Okaloosa County BOCC — November 5, 2013 — Recommendation of Award, 7-25-13 — reading text
Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 93-Recommendation of Award_ 7-25-13.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Zafz.e5e.04] Zot,
AVCON, INC.
ENGINEERS & PLANNERS
320 Bayshore Drive, Suite A
Niceville, Florida 32578
Phone: (850) 678-0050
2012.050.09/Recommendation of Award 7-25-13 Fax: (850) 678-0040
www.aveoninc.com
July 25, 2013
Mr. Tracy Stage, A.A.E.
Deputy Airports Director
Okaloosa County Airports
1701 State Road 85 North
Eglin Air Force Base, FL 32542
Reference: Tabulation of Bids and Recommendation of Award
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
Dear Mr. Stage:
On Thursday, July 25, 2013 at 3:00 p.m. local time, bids were received at the Okaloosa County office at 302 N.
Wilson Street in Crestview for the Eglin Air Force Base ARFF Development project at Eglin Air Force Base.
A total of seven bids were received and a tabulation of the bids is enclosed herein as Attachment A for your
reference. The total bid amounts are summarized as follows:
Bidder Total Bid
1. Birkshire Johnstone, LLC $2,616,793.60
2. Speegle Construction, Inc. $2,712,852.70
3. Cathey Construction and Development, LLC $2,729,127.71
4. Lord and Son Construction, Inc. $2,744,542.63
5. The Green-Simmons Company, Inc. $2,822,566.93
6. Ram Construction and Development, LLC $2,866,994.00
7, Design/Build Systems, Inc. $3,412,074.69
As stated in Item 10, Page BF-Page 4 of 6, “the Basis of Award shall be the Total Bid Amount, price and other
factors considered.” Based on our review of the submittals by the seven bidders, Birkshire Johnstone, LLC
appears to be a responsible contractor with the lowest Total Bid Amount. We have reviewed the scope of work
and DBE goals with Birkshire Johnstone and have confirmed their understanding of the project.
The Total Bid Amount by Birkshire Johnstone is approximately 11.3% higher than the Engineer’s Estimate
($2,350,353.50). Factors contributing to this variation may include additional efforts related to controlled
access to the project site (personnel, deliveries, badging, etc.), compared to standard construction costs. In
addition, integration of the Westnet mass notification system may require extended efforts to install and verify
functionality. The difference between the Total Bid Amount for the apparent low bidder (Birkshire Johnstone)
and the sixth lowest bidder (Ram Construction and Development, LLC) is only 9.6%; therefore, the bids
received appear to validate that the low bid is a reasonable cost for this project.
CIVIL & STRUCTURAL ENGINEERING @™ AIRPORT & AVIATION CONSULTING @™ TRANSPORTATION DESIGN & PLANNING
Mr. Tracy Stage, A.A.E.
July 25, 2013
Page 2 of 2
A review of the bid proposal submitted by Birkshire Johnstone, LLC identified two discrepancies between the
multiplication of the unit prices and the quantities. For example, the Total Amount for Bid Item No. 10 was
provided as “$6,278.00”; however, the product of the unit price and the quantity is $6,044.40 and a similar
discrepancy appears in Item No. 11. As stated in Section 17.1, Instruction to Contractors of the Bidding
Documents, discrepancies between the multiplication of units of Work and unit prices will be resolved in favor
of the unit prices. These corrections have been depicted on the attached Bid Tabulation.
Several of the remaining contractor’s bids included minor discrepancies which appear to have no direct bearing
on our recommendation of award provided herein, but may require County legal review in the event that the
project is ultimately awarded to a firm other than Birkshire Johnstone who provided the apparent low bid.
The Disadvantaged Business Enterprise Program form (OC-10) submitted by Birkshire Johnstone includes
subcontractors for fire protection, acoustical ceilings, electrical, flooring, and sitework but does not include
estimated amounts for each subcontractor or a total estimated DBE participation percentage. We reviewed the
DBE requirements of the bidding documents with Birkshire Johnstone and they confirmed that the 4.03% DBE
participation requirement is reasonable and will be achieved for this project.
Notwithstanding the County’s final review of the complete project documents and legal review of bid forms,
we recommend award of the Eglin Air Force Base ARFF Development contract to Birkshire Johnstone, LLC at
the bid amount of $2,616,793.60, subject to available funding and concurrence by FAA. .
