Okaloosa County BOCC — August 19, 2014 — FAA Grant Application_VPS Boarding Ramps — reading text
Part 3 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 39-FAA Grant Application_VPS Boarding Ramps.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
are-op Will)
be clearly identified and separated from eligible items in
solicitations, contracts, and related project documents.
June 28, 2005
Page 1 of 2
Yes No N/A
7. Mandatory contact provisions for grant-assisted contracts have ra
been oil bSincluded in consultant services contracts. LJ L]
8. The cost-plus-percentage-of-cost methods of contracting aA 0
LJ
prohibited under Federal standards were-not or will notbe used.
9. If the services being procured cover more than the single grant
project referenced in this certification, the scope of work was-or ef
(will be specifically described in the advertisement, and future CJ LJ
work will not be initiated beyond five years.
| certify, for the project identified herein, responses to the forgoing items are accurate as marked and
have prepared documentation attached hereto for any item marked “no” that is correct and complete.
OKALOOSA COUNTY FLORIDA
lame Ff Sponsor)
4
(Signatur¢ of Sp Vina Official Representative)
Sunil Hafman/AA.E., IAP
{T} yped Name of Sponsor's Designated Official Representative)
Airports Director
(Typed Title of Sponsor's Designated Official Representative)
July 31, 2014
(Date)
Page 2 of 2 June 28, 2005
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
AIRPORT IMPROVEMENT PROGRAM
SPONSOR CERTIFICATION
PROJECT PLANS AND SPECIFICATIONS
NORTHWEST FLORIDA REGIONAL PAX LOADING BRIDGES
OKALOOSA COUNTY
(Sponsor) (Airport)
(Project Number)
Description of Work:
Title 49, United States Code, section 47105(d), authorizes the Secretary to require certification from
the sponsor that it will comply with the statutory and administrative requirements in carrying outa
project under the Airport |!mprovement Program (AIP). AIP standards are generally described in
FAA Advisory Circular (AC) 150/5100-6, Labor Requirements for the Airport Improvement Program,
AC 150/5100-15, Civil Rights Requirements for the Airport Imorovement Program, and AC
150/5100-16, Airport Improvement Program Grant Assurance One--General Federal Requirements.
A list of current advisory circulars with specific standards for design or construction of airports as
well as procurement/installation of equipment and facilities is referenced in standard airport sponsor
Grant Assurance 34 contained in the grant agreement.
Except for the certified items below marked not applicable (N/A), the list includes major requirements
for this aspect of project implementation, although it is not comprehensive, nor does it relieve the
sponsor from fully complying with all applicable statutory and administrative standards.
Yes No N/A
1. The plans and specifications veri prepared in
accordance with applicable Federal standards and requirements,
so no deviation or modification to standards set forth in the
advisory circulars, or State standard, is necessary other than
those previously approved by the FAA.
C
O
e) proprietary or written so as to restrict competition. At least
2. Specifications for the procurement of equipment are not {will not
2 manufacturers can meet the specification.
3. The development included@to be included in the plans is
depicted on the airport layout plan approved by the FAA.
4, Development that is ineligible for AIP funding has beer(will be)
omitted from the plans and specifications.
5. The process control and acceptance tests required for the
project by standards contained in Advisory Circular 150/5370-10
included in the project specifications.
a
6. Ifa value engineeri use is incorporated into the contract,
concurrence was (will be) obtained from the FAA.
7.
a FRA RR
Oooogoa g
Omqg@ooaoadg
The plans and specifications incorporate twill incorporate
applicable requirements and recommendations sef forth in the
Federally approved environmental finding.
Pago 1 of 2
Jure 28, 2005
Yes No N/A
8. For construction activities within or near aircraft operational
areas, the requirements ,contained in Advisory Circular
150/5370-2 have been (will bé)discussed with the FAA as well wm [| [|
as incorporated into the specifications, and a safety/phasing plan
has FAA’s concurrence, if required.
