Okaloosa County BOCC — February 4, 2014 — Pre-application for Design, Construct and Equip Air Traffic Control Tower at DTS — reading text
Part 9 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 83-Pre-application for Design_ Construct and Equip Air Traffic Control Tower at DTS.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
properties listed, or eligible for listing, in the National Register of Historic Places. The review was conducted in
accordance with Section 106 of the National Historic Preservation Act of 1966, as amended and 36 CFR Part 800:
Protection of Historic Properties.
Based on the information provided, it is the opinion of this office that no historic properties will be affected as a
result of the proposed undertaking.
However, our review indicates that the Destin Airport (aka the Northwest Florida Regional Airport) began operating
in 1957 but it has not been formally recorded and entered into the Florida Master Site File (FMSF). If historic, we
request that the airport, including associated runways, taxiways, and all buildings or structures 50 years old or older
be recorded using a Resource Group form. A copy of this form may be obtained at the FMSF website
(http:/Avww. fiheritage.com/preservation/sitefile). However, if the buildings or structures in the project area are less
than 50 years old, no additional information is required.
For any questions, please contact Katherine Shelfer, Historic Preservationist, katherine.shelfer@dos.myflorida.com,
or by phone, 850.245.6333,
Sincerely,
CirmcoAbug, A. Prraons, DSHPO fer
Robert F. Bendus, Director
Division of Historical Resources
and State Historic Preservation Officer
\
tt,
DIVISION OF HISTORICAL RESOURCES
R. A. Gray Building * 500 South Bronough Street ° Tallahassee, Florida 32399-0250 \
3
M Telephone: 850.245.6300 « www. flheritage.coimn
Commemorating 500 years of Florida histor www.fla500.com
VIVA FLORIOA500. g 500 years of ae!" VIVA FLORIDA SOD
FAA
Airports
Grant Assurances
Airport Sponsors
A. General.
1.
These assurances shall be complied with in the performance of grant agreements
for airport development, airport planning, and noise compatibility program grants
for airport sponsors.
These assurances are required to be submitted as part of the project application by
sponsors requesting funds under the provisions of Title 49, U.S.C., subtitle VII, as
amended. As used herein, the term "public agency sponsor" means a public
agency with control of a public-use airport; the term "private sponsor" means a
private owner of a public-use airport; and the term "sponsor" includes both public
agency sponsors and private sponsors.
Upon acceptance of this grant offer by the sponsor, these assurances are
incorporated in and become part of this grant agreement.
B. Duration and Applicability.
1.
Airport development or Noise Compatibility Program Projects Undertaken
by a Public Agency Sponsor. The terms, conditions and assurances of this grant
agreement shall remain in full force and effect throughout the useful life of the
facilities developed or equipment acquired for an airport development or noise
compatibility program project, or throughout the useful life of the project items
installed within a facility under a noise compatibility program project, but in any
event not to exceed twenty (20) years from the date of acceptance of a grant offer
of Federal funds for the project. However, there shall be no limit on the duration
of the assurances regarding Exclusive Rights and Airport Revenue so long as the
airport is used as an airport. There shall be no limit on the duration of the terms,
conditions, and assurances with respect to real property acquired with federal
funds. Furthermore, the duration of the Civil Rights assurance shall be specified
in the assurances.
Airport Development or Noise Compatibility Projects Undertaken by a
Private Sponsor. The preceding paragraph 1 also applies to a private sponsor
except that the useful life of project items installed within a facility or the useful
life of the facilities developed or equipment acquired under an airport
development or noise compatibility program project shall be no less than ten (10)
years from the date of acceptance of Federal aid for the project.
Alrport Sponsor Assurances (4/2012)
ARP Page 1 of 17
3. Airport Planning Undertaken by a Sponsor. Unless otherwise specified in this
grant agreement, only Assurances 1, 2, 3, 5, 6, 13, 18, 30, 32, 33, and 34 in
section C apply to planning projects. The terms, conditions, and assurances of
this grant agreement shall remain in full force and effect during the life of the
project.
C.
grant that:
1.
Sponsor Certification. The sponsor hereby assures and certifies, with respect to this
General Federal Requirements. It will comply with all applicable F ederal laws,
regulations, executive orders, policies, guidelines, and requirements as they relate
to the application, acceptance and use of Federal funds for this project including
but not limited to the following:
Federal Legislation
es Ao Tf
mh
PODOB RS Ree
¥
t
u.
Vv.
Ww,
X.
Title 49, U.S.C., subtitle VII, as amended,
Davis-Bacon Act - 40 U.S.C. 276(a), et seq.’
Federal Fair Labor Standards Act - 29 U.S.C. 201, et seq.
Hatch Act—5 U.S.C. 1501, et seq.”
Uniform Relocation Assistance and Real Property Acquisition Policies
Act of 1970 Title 42 U.S.C. 4601, et seq.”
National Historic Preservation Act of 1966 - Section 106 - 16 U.S.C.
470(f).'
Archeological and Historic Preservation Act of 1974 - 16 U.S.C. 469
through 469c.!
Native Americans Grave Repatriation Act - 25 U.S.C. Section 3001, et
seq.
Clean Air Act, P.L. 90-148, as amended.
Coastal Zone Management Act, P.L. 93-205, as amended.
Flood Disaster Protection Act of 1973 - Section 102(a) - 42 U.S.
Title 49, U.S.C., Section 303, (formerly known as Section 4(f))
Rehabilitation Act of 1973 - 29 U.S.C. 794.
Civil Rights Act of 1964 - Title VI - 42 U.S.C. 2000d through d-4.
Age Discrimination Act of 1975 - 42 U.S.C. 6101, et seq.
American Indian Religious Freedom Act, P.L. 95-341, as amended.
