Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: July 21, 2015
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Public Hearing - Approval to Authorize OCWS to Construct the Meigs
Seminole Pump Station Project
DEPARTMENT: Water and Sewer
BCC DISTRICT: District 5
STATEMENT OF ISSUE: In accordance with Chapter 255, Public Property and Publicly
Owned Buildings, Florida State Statues (F.S.), Section 255.20, Local bids and contracts for
public construction works; specification of state-produced lumber, the BCC must hold a public
meeting to discuss the County’s proposal to construct a new pump station and force main to
serve the Bluewater Bay Service Area using Okaloosa County Water and Sewer Department
(OCWS) staff and equipment. Specifically, the statute states that a County government may
“self-perform” public works projects valued at greater than $300,000... “When the governing
board of the local government, after public notice, conducts a public meeting under s. 286.011
and finds by a majority vote of the governing board that it is in the public's best interest to
perform the project using its own services, employees, and equipment.” The public hearing shall
constitute the public meeting as required by Section 255.20 of the Florida State Statues.
Therefore, OCWS staff request approval to self-perform construction of the Meigs Seminole
Pump Station and Force Main Improvements Project.
BACKGROUND: The proposed project will replace the existing Meigs Seminole Pump Station
located in Bluewater Bay, with a new submersible sewer pumping station, electrical control
building and emergency/backup power generator. The new pump station is designed to handle all
projected future flows from the Bluewater Bay Area. The project includes approximately 1,000
LF of sanitary sewer force main along SR 20 at the Bolton Branch Bridge in the Niceville Area.
This new force main will replace the existing undersized force main currently running along SR
20 in that area. The new force main is sized to handle all projected future flows from the
Bluewater Bay Area. This project also includes approximately 5,500 LF of sanitary force main
along Highway 20 to reroute the flow coming from the Lancaster Area to the new Meigs
Seminole Pump Station. This new force main is required to reroute the flows that currently
discharge to the Rocky Bayou Pump Station.
The Meigs Seminole Pump Station and Force Main Improvements Project is part of the East
County Master Sewer Plan. Upon completion of this project and the new East County Repump
Station (currently under construction) we will be able to replace one aging and failing pump
station (Meigs Seminole) and bypass two aging and failing pump stations (Post Office Pump
Station and Rocky Bayou Pump Station) and also bypass an aging and failing 14 inch force main
running along SR 20 and Palm Blvd.
Funding for this project is available from our 2012 bank loan. The project is in our fiscal year
2015-2016 budget under capital improvements.
OCWS is proposing to self-perform the construction of the new pump station and installation of
the new force mains using OCWS staff and equipment to expedite completion of the project.
OCWS estimates that using their own forces and equipment to construct the project will shorten
the construction schedule and will reduce the project costs over contracting with an outside
construction company. OCWS has estimated the project to cost approximately $1,779,000.00.
As stated in the attached Public Notice, a cost breakdown of the project could be viewed by the
public at our office anytime between publication of the notice and the public hearing. The cost
includes material (with fringe/insurance), labor, equipment (with maintenance), and
subcontracted work.
OCWS staff have reviewed the construction requirements for the project and have determined
that they have the necessary qualifications, labor and available time to complete the project. As
presented earlier, Section 255.20 F.S., Local bids and contracts for public construction works;
specification of state-produced lumber includes specific requirements for County governments
that choose to construct projects valued at greater than $300,000 using their own forces and
equipment.
OPTIONS: Approve or Deny.
RECOMMENDATIONS: Staff requests BCC approval to authorize OCWS to construct the
Meigs Seminole Pump Station and Force Main Improvements Project using OCWS staff and
equipment, as supplemented in accordance with County Ordinances and State Statutes.
RECOMMENDED BY:
APPROVED BY:
John Hofstad, County Administrator