READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 03-12-13--regular — reading text

Part 30 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-31685-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

E sworn by me, affixed his/her signature at the space provided above on this _ 1rf " iday U of uti Nr. Ir': 2013, and is personally known to me, or has °• as identification. Pub] My Commission expires wrrYwwrc - ttr. a craw. th Ck .: atwn M it,2614 ry COMMWbn ti 217166 10028 fig. 99 F-1 5.2. a Commercial bulalhaion Di, i,, ion Li0 „ i VT ON9 PROJECT REFERENCES 1) Project: New Orleans, Mercedes Benz Superdome, New Orleans, LA Date of Completion: August, 2011 Project Cost: $ 1, 654, 000. 00 Owner Contact: Pat Tobler Project Manager y Mercedes -Benz Superdome m C Sugar Bowl Drive New Orleans, LA 70112 504) 587 -3663 c Architect: Kurt Hagstette, AIA n Eskew Dumez Ripple 365 Canal Street, Suite 3150 LL New Orleans, LA 70130 a 504) 561 - 8688 Po3 Consultant: Ron Baker a Wrightson, Johnson, Haddon, and Williams r 4801 Spring Valley Road Suite 113 n Dallas, TX 75244 972) 934 -3700 U C Scope: m m This was a 2 year AV systems renovation project that was conducted in two phases on very tight time schedules. This first phase included relocating the press box and all associated areas from the 3t° level to the 7” level of the stadium. This work v encompassed the identification, labeling, and protection of all cabling and equipment o while construction took place. Relocation and extension of cabling, installation of new a fiber backbone and network cabling, and the installation of a large number of video a displays, loudspeakers and related equipment was performed in conjunction with the pace of the project to maintain the project schedule. Our work also included renovation b of the Saints locker room, interview room and several adjacent areas with new audio and M video components. Phase One was completed in time for the 2010 NFL football season. nLa:L The second phase of the project included the renovation of the lower seating structure and the addition of new bunker clubs under the seating areas. This phase also included the installation of new video displays and over 250 new loudspeakers. The second t phase was completed on time and ready for the 2011 NFL football season in August, n 2011. a This was a very time intensive and schedule constrained project where All Pro Sound project management worked hand in hand with the general contractor, electrical contractor and owner to complete the project ahead of schedule. 806 Beverly Parkway • Pensacola, FL 32505 Toll Free 800.925. 9822 • Local 850.432. 5780 - Fax 850. 469. 9780 ww . allprosoundmet P 1007 15. 2. d FUOIO • VIDEO • uoNrwa 9olUnoMS Commercial Msta /larlon Dirisinn 2) Jefferson State Community College Date of Completion: March 2011 Project Cast: $ 364, 926. 00 Owner Contact: Sandy M. Stevens, CMP Event Coordinator Jefferson State Community College Economic Development Center 1850 Lay Dam Road Clanton, AL 35045 205) 280 -8211 Architect: Mark Coyle, AIA Goodwyn IMills I Cawood 2701 1" Avenue South Suite 100 Birmingham, AL 35233 205) 879 -4462 Consultant: James Hill Merck & Hill 1995 North Park Place, Suite 450 Atlanta, GA 30339 770) 937 -0185 Scope: A new recital hall at the Clanton campus that included a 48 channel performance sound system with CobraNet digital audio transport, video projection system, production intercom, distributed audio and video to public areas and dressing rooms with video distribution using twisted pair transport, and a Crestron control system . An exhibit hall area also included a distributed sound reinforcement system. 00 c2 aLK C rUEN Q 806 Beverly Parkwa • Pensacola, FL 32505 Toll Free 800. 925. 9822 - Local 850. 432. 5780 • Fax 850. 469. 9780 Nvww. allprosound.net 15. 2. d A" MAMP- Commercial Installation D,, i, wn 6) Project: Boston College Alumni Stadium Date of Completion: January 2008 Project Cost: $ 1, 100, 000. 00 Owner Contact: Donald Woodring - Project Manager Boston College Capital Projects Management 201 Foster St. Brighton, MA 02135 617) -552 -0330 Architect: None Consultant: WJHW, Inc. - Kevin Day- ( 972)- 934 -3700 4801 Spring Valley Rd. Suite 113 Dallas, TX 75244 Scope: Renovation of sound reinforcement system in 47, 000 seat football stadium. Main 3 system included 99 loudspeakers in seating bowl, 50 amplifiers in 3 locations, new DSP ¢ processing, and new front of house gear. New Media Matrix Nion digital signal o processing was installed with all processing and a custom graphical user interface n developed by All Pro Sound staff. Audio transport is via Cobranet over fiber optic - cabling. New speakers were also installed in the concourses, restrooms, gate areas, and luxury boxes. All Pro Sound provided project management, engineering, all installation labor, detailed shop drawings of consultant' s concept, documentation, commissioning, d and training. Also subcontracted Wayne J. Griffin Electric, Inc. for electrical improvements needed and conduit work. All Pro helped the university project - 0 management coordinate installation of custom mounting poles for upper deck 0 loudspeakers. 0 After completion of the Alumni Stadium system, the university further contracted d All Pro Sound to upgrade the audio systems on baseball and softball fields and in the basketball practice gym. Concourse speakers were added to Conte Forum where ice hockey and basketball games are hosted. The main Conte audio system was integrated o with the Alumni stadium DSP allowing user control of both venues for separate events or o combined overflow situations. Project was not bonded. 85 percent of the work completed by our workers, all electrical work electrical contractor managed by All Pro LL Sound. c L7U0NEr 806 Beverly Parkway • Pensacola, FL 32505 Toll Free 800. 925. 9822 • Local 850. 432. 5780 • Fax 850. 469. 9780 www.allpmsound. net

Download this text file with its original spacing ↓