READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 3, 2015 — Application for X867 — reading text
Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Application for X867 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
12
B. Spares 6 0 6
C. Total (A+B) 18 0 18
D. Spare Ratio (B/A) 50.00% 0.00% 50.00%
II. Inactive Fleet
A. Other 0 0 0
B. Pending Disposal 0 0 0
C. Total (A+B) 0 0 0
III. Total (I.C and II.C) 18 0 18
Or current fixed route spare ratio is higher than usual due to our cutting routes in the recent past.
We currently use several of our fixed route vehicles for paratransit because the spares for
paratransit is insufficient.
Fixed route vehicles to be replaced in 2015:
2015 Chevrolet 1GBE4V1958F415574
2015 Chevrolet 1GBE4V19X8F415473
Paratransit
Before Change After
I. Active Fleet
A. Peak Requirement 28 0 28
B. Spares 3 0 3
C. Total (A+B) 31 0 31
D. Spare Ratio (B/A) 10.71% 0.00% 10.71%
II. Inactive Fleet
A. Other 0 0 0
B. Pending Disposal 0 0 0
C. Total (A+B) 0 0 0
III. Total (I.C and II.C) 31 0 31
Paratransit vehicles scheduled to be replaced in 2015:
Chevrolet 1GBJG31K191162328 2015
1/27/2015
View Print Page 11 of 12
Chevrolet 1GBJG31K191160899 2015
Chevrolet 1GBJG31K391161262 2015
Part 7. FTA Comments
General Review
Comment Title: Initial Review
Comment By: Richelle N Gosman
Date Created: Dec. 22, 2014
Date Updated: Jan. 09, 2015
Ref Section: Unknown
Comment: Recipient Information. FY2015 Certifications & Assurances were published on 10/30/14.
These must be pinned in TEAM before this grant application can move past the regional
review.
1. Project Information.
a. Please attach STIP page.
b. Please attach FY14 FDOT apportionment table. CLEARED
c. When entering the Program Date, use the date on which FTA approves the current
STIP. I believe the latest FTA STIP approval date is 9/30/14. CLEARED
d. Project Details. Enter note about use of toll credits and the source of local funding for
operating match. CLEARED
2. Budget.
a. There are 8 ALIs (including the Security non-add scope) in this application. Each of
these must include an extended budget description. CLEARED
b. Include Period of Use for 11.7A.00, 11.79.00, 30.09.01 (Preventative Maintenance,
Operating Assistance periods may not exceed 1 year). Ensure that corresponding
Milestones match.
c. 11.42.09. Include useful life for all capital expenditures over $5k. CLEARED
d. 11.13.04. This is an expansion ALI. Please change to 11.12.04 for replacement.
Include useful life of new vehicles and indicate that make/model/year are listed in Fleet
Status. CLEARED
3. Milestones.
a. There are 8 ALIs (including the Security non-add scope) in this application. Each of
these must include a set of milestones. Add 11.7A.00, remembering that period of use
may not exceed 1 year and should match that listed in extended budget description.
CLEARED
b. 30.09.01. Each ALI should have at least 2 milestones. Please add initial expenditure,
remembering that period of use may not exceed 1 year and should match that listed in
extended budget description. CLEARED
c. 119-00. Scopes should not appear in the Milestone section. Please edit to include
11.92.08 instead. CLEARED
d. According to the milestones, these projects are not expected to begin at all in the near
future (with the exception of Project Admin). Please explain. CLEARED
4. Environmental Findings. There are 8 ALIs (including the Security non-add scope) in
this application. Each of these must include an environmental finding. CLEARED
Conditions of Award
Comment Title: FL TDC
Comment By: Richelle N Gosman
Date Created: Jan. 21, 2015
Date Updated: None Specified
1/27/2015
View Print Page 12 of 12
Ref Section: Unknown
Comment: A letter is attached to TEAM dated 11/10/14 from FDOT confirming toll revenue credits in
the amount of $187,500 for this application.
Comments to DOL
Comment Title: 5333(b) Certification
Comment By: Richelle N Gosman
Date Created: Jan. 21, 2015
Date Updated: None Specified
Ref Section: Unknown
Comment: This grant application is for capital & operating. Please review this application for labor
certification in accordance with DOL Section 5333(b) Certification. The grantee contact is
Janet Willis and can be reached at 850-609-7003.
Part 8: Results of Reviews
The reviewer did not find any errors
1/27/2015
