READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 15, 2013 (meeting #1142) — reading text
Part 11 of 23. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
conversion from timber to concrete.
8. Stabilize dirt roads with millings.
9. Antioch Road – Drainage improvements and resurface.
10. Okaloosa Lane – Dirt to pave.
11. Gilmore Road – Dirt to pave.
12. Kervin Road – Install drainage swales and stabilize road.
13. Lighthouse Church Road – Drainage improvements and resurface.
14. Robinson Road – Dirt to pave.
15. Stateline Road – Dirt to pave.
Actual Estimated Adopted
Performance Measures
FY11/12 FY12/13 FY13/14
Number of FTEs 0 0 0
Input
Constitutional / Local Option Gas Tax Projected Revenue 3,450,000 3,450,000
Miles of roads resurfaced 22.7 14.5 15
Output
Miles of roads restriped 25 24.7 25
Jurisdictional miles of roads maintained 939 942 944
Efficiency
Miles of cold mix stabilized roads rehabilitated 8 10 5.3
Effectiveness
Miles of dirt roads improved 0.9 0.84 10
Bridge conversions 2 1 3
Packet Pg. 49
Budget Revenue Report - Departments (Requested) Date: 7/11/2013
2nd Prior Year 1st Prior Year Current Year Current Year Base %
Account Title Actual Actual Original Budget 6 mos Actual Request +/- +/-
302 ROAD/BRIDGE CONSTRUCTION FUND
3201R R/B CGT REVENUE
335493 CONSTITUTION GAS TAX-80% $1,432,963.27 $1,450,710.66 $1,430,000.00 $379,092.90 $1,525,000.00 $95,000.00 6.6%
INTERGOVERNMENTAL REVENUE $1,432,963.27 $1,450,710.66 $1,430,000.00 $379,092.90 $1,525,000.00 $95,000.00 6.6%
361101 INTEREST ON TIME DEPOSITS $158,704.05 $171,214.18 $115,000.00 $41,799.80 $115,000.00 $0.00 0.0%
361104 STATE INVESTMENT POOL INT $5,999.24 $8,750.20 $10,000.00 $5,380.90 $10,000.00 $0.00 0.0%
361400 GAIN OR (LOSS) SALE INVST ($123,144.84) ($27,486.60) $0.00 $21,713.78 $0.00 $0.00 NA
366990 DONATIONS-OTHER $0.00 $0.00 $0.00 $104,421.00 $0.00 $0.00 NA
MISCELLANEOUS REVENUE $41,558.45 $152,477.78 $125,000.00 $173,315.48 $125,000.00 $0.00 0.0%
389901 BALANCES-CASH $0.00 $0.00 $5,000,000.00 $0.00 $7,000,000.00 $2,000,000.00 40.0%
OTHER SOURCES $0.00 $0.00 $5,000,000.00 $0.00 $7,000,000.00 $2,000,000.00 40.0%
DEPARTMENT TOTAL $1,474,521.72 $1,603,188.44 $6,555,000.00 $552,408.38 $8,650,000.00 $2,095,000.00 32.0%
Packet Pg. 50
Budget Expense Report (Department Requests)
2nd Prior Year 1st Prior Year Current Year Current Year Base Base %
Account Title Actual Actual Original Budget 6 mos Actual Request New Request +/- +/-
302 ROAD/BRIDGE CONSTRUCTION FUND
3201 R/B CONSITUTIONAL GAS TAX
544640 R/L-EQUIPMENT $0.00 $0.00 $173,585.00 $80,996.02 $0.00 $0.00 ($173,585.00) (100.0%)
546646 RM-ROAD PAINT STRIPING $0.00 $0.00 $300,000.00 $0.00 $0.00 $0.00 ($300,000.00) (100.0%)
546648 RM-PIPE LINING $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 ($100,000.00) (100.0%)
552013 SIGN MATERIALS $0.00 $0.00 $74,000.00 $38,657.94 $0.00 $0.00 ($74,000.00) (100.0%)
553010 ROAD MAINTENANCE-#2 $0.00 $0.00 $427,000.00 $98,165.12 $0.00 $0.00 ($427,000.00) (100.0%)
553038 MATERIALS-MILLINGS $0.00 $36,469.62 $0.00 $49,934.24 $0.00 $0.00 $0.00 0.0%
OPERATING EXPENSES $0.00 $36,469.62 $1,074,585.00 $267,753.32 $0.00 $0.00 ($1,074,585.00) (100.0%)
