READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — December 6, 2016 — Gap Creek QAPP — reading text
Part 2 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Gap Creek QAPP — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
MS Matrix Spike
MSD Matrix Spike Duplicate
OPR Ongoing Precision and Recovery
Precision, Accuracy, Representativeness, Completeness, Comparability
PARCCS
and Sensitivity
QA Quality Assurance
QAM Quality Assurance Manager
QAPP Quality Assurance Project Plan
QC Quality Control
QCCS Quality Control Check Samples
QL Quantitation Limits
RPD Relative Percent Difference
SOPs Standard Operating Procedures
STEPL Spreadsheet Tool for the Estimation of Pollutant Load
TKN Total Kjeldahl Nitrogen
TSS Total Suspended Solids
June 2016 | iii
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
Distribution List
Name Organization Address Phone Number Email
Jason Okaloosa County 1759 South Ferdon Boulevard (850) 689-5772 jautrey@co.okaloosa.fl.
Autrey, Engineer Crestview, Florida 32536 us
Michael FL DEP Florida Department of (850) 245 2951 Michael.scheinkman@
Scheinkman, Nonpoint Source Environmental Protection dep.state.fl.us
Management Division of Water Restoration
Section Assistance
Division of Water 3900 Commonwealth Blvd.,
Restoration MS 3570
Assistance Tallahassee, FL 32399-3000
Maria TestAmerica Inc. 3355 McLemore Drive, (850) 474-1001 Maria.bundy@
Bundy, Quality Pensacola, FL 32514 testamericainc.com
Assurance
Manager
Brad Collins, HDR Engineering 25 West Cedar Street, (850)-429-8931 Michael.Collins@
Project Manager Suite 200 Hdrinc.Com
Pensacola, FL 32502
iv |June 2016
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
1 Introduction
1.1 Purpose
This Quality Assurance Project Plan (QAPP) describes the procedures to be followed to
achieve the objectives of sampling and analysis for the Gap Creek Stormwater
Improvements in Okaloosa County, Florida.
1.2 Background
The stormwater management system is located in the 2.9 square mile Gap Creek
Drainage Basin, located in both unincorporated Okaloosa County and the City of Fort
Walton Beach. Currently the system provides inadequate water quality treatment and
flood attenuation. Most of this watershed is built out, primarily consisting of residential
neighborhoods, multi-family, commercial and industrial uses. Runoff from portions of the
basin receives little or no water quality treatment before discharging downstream into
Gap Creek. A stormwater master plan was prepared by HDR Engineering in April 2003
and through modeling, the watershed has shown to have one of the highest pollutant
loading rates in Okaloosa County. In 2008, in a cooperative effort between the Northwest
Florida Water Management District, Okaloosa County and the City of Fort Walton Beach,
the three agencies provided funding for a detailed water quality study of the Gap Creek
watershed that was also completed by HDR Engineering. The purpose of this study was
to identify and prioritize stormwater Best Management Practice (BMP) opportunities for
enhancing treatment and pollutant loading reduction capability within the Gap Creek
watershed.
Of the 19 sites within the Gap Creek watershed recommended for retrofit opportunities to
provide pollutant loading reduction, eight sites had also the potential to reduce flood risk
in localized areas of the watershed. The structural BMP improvements for this project
were chosen based on their high potential to provide both water quality improvements
and flood attenuation.
The original concept for this project included a treatment train within a 126 acre sub-
basin of the Gap Creek watershed known as the Lovejoy Community. The project was
comprised of modifying conveyance channels (upstream of Poplar Avenue Pond) to
provide more storage and direct runoff to treatment areas, upgrading the existing County
Poplar Avenue Pond to provide additional storage capacity and enhance nutrient uptake,
and constructing a new stormwater facility (Echo Circle site) to provide additional
treatment/attenuation and nutrient removal. The upgrades, as modeled by Spreadsheet
Tool for the Estimation of Pollutant Load (STEPL), were expected to reduce nitrogen
loads by 442 lbs/yr or 43.5%, phosphorus by 145 lbs/yr or 89.5%, Biochemical Oxygen
Demand (BOD) by 3,400 lbs/yr or 91.2% and suspended sediment by 23.8 lbs/yr or
99.1%. Monitoring was planned for after completion of construction at the inflow and
outflow of the proposed BMPs to determine the system’s effectiveness.
