READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-28-14--regular — reading text
Part 56 of 153. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-33713-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
co
M
ITEM Quantity Unit Price LLI
Miscellaneous:
C.)
Mobilization 1 LS 7 a ta-
a)
Maintenance of Traffic 1 LS t c
Dumpster pad/ enclosure 1 LS A
L-_
Wheel Stops 18 EA M
N
4 foot wooden picket fence 53 L. F.
Demolitions, Erosion Control:
C
7)
Clearing and Grubbing 0. 25 AC
FA-'
8?- C-C.) a
Demolition to natural grade 7, 331 S. F.
CD
Silt Fencing 327 L. F.
Construction Entrance 1 LS
E
Parking Area Improvements:
Excavation 100 C. Y. I .
Packet`Pg 125
15:2. 13
A) r'`
Stabilization of Sub base ( min. LBR 40) 815 S. Y.
6" Limerock Base Material( 98% max. density) 815 S. Y. I Y
Cl)
Asphalt Type SP 9. 5 ( 1. 5" thick/ 165 ) 67 TN
7
Concrete Ribbon Curb( 12" wide) 540 L. F.
6
Signage and Striping:
a)
6" White parking striping 1 LS
L" L"
Traffic Arrows ( white) 5 EA M
M
N
Landscape/ Hardscape:
Keystone Gravity Wall( 18" Standard units) 139 L. F.
r-:
Ground cover/ mulch 225 S. Y.
J LL
6" Caliper Live Oak 6 EA 1 t(? c.
cc
Japanese Yew( 15 Gal.) 59 EA
Dwarf Yaupon Holly( 7 Gal.) 51 EA 1Tht
Super Blue Liriope( 1 Gal.) 223 EA 1 ,-`
3
Sod 200 S. Y.
Irrigation 1 LS iLA-',
Col
w
cn
Total Project
Costs 1 .\ .{- 1`' i "
c
a)
a)
a
M
N
O
7
Q
a1
o.
t9
a)
a+
C
a1
L
V
a-.
f0
Packet Pg. 126
233 Alconese Avenue Parking Improvements
w
Request for Bids cn
0
Company:_ Utility Solutions Group LLC
Address:_ 1667 Hwy 83 North
City& State:_ DeFuniak Springs, FL Zip Code:_ 32433 M
Telephone: 850- 951- 2670 Fax:_ 850- 951- 2673
a)
Email:_ curtis @utilitysolutionsgroup. com
u_
fa
Scope of Work:
The scope of work will include the demolition of the existing parking improvements at 233 Alconese
Avenue, Fort Walton Beach, FL and reconstruction of parking improvements as depicted on Jenkins U
Engineering, Inc. plan set( Project# 14- 30). Scope of work will include all demolition/ disposal, sub base
and base preparation, curbing and concrete, dumpster pad/ enclosure construction, paving, striping, ea
landscaping, retaining wall construction, and miscellaneous improvements as detailed on plans. This
project is to be completed in 60 days.
co
F-
M
ITEM Quantity Unit Price y
Miscellaneous:
a)
Mobilization 1 LS 12000. 00
a)
Maintenance of Traffic 1 LS S1S00. 00 m
c
Dumpster pad/ enclosure 1 LS 5000.00
a
Wheel Stops 18 EA 94. 00
4 foot wooden picket fence 53 L. F. 50.00
Demolitions, Erosion Control:
O
Clearing and Grubbing 0. 25 AC 2500. 00 Q.
ca
7, 331 S. F. 2. 00 w
Demolition to
