Okaloosa County BOCC — October 21, 2014 — 09-10-14 Sheriff's Office GMP Proposal — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 82-09-10-14 Sheriff_s Office GMP Proposal.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
27,160
2a {DEMOLITION $ -|$ 8,500 | $ 8,500
2b {UTILITIES $ -|$ 38,107 | $ 22,310
2c _|DEWATER ELEVATOR PIT $ -|$ 19,111 | $ 7,911
2d {FENCE $ -|$ -|$ 2,500
3 _|CONCRETE $ 95,164 | $ 167,772 | $ 160,887
4 MASONRY $ 11,000 | $ 11,000 | $ 16,371
5 _|METALS $ 21,650 | $ 21,650 | $ 21,897
5a__|DOWN SPOUT BOOTS $ 2,522 | $ 2,522 | $ a
6 _|ROUGH CARPENTRY $ 638 | $ 638 | $ 3,545
6a__|CASEWORK $ 18,000 | $ 24,050 | $ 17,640
6b __|WINDOW SILLS (w/ Casework) $ -|$ 6,002 | $ a
7__|WATERPROOF ELEVATOR PIT $ 2,500 | $ 3,000 | $ 4,000
8 FRAMES, DOORS AND HARDWARE $ 60,353 | $ 60,810 | $ 58,191
8a__|ACCESS CONTROL $ 6,360 | $ 27,560 | $ 17,989
8b _|ALUMINUM WINDOWS & GLAZING $ 23,314 | $ 23,314 | $ 22,832
9 GYPSUM BOARD SYSTEM $ 63,920 | $ 80,801 | $ 95,400
9a__|ACOUSTICAL CEILING (W/Gyp Brd) $ 33,800 | $ 31,155 | $ =
9b _|HARD TILE $ 10,878 | $ 13,810 | $ 8,500
9c __|CARPTET & RESILIENT $ 27,500 | $ 27,500 | $ 16,677
Qd__|PAINT $ 25,975 | $ 25,975 | $ 17,350
10 _|SPECIALTIES $ 7,488 | $ 10,645 | $ 5,983
10a_|CANOPY $ -|$ 6,000 | $ 7,600
11 |EQUIPMENT $ -|$ -|$ -
12 __|BLINDS $ 900 | $ -|$ =
13 __|METAL BUILDING $ 230,868 | $ 234,525 | $ 233,314
13a_ {METAL BUILDING ERECTION $ 71,250 | $ 73,313 | $ 83,000
13b_|METAL BUILDING / PANELS UNLOAD $ -|$ -|$ 5,733
14 _|ELEVATOR $ 40,000 | $ 35,750 | $ 35,750
15 _|FIRE PROTECTION $ 25,577 | $ 25,577 | $ 24,500
15a_|PLUMBING $ 30,000 | $ 36,500 | $ 48,500
15b {HVAC $ 110,000 | $ 124,615 | $ 125,945
16 |ELECTRICAL $ 171,000 | $ 153,950 | $ 145,000
17 _|COMMUNICATIONS $ -|$ -|$ =
SUBTOTAL] $ 1,191,219 | $ 1,431,343 | $ 1,362,771
CONTINGENCY (3%)
TOTAL COST + CONTINGENCY
LIABILITY INSURANCE
BUILDERS RISK
TOTAL COST + INSURANCE
ADD FOR BOND
TOTAL COST + BOND
OVERHEAD & PROFIT (5%)
TOTAL COST + O&P
BUILDING PERMIT (Allowance)
CONTRACT PRICE
$ - $ 42,940 $ 41,740
$ 1,191,219 $ 1,474,283 $ 1,404,511
$ - $ 3,686 $ 681
$ 6,982 $ 7,396 $ 7,110
$ 1,198,201 $ 1,485,365 $ 1,412,303
$ 11,401 $ 14,082 $ 12,305
$ 1,209,602 $ 1,499,447 $ 1,424,608
$ 59,910 $ 74,268 $ 70,615
$ 1,269,512 $ 1,573,715 $ 1,495,223
$ - $ - $ 8,924
$ 1,269,512 $ 1,573,715 _$ 1,504,147
Lord & Son Construction, Inc. . . . Start Date: OSMAY14 | MEE Early bar GE Critical bar rs Finish milestone point
Bala ies 2a Sheriff Office at Shalimar, FL Completion Date: 19FEBIS | pa progress har @ Start milestone point
T 2014
‘b — besenpwer Dur start | 7 Finish - Float es — ie a bo ps _ a a | 3 fro i [ea ba : — fos
100 CM Contract Award O|O5MAY14A
110 _ | Sheriff Construction Doc Estimate ~ OJOSMAY14A |23MAY14 A 100
120° | | Approved Const Doc Estimate 0/26MAY14A |28MAY14A 100) \
430 | Metal Building Shop Drawings | ~ 0/O5MAY14A |23JUN14. A 100 Finalized
132 | Geotechical Survey | ofO1UL14a fttuUL14A | Ie Survey
140 | Design Foundations - 0/08JUL14A |18JUL14A 100 gn Foundations
150 | Fab & Deliver Metal Building ~ §|23JUN14A |29AUG14 | 35d] 85 | Fab & Deliver Metal Building
152 | Bid Rebar 0/08JUL14A |31JUL14A 100 BidResar =P)
160 |Rebar Shop Drawings 3/04AUG14A |27AUG14_ | 118d] 40 es re Rebar Shop Drawings
1470 ~ | Approve Rebar 1 28AUG14 28AUG14 : “118d 7 0 =a Approve Rebar
180 |Fab&DeliverRebar 5|20auG14 |04SEP14 | 118d| 0 ; ||) qm Fab & Deliver Rebar
190 | Advertise for Bids ~ olosmay14a |temayi4a| | 100
200 | Sheriff Final | Drawings OS 0|26MAY14A |30JUL14A 100 Sheriff Final Drawings
[220 Review 100% Documents O|0aJUL14A [16JUL14A | | 100) 100% Documents
[230 | Bid Sheriff's Building _ 0/29JUL14A |20AUG14A| |: 100 Seis Puig st
240 |Review GMP 7|25aUG14A |02SEP14 | 13d| 30 | > EE | ReviewGMP —
250 | Approved GMP 9 o2seP14 | 13d) 0 Caliente
260 | Bid Demolition 0/27JUN14A |07JUL14A | | 100 :
270 | Recieve Bids for Demolition 0 ‘JO7JUL14 A 100}r Demolition ot
280 |Write Contract — 2/25AUG14 |26AUG14 ol 0 aes Contract | ;
290 | Demolition of Concrete Paving 4|27auG14 |01SEP14 | 0] Oo! f :
292 |BuildingPad 14|02SEP14 |19SEP14
300 Publish Concrete Fnd & Bldg 0/29JUL14A | 11AUG14A
310 | Mobilize Concrete Work 5/02SEP14 | 08SEP14
840 |SubmitElevator = 0/16JUN14 A |40JUL14A
850 | Approve Elevator ~ | 2fttuuL14a |26auG14 | 25d
860 | Fab & Deliver Elevator 7o|27AUG14 |o2DEC14 | 25d |Fab & Deliver Elevator
1120 |Layout Foundations ajzesepia [zssepia | of 0) «=—Sti(<ié‘é‘aé‘iédlé~*~*~*~” Cm ayoutRoundations |
1140 | Prep Slab On Grade ~15/24SEP14 |140CT14 0
4150 |Plumbing R/l Slab On Grade 3/24SEP14 |26SEP14 | 124/ 0
1160 | Electrical R/I Slab On Grade 6|24SEP14 |o1ocT14 | 9d} 0
1170 |Fire Protection RI Slab OnGrade | 2/24SEP14 |25SEP14 0
1180 |Pour Slab On Grade | 3{ts0cT14 |avoctia | 0] 0 mm Pour Slab On Grade
1190 |Erect Pre-Engineered Bldg Frame 15/200CT14 |07NOV14 0 0) ‘J Erect Pre-Engineered Bldg Frame
1200 |Masonry Walls - Building Tie In 5|200CT14 |240CT14 19d 0 Masonry Walls - Building Tie In '
1210 |Framing Roof- Bldg TieIn s|270cT14 |310cT14 | 19d) 0 er Fring Roof - Bldg Tie In
1220 | Roof Pre-Engineered Metal Bldg 8|10NOV14 |19NOV14 o| o | ml Roof Pre Engineered Metal Bldg
1230 |Prep- Slab OnMetalDeck 4|14nov14 |19Nov14 | of 0 '- Prep- Slab On Metal Deck |
1240 | Pour Slab On Metal Deck 3/20N0V14_|24Nov14 o| Oo “= Pour Slab On Metal Deck
4250 |Metal Siding Pre-Engineered Metal 10/21NOv14. |o4DEC14 | 0] OO —— Siding Pre- -Engineered Metal Bldg
