans and bid documents) to be completed by October 30, 2015 If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is subject to the withdrawal of federal funding. The Agency shall be responsible for verifying that the NEPA document is adhered to for the life of the project. The project will be designed within existing right of way and no work shall begin until a Notice to Proceed is issued by the Department. SPECIAL CONSIDERATIONS BY DEPARTMENT: The Cultural Resource Assessment Survey (including coordination with the State Historic Preservation Officer) and all documentation necessary to support the environmental Class of Action Determination will be the responsibility of the Department. The Department will reimburse the Agency for the eligible costs directly related to the construction and CEI not to exceed $30,000. Packet Pg. 241 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 PRODUCTION SUPPORT LOCAL AGENCY PROGRAM AGREEMENT 09/11 Page 16 EXHIBIT “B” SCHEDULE OF FUNDING AGENCY NAME & BILLING ADDRESS FPN: 430038-2-38-01 Okaloosa County B.O.C.C. 302 N. Wilson Street, Ste 203 Crestview, Fl 32536 PROJECT DESCRIPTION Name: Crestview Sidewalk Project Length: 0.750 miles Termini: Aplin Road – From SR 85 to Rayburn St.; North Ave – From Anderson St. to Medley Dr.; Long Dr – From SR 85 to Bent Creek Rd FUNDING (1) (2) (3) TOTAL AGENCY STATE & TYPE OF WORK By Fiscal Year PROJECT FUNDS FUNDS FEDERAL FUNDS Planning FY: FY: FY: Total Planning Cost Project Development & Environment (PD&E) FY: FY: FY: Total PD&E Cost Design FY: 2015 $30,000.00 $0.00 $30,000.00 FY: 2016 FY: 2017 Total Design Cost $30,000.00 $0.00 $30,000.00 Right-of-Way FY: FY: FY: Total Right-of-Way Cost Construction FY: FY: 2016 FY: 2017 FY: 2018 Total Construction Cost Construction Engineering and Inspection (CEI) FY: 2015 FY: 2016 FY: 2017 Total CEI Cost Total Construction and CEI Costs TOTAL COST OF THE PROJECT $30,000.00 $0.00 $30,000.00 The Department's fiscal year begins on July 1. For this project, funds are not projected to be available until after the 1st of July of each fiscal year. The Department will notify the Agency, in writing, when funds are available. Packet Pg. 242 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 PROJECT MANAGEMENT OFFICE LOCAL AGENCY PROGRAM AGREEMENT 07/09 Page 17 EXHIBIT “C” RESTRICTION ON CONSULTANT’S ELIGIBILITY TO COMPETE FOR DEPARTMENT ASSISTED CONTRACTS FPN: 430038-2-38-01 This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and Okalooa County B.O.C.C. . EXISTING CONSULTANT CONTRACTS: Existing consultant or professional services contracts shall not be used in the development and delivery of this project, doing so will federalize the existing contract. All consultant and professional services contracts associated with this project shall be advertised and selected in accordance with the Consultants Competitive Negotiations Act(CCNA). Consult the District LAP Administrator for the appropriate federal language that must appear in each consultant contract. CONSULTANT CEI CONTRACTS: A consultant firm or its affiliate that was the engineer of record(EOR) on a project shall not be considered for construction engineering and inspection(CEI) services, as a prime, on the same project. A consultant firm or its affiliate who was the EOR on a project may only be considered for CEI services as a sub consultant to the prime CEI firm with the approval of the Department prior to submittal of letters of response. A consultant firm or its affiliate who was the sub to the EOR on a project may only be considered for CEI services, as prime, on the same project, with the approval of the Department prior to submittal of letters of response. The Department’s approval shall be based on the extent of the firm’s involvement in the design of the project or CEI services, as the case may be, and the potential of hindrance I of any objective decision making. A consultant or its affiliate who performed geotechnical services for the EOR shall not be considered as a sub to the firm providing CEI services on the same project, in any capacity. DESIGN-BUILD CONTRACTS: The contractor or design professional cannot team, as a prime, with other firms to submit more than one bid per project. The secondary member (i.e., designer or contractor) of the design-build team cannot change, after award, without the written approval of the Department. A professional firm shall not be considered for CEI services, either as a prime or a sub, for a Design-Build contract for which the same firm or its affiliate is the EOR or is sub to the EOR. A consultant firm, its affiliate, or sub consultant that is under contract with the Local Agency to develop the RFP for a Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or a sub consultant. A consultant firm, its affiliate, or sub consultant that is under contract with the Local Agency to provide CEI services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or sub consultant. A consultant or its affiliate, who was the prime EOR on a Design-Bid-Build project, where the project is switched to Design-Build, may participate on a Design-Build contract with the approval of the Department. The Department shall consider level of design (% completed) by the EOR, the number of component design plans by different EOR’s, etc. Packet Pg. 243 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 PRODUCTION SUPPORT LOCAL AGENCY PROGRAM AGREEMENT 08/06 Page 18 EXHIBIT “1” SINGLE AUDIT ACT Federal Resources Awarded to the Recipient Pursuant to This Agreement Consist of the Following: Federal Agency: Federal Highway Administration CFDA #: 20.205 Highway Planning and Construction Amount: FPID 430038-2-38-01......................................................................................................... $30,000.00 Compliance

Download this text file with its original spacing ↓