1858 Bay Oaks Circle
Milton, FL 32583
gecfl@bellsouth.net
Phone: (850) 623-0777 ● Fax: (850) 623-3388
Jimmy Grissett (334) 504-1859 ● Kenny Grissett (334) 504-1886
June 26, 2013
Innisfree Development
Baybridge Parkway
Gulf Breeze, FL 32502
Attn: Christian Mills
Re: Holiday Inn Fort Walton Beach
Thank you for inviting Grissetts’ Excavating to price your project. We are pleased to
offer you a proposal to furnish all labor, equipment, materials and supervision necessary
for the successful completion of the project.
This proposal is to provide:
1. 48” diameter sanitary sewer manhole delivered and installed
2. 96” diameter lift station delivered and installed
3. Set and drive 64’ wall foot of PZC-13 temporary steel. Sheet piles 30’ sheets
with 4 bent corners
4. Extract 64’ wall foot of PXC-13 temporary steel sheets
5. Install necessary shoring
6. Provide de-watering
7. 80 tons crane
8. Long reach excavator
9. Labor, equipment, materials and supervision
10. Connect lift station to sanitary sewer manhole
This project does not include the following:
Survey
Engineering
Lift Station hardware
Pluming or Electrical Hook-ups
Total Cost of Project …………….. $ 94,573.00