READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 03-12-13--regular — reading text

Part 32 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-31685-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

of existing standard 0M definition JVC cameras while providing upgradability for HD cameras when purchased within the near future. a LLK All Pro Sound also installed an acoustical treatment package to control slap echoes C within the venue. LUEA Q 806 Beverly Parkway • Pensacola, FL 32505 Toll Free 800.925. 9822 • Local 850.432. 5780 • Fax 850. 469.9780 www. allprosound. net Pack', 109' IS 5. 2 s i 3101VN'D O. 0011 so onorus Commercial Installation Division o7) 11) Project: Pensacola Christian College, Crowne Centre Date of Completion: February, 2002, June 2012 Project Cost: $ 1, 468, 000. 00 Owner Contact: Greg Moses — (850)- 478 -8496 P. O. Box 18000 Pensacola, FL 32523 Architect: Strobel & Hunter, Inc. — (850)- 432 -2153 715 E Gadsden Street Pensacola, FL 32501 Consultant: Design Build by All Pro Sound Scope: All Pro Sound provided design, engineering, and installation services for the audio system and acoustics for the 6200 seat Crowne Centre Auditorium. This facility features over 300 loudspeakers, digital mixing equipment, digital over analog production intercom system and over 200 microphone inputs. The unique design features a 110' rotating stage area that allows for Worship Services to be followed by full production events with the 180degree rotation of the stage. There are also ( 2) 250 seat wedding chapels located within the facility along with adjacent reception halls. The entire system NN is controlled by a central processing system that allows routing changes to be made as required for different functions. The systems include main FOH mixing equipment along NU with a complete broadcast audio system integrated with a National based television a production facility also housed in the building. av All Pro Sound has been involved with 2 upgrades in the recent years totaling c approximately $ 200,000. 00 that include new lighting consoles ( 2) and upgrades to the theatrical lighting package with an additional 100 fixtures. woa0` June 2012, System Renovations 0 All Pro Sound was called on to replace the original 11 year old Yamaha consoles at FOH 0 and Broadcast with new Studer Vista 9 Digital Mixing System. This system features a fiber optic infrastructure and updated capability. This update also included replacement of the aging BSS Sound web processing with new BSS London Processing. The upgrades and replacement of the consoles was completed in a tight 3 week timeframe to coordinate with the schedule of usage of this very large and busy venue. Total Cost of Renovations $ 546, 386. 00 LUEA a 806 Beverly Parkway • Pensacola, FL 32505 Toll Free 800. 925. 9822 • Local 850.432. 5780 • Fax 850. 469. 9780 www.allprosound. net 15. 2. d W oeo., oNr sownoes C.. innercial Installation Division 12) Project: Jordan -Hare Stadium Sound System Renovations Date of Completion: August, 2007 Project Cost: $ 197, 000. 00 Owner Contact: Auburn Athletics Mr. Randy Byars 334) 844 -9895 bvarsir(cmail. auburn. edu Consultant: Design /Build by All Pro Sound Scope: Renovation of complete stadium sound system. A new video display was installed which required a new structure to be built. This structure required the sound system to be relocated and allowed for additional components to upgrade the sound quality. Additional loudspeaker components, new amplification and system processing was installed. 13) Project: Jordan -Hare Stadium Broadcast Cabling System NU Date of Completion: July, 2006 m Project Cost: $ 205, 402. 00 vm Owner Contact: Auburn Athletics c Mr. Randy Byars 334) 844 -9895 No bvarsir(cDmail. auburn. edu a2` 6 Consultant: WJHW, Inc. 0 0M a Scope: Project was to install a complete new broadcast cabling infrastructure in Jordan - Hare Stadium that carries broadcast audio and video signals as well as communications c to broadcast trucks and local facilities. Work included all new cabling and terminations LEE from stadium locations to broadcast pedestals for complete connectivity. m a 806 Beverly Parkway • Pensacola, FL 32505 Toll Free 800. 925. 9822 • Local 850. 432. 5780 • Fax 850. 469. 9780 wv,w.al Iprosound. net 15. 2. d 1 r Commercial Installation Division SOLVTION9 OIO • VIDEO 14) Project: Pensacola Christian College, Sports Center Additions Date of Completion: June, 2009 Project Cost: $279, 000. 00 Owner Contact: Greg Moses — (850) 478 -8496 P. O. Box 18000 Pensacola, FL 32523 Architect: Strobel & Hunter, Inc. — (850)- 432 -2153 715 E Gadsden Street Pensacola, FL 32501 Consultant: Walthall & Associates Scope: All Pro Sound provided the installation and coordination of the audio visual systems for the New Sports Center Addition. The facility features a large meeting space, in -line skate track, massive climbing wall and indoor water park. All Pro designers coordinated with the consultant to provide a distributed audio system that features components from Renkus- Heinz, Soundtube, BSS London, Crown and Crestron. The system includes multi -zoned audio systems and video presentation NN_ equipment that is easily adaptable to a variety of different formats needed for this facility. N The components blend in to the surroundings to provide a very user friendly and functional package. UvmC rcva a a0` Q 0 0M aLK C LUEA Q 806 Beverly Parkway • Pensacola, FL 32505 Toll Free 800. 925.9822 • Local 850. 432. 5780 • Fax 850. 469.9780 www. allprosound. net Packet, Pg. 1 • 15. 2. d

Download this text file with its original spacing ↓