READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 16, 2014 — reading text
Part 45 of 102. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
City of Mary
18b 2013 Hurricane/Tropical no City of Mary Esther City of Mary Esther $350,000.00 X No Funding 120 days Existing
Concrete Culvert stormwater culvert Esther Esther
Storm
Stormwater redesign and replace the
Hurricane & Tropical
inprovements on existing stormwater Town of
19a 2014 Storm; Flood; and yes Town of Shalimar Town of Shalimar Town of Shalimar $30,000.00 X No Funding 6 months Existing Y
Brande Court & darinage system for both Shalimar
Severe Storms
Mande Court streets
Hardening of conventional
single famile detached
County Wide Wind
19b 2011 homesteaded dwellings to All Hazards yes ALL Jurisdictions 25% Private All Jurisdictions All Jurisdictions $3,000,000.00 X No Funding 1 year Existing All Jurisdictions Y
Retrofit
meet current FBC wind
requirements
replacing the roof over the
Roof replacement
meeting room and freexer Okaloosa County Okaloosa County Okaloosa County School Board -
20 Carvier Hill 2014 All hazards yes $500,000.00 x No Funding 6 months Existing All Jurisdictions Y
at Carver Hill Administration School Board School Board Facilities Dept.
Administration
Complex
TED/REMOVED PROJECTS
insufficient
Restore 4.5 miles of X - completed
Beach Erosion; funding from
critically eroded beaches per Mr. Jim All Jurisdictions
1 Beach Renourishment 2005 Hurricane & Tropical yes Okaloosa County Okaloosa County Okaloosa County $20,000,000.00 $.01 Tourist 4 months Existing Y
on Okaloosa Island and Trifilio and tourist
Storm; and Storm Surge Development tax
western Destin 8/13/2014
& MSBU
X - completed
Need master plan to
per Mr.Tom Town of
3 Master Drainage Plan 1999 mitigate stormwater runoff Flood yes Town of Shalimar Town of Shalimar Town of Shalimar - Public Works $50,000.00 X No Funding 120 days Existing Y
Burns Shalimar
& flooding
8/19/2014
The Coleman Lake outfall
runs under Main Street in
the City of Destin through a
structurally deficient
earthen dam. Based on Dam Safety; Hurricane X - per Mr.
Dunes of Destin Lake
13 2010 increasing frequency and & Tropical Storm; Flood; yes City of Destin City of Destin City of Destin - Public Works $600,000.00 Ken Gallander 3 months Existing City of Destin Y
Drainage Project
depths of potholes at the and Severe Storms 8-19-2014
outfall location, it is
eveident that the structure
is leaking and could lead to
failure
Sewer pump Station Location is unstable and X- per Mr.
City of Niceville - Water & Sewer
12 13 protective 2010 susceptible to erosion and Land Erosion yes City of Niceville City of Niceville $ 10,000.00 Bruce Price 8- X No Funding 90 days Existing City of Niceville Y
Dept.
measures washing. 29-2014
E-6 Packet Pg. 615
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: September 16, 2014
TO: Honorable Chairman and Members of the Board
FROM:
