Okaloosa County BOCC — February 16, 2016 — Final Pay Packet — reading text
Part 4 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Final Pay Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
procedures.
PERMITS: The PA Project Specialist has advised the Applicant that it is
their responsibility to obtain all applicable local, state and federal permits
prior to any construction or debris disposal activity referenced on this
project. Applicant has also been advised that the lack of obtaining and
maintaining these documents may jeopardize funding.
INSURANCE: The applicant is aware that all projects are subject to an
insurance review as stated in 44 C.F.R. Sections 206.252 and 206.253.lf
applicable an insurance determination will be made either as anticipated
proceeds or actual proceeds in accordance with the applicant's insurance
policy that may affect the total amount of the project.
DIRECT ADMINISTRATIVE COSTS: The sub grantee is requesting direct
administrative costs that are directly chargeable to this specific project.
Associated eligible work is related to the administration of this PA project
only and in accordance with 44 CFR 13.22. These costs are treated
consistently and uniformly in all federal awards and other sub grantee
activities and are not included in any approved indirect cost rates. The Sub-
Grantee Applicant will claim Direct Administrative Cost. 26.5 hours were
spent in direct preparation of this specific PW for a total cost of $903.12
including 56.15% fringe benefit rate.
Hazard Mitigation Proposal
• Is effective mitigation feasible on this site? INo
If you answered Yes to the above question, the next question is required
Will mitigation be performed on this site? INo
If you answered Yes to the above question, the next question is required
Do you wish to attach a Hazard Mitigation
Proposal?
https://connect l .dhs.gov/emmie/,Danalnfo=isource.fema.net, SSL+dispatchDestination.do?... 12/2/2014
Federal Emergency Management Agency E-Grants Page 6of13
If you answered Yes to the above question, the next two questions are required
Please provide the Scope of Work for the estimate:
(maximum 4000 characters)
Would you like to add the Hazard Mitigation
No
Proposal as a cost line item to the project cost?
GIS Coordinates
Project Location Latitude Longitude
Corrections Building 30.76222 -86.55794
Special Considerations
1. Does the damaged facility or item of work have insurance coverage and/or is it an insurable risk Yes
(e.g., buildings, equipment, vehicles, etc)?
If you would like to make any comments, please enter them below.
(maximum 4000 characters)
Insurance Policy was uploaded to the Network Drive: PA/Insurance/Okaloosa County and attached in CMF
2. Is the damaged facility located within a floodplain or coastal high hazard area and/or does it
No
have an impact on a floodplain or wetland?
If you would like to make any comments, please enter them below.
(maximum 4000 characters)
Panel # 165 of 494 Map # 12091 C0165H
3. Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource
No
System Unit or an Otherwise Protected Area?
4. Will the proposed facility repairs/reconstruction change the pre-disaster conditions (e.g.,
No
footprint, material, location, capacity, use of function)?
5. Does the applicant have a hazard mitigation proposal or would the applicant like technical
No
assistance for a hazard mitigation proposal?
If you would like to make any comments, please enter them below.
(maximum 4000 characters)
Project was reviewed for 406 Hazard Mitigation and determination is made that mitigation is not feasible
6. Is the damaged facility on the National Register of Historic Places or the state historic listing? Is No
it older than 50 years? Are there more, similar buildings near the site?
7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of No
forestland?
8. Are there any hazardous materials at or adjacent to the damaged facility and/or item of work? No
9. Are there any other environmental or controversial issues associated with the damaged facility
and/or item of work? No
Attachments
Document Hard Copy File
User Date Description File Name Action
Type Reference
ELEANOR 08-29- Firmette.pdf(423. 73
Floodplain Firmette View
CONIGO 2014 kb)
For Category C, D, E, F, and G Projects only
Is effective mitigation feasible on this project? No
If you answered Yes to the above question, the next question is required
Will mitigation be performed on any sites in this project? No
If you answered Yes to the above question, the next question is required
Do you wish to attach a Hazard Mitigation Proposal? No
https://connect l .dhs.gov /emmie/,Danalnfo=isource.fema.net,SSL+dispatchDestination.do? ... 12/2/2014
Federal Emergency Management Agency £-Grants Page 7of13
If you answered Yes to the above question, the next two questions are required
Please provide the Scope of Work
for the estimate:
Would you like to add the Hazard Mitigation
No
Proposal as a cost line item to the project cost?
Comments
Project was reviewed for 406 Hazard Mitigation and determination is made that mitigation is not feasible
Attachments
Cost Estimate
Iis this Project Worksheet for
(Preferred) Repair
Material
Unit Unit of Subgrant Cost
Sequence Code and/or Unit Price Type Action
Quantity Measure Budget Class Estimate
Description
*** Version 0 •••
Work Completed
Work
1 9007 Labor 1 LS $ 602.69 PERSONNEL $ 602.69
Completed
Work
2 9009 Material 1 LS $4,727.06 SUPPLIES $ 4,727.06
Completed
Direct
Administrative Work
3 9901 1 LS $ 903.12 PERSONNEL $ 903.12
Costs Completed
(Subgrantee)
Work To Be Completed
Work To
$
4 9001 Contract 1 LS CONTRACTUAL Be $ 277,887.00
277,887.00
Completed
Total Cost: $ 284,119.87
Insurance Adjustments (Deductibles, Proceeds and Settlements) - 5900/5901
Subgrant
Material and/or Unit Unit of Cost
Sequence Code Unit Price Budget Type Action
Description Quantity Measure Estimate
Class
*** Version 0 ***
Deduct Anticipated $
1 5901 1 LS $ -233,216.75
Insurance Proceeds -233,216. 75
Total Cost: $ -233,216.75
Total Cost Estimate: $ 50,903.12
(Preferred Estimate Type + Insurance Adjustments)
IComments l
i
https://connect l .dhs.gov/emmie/,Danalnfo=isource.fema.net,SSL +dispatchDestination.do?. .. 12/2/2014
I
Federal Emergency Management Agency E-Grants Page 8of13
Attachments