Architectural Barriers Act of 1968 -42 U.S.C, 4151, et seq.!
Power plant and Industrial Fuel Use Act of 1978 - Section 403-2 U.S.C.
8373.|
Contract Work Hours and Safety Standards Act - 40 U.S.C. 327, et seq.
Copeland Anti kickback Act - 18 U.S.C. 874.1
National Environmental Policy Act of 1969 - 42 U.S.C. 4321, et seq.’
Wild and Scenic Rivers Act, P.L. 90-542, as amended.
Single Audit Act of 1984 - 31 U.S.C. 7501, et seq.”
Drug-Free Workplace Act of 1988 - 41 U.S.C. 702 through 706.
C. 4012a.'
Executive Orders
Paga 2 of 17
Alrport Sponsor Assurances (4/2012)
ARP
Executive Order 11246 - Equal Employment Opportunity’
Executive Order 11990 - Protection of Wetlands
Executive Order 11998 — Flood Plain Management
Executive Order 12372 - Intergovernmental Review of Federal Programs
Executive Order 12699 - Seismic Safety of Federal and Federally Assisted New
Building Construction!
Executive Order 12898 - Environmental Justice
Federal Regulations
14 CFR Part 13 - Investigative and Enforcement Procedures.
a.
b. 14 CFR Part 16 - Rules of Practice For Federally Assisted Airport
Enforcement Proceedings.
C, 14 CFR Part 150 - Airport noise compatibility planning.
d. 29 CFR Part | - Procedures for predetermination of wage rates, |
e. 29 CFR Part 3 - Contractors and subcontractors on public building or
public work financed in whole or part by loans or grants from the United
States.
f, 29 CFR Part 5 - Labor standards provisions applicable to contracts
covering federally financed and assisted construction (also labor standards
provisions applicable to non-construction contracts subject to the Contract
Work Hours and Safety Standards Act).
g. 41 CFR Part 60 - Office of Federal Contract Compliance Programs, Equal
Employment Opportunity, Department of Labor (Federal and federally
assisted contracting requirements).
h, 49 CFR Part 18 - Uniform administrative requirements for grants and
cooperative agreements to state and local governments.”
49 CFR Part 20 - New restrictions on lobbying.
49 CFR Part 21 - Nondiscrimination in federally-assisted programs of the
Department of Transportation - effectuation of Title VI of the Civil Rights
Act of 1964.
k. 49 CFR Part 23 - Participation by Disadvantage Business Enterprise in
Airport Concessions.
L 49 CFR Part 24 - Uniform relocation assistance and real property
acquisition for Federal and federally assisted programs.'
49 CFR Part 26 — Participation By Disadvantaged Business Enterprises in
m,
Department of Transportation Programs.
n, 49 CFR Part 27 - Nondiscrimination on the basis of handicap in programs
and activities receiving or benefiting from Federal financial assistance. '
0. 49 CFR Part 29 - Government wide debarment and suspension
(nonprocurement) and government wide requirements for drug-free
workplace (grants).
p. 49 CFR Part 30 - Denial of public works contracts to suppliers of goods
and services of countries that deny procurement market access to U.S.
contractors,
Page 3 of 17
Airport Sponsor Assurances (4/2012) ARP
49 CFR Part 41 - Seismic safety of Federal and federally assisted or
q.
regulated new building construction,
Office of Management and Budget Circulars
A-87 - Cost Principles Applicable to Grants and Contracts with State and
Local Governments,
b. A-133 - Audits of States, Local Governments, and Non-Profit
Organizations
| These laws do not apply to airport planning sponsors.
2 These laws do not apply to private sponsors.
3 49 CFR Part 18 and OMB Circular A-87 contain requirements for State
and Local Governments receiving Federal assistance. Any requirement
levied upon State and Local Governments by this regulation and
circular shall also be applicable to private sponsors receiving Federal
assistance under Title 49, United States Code.
Specific assurances required to be included in grant agreements by any of the
above laws, regulations or circulars are incorporated by reference in this grant
a.
agreement,
2. Responsibility and Authority of the Sponsor.
Public Agency Sponsor: It has legal authority to apply for this grant, and
to finance and carry out the proposed project; that a resolution, motion or
similar action has been duly adopted or passed as an official act of the
applicant's governing body authorizing the filing of the application,
including all understandings and assurances contained therein, and
directing and authorizing the person identified as the official
representative of the applicant to act in connection with the application
and to provide such additional information as may be required.
b. Private Sponsor: It has legal authority to apply for this grant and to
finance and carry out the proposed project and comply with all terms,
conditions, and assurances of this grant agreement. It shall designate an
official representative and shall in writing direct and authorize that person
to file this application, including all understandings and assurances
contained therein; to act in connection with this application; and to
provide such additional information as may be required.
Sponsor Fund Availability. It has sufficient funds available for that portion of
the project costs which are not to be paid by the United States. It has sufficient
funds available to assure operation and maintenance of items funded under this
grant agreement which it will own or control,
4, Good Title.
It, a public agency or the Federal government, holds good title,
satisfactory to the Secretary, to the landing area of the airport or site
thereof, or will give assurance satisfactory to the Secretary that good title
will be acquired.
a.
a.
Page 4 of 17
Airport Sponsor Assurances (4/2012) ARP
b. For noise compatibility program projects to be carried out on the property
of the sponsor, it holds good title satisfactory to the Secretary to that
portion of the property upon which Federal funds will be expended or will
give assurance to the Secretary that good title will be obtained.
5. Preserving Rights and Powers.
It will not take or permit any action which would operate to deprive it of
any of the rights and powers necessary to perform any or all of the terms,
conditions, and assurances in this grant agreement without