READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 16, 2014 — reading text
Part 44 of 102. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
of Public Sheltering
resistance.
Norriego Point is the tip of
Holiday Isle and provides
protection to Destin harbor.
Project anticipates
Permanent stabilizing or hardening the
Beach Erosion; and City of Destin
15a Stabilization of 1999 point for improved storm yes City of Destin City of Destin City of Destin - Public Works Dept. $10,200,000.00 X No Funding 2 years Existing Y
Storm Surge and tourist
Norriego Point protection, minimizing
harbor channel shoaling
and to preserve habitat and
recreational areas provided
by the point
Install 120 linear feet of
Upland retaining wall - upland retaining wall along Beach Erosion; and
15b 2014 yes City of Niceville City of Niceville City of Niceville - Public Works Dept. $12,000.00 X No Funding 6 months Existing City of Niceville Y
Lions Park the remaining unprotected Storm Surge
shore line at Lions park
Installation of water
distribution isolation valves Hurricane & Tropical
Water distribution to preserve water quality Storms; Flood; Severe City of
16a 2011 yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $150,000.00 X No Funding 1 year Existing Y
isolation valves and losses in the event of Storms: Erosion and Valparaiso
system depresurization for storm Surge
any reason
E-5 Packet Pg. 614
Okaloosa County
2011 LMS
Appendex E
YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP
PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY
SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE
NEW COMPLETED DELETED DEFERRED
various locations Hurricane & Tropical
Relocation, elevation, throughout unincorporated Storms; Flood; Severe Okaloosa
16b 2014 yes Okaloosa County Okaloosa County Okaloosa County $ 2,000,000.00 + X No Funding 1 year Existing Y
or acquisition Okaloosa county which Storms: Erosion and County
frequently flood. Storm Surge
Construct new public works
Hurricane & Tropical
New Public Works maintenance garage in City of
17a 2010 Storms; Flood; and yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $750,000.00 X No Funding 18 months New Y
Maintenance Yard accordance with Florida Valparaiso
Severe Storms
Building Codes
Wind Retrofit of Golf The Golf Course
Course Clubhouse & Clubhouse does not Hurricane & Tropical Structural Soundness
City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public City of Fort
17b Develop Backup 1999 currently meet the 140 mph Storm; Flood; and of Existing Local $100,000.00 X No Funding 6 months Existing Y
Beach Beach Works Dept. Walton Beach
Emergency Operation wind code for building Severe Storms Government Centers
Center construction.
Redesign of Redesign and replace Hurricane & Tropical
City of Mary City of Mary
18a stormwater culvert on 2014 stormwater culvert behind Storm; Flood; and yes City of Mary Esther City of Mary Esther - Public Works $300,000.00 X X No Funding 6 months Existing Y
Esther Esther
Brewer Circle 142 - 162 Brewer Circle Severe Storms
Flood,
Brewer Circle Redesign and replace City of Mary
