Okaloosa County BOCC — August 12, 2014 — reading text
Part 2 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
4,270,937
Debt Service 879,455 878,584 1,840,419 1,872,456
Other 0 337,490 3,843,549 3,753,063
Total 6,640,707 6,222,910 12,122,562 13,711,670
HISTORICAL STAFFING SUMMARY:
Category FY12 FY13 FY14 FY15
Full-time 28 28 28 28
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 28 28 28 28
MAJOR ACCOMPLISHMENTS LAST YEAR:
Maintained 24/7 standby coverage on all program components, lift stations, and water wells.
Transported biosolids from all 3 wastewater reclamation facilities (WRFs) off site to be used as fertilizer.
Operated and maintained compliance with FDEP permits on all 3 WRFs.
Packet Pg. 16
Maintained 146 lift stations in our collection system.
Maintained 225 acres of RIBs for effluent disposal at the Arbennie Pritchett WRF.
Operated and maintained Public Access Reuse System for the City of FWB.
Implementation of Pretreatment Program for Industrial Users.
Operated and maintained a State Certified Lab at the Arbennie Pritchett WRF.
Maintain 48 stationary & portable generator sets.
Provided electronic/mechanical support on 19 potable water wells and 20 tanks.
Operations staff provides 24/7 customer service, monitors alarms & notifications for entire water &
wastewater systems.
Provided better grit/garbage disposal storage at the headworks of APWRF by purchasing and implementing
better containers for the process.
PROGRAM GOAL: Protect public health by providing sanitary sewers for wastewater collection (lift
stations), treatment plants, and effluent disposal. Provide seamless addition of new sewer customers. Repair and
maintain 146 sewage lift stations, 3 water reclamation facilities (WRFs) and all other portions of the
infrastructure. Maintain the highest standard as it relates to all facets of the customer service function including
new service set up, billing and collections. Insure strict compliance with ALL Federal and State requirements
through compliance sample testing and constant monitoring.
KEY OBJECTIVES:
1. Ensure budgetary, personnel, customer service and purchasing functions comply with County policies and
procedures.
2. Preserve and protect infrastructure to provide quality of service to customers.
3. Maintain and extend the useful life and utility of County facilities.
4. Ensure the preservation and safe operation of all work related equipment.
5. Provide adequate collection lines and treatment facilities to provide capacity for 85 GPD per capita.
6. Meet or exceed State and Federal wastewater treatment standards
7. Protect ground and surface waters through provision of consistent high quality wastewater treatment.
8. Continue to ensure maximum efficiencies by utilizing the best operating practices.
The following projects are planned for Fiscal Year 2015:
Arbennie Pritchett WRF Expansion (design-build construction) – Expand the current facility from 10
million gallons per day (MGD) to 15 MGD because of additional flow from Eglin AFB projects, the East
County Service Area (diversion project mentioned above), and future growth. Project will be funded with
Capacity Expansion Charges that have been received from some of these listed projects and other land
development projects.
Bob Sikes WRF – Install membranes we have in storage in additional train. Only one train has membranes
installed. Need other membranes installed and new train online to do repairs/maintenance on existing train.
Diversion of the OCWS portion of Sewer flow to Niceville-Valparaiso Regional Sewer Board Plant (design
& construction) – Construct a new force main and pump station to divert OCWS sewer flow from NVRSB
to the Arbennie Pritchett WRF. This will consolidate flows and reduce overall wastewater treatment cost for
the flows from our East County service area. The East County Repump Station is planned to be constructed
in FY2014-FY2015 and the East County Transmission Main (approx. 6.7 miles) is planned
Packet Pg. 17
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY12/13 FY13/14 FY14/15
Total Wastewater treated (millions of gallons) 2,550.66 2,575 2,730
Input
Total number of trouble call outs 1,109 961 1,000
Dry Tons of Sludge Hauled 1,365 > 1,365 > 1,400
Output
Total number of pumps pulled 67 60 60
Total number of wastewater operators (3 plants) 12 12 12
Efficiency
Cost per gallon of wastewater treated 0.0063 0.0063 0.0060
Total square miles of service area 27.1 27.1 27.1
Effectiveness
Total Public Access reuse water (millions of gals.) 108.2 > 120 > 120
Total Number of Loads Sand/Grit to Landfill. 16 28 30
Interdepartmental project support (Airport, Road ) 8 7 >5
Packet Pg. 18
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: PHYSICAL ENVIRONMENT
DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/ENGINEERING
PROGRAM DESCRIPTION: To provide service to the department and public in the area of engineering
services for design, inspection, development review and acceptance, and to offer assistance to the public and
staff relating to information regarding the operation of Okaloosa County Water & Sewer.
