July 21, 2015

Okaloosa County BOCC — July 21, 2015 — Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request

Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request in the July 21, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the July 21, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1274). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used June 2, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
July 21, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 4.7 KB · 2

Download ↓

Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 289.0 KB · 2

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: July 21, 2015 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Public Hearing - Approval to Authorize OCWS to Construct the Meigs Seminole Pump Station Project DEPARTMENT: Water and Sewer BCC DISTRICT: District 5 STATEMENT OF ISSUE: In accordance with Chapter 255, Public Property and Publicly Owned Buildings, Florida State Statues (F.S.), Section 255.20, Local bids and contracts for public construction works; specification of state-produced lumber, the BCC must hold a public meeting to discuss the County’s proposal to construct a new pump station and force main to serve the Bluewater Bay Service Area using Okaloosa County Water and Sewer Department (OCWS) staff and equipment. Specifically, the statute states that a County government may “self-perform” public works projects valued at greater than $300,000... “When the governing board of the local government, after public notice, conducts a public meeting under s. 286.011 and finds by a majority vote of the governing board that it is in the public's best interest to perform the project using its own services, employees, and equipment.” The public hearing shall constitute the public meeting as required by Section 255.20 of the Florida State Statues. Therefore, OCWS staff request approval to self-perform construction of the Meigs Seminole Pump Station and Force Main Improvements Project. BACKGROUND: The proposed project will replace the existing Meigs Seminole Pump Station located in Bluewater Bay, with a new submersible sewer pumping station, electrical control building and emergency/backup power generator. The new pump station is designed to handle all projected future flows from the Bluewater Bay Area. The project includes approximately 1,000 LF of sanitary sewer force main along SR 20 at the Bolton Branch Bridge in the Niceville Area. This new force main will replace the existing undersized force main currently running along SR 20 in that area. The new force main is sized to handle all projected future flows from the Bluewater Bay Area. This project also includes approximately 5,500 LF of sanitary force main along Highway 20 to reroute the flow coming from the Lancaster Area to the new Meigs Seminole Pump Station. This new force main is required to reroute the flows that currently discharge to the Rocky Bayou Pump Station. The Meigs Seminole Pump Station and Force Main Improvements Project is part of the East County Master Sewer Plan. Upon completion of this project and the new East County Repump Station (currently under construction) we will be able to replace one aging and failing pump station (Meigs Seminole) and bypass two aging and failing pump stations (Post Office Pump Station and Rocky Bayou Pump Station) and also bypass an aging and failing 14 inch force main running along SR 20 and Palm Blvd. Funding for this project is available from our 2012 bank loan. The project is in our fiscal year 2015-2016 budget under capital improvements. OCWS is proposing to self-perform the construction of the new pump station and installation of the new force mains using OCWS staff and equipment to expedite completion of the project. OCWS estimates that using their own forces and equipment to construct the project will shorten the construction schedule and will reduce the project costs over contracting with an outside construction company. OCWS has estimated the project to cost approximately $1,779,000.00. As stated in the attached Public Notice, a cost breakdown of the project could be viewed by the public at our office anytime between publication of the notice and the public hearing. The cost includes material (with fringe/insurance), labor, equipment (with maintenance), and subcontracted work. OCWS staff have reviewed the construction requirements for the project and have determined that the

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — July 21, 2015 — Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request.” July 21, 2015. Action Item Printout. Crypt of Echoes evidence ID LED-2026-237b67c857f54fca962ce0972563740a. http://127.0.0.1:58097/evidence/LED-2026-237b67c857f54fca962ce0972563740a. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Public Hearing - Approval to Authorize OCWS to Construct the Meigs — agenda request, meeting materials for July 21, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=14811&MeetingID=1274

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