READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 03-12-13--regular — reading text
Part 32 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31685-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
of existing standard 0M
definition JVC cameras while providing upgradability for HD cameras when purchased
within the near future.
a
LLK
All Pro Sound also installed an acoustical treatment package to control slap echoes C
within the venue.
LUEA
Q
806 Beverly Parkway • Pensacola, FL 32505
Toll Free 800.925. 9822 • Local 850.432. 5780 • Fax 850. 469.9780
www. allprosound. net
Pack', 109'
IS
5. 2
s
i 3101VN'D
O. 0011 so onorus
Commercial Installation Division
o7)
11) Project: Pensacola Christian College, Crowne Centre
Date of Completion: February, 2002, June 2012
Project Cost: $ 1, 468, 000. 00
Owner Contact: Greg Moses — (850)- 478 -8496
P. O. Box 18000
Pensacola, FL 32523
Architect: Strobel & Hunter, Inc. — (850)- 432 -2153
715 E Gadsden Street
Pensacola, FL 32501
Consultant: Design Build by All Pro Sound
Scope:
All Pro Sound provided design, engineering, and installation services for the
audio system and acoustics for the 6200 seat Crowne Centre Auditorium. This facility
features over 300 loudspeakers, digital mixing equipment, digital over analog production
intercom system and over 200 microphone inputs. The unique design features a 110'
rotating stage area that allows for Worship Services to be followed by full production
events with the 180degree rotation of the stage. There are also ( 2) 250 seat wedding
chapels located within the facility along with adjacent reception halls. The entire system NN
is controlled by a central processing system that allows routing changes to be made as
required for different functions. The systems include main FOH mixing equipment along NU
with a complete broadcast audio system integrated with a National based television a
production facility also housed in the building.
av
All Pro Sound has been involved with 2 upgrades in the recent years totaling c
approximately $ 200,000. 00 that include new lighting consoles ( 2) and upgrades to the
theatrical lighting package with an additional 100 fixtures.
woa0`
June 2012, System Renovations
0
All Pro Sound was called on to replace the original 11 year old Yamaha consoles at FOH 0
and Broadcast with new Studer Vista 9 Digital Mixing System. This system features
a
fiber optic infrastructure and updated capability. This update also included replacement
of the aging BSS Sound web processing with new BSS London Processing. The
upgrades and replacement of the consoles was completed in a tight 3 week timeframe to
coordinate with the schedule of usage of this very large and busy venue.
Total Cost of Renovations $ 546, 386. 00
LUEA
a
806 Beverly Parkway • Pensacola, FL 32505
Toll Free 800. 925. 9822 • Local 850.432. 5780 • Fax 850. 469. 9780
www.allprosound. net
15. 2. d
W oeo., oNr sownoes
C.. innercial Installation Division
12) Project: Jordan -Hare Stadium Sound System Renovations
Date of Completion: August, 2007
Project Cost: $ 197, 000. 00
Owner Contact: Auburn Athletics
Mr. Randy Byars
334) 844 -9895
bvarsir(cmail. auburn. edu
Consultant: Design /Build by All Pro Sound
Scope:
Renovation of complete stadium sound system. A new video display was
installed which required a new structure to be built. This structure required the sound
system to be relocated and allowed for additional components to upgrade the sound
quality. Additional loudspeaker components, new amplification and system processing
was installed.
13) Project: Jordan -Hare Stadium Broadcast Cabling System NU
Date of Completion: July, 2006 m
Project Cost: $ 205, 402. 00
vm
Owner Contact: Auburn Athletics
c
Mr. Randy Byars
334) 844 -9895 No
bvarsir(cDmail. auburn. edu
a2`
6
Consultant: WJHW, Inc.
0
0M
a
Scope:
Project was to install a complete new broadcast cabling infrastructure in Jordan -
Hare Stadium that carries broadcast audio and video signals as well as communications c
to broadcast trucks and local facilities. Work included all new cabling and terminations
LEE
from stadium locations to broadcast pedestals for complete connectivity. m
a
806 Beverly Parkway • Pensacola, FL 32505
Toll Free 800. 925. 9822 • Local 850. 432. 5780 • Fax 850. 469. 9780
wv,w.al Iprosound. net
15. 2. d
1
r Commercial Installation Division
SOLVTION9
OIO • VIDEO
14) Project: Pensacola Christian College, Sports Center Additions
Date of Completion: June, 2009
Project Cost: $279, 000. 00
Owner Contact: Greg Moses — (850) 478 -8496
P. O. Box 18000
Pensacola, FL 32523
Architect: Strobel & Hunter, Inc. — (850)- 432 -2153
715 E Gadsden Street
Pensacola, FL 32501
Consultant: Walthall & Associates
Scope:
All Pro Sound provided the installation and coordination of the audio visual
systems for the New Sports Center Addition. The facility features a large meeting
space, in -line skate track, massive climbing wall and indoor water park. All Pro
designers coordinated with the consultant to provide a distributed audio system that
features components from Renkus- Heinz, Soundtube, BSS London, Crown and
Crestron. The system includes multi -zoned audio systems and video presentation NN_
equipment that is easily adaptable to a variety of different formats needed for this facility. N
The components blend in to the surroundings to provide a very user friendly and
functional package.
UvmC
rcva
a
a0`
Q
0
0M
aLK
C
LUEA
Q
806 Beverly Parkway • Pensacola, FL 32505
Toll Free 800. 925.9822 • Local 850. 432. 5780 • Fax 850. 469.9780
www. allprosound. net
Packet, Pg. 1 •
15. 2. d