Unfortunately, the project cannot be constructed as originally conceived thus requiring
that the Grant Work Plan be amended. Only a limited amount of improvement to the
conveyance to Poplar Pond was practical (a cross drain under Lovejoy Road is being
June 2016 | 1
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
added and the pipe on the north side of Lovejoy Road that connects the roadside
conveyance system to the pond is being replaced with an open channel). Some minor
reconstruction of the berm for the existing Poplar Pond and modification of the outfall
structure will also be done in the amended Gant Work Plan to maximize retention and
detention. The other planned elements of the original treatment train were eliminated.
Some of these original activities were not permittable, some were not necessary and
some were simply found to be not practical during the design phase.
The modeled estimated pollutant load reduction goals of the original project were very
good and these results will not be achieved by the reduced scope of work. However, it is
important to note that the water quality benefits of the conveyance improvements which
were not part of the original modeled pollutant load reduction goals will still be
achieved. By adding a culvert beneath Lovejoy Road and substantially increasing the
capacity of the conveyance ditch to the existing Poplar retention basin and by
replacing a pipe that was too small with an open channel we are now able to
treat all of the stormwater runoff from the 86.9 acre watershed area up to a 25 year
storm event and only 4% or less of the total annual runoff will bypass the treatment.
What used to exceed the confines of the existing ditch and culvert system will now be
properly conveyed allowing for much better treatment of the runoff. This will mitigate
flooding potential and dramatically improve the total volume of water treated.
ESTIMATED POLLUTANT LOAD REDUCTION:
Analysis shows that for the existing condition, the annual total runoff for the 86.9 acre
Poplar Pond watershed is 291.9 ac-ft. Flooding occurs above mean annual event, and
about 32 ac-ft or 11 % of the annual total runoff is bypassed. After the improvements
are made, flooding only occurs for events above the 25 year event. Only 4% of the total
runoff will be bypassed or 11.6 ac-ft. Therefore, 20.6 ac-ft of runoff untreated in existing
condition will be treated in the proposed condition. Using 1.2 mg/l TN, 0.26 mg/l TP and
65.2 mg/l TSS which are accepted as the EMCs for light industrial land use, the 20.6
acre feet being treated, and assuming 100% effectiveness for retention – approximately
66 lbs/yr, 14 lbs/yr and 3593 lbs/yr will be removed for TN, TP and TSS, respectively.
1.3 Goals
The sampling and analysis described in this QAPP has the purpose of determining
sample concentrations to determine the effectiveness of the BMP. Composite and grab
samples will be collected from water flowing into and out of Poplar Pond. All sample
analysis will be conducted by TestAmerica of Pensacola, Florida. To generate the
intended data, it will be necessary to:
Collect stormwater and Quality Control (QC) samples in a manner consistent with
QC goals
Package, label, and ship samples according to quality objectives
Coordinate with the laboratory for sample analysis and reporting
Maintain records of sampling and shipping activities
Verify that laboratory analysis meets quality objectives
Report sample analysis results to the client in three quarterly reports and one
final report.
2 |June 2016
Gap Creek Stormwater Improvements
Quality Assurance Project Plan
Okaloosa County, Florida
Data from each of the sampled storm event will be evaluated by comparing analytical
results from the up-stream sample location (prior to entering into the BMP) to the
analytical results as water leaves the BMP through the outlet structure. This comparison
will determine the effectiveness of the BMP. These results can also be compared to
national averages such as EMCs for similar wet pond BMPs to evaluate BMP
effectiveness.
1.4 Organization
Project team roles, responsibilities, and contact information is included on Table 1. The
HDR Engineering Project manager will be responsible for coordinating with local HDR
staff for the sampling event. This includes monitoring rainfall reports and oversight on
sampling. The HDR Engineering Project manager will also coordinate with the project
chemist to ensure laboratory requirements are met. The Lab QA manager will be
responsible for coordinating with local Test America staff to conduct the proper analysis.
Table 1. Key Roles and Responsibilities
Name Role Organization Responsibilities Contact Information
Brad Project HDR Project Management Michael.collins@hdrinc.com
Collins Manager Engineering (850)-429-8931
Lynn Chemist HDR Analytical Review of Lynn.lutz@hdrinc.com
Lutz Engineering laboratory data