9. The project was((uil be) physically completed without Federal
participation in costs due to errors and omissions in the plans ta
and specifications that were foreseeable at the time of project LI LJ
design.
| certify, for the project identified herein, responses to the forgoing items are accurate as marked and
have prepared documentation attached hereto for any item marked “no” that is correct and complete.
OKALOOSA COUNTY FLORIDA
2. PA
(Namgfof SfoprSor)
(Signaffre of Sons lesignated Official Representative)
Su Hafmay, A.A.E., IAP
(Typed Name of Sponsor's Designated Official Representative)
Airports Director
(Typed Title of Sponsor's Designated Official Representative)
July 31, 2014
(Date)
Page 2 of 2 June 28, 2005
LPA Group Inc.
A Unit of Michael Baker
THE
LPA ee 4503 Woodland Corporate Bivd.
GROUP — .
TRANSPORTATION CONSULTANTS Suite 400
Tampa, Florida 33614
A UNIT OF MICHAEL BAKER CORPORATION
(813) 889-3892
July 14, 2014
Mr. Tracy Stage, A.A.E.
Deputy Director
Okaloosa County Airports
1701 State Road 85 N
Eglin AFB, Florida 32542-1413
Re: Recommendation of Award; Bid No. AP 49-14
Boarding Bridges and Bag Lifts
Dear Mr. Stage,
We have reviewed the bids submitted on June 25, 2014 for the above referenced project.
The County had a total of two bidders, however only one was responsive.
Thyssen Krupp Airport Systems Inc. Base Bid: $1,686,450.00
Additive 1: $ 197,577.00
Additive 2: $114,611.00
Cathey Construction and Development, LLC No price provided
Thyssen Krupp Airport Systems Inc., (TKAS) has been determined to be the lowest
responsive bidder. Details of their bid are listed below:
o History- In Florida alone, TKAS has supplied 55 bridges to Miami, 35 to Orlando, 28 to
West Palm Beach, 12 to Sanford, two in Tallahassee, and 13 to Tampa.
Internationally, they have installed over 5,000 bridges. They have been in business for
30 years and are widely considered a reputable manufacturer of airport boarding
bridges.
Size of Firm- Bonding capacity of $400M. They have 217,042 s.f. of manufacturing
space with 14 overhead cranes.
o Subcontractor- The installer they identify is Aero Bridge Works for a contract value of
$241,864.00. No Subcontractor Qualification form was provided, however it was not
required because the subcontract amount is below $500,000 and it is less than 25% of
contract value.
o DBE participation- TKAS lists two DBE subcontractors. The first is Airport Contractor
Services for an amount of $103,101.00 to perform or supply barricades, cranes,
engineering, apron striping, and auxiliary components. The second is Davis Freight
Management for an amount of $27,635 to perform transportation. Since equipment
suppliers only count for 60% of total, this number is adjusted to $89,496 which
equates to 4.48%; exceeding the County goal of 4.03%.
Funding- Since there is two different grants, the bag lifts must be broken out of the bid
schedule. For tracking, | have identified the boarding bridges as Grant #1 and the Bag lifts as
Grant #2. Please refer to attached Bid Tab for calculations under the heading “Funding
Adjustments”. The total for Grant #1 including additive bids (preconditioned air and ground
power) is $1,858,917. The total for Grant #2 is $139,721.
A bid bond was provided and all required forms were completed without exception. All
addendums were acknowledged. Thyssen Krupp provided a General Contractors license and
the installer provided a Florida General Contractor’s license. In LPA’s review, we found no
major unbalanced unit prices and no irregularities with their bid. It is our opinion the bid is
complete and responsive, subject to County Purchasing review and Okaloosa County Board of
County Commissioners’ approval. LPA recommends award of the contract to Thyssen Krupp
Airport Systems Inc. Selection of the additive bids is dependent on grant funding and local
matches.
Should you have questions, please advise.
Sincerely,
THE LPA GROUP INCORPORATED
Doug Hambrecht, PE,
Project Manager
Attachment: Bid Tabulation (1 page)
LPA Group Inc.
A Unit of Michael Baker
E
(pA aN 4503 Woodland Corporate Blvd.
