READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — August 24, 2013 — Exhibit B_Grisset Quote — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 123-Exhibit B_Grisset Quote.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

1858 Bay Oaks Circle Milton, FL 32583 gecfl@bellsouth.net Phone: (850) 623-0777 ● Fax: (850) 623-3388 Jimmy Grissett (334) 504-1859 ● Kenny Grissett (334) 504-1886 June 26, 2013 Innisfree Development Baybridge Parkway Gulf Breeze, FL 32502 Attn: Christian Mills Re: Holiday Inn Fort Walton Beach Thank you for inviting Grissetts’ Excavating to price your project. We are pleased to offer you a proposal to furnish all labor, equipment, materials and supervision necessary for the successful completion of the project. This proposal is to provide: 1. 48” diameter sanitary sewer manhole delivered and installed 2. 96” diameter lift station delivered and installed 3. Set and drive 64’ wall foot of PZC-13 temporary steel. Sheet piles 30’ sheets with 4 bent corners 4. Extract 64’ wall foot of PXC-13 temporary steel sheets 5. Install necessary shoring 6. Provide de-watering 7. 80 tons crane 8. Long reach excavator 9. Labor, equipment, materials and supervision 10. Connect lift station to sanitary sewer manhole This project does not include the following:  Survey  Engineering  Lift Station hardware  Pluming or Electrical Hook-ups Total Cost of Project …………….. $ 94,573.00

Download this text file with its original spacing ↓