READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 55-18--Execute Utilities Agreement — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-6362-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
f
f
o
81m NO......
SECTIOll ',."',,,.,'. ....... ... .,'.
STATE ROAD' ".' .', " '
COUITY OF _ 11111. 1
CITY t7l'ILITY AGamMElT
ms AGREEMEIT, Mad~ 1ibd enw:red into this 1/ day at t!
P~
A. I. 19' 7 , by and between theS'lA
' TE BOa\D
hereinatter
. ' OF FLORIDA,
DEPARrMEIfl
re:temtd to aathe DEPAImar, aDd the Cl'l'dI
Y T~ p~ ~~ ,
a municipal corporation, hereinafter referred to as the CITY.
W_ I_T_H_E_ S_ S_ E_ T_ Bl
TIfAT, WHEREAS, the Depef. rtme1.1t proposes to construct or reconstruct
a
munic1palconnecting link State Road within said City, ' which Road is known
and described as tollC7#
s: ........ II, . m1"' M,'" .......
JO,
ft." """
i, .
WBEBEAS, in order to tacilitate such work it is necessary that
provisions be made tor adJustment, change or relocation of certain faci11t.iea
and/or utilities with1n said City and located within the right of way of
s8,id municipal ,connecting link State Road or appurtenances thereto, viz:
Any and all water mains, fire hydrants , sanitary 8ewers,
gas mains, tire and police call systems, telephone, eIectri-
cal and telegraph systems, lines and
including poles, pole
underground tac ili't:1es ' thereot , and8lly
. other utilities and
facilities within such right of way.
o
NOW, TBEBEFOBE, the premises considered and in consideration 0'1 the
sum ot One ($ 1. 00) Dollar moving between the parties and in tU%"
ther consid-
eration of the mutual covenants hereinafter contained, it is agreed by the
parties as follows:
l-
That the Department viII provide at its expense tor the construc-
t1on, reconstruction, change or replacement of all drainage structures
necessary to properly drain said munioipal connecting link State Road within
the' said City, ~ ut not otherwise.
2-
That in consideration of the Department ' 8
undertaking the construe-
tion or reconstruction 0'1 said municipal connecting link State Road which will
be of benefit to the City and the citizens thereof as a City thoroughfare,
the City agrees to make or cause to be made all necessary adjustments, re..
locations or changes ot said facilities or utilities thereoa, municipal or
otherwise, in order to comply with the plans, designs and specifications 0'1
the Department for the construction or reconstruction of said m\micipa. l
connecting link State Road, without cost or expense to the Department. The
City further agrees that said adjustments, changes or relocations of said
facilities or utilities will be performed by the City or at its direction
with sufficient promptness so 8S to cause no delay to the Department or its
contractor on such construction or reconstruction work on s8id munic ipal
connecting link State Road. The City further agrees: That in the event
this work is done
simultaneously with the construction 0'1 the project the
City agrees to reinburse the contractor
directly for any '" ust claim due to
delays caused by the City' s operations, or hinderance to the contrac'tor' s
efficient prosecution of his work.
The City further agrees to make and enter into written
a agreement
with the Department t s successful bidder and tile an executed
copy with the
Department to provide as tollows:
1. Covering procedure for coordinating the work.
2. Minimization ot de lays .
i 3. Method of arriving at compensation to contractor
tor delays occasioned by City' s olJ8rations.