1260 | Light Gauge Metal Framing | 40/02DEC14 | 15DEC14 o| oo a Light Gauge Metal Framing
Lord & Son Construction, Inc. . . . Start Date: OSMAY14 | iz Early bar HEE Critical bar ® Finish milestone point
Loco oe 23AUGT4 Sheriff Office at Shalimar, FL Completion Page 34 Poa | HH Progress bar ® Start milestone point
2014 2015
i Description : jour Star 7 Finish Peat aa : ia Se 5 ka ~ - ve 2 zl joe ra oa we 7 pr Fe os — 22 = _ ee {19 ~ ge Te ~_ [os f
1270 |Hang & Finish Gypsum Board 40/16DEC14 |30DEC14 2d 0 > -Hang & Finish Gypsum Board
1280 | Plumbing Wall & Ceiling Rough- In 5|/05DEC14 MMDEC14 4d 0 ng f
1290. | Ductwork ‘| 10/05DEc14 |1spEci4 | 0] 0
1300 | Insulate Ductwork —_ 10/15DEC14 |29DEc14 | | 0
1310 | Electrical Wall & Ceiling Rough In | 10/05DEC14 |18pECi4 | 1a] 0
1320 | Electrical Pull Conductors 10/12DEC14 |26DEC14 1d] 0 {Electrical Pull Conductors
1330 | Fire Protection Rough In ~42/03pEC14 | 18DEC14 4d| 0 iE Fire Protection Rough In
/1340 | Equipment Pads ~ 4/25NOV14. |28NOV14 bd] 0 Le Equipment Pads H
1350 |Set HVAC Equipment 4lo1DEct4 |o4DEC14 5d| 0 “C. Set HVAC Equipment!
1360 [Hookup HVAC Equipment ~ elospecta |120EC14 | 5d) 0, ea Hookup HAG Equipment
1370 | Start Up HVAC 5/15DEC14 |19DEC14 sd| oo pian Stat Up HVAC
[1380 |Elevator 25|31DEC14 |o4FEB15 | 6d) 0 ‘lf ENE Elevator
[1390 |Prme&1stCoat | | ~—*| ~=s7/30DEC14_losvANiS | 0] O uh Prime & 1st Coat “
1400 |Door & Hardware 6/05JAN15 | 12JAN15 ad| 0 dware
1410. |Hard Tile —_ B|30DEC14 [OQJAN1IS | 13d) 0)
1420. | Casework 5/09JAN15 | 15JAN15 gd] 0
1430 | Acoustical Ceiling Grid 4/09JAN15 | 14JAN15 o| oo pa Acoustical Ceiling Grid |
1440. |Light Fixtures and Ceiling Devices | 8/12JAN15 |21JAN15 | | | ‘Light Fixtures and Ceiling Devices
1450 |Grills & Registers 4/13JAN15 16JAN15 1d 0 > Grills & Registers |
1460 |Acoustical Ceiling Tile 4/19JAN15 [22JAN15 1d] 0 a-Acoustical Celling Tile
1470 |VCT&Base —-3/23JAN15 |27JAN15 1d} 0 ie: VCT & Base
1480 | Carpet 3/28JAN15 | 30JAN15 1d} 0 ‘lum Carpet!
1490 [Plumbing Fixtures 2/28JAN15 | 29JAN15 1d] 0 ie Plumbing Fiures
1500 |Specialties ~ 2/30JAN15 |02FEB15 1d] 0 ae Specialties
1510 | Electrical Trim 8/20JAN15 |29JAN15 | 0] O Electrical Trim
1520 |Comm, FA, SecurityTrim | 10/12JAN15 |23JAN15 4a} 0 |» mmm Comm, FA, Security Trim
1530 |FinishPaint | | 5|30JAN15 |O5FEBIS | | 0 a Finish Paint
1540 |Test&Balance 10/13UAN15 |26JAN15 | 8d| 0 sm Test & Balance
1550 |Close Out Documents “| 40/20JAN15 |02FEB15 8d) 0 —— Out Documents
4560 | Final Clean | S/06FEB15 | 12FEB15 Ce) : nse Clean
1570 |Inspection& PunchOut 5/13FEB15 | 19FEB15 o| ol ut Inspectio!
11580 | Turn Over Project na) ~-|49FEB15 of 0 ” Hire Ove