disturbance and if
Standard any potential archeological
EHP Review other (EHP) No Recommended
Condition #3 resources are discovered, will
immediately cease construction in
that area and notify the State and
FEMA.
This review does not address all
federal, state and local
requirements. Acceptance of
federal funding requires recipient
Standard to comply with all federal, state
EHP Review Other (EHP) No Recommended
Condition #2 and local laws. Failure to obtain all
appropriate federal, state and local
environmental permits and
clearances may jeopardize federal
funding.
Any change to the approved
scope of work will require re-
Standard
EHP Review Other (EHP) evaluation for compliance with No Recommended
Condition #1
NEPA and other Laws and
Executive Orders.
Insurance Program Requirement to As a condition for receiving Public Yes Recommended
Review Conditions Obtain and Assistance for permanent work, an
(Program Maintain applicant must obtain and
Specific) Insurance maintain insurance to cover that
facility for the hazard that caused
the damage. Such coverage must,
at a minimum, be in the amount of
the estimated eligible damages for
that structure prior to any
reduction. The costs of Section
406 hazard mitigation measures
are included in the amount of
insurance required. If the
requirement to purchase all
insurance is not met, FEMA will
not provide assistance for damage
sustained in the current or a future
disaster of the same type. If the
applicant does not maintain all
required insurance, FEMA will not
provide any assistance for that
facility in future disasters of the
same type. An applicant is exempt
from this requirement for: projects
where the eligible damage (before
any reductions) is less than
$5,000; or facilities for which, in
the determination of the State
https://connect l .dhs.gov /emmie/,Danalnfo=isource. fema.net,SSL+dispatchDestination.do?... J2/2/2014
Federal Emergency Management Agency E-Grants Page 13of13
OKALOOSA (COUNTY): PA-04-FL-4177-PW-00327
Conditions Information
insurance commissioner, the type
and/or extent of insurance being
required by FEMA is not
reasonable. This exemption does
not apply to facilities insurable
under the NFIP because
insurance is both available and
reasonable. The commitment by
the applicant to purchase and
maintain insurance must be
documented and submitted to
FEMA before project approval.
Internal Comments
No. Queue User Date/Time Reviewer Comments
Grantee FRANCIS 11-20-2014
4 Grantee reviewed and advanced for further processing.
Review JEANNETIE 02:16AM GMT
SOW: Okaloosa County, (30.76222, -86.55794), Category E:
Correction' s Alarm Sytem- applicant will replace various
components of corrections building's alarm system. NO HMP.
- pjerniga - 11/07/2014 20:36:01 GMT
EO 11990: Project is not located in wetlands per review of
USFWS National Wetlands Inventory (NWI) mapper, accessed
9/23/2014. - pjerniga - 11/07/2014 20:31:28 GMT
EO 11988: Project is located in an un-shaded X zone per
Okaloosa County FIRM Panel# 12091C0165H dated
12/06/2002. - pjerniga - 11/07/2014 20:30:27 GMT
EHP 11-07-2014
3 KLEIN ADAM NHPA: Per the executed Programmatic Agreement among FL
Review 08:44 PM GMT
SHPO, FL DEM and FEMA, dated September 10, 2014, the
SOW meets the following Programmatic Allowance(s)
(Appendix B of the Programmatic Agreement):
Consult as per Chuck Diters MA SOI Qualified,
11.B.3.d., Installation of communication and surveillance security
systems, such as cameras, closed-circuit television, alarm
systems, and public address systems, provided that installation
of the system hardware does not damage or cause the removal
of character defining architectural features and can be easily
removed in the future. - pjerniga - 11/07/2014 20:27:19 GMT
11nt14 - Review of applicant's insurance policy reveals
coverage for all locations subject to a $50,000 deductible.
Flood deductible has been partially funded under PW 42. No
property damages have been funded to date for non-flood loss.
Insurance 11-07-2014
2 WILSON GINA The anticipated insurance reduction for this project is
Review 07:48 PM GMT
$233,216.75. This project is written for reimbursement under
section 406 of the Stafford Act. As such, an insurance
requirement in the amount of $283,216.75 is set for the
Correction's Center. G. Wilson, Insurance Reviewer
Mitigation AMBROSEN 10-24-2014
1 No mitigation opportunities were identified. RJA 10/24/14
Review RICHARD 05:46 PM GMT
https://connectl.dhs.gov/emmie/,Danalnfo=isource.fema.net,SSL+dispatchDestination.do?... 12/2/2014
.
2016 Q 1: Oct-Dec~ FloridaPA.org Page 1 of 2
4177 Florida Severe Storms, Tornadoes,.c. Okaloosa County Account for 4177 (PA) • Okaloosa Count.
2016 Q1: Oct-Dec
Routing in Progress: State Review (Step 2 of 3)
Form
Previous 1 of 7 - #327 Correction's Alarm System Next Project
Project
Filter for Project: 0 < 100% Complete 0 100%
F #327 - Correction's Alarm System~~~roject)
Category: E Public Buildings & Last Viewed By: Marcella Eubanks (Jan 14,
Equipment 2016)
Eligible $50,903.12 Last Saved By: Marcella Eubanks ( Jan 14,
Amount: 2016)
Work December 4, 2015
Deadline:
Note
If the Estimated Completion Date is greater than the Work Deadline, a Time Extension may be
required (Create New).
If the project scope of work has deviated from the original as approved by FEMA a Interim
Inspection may be required. (Create New).
If this project is 100% complete a Project Closeout is required (Create New).
This Quarterly Report contains 7 Projects. Ensure that all projects are reported on before
submitting this Quarterly Report. Use the above navigation bar to navigate to all Projects.
General
Current Percent Complete: 100 .o/o
The percentage of actual work that has been completed at the end of the reporting period
(not a% of funds expended).
Total Funds Expended to $ 125,958.87
Date: The amount that has been spent on the project to date
Actual Final Amount: $ 284, 119.87
Tl1e estimated cost of a project at completion (which may even exceed the obligated
amount).
Actual Completion Date: Dec 4, 2015