READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 10-28-14--regular — reading text

Part 49 of 153. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-33713-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

15.1 City Council of Fort Walton Beach ENGINEERING & UTILITY SERVICES MEMORANDUM To: Michael D. Beedie, City Manager From: Tim Bolduc, Engineering and Utilities Services Director Date: October 28, 2014 Subject: Task Order for Carson Drive Streetscape Engineering & Design 1. BACKGROUND: 1. 1. Carson Drive SE and Third Street SE are located in the heart of the Community Redevelopment Area ( CRA), directly surrounding the newly constructed Sound Side Apartment Homes. 1. 2. Streetscaping along these two roads will complement the new construction in the area and help achieve the goal of the CRA, which is to eliminate slum and blight using strategies that promote reinvestment and revitalization in the community. Specifically, the project will achieve several objectives of the 2012 CRA Plan, as follows: 1. 2. 1. Objective 3. 1 — Improve Safety Through Installing Traffic Calming and Congestion Management Design Features 1. 2. 2. Objective 3. 3 — Continue to Promote Walkable Areas Throughout the CRA Through the Installation of Pedestrian- Friendly Features 1. 3. With the adoption of the 2007 CRA Plan and an associated Beal Parkway Neighborhood Plan in 2006, several items for improvement were identified for this area of the CRA including more housing, lighting upgrades, improved walkability, and stormwater upgrades. In 2008, the cul- de- sac improvements were completed at Carson Drive SE and Second Street SE, and in 2014, the Sound Side Apartment Homes development was completed. 1. 4. To continue with needed improvements to the area, the scope of this project will address flooding issues/ stormwater upgrades, lighting upgrades, walkability, aesthetic enhancements, and additional on- street parking. 2. DISCUSSION: 2. 1. Staff contacted Atkins North America, Inc. ( Atkins), one of the City' s general engineering consultants, to request a Task Order to complete the design, bidding, and construction of streetscaping along Carson Drive SE from Third Street SE to Hollywood Boulevard and Third Street SE from Beal Parkway to Carson Drive SE. 2. 2. The scope of work includes surveying, geotechnical, planning, engineering design, landscape architecture, lighting design, permitting, bidding assistance, and construction assistance. 2. 3. The proposed schedule for completing the design and bidding of the project is Page 1 of 2 Packet Pg. 107 Oki951 estimated to take approximately six ( 6) months from the execution of the Task Order with a cost of$ 112, 769. 72. 2. 4. Construction engineering and inspection services are optional for an additional 41, 967. 15. This service may or may not be used, and will be determined at a later date in the project development. 2. 5. The construction phase of the project will begin approximately in August 2015 and is expected to take six to eight months to complete. The award of the construction contract for the project will be brought back to City Council for approval. 3. FINANCIAL INFORMATION: 3. 1. To complete all of the tasks for the engineering and design of the Carson Drive SE and Third Street SE Streetscaping, Atkins has proposed a total cost of $ 112, 769. 72 for design, engineering and permitting. 3. 2. Atkins further proposed a not- to- exceed amount of $ 41, 967. 15 for construction engineering and inspection services. 3. 3. The total proposed amount for the Task Order is $ 154, 736. 86. 3. 4. If approved, sufficient funding is available in CRA Fund Balance. 4. RECOMMENDATION: 4. 1. Staff respectfully recommends City Council authorization for the City Manager to execute a Task Order with Atkins North America, Inc., of Pensacola, Florida to complete the engineering and design for the Carson Drive SE and Third Street SE Streetscaping project for a not-to- exceed amount of$ 112, 769. 72. 4. 2. Staff also recommends City Council approval of a not- to- exceed task for $ 41, 967. 15 for the construction engineering and inspections. This task will only be executed if the construction of the project is approved by City Council following completion of the engineering design. ATTACHMENTS: Task Order- Carson Drive SE Streetscape PDF) Carson Drive SE Streetscape Scope of Work ( PDF) SIGNATURE BLOCK: Stella Wilson Completed 10/ 20/ 2014 2: 07 PM Tim Bolduc Completed 10/ 21/ 2014 7: 17 AM Finance Completed 10/ 21/ 2014 9: 08 AM Carole Jones Completed 10/ 21/ 2014 9: 10 AM City Manager Completed 10/ 23/ 2014 7: 53 AM City Council Pending 10/ 28/ 2014 6: 00 PM Page 2 of 2 P ket Pg 108 Task Work Order No. 1 Carson Drive Community Streetscape Project c;) Engineering Scope Estimation a) 0 Prepared for the City of Fort Walton Beach c:3) AT K. I S Activity Fee Segment 1 ( Carson Drive From 3rd Street to Hollywood Blvd. including 3rd LU a) Street from Harbeson Ave. to Carson Drive. Estimate 0. its L.11 1. 0 Survey( Rebo Battle& Associates) 8, 300. 00 WPVIAra$8;30010 0 i75 2. 0 Geotechnical( Larry Jacobs& Associates) 5, 275. 00 C 3. 0 Planning 8, 533. 05 co" 4. 0 Engineering Design Site Design 16, 429. 31 Drainage Design 13, 957. 60 Utility Coordination 8, 410. 41 Signing and Pavement Markings 3, 320. 77 Traffic Control 3, 061. 33 Construction Plans 11, 910. 43 57, 089 85 5. 0 Landscape Architecture 14, 646. 29 cu 14-;646:29 c.) co 6. 0 Lighting( Bagwell Engineering) 7, 100. 00 a) 71 0000 I 7. 0 Permitting 6, 702. 86 Y46102186 8. 0 Bidding Assistance 2, 967. 00 219671.00 iP.:",;4'W.§$ 9. 0 Construction Assistance 2, 155. 67 55: 67 Sub Total 112, 769. 72 10. 0 Construction Engineering& Inspection( Optional Service) 41, 967. 15 4t967:15 Total 154,736. 86 c rt Packet Pg. 109 : Task Work Order No. 1 c- c) Carson Drive Community Streetscape Project o Engineering Scope Estimation ea Prepared for the City of Fort Walton Beach

Download this text file with its original spacing ↓