About this source
Action Item Printout from the Okaloosa County BOCC meeting of September 16, 2014 (IQM2 meeting #1234). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- September 16, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 366.3 KB
Download ↓Machine-extracted text — 195-Action Item Printout.pdf
Text extracted on 2026-10-31 from 195-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 3.8 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: September 16, 2014
TO: Honorable Chairman and Members of the Board
FROM: Elliot Kampert
SUBJECT: Approval of 2014 LMS-CRS Annual Update
DEPARTMENT: Growth Management
BCC DISTRICT: All
STATEMENT OF ISSUE: Each year, the County must provide the Florida Division of
Emergency Management an update as to the status of the adopted Local Mitigation Strategy,
including any new and completed projects as well as a brief summary of any other changes.
Failure to provide the annual update could jeopardize the County's ability to receive funds in the
event of a declared disaster.
BACKGROUND: In 2011, Okaloosa County and all its municipalities adopted a substantially
revised version of the Local Mitigation Strategy (LMS). The new LMS was found in compliance
by the Florida Division of Emergency Management in April 2011, and by the Federal
Emergency Management Agency in May 2011. By July 2011, all the municipalities as well as
the County had passed ordinances or resolutions adopting the 2011 LMS. Because it includes a
comprehensive analysis of the County’s and municipalities’ floodplain areas and floodplain
management strategies, as well as analyses of all other hazards by which the County is
threatened, the LMS serves as the County’s Hazard Mitigation Plan as provided in Section 510
of the Community Rating System (CRS) Coordinator’s Manual.
The attached Annual Report is structured to comply with the requirements of CRS Activity 510
reporting criteria as provided on pages 510-30 and 510-31 of the National Flood Insurance
Program Community Rating System Coordinator’s Manual, FEMA publication FIA-15/2007.
By providing this update to the media as well as being made available to the public, the County
will receive points for its CRS ranking under the Activity 510 Criteria.
Accompanying the Annual Report is the project priority list for 2014. The following changes
have been made to the priority list as reflected in the Annual Report:
New Projects
New projects have been submitted by the City of Destin, City of Mary Esther, Okaloosa County
and City of Niceville. Most of these projects are a result of the floods in April 2014.
Project # 42 Permanent Stabilization of Norriego Point was updated for an additional 3 million
dollars per Mr. Ken Gallander, Community Development Director for the City of Destin.
Completed Projects
Project #1 Beach re-nourishment described as restoring 4.5 miles of critically eroded beaches on
Okaloosa Island and western Destin. This project was modified by the Board of County
Commissioners to include only 1.7 miles of beaches located in west Destin. These 1.7 miles
were completed in early 2013.
Project #12 Sewer pump station # 13 protection measures for the City of Niceville.
Project # 3 Stormwater plan for the Town of Shalimar was completed in-house.
Project # 13 Dunes of Destin Lake Drainage Project was completed.
Removed Projects
Project #1 Beach re-nourishment described as restoring 4.5 miles of critically eroded beaches (as
subsequently modified) on Okaloosa Island and western Destin was removed.
Project # 3 Stormwater plan for the Town of Shalimar was completed in-house and removed by
Mr. Tom Burns of the Town of Shalimar.
Project #12 Sewer pump station # 13 protection measures for the City of Niceville was
completed and removed by Mr. Bruce Price, City of Niceville.
Project # 13 Dunes of Destin Lake Drainage Project was completed and removed by Mr. Ken
Gallander, City of Destin.
RECOMMENDATIONS: Staff recommends that the Board of County Commissioners
approve the 2014 LMS-CRS Annual Update and authorize transmittal to the Florida Division of
Emergency Management.