Okaloosa County BOCC — February 3, 2015 — Application for X867 — reading text
Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Application for X867 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
2. Contract Award Nov. 01, 2016
3. Contract Complete Sep. 01, 2018
11.92.08 PURCHASE SIGNAGE 0 $5,000 $5,000
Milestone Description Est. Comp. Date
1. RFP/IFB Issued May. 01, 2016
Signage purchasing is part of out effort to develop and upgrade our ITS with
signage that can be easily integrated into the system.
2. Contract Award Jun. 15, 2016
3. Contract Complete Dec. 31, 2016
11.42.09 ACQUIRE - MOBILE SURV/SECURITY 5 $30,000 $30,000
EQUIP
Milestone Description Est. Comp. Date
1. RFP/IFB Issued Sep. 01, 2015
Security cameras will be installed as replacement vehicles are delivered. We
also plan to install GPS hardware on the vehicles.
2. Contract Award Sep. 30, 2015
3. Contract Complete Dec. 01, 2015
11.42.10 ACQUIRE - MOBILE FARE COLL EQUIP 5 $30,000 $30,000
Milestone Description Est. Comp. Date
1. RFP/IFB Issued Mar. 15, 2016
RFP will be issued to upgrade our current fare collection equipment to include
a system that accepts fare cards and possibly credit/debit cards.
2. Contract Award Apr. 30, 2016
3. Contract Complete Aug. 15, 2016
1/27/2015
View Print Page 7 of 12
11.12.04 BUY REPLACEMENT <30 FT BUS 5 $520,000 $520,000
Milestone Description Est. Comp. Date
1. RFP/IFB OUT FOR BID May. 01, 2015
Buses are purchased from state contract if ICE analysis determined state
contract yields the best deal. All vehicle purchases are on a replacement
basis after the useful life expiration.
2. CONTRACT AWARDED Jun. 15, 2015
vehicles to be replaced due to meet and exceeding their useful life include the
2 FR and 3 DR vehicles listed below:
2007 Cutaway 1BE4V1217F404217 (FR)
2007 Cutaway 1GBE4V1247F404115 (FR)
2009 Cutaway 1GBJG31K191160529 (DR)
2009 Cutaway 1GBJG31K191160109 (DR)
2009 Cutaway 1GBJG31K591161232 (DR)
3. FIRST VEHICLE DELIVERED Aug. 15, 2015
4. ALL VEHICLES DELIVERED Sep. 30, 2015
5. CONTRACT COMPLETE Oct. 30, 2015
30.09.01 UP TO 50% FEDERAL SHARE 0 $701,246 $1,402,492
Milestone Description Est. Comp. Date
1. Initial Expenditure Oct. 01, 2016
Operating funds will be expended in support of fixed route and demand
response operations.
2. Final Expenditure Sep. 30, 2017
11.42.09 ACQUIRE - MOBILE SURV/SECURITY 5 $30,000 $30,000
EQUIP
Milestone Description Est. Comp. Date
1. RFP/IFB Issued Sep. 01, 2015
Okaloosa County will expended grant funds on security. Security cameras will
be installed as replacement vehicles are delivered. We also plan to install
GPS hardware on the vehicles.
2. Contract Award Sep. 30, 2015
3. Contract Complete Dec. 01, 2015
Part 5. Environmental Findings
114209 ACQUIRE - MOBILE
5 $30,000 $30,000
SURV/SECURITY EQUIP
1/27/2015
View Print Page 8 of 12
Finding No. 1 - Class II(c)
C05 - Action Promoting Safety, Security, Accessibility
Activities, including repairs, replacements, and rehabilitations, designed to promote transportation safety,
security, accessibility and effective communication within or adjacent to existing right-of-way, such as: the
deployment of Intelligent Transportation Systems and components; installation and improvement of safety
and communications equipment, including hazard elimination and mitigation; installation of passenger
amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or
upgrading to current standards.
114210 ACQUIRE - MOBILE FARE COLL
5 $30,000 $30,000
EQUIP
Finding No. 1 - Class II(c)
C05 - Action Promoting Safety, Security, Accessibility
Activities, including repairs, replacements, and rehabilitations, designed to promote transportation safety,
security, accessibility and effective communication within or adjacent to existing right-of-way, such as: the
deployment of Intelligent Transportation Systems and components; installation and improvement of safety
and communications equipment, including hazard elimination and mitigation; installation of passenger
amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or
upgrading to current standards.
111204 BUY REPLACEMENT <30 FT BUS 5 $520,000 $520,000
Finding No. 1 - Class II(c)
C07 - Acquisition, Maintenance of Vehicles / Equipment
Acquisition, installation, rehabilitation, replacement, and maintenance of vehicles or equipment, within or
accommodated by existing facilities, that does not result in a change in functional use of the facilities, such
as: equipment to be located within existing facilities and with no substantial off-site impacts; and vehicles,
including buses, rail cars, trolley cars, ferry boats and people movers that can be accommodated by existing
facilities or by new facilities that qualify for a categorical exclusion.
117A00 PREVENTIVE MAINTENANCE 0 $150,000 $150,000
Finding No. 1 - Class II(c)
C08 - Maintenance, Rehab, Reconstruction of Facilities
Maintenance, rehabilitation, and reconstruction of facilities that occupy substantially the same geographic
footprint and do not result in a change in functional use, such as: improvements to bridges, tunnels, storage
yards, buildings, stations, and terminals; construction of platform extensions, passing track, and retaining
walls; and improvements to tracks and railbeds.
1/27/2015
View Print Page 9 of 12
117900 PROJECT ADMINISTRATION 0 $15,000 $15,000
Finding No. 1 - Class II(c)
C04 - Planning and Administrative Activity
Planning and administrative activities which do not involve or lead directly to construction, such as: training,
technical assistance and research; promulgation of rules, regulations, directives, or program guidance;
approval of project concepts; engineering; and operating assistance to transit authorities to continue
existing service or increase service to meet routine demand.
119208 PURCHASE SIGNAGE 0 $5,000 $5,000
Finding No. 1 - Class II(c)
C05 - Action Promoting Safety, Security, Accessibility
Activities, including repairs, replacements, and rehabilitations, designed to promote transportation safety,
security, accessibility and effective communication within or adjacent to existing right-of-way, such as: the
deployment of Intelligent Transportation Systems and components; installation and improvement of safety
and communications equipment, including hazard elimination and mitigation; installation of passenger
amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or
upgrading to current standards.
114209 ACQUIRE - MOBILE
5 $30,000 $30,000
SURV/SECURITY EQUIP
Finding No. 1 - Class II(c)
C05 - Action Promoting Safety, Security, Accessibility
Activities, including repairs, replacements, and rehabilitations, designed to promote transportation safety,
security, accessibility and effective communication within or adjacent to existing right-of-way, such as: the
deployment of Intelligent Transportation Systems and components; installation and improvement of safety
and communications equipment, including hazard elimination and mitigation; installation of passenger
amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or
upgrading to current standards.
300901 UP TO 50% FEDERAL SHARE 0 $701,246 $1,402,492
Finding No. 1 - Class II(c)
C04 - Planning and Administrative Activity
Planning and administrative activities which do not involve or lead directly to construction, such as: training,
technical assistance and research; promulgation of rules, regulations, directives, or program guidance;
approval of project concepts; engineering; and operating assistance to transit authorities to continue
existing service or increase service to meet routine demand.
1/27/2015
View Print Page 10 of 12
Part 6: Fleet Status
Fixed Route
Before Change After
I. Active Fleet
A. Peak Requirement 12 0