REVENUE: The Water & Sewer enterprise fund receives all revenue through monthly customer billings,
capacity expansion charges and related ancillary charges for use of both the Water and Sewer systems within
the Okaloosa County service area. The funds customer base is currently in excess of 36,000 water service and
33,000 sewer service connections both residential and commercial.
EXPENDITURES:
Expenditures Budget
FY12 FY13 FY14 FY15
Category Actual $ Actual $ Original $ Approved $
Personal Services 529,240 377,179 482,627 485,802
Operating Expenses 1,448,414 795,030 654,447 644,631
Capital Outlay 285,695 311,297 770,657 1,265,463
Debt Service 345,501 260,321 545,309 554,802
Other 0 99,998 1,138,829 1,112,019
Total 2,608,850 1,843,825 3,591,869 4,062,717
HISTORICAL STAFFING SUMMARY:
Category FY12 FY13 FY14 FY15
Full-time 9 9 9 9
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 9 9 9 9
MAJOR ACCOMPLISHMENTS LAST YEAR:
Provided engineering, surveying, permitting, inspection, and project management services for the following:
Future Water Supply (planning) – continue with Implementation Plan to ensure the sustainability of a safe,
reliable, and adequate water supply in the future, with efforts focused along the Shoal River for an offline
reservoir. Partnered with the U.S. Army Corps of Engineers on a hydraulic and water quality model that is
underway. Obtained additional grant funding for land acquisition.
Packet Pg. 19
Newcastle Area Water System Improvements (design) – provide new, larger water mains to the area and fire
hydrants to provide increased fire protection and ensure the reliability of the system. This project is partially
funded by a Florida Department of Economic Opportunity Community Development Block Grant.
Camp Rudder Force Main & Lift Station (design) – provide sewer service to Camp Rudder via 1 master lift
station and approximately 8.6 miles of piping. This project will divert all wastewater flows from Camp
Rudder to the Arbennie Pritchett WRF.
Poquito Bayou Water Main & Force Main Bores (design) – replace the aging, deteriorated mains under
Poquito Bayou with new directional bores.
Diversion of the OCWS portion of Sewer flow to Niceville-Valparaiso Regional Sewer Board Plant (design)
– Construct a new force main and pump station to divert OCWS sewer flow from NVRSB to the Arbennie
Pritchett WRF. This will consolidate flows and reduce overall wastewater treatment cost for the flows from
our East County Service Area (Bluewater Bay area). Project will also eliminate Rocky Bayou Lift Station,
Post Office Lift Station, and miles of 14” aging, sewer force main.
Eglin Main Force Mains & Lift Stations (design & construction) – provide sewer service to Eglin Main
Base via 2 lift stations “inside the fence” and approximately 7 miles of piping. This project will divert all
wastewater flows from Eglin proper to the Arbennie Pritchett WRF. Design is complete, and construction is
over half-way complete.
Ft. Walton Beach 36” Force Main (construction) – joint project with the City of Ft. Walton Beach to install
a 36” ductile iron force main on Roberts Blvd. the Ft. Walton Beach Golf Course, and Denton Blvd. to
replace 3 critical, aging force mains feeding the Arbennie Pritchett Water Reclamation Facility (WRF).
Del Cerro II Well (construction) – install new potable water well in the Mid-County area to increase potable
water supply and reliability of the system. Project is not yet completed and online, but well underway.
Garniers Area Sanitary Sewer Rehab (construction) – installed cured-in-place liners on vitrified clay sewer
mains and brick manholes to reduce the inflow and infiltration, which is currently inundating the wastewater
collection system.
Subsurface utility engineering (AKA mapping) was completed in the Mid-County Service Area
(unincorporated Crestview) and East County Service Area.
PROGRAM GOAL: When land development projects are submitted, complete the review and issue
comments within 15 business days. Begin new construction inspections within