563142 FOXWOOD SUBDIVISION $0.00 $0.00 $0.00 $64,114.05 $0.00 $0.00 $0.00 0.0%
563145 P.J. ADAMS- TRIP $0.00 $0.00 $1,225,000.00 $0.00 $975,000.00 $0.00 ($250,000.00) (20.4%)
563146 GREEN ACRES BOULEVARD $0.00 $0.00 $50,000.00 $0.00 $450,000.00 $0.00 $400,000.00 800.0%
563147 MLK BOULEVARD $0.00 $0.00 $100,000.00 $0.00 $900,000.00 $0.00 $800,000.00 800.0%
563377 CLEAR CREEK ROAD $0.00 $0.00 $0.00 $111,414.31 $0.00 $0.00 $0.00 0.0%
563401 MATERIAL-NEW CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.0%
563445 KEYSER MILL ROAD $0.00 $0.00 $0.00 $4,502.87 $0.00 $0.00 $0.00 0.0%
563464 PD&E P.J. ADAMS PKWY $0.00 $0.00 $100,000.00 $28,553.93 $0.00 $0.00 ($100,000.00) (100.0%)
563472 FAIRCHILD ROAD $0.00 $0.00 $1,000,000.00 $0.00 $500,000.00 $0.00 ($500,000.00) (50.0%)
563486 ANTIOCH ROAD $0.00 $0.00 $900,000.00 $618,166.29 $0.00 $0.00 ($900,000.00) (100.0%)
563487 OKALOOSA LANE $0.00 $0.00 $1,435,000.00 $0.00 $500,000.00 $0.00 ($935,000.00) (65.2%)
CAPITAL OUTLAY $0.00 $0.00 $4,810,000.00 $826,751.45 $3,325,000.00 $0.00 ($1,485,000.00) (30.9%)
599300 RESERVE-FUTURE CAP OUTLAY $0.00 $0.00 $670,415.00 $0.00 $5,325,000.00 $0.00 $4,654,585.00 694.3%
NON-OPERATING EXPENSES $0.00 $0.00 $670,415.00 $0.00 $5,325,000.00 $0.00 $4,654,585.00 694.3%
TOTAL DEPARTMENT $0.00 $36,469.62 $6,555,000.00 $1,094,504.77 $8,650,000.00 $0.00 $2,095,000.00 32.0%
Packet Pg. 51
Notes
Account Account Title Note Amount
302 ROAD/BRIDGE CONSTRUCTION FUND
3201 R/B CONSITUTIONAL GAS TAX
563145 P.J. ADAMS- TRIP ACCUMULATING CASH MATCH FOR TRIP GRANT FOR WIDENING $975,000.00
DESIGN FOR PH 1. TOTAL CASH MATCH REQ $2.2M BY FY14
(ESTIMATED PROP CONST COST FOR PH 1 WIDENING $30M)
TOTAL ACCOUNT $975,000.00
563146 GREEN ACRES BOULEVARD RECLAIM, REPAIR BASE AND RESURFACE $450,000.00
TOTAL ACCOUNT $450,000.00
563147 MLK BOULEVARD RECLAIM, REPAIR BASE AND RESURFACE $900,000.00
TOTAL ACCOUNT $900,000.00
563472 FAIRCHILD ROAD CARRYFORWARD - FULL DEPTH RECLAMATION, WIDEN & OVERLAY $500,000.00
PAVE FROM APLIN ROAD TO SERENITY LANE
TOTAL ACCOUNT $500,000.00
563487 OKALOOSA LANE CARRYFORWARD - RIGHTOF WAY ACQUISITION & PAVING $500,000.00
TOTAL ACCOUNT $500,000.00
Packet Pg. 52
Budget Revenue Report - Departments (Requested) Date: 7/11/2013
2nd Prior Year 1st Prior Year Current Year Current Year Base %
Account Title Actual Actual Original Budget 6 mos Actual Request +/- +/-
302 ROAD/BRIDGE CONSTRUCTION FUND
3202R R/B 1 LOGT REVENUE
312410 FIRST LOCAL OPTION FUEL $1,531,093.73 $1,767,631.00 $1,700,000.00 $618,220.27 $1,937,500.00 $237,500.00 14.0%
TAXES $1,531,093.73 $1,767,631.00 $1,700,000.00 $618,220.27 $1,937,500.00 $237,500.00 14.0%
389901 BALANCES-CASH $0.00 $0.00 $2,000,000.00 $0.00 $2,455,000.00 $455,000.00 22.8%
OTHER SOURCES $0.00 $0.00 $2,000,000.00 $0.00 $2,455,000.00 $455,000.00 22.8%
DEPARTMENT TOTAL $1,531,093.73 $1,767,631.00 $3,700,000.00 $618,220.27 $4,392,500.00 $692,500.00 18.7%
Packet Pg. 53
Budget Expense Report (Department Requests)
2nd Prior Year 1st Prior Year Current Year Current Year Base Base %
Account Title Actual Actual Original Budget 6 mos Actual Request New Request +/- +/-
302
