READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — December 6, 2016 — Gap Creek QAPP — reading text
Part 3 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Gap Creek QAPP — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
303-754-4200 Ext 266
Maria Lab QA TestAmerica Understanding and Maria.bundy@testamericainc.com
Bundy Manager implementing the (850) 474-1001
measurement procedures;
Quality Assurance (QA) for
lab analysis
Michael Project Florida Dept. Project Oversight Michael.scheinkman@dep.state.fl.us
Scheinkman Oversight of (850) 245 2951
Environmental
Protection
June 2016 | 3
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
2 Sampling and Analysis
Two sampling stations will be used to evaluate the BMPs effectiveness: one from the
inflow and one from the outflow of Poplar Pond. A minimum of seven (7) and a maximum
of ten (10) qualifying stormwater events will be sampled over a twelve (12) month period
as described below. The proposed start date for sampling will begin October 1, 2016.
2.1 Monitored Events
Qualifying storm events must have a rainfall event greater than 0.20 inches and less than
1.5 inches within a 24 hour period. The qualifying storm event shall not have a
precipitation event greater than 0.1 inches within a seven day period prior to the
qualifying storm event occurring.
Actual rainfall totals will be monitored from Hurlburt Field, approximately 2 miles to the
west of the Poplar BMP site. Real time precipitation data can be viewed via the internet
at: https://www.wunderground.com/cgi-
bin/findweather/getForecast?query=30.42783356,-86.68933105&sp=KHRT
Two sample stations will be used to determine the BMP’s effectiveness: one immediately
upstream of the forebay at the Poplar Avenue structure within the fenced area to
estimate pollutant levels entering into the retention pond, and the second at or near the
outlet structure, either attached to the outfall’s discharge port or as a free standing point
next to the outlet structure, to estimate pollutant levels being discharged from the
retention pond. See below for Figure 1 showing sample locations:
Qualifying events flowing into the Poplar Avenue site that do not discharge from the
outlet structure are considered valid events since the BMP’s storage and infiltration of the
storm event reduced the qualifying event’s volume and pollutants by 100%. If a
qualifying event does not produce sufficient runoff to fill the sample containers, either the
height of the sample containers should be lowered or larger qualifying events should be
used that produce sufficient runoff to flow into the samplers.
Project Schedule
This evaluation will be conducted over the course of one year beginning October 1, 2016
and ending September 30, 2017. Quarterly reports are to be submitted within 30 days of
the laboratory results being submitted for the last sampling event for that given quarter.
A final report will be included in the 4th quarter report.
1st Quarter Oct 1 – January 1
2nd quarter January 1- March 31
3rd quarter April 1 – June 31
4th quarter July 1 – September 30
4 |June 2016
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
Figure 1: Site Diagram
2.2 Composite Samples
Due to the site’s security and the temporary nature of the sampling stations, an industry
standard Nalgene Stormwater Sampler (see Appendix A) will be used to capture the first
flush of a qualifying storm event to evaluate the effectiveness of the retention pond. Due
to the sample volume requirements, 4 samplers will be installed at these two sample
locations to capture the required sample volume. One sampler at each of the stations will
be fitted with a glass collection chamber to allow for the Oil and Grease samples to be
collected while the remaining samples will be collected in a laboratory clean Nalgene
container to collect aliquots that will be transferred into their individual laboratory
container and preserved prior to shipment to the laboratory. Sample preservation will
occur immediately after collection from the Nalgene container.
Sample inlet ports for the Nalgene samplers will be located approximately one inch
above the channel bottom and at the outlet spill elevation.
2.3 Grab Samples
Grab samples will also be collected within the retention area at influent and effluent
stations. Grab samples will be collected for the analysis of fecal coliform.
June 2016 | 5
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
2.4 Quality Objectives
The measurement quality objectives (MQOs) for this study have been developed in order
to provide quality data that supports the objectives of the project. The analytical methods
discussed in this QAPP provide a level of quality that allows the data to be used in the
decision-making process.
The lab will use the methods specified in this QAPP to analyze the samples for the
analytes shown in Table 2. The laboratory will analyze field and laboratory QA/QC
samples using the procedures in their Standard Operating Procedures (SOPs) and the
analytical method to assess data quality.
Data quality is expressed in terms of precision, accuracy, representativeness,
completeness, comparability and sensitivity (PARCCS) as well as method sensitivity.
Table 2. Analytes and Methods
Collection Required
Parameter Unit Analytical Method
Method Detection Limit
Cd - 1 µg/L
Total Metals Cr - 5 µg/L
µg/L 200.7/SW6010B Composite
(Cadmium, Chromium, Copper, Zinc) Cu - 5 µg/L
Zn - 10 µg/L
Nitrate + Nitrate mg/L 300.0/SW9056 Composite 0.1 mg/L
Total Kjeldahl Nitrogen (TKN) mg/L 351.2 Composite 0.3 mg/L
Total Nitrogen mg/L 300.0/351.2 Composite --
Ortho-Phosphate mg/L 300.0/SW9056 Composite 0.05 mg/L
Total Ammonia (Ammonia Nitrogen) mg/L 350.1 Composite 0.05 mg/L
Total Phosphorus mg/L 365.4 Composite 0.05 mg/L
Total Suspended Solids (TSS) mg/L 160.2 Composite 5 mg/L
Oil & Grease mg/L 1664A Composite 5 mg/L
# per 100
Fecal Coliform SM9222D Grab Not Applicable
mL (CFU)
2.4.1 Precision
Precision is a measure of reproducibility of analytical results. It can be defined as the
degree of mutual agreement among individual measurements obtained under similar
conditions. Total precision is a function of the variability associated with both sampling
and analysis. Precision is evaluated in terms of relative percent difference (RPD) for field
duplicate (FD) samples, lab control samples (LCS) and their duplicates (LCSD), and
matrix spike (MS) and matrix spike duplicate (MSD) samples.
2.4.2 Accuracy
Accuracy is the degree of agreement between a measured value and the “true” or
expected value. It represents an estimate of total error from a single measurement,
6 |June 2016
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
including both systematic or matrix error (bias), and random error that may reflect
variability due to imprecision. Accuracy is evaluated in terms of percent recoveries
determined from results of analysis of LCS, LCSD, ongoing precision and recovery
(OPR) samples and MS and MSD samples. Surrogate recoveries and internal standards
are also used to assess accuracy.
Contamination in field and laboratory blanks is monitored to assess potential bias in field
sample results.
2.4.3 Representativeness
Representativeness is the degree to which sample data accurately reflect the
characteristics of a population of samples. It is achieved through a well-designed
sampling program and by using standardized sampling strategies and techniques and
analytical procedures. Factors that can affect representativeness include site
homogeneity, sample homogeneity at a single point, and available information around
which the sampling program is designed. Using multiple methods to measure an analyte
can also result in non-representativeness of sample data. Representativeness will be
achieved for this project by training field staff in proper sample collection techniques and
reviewing field records for consistency.
It should be noted that typically stormwater is not considered a homogeneous solution.
2.4.4 Completeness
Completeness is the percentage of the total amount of data expected compared to the
amount of data actually obtained. Completeness may be affected by conditions in the
field which make a location inaccessible, container breakage during shipment, or
laboratory QC failures causing the rejection of data. In general, a completeness goal of
greater than 90% is considered acceptable.
2.4.5 Comparability
Comparability is the confidence with which one dataset can be compared to another. It is
achieved by maintaining standard techniques and procedures for collecting and
analyzing samples and reporting the analytical results in standard units. Results of
performance evaluation samples and systems audits will provide additional information
for assessing comparability of