GROUP Suite 400
TRANSPORTATION CONSULTANTS
A UNIT OF MICHAEL BAKER CORPORATION Tampa, Florida 33614
(813) 889-3892
July 14, 2014
Mr. Tracy Stage, A.A.E.
Deputy Director
Okaloosa County Airports
1701 State Road 85 N
Eglin AFB, Fiorida 32542-1413
Re: Recommendation of Award; Bid No. AP 49-14
Boarding Bridges and Bag Lifts
Dear Mr. Stage,
We have reviewed the bids submitted on June 25, 2014 for the above referenced project.
The County had a total of two bidders, however only one was responsive.
Thyssen Krupp Airport Systems Inc. Base Bid: $1,686,450.00
Additive 1: $197,577.00
Additive 2: $ 114,611.00
Cathey Construction and Development, LLC No price provided
Thyssen Krupp Airport Systems Inc., (TKAS) has been determined to be the lowest
responsive bidder. Details of their bid are listed below:
9 History- In Florida alone, TKAS has supplied 55 bridges to Miami, 35 to Orlando, 28 to
West Palm Beach, 12 to Sanford, two in Tallahassee, and 13 to Tampa.
Internationally, they have installed over 5,000 bridges. They have been in business for
30 years and are widely considered a reputable manufacturer of airport boarding
bridges.
o Size of Firm- Bonding capacity of $400M. They have 217,042 s.f. of manufacturing
space with 14 overhead cranes.
o Subcontractor- The installer they identify is Aero Bridge Works for a contract value of
$241,864.00. No Subcontractor Qualification form was provided, however it was not
required because the subcontract amount is below $500,000 and it is less than 25% of
contract value.
o DBE participation- TKAS lists two DBE subcontractors. The first is Airport Contractor
Services for an amount of $103,101.00 to perform or supply barricades, cranes,
engineering, apron striping, and auxiliary components. The second is Davis Freight
Management for an amount of $27,635 to perform transportation. Since equipment
suppliers only count for 60% of total, this number is adjusted to $89,496 which
equates to 4.48%; exceeding the County goal of 4.03%.
Funding- Since there is two different grants, the bag lifts must be broken out of the bid
schedule. For tracking, | have identified the boarding bridges as Grant #1 and the Bag lifts as
Grant #2. Please refer to attached Bid Tab for calculations under the heading “Funding
Adjustments”. The total for Grant #1 including additive bids (preconditioned air and ground
power) is $1,858,917. The total for Grant #2 is $139,721.
A bid bond was provided and all required forms were completed without exception. All
addendums were acknowledged. Thyssen Krupp provided a General Contractors license and
the installer provided a Florida General Contractor’s license. In LPA’s review, we found no
major unbalanced unit prices and no irregularities with their bid. It is our opinion the bid is
complete and responsive, subject to County Purchasing review and Okaloosa County Board of
County Commissioners’ approval. LPA recommends award of the contract to Thyssen Krupp
Airport Systems Inc. Selection of the additive bids is dependent on grant funding and local
matches.
Should you have questions, please advise.
Sincerely,
THE LPA GROUP INCORPORATED
Doug Hambrecht, P.E.
Project Manager
Attachment: Bid Tabulation (1 page)
Bid Tabulation for NORTHWEST.
NORTHWEST FLORIDA REGIONAL AIRPORT 4
FLY VPS
BOARDING BRIDGES AND BAG LIFTS x
OKALOOSA COUNTY AIRPORTS REGIONAL
Bid #: AP 49-14 Sorintamnerer ad
Bid Opening: 6/25/2014, 4:00 PM
BID Engineer's Estimate ThyssenKrupp
Item{ Pay Item Number item Description Quantity j Unit Unit Price Amount Unit Price Amount
4 01000 Mobilization 4 ts $95,000.00: $95,000.00! $59,959.00 $59,959.00
2 P-620-1 Reflective Pavement Markings 2,500 SF $2.10 $5,250.00 $2.35 $5,875.00
Be : P-620-2