READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 16, 2016 — Final Pay Packet — reading text
Part 3 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Final Pay Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
~
I
Attachments
Hard Copy
Document
User Date Description File File Name Action
Type
Reference
'Il
08-
ELEANOR
29- Map Location Map Location Map.pdf(407.48 kb) View
CON IGO
2014
08-
ELEANOR GEM-80 Pictures and Description.pdf
29- Photos Photo Pages View
CONIGO (1.10 Mb)
2014 I
r
ELEANOR
08-
Contract Procurement
Okaloosa Co i
29- Purchasing_Manual_Policy.pdf(3.51 View
CONIGO Document Policy
2014 Mb)
08-
ELEANOR Contract Okaloosa Co HR_Labor Policy.pdf
29- Labor Policy View
CON IGO Document (867.47 kb)
2014
08- Contractor
ELEANOR Contractor Discription of work and
29- Miscellaneous Repair View
CONIGO Warrenties.pdf(1.60 Mb)
2014 Discription
Facility Name: Correction's Alarm System
Address 1: 1200 E James Lee Blvd.
Address 2:
County: Okaloosa
City: Crestview
State: FL
ZIP: 32539
Was this site previously damaged? No
Percentage Work Completed? 2.00%
PA-04-FL-4177-PW-00327(0):
I
Location:
1200 E James Lee Blvd. GPS (30.76222, -86.55794)
I
Damage Description and Dimensions: PA-04-FL-4177-PW-00327(0):
During the incident period 4/28/2014 thru 5/6/2014 a lightning storm
impacted the Department of Corrections Facility located at 1200 E James
I
Lee Blvd GPS(30.76222, -86.55794). Multiple lightning strikes shorted out 3
GEM-80 PLC Electronic Control Centers and 7 panels for the automated
door lock, intercom and closed circuit TV/camera system. The electronically
grounded control system was rendered inoperable and manual override was
initiated until repairs could be made. In addition, a computer network
Interface was destroyed which controls Internet, primary phone service and
DVR recording.
Control System GEM-80 PLC: The main Door Locking Control Systems
located in the Attic above Central Control and system interface modules in
Central Control and additional modules in the Medical Housing Unit, E Pod,
and C Pod Housing. The Interface system currently controls all Cell Doors,
Corridor Doors, Exit Doors, Emergency Releases, Group Releases,
https://connect l .dhs.gov/emm ie/,Danalnfo=isource.fema.net,SSL+dispatchDestination.do?. .. 12/2/2014
Federal Emergency Management Agency E-Grants Page 4of13
Intercom, Closed Circuit TV/Cameras and Paging Functions.
Intercom ICM-100 Interface: The system is currently integrated into the
existing Door Control Panels and provides communication to individual staff
stations via pushbuttons, speaker and microphone.
Closed Circuit TV: The system is currently using Redundant DVRs (Digital
Video Recording) to control 36 cameras and provide digital primary and
backup recording, camera call ups and multiplexed viewing capabilities
controlled through the main interface.
Computer Network Switch CAT 3560V2: Including (2) Transceivers;
Incorporates existing computers to operate the phone system and DVR
recording devices.
Scope of Work: PA-04-FL-4177-PW-00327(0):
Completed Work:
Replaced Computer Network Switch Cat 3560V2 and (2) Transceivers and
Cable; The Applicant used 27 hours of Force Account Labor to test and
repair the Network Switch and (2) Transceivers and cable for a cost of
$602.69 including a Fringe Benefit Rate of39.41%. Supply Cost: $4727.06
including Network Switch, (2) Transceivers and Network Cable; See Invoice
and Purchase Order Attached.
Work to be Completed:
The Sub-Grantee Applicant has provided an estimate from Willo Products
for $277,887.00 to replace the GEM-80 PLC system that was damaged.
The current system is outdated and parts are no longer available, therefore
the entire control system will need to be replaced See Applicant Memo
regarding system replacement. Note: temporary repairs were completed
using some remaining stock parts by Force Account Labor to get minimal
operation returned to the facility.
Cost includes design and replacing the Control Panels, Modules, Relays,
Monitors, Intercom and Closed Circuit TV Interface. The existing System
Control is responsible to operate 189 swing doors, 7 roll up gates, 75 staff
stations intercoms, 26 paging speakers, 5 internal phones and 40 CCTV
cameras. See Attached Estimate from Willo Products. Estimated cost does
not include replacement of intercom speakers, CCTV cameras or the actual
door locks. The existing hardware items will be integrated into the new
control system.
Attachments:
a. Location Map
b. Photo Pages
c. Estimate
d. Time Sheet
e. Invoice
f. Firmette
g. DAG
PROJECT NOTES:
Applicant states that this facility was not under warranty at the time of the
declared event.
PROJECT COSTS AND CEF:
Costs in this project are based on a Contractor Proposal. Applicant will
solicit competitive bids for this work. Because the proposal is based on a
https://connect l .dhs.gov /emmie/,Danalnfo=isource. fema.net,SSL+dispatchDestination.do?... 12/2/2014
Federal Emergency Management Agency E-Grants Page 5of13
lump sum amount, it is not possible to perform CEF on this project. "As
lump-sum construction cost estimates do not meet the requirement for
quantitative estimates, lump sums are not acceptable
for preparing the CEF estimate." CEF for Large Projects
Instructional Guide V2.1, 4-4, Sept. 2009
(See attached email correspondence.)
Applicant has been advised that Grantee must be notified of any changes to
the Scope of Work described in this project.
RECORD RETENTION: Complete records and cost documents for all
approved work must be maintained for at least 5 years from the date the last
project was completed or from the date final payment was received,
whichever is later. Applicant is responsible for retention of all documentation
associated with this project.
SUPPORTING DOCUMENTATION: All of the documentation to support this
project have been reviewed and verified by the Applicant and the Project
Specialist.
PROCUREMENT: The applicant is required to adhere to State Government
Procurement rules and regulations and maintain adequate records to
support the basis for all purchasing of goods and materials and contracting
services for projects approved under the Public Assistance program, as
stated in 44 CFR 13.36. The applicant has advised they have/will follow
their normal procurement