We stand ready to assist the Airport in the implementation of this project based on your determination of the
desirability of the award at this time. Should you have any questions or require additional information, please
do not hesitate to contact us at your convenience.
Sincerely,
AVCON, INC.
John Collins, P.E.
Project Manager
Enclosures as list below:
1. Attachment A—Bid Tabulation
ATTACHMENT A
BID TABULATION
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
BID OPENING: July 25, 2013 AT 3:00 PM
1. Engineer's Opinion of Construction Cost recommended a 10% contingency.
Recommended budget was $2,350,353.50
fhe Gin
-25-)3
ENGINEER'S ESTIMATE
ITEM EXTENDED
NUMBER BID ITEM ITEM DESCRIPTION UNIT] QUANTITY} = UNIT PRICE TOTAL
1 M-101-1 MOBILIZATION AND MAINTENANCE OF TRAFFIC LS 1 $ 25,000.00 | $ 25,000.00
2 P-151-1 STRIPPING AND STOCKPILING SY 10,900 $ 1.00 | $ 10,900.00
3 P-152-1 EXCAVATION AND EMBANKMENT LS 1 $ 20,000.00 | $ 20,000.00
4 P-152-2 SUBGRADE PREPARATION SY 3,600 $ 1.50 | $ 5,400.00
5 P-156-1 EROSION AND POLLUTION CONTROL LS 1 $ 7,000.00 | $ 7,000.00
6 P-209-1 CRUSHED AGGREGATE BASE COURSE, 6” SY 1,300 $ 18.00 | $ 23,400.00 | §
£ P-211-1 LIMEROCK BASE COURSE, 8" SY 1,100 $ 15.00 | $ 16,500.00 }
8 P-501-1 PCC PAVEMENT, 10" SY 1,250 $ 110.00 | $ 137,500.00
9 T-904-1 SODDING, BAHIA ARGENTINA sY 7,700 $ 3.00 | $ 23,100.00
10 D-701-1 18" RCP, CLASS IIl LF 207 $ 40.00 | $ 8,280.00
al D-701-2 18" RCP, CLASS V LF 32 $ 60.00 | $ 1,920.00
12 D-751-1 TYPE F DITCH BOTTOM INLET EA 3 $ 3,300.00 | $ 9,900.00
13 D-751-2 18" MES EA 2 $ 1,500.00 | $ 3,000.00
14 334-1 SUPERPAVE ASPHALTIC CONCRETE TON 200 $ 130.00 | $ 26,000.00 |
15 520-1 CONCRETE SPILLWAY LS 1 $ 5,000.00 | $ 5,000.00
16 520-2 CONCRETE "F" CURB LF 450 $ 20.00 | $ 9,000.00 | §
17 520-3 CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON LS 1 $ 13,000.00 | $ 13,000.00
18 522-1 CONCRETE SIDEWALK SY 240 $ 40.00 | $ 9,600.00
19 527-1 DETECTABLE WARNING SURFACE EA 2 $ 400.00 | $ 800.00
20 530-1 RIPRAP (RUBBLE) (18" DEPTH) SY 70 $ 100.00 | $ 7,000.00
21 700-1 VEHICULAR SIGNAGE LS 1 $ 500.00 | $ 500.00
22 710-1 VEHICULAR PAVEMENT MARINGS LS 1 $ 4,000.00 | $ 4,000.00
23 02660-1 POTABLE WATER IMPROVEMENTS LS 1 $ 35,000.00 | $ 35,000.00
24 02730-1 SANITARY SEWER IMPROVEMENTS LS 1 $ 15,000.00 | $ 15,000.00 |
25 SS-1 SEPTIC SYSTEM, COMPLETE LS 4 $ 40,000.00 | $ 40,000.00
26 WH-1 WHEEL STOP EA ii $ 55.00 | $ 385.00
27 SD-1 41 WAY 4" PVC SPLIT DUCT CONCRETE ENCASED LF 75 $ 20.00 | $ 1,500.00
28 AL-1 SIGNAGE ALLOWANCE AL 1 $ 20,000.00 | $ 20,000.00
29 AL-2 UTILITY ALLOWANCE AL 1 $ 10,000.00 | $ 10,000.00
30 AL-3 TRANSFORMER ALLOWANCE AL 1 $50,000.00 | $ 50,000.00 |
31 AL-4 OWNERS ALLOWANCE AL 1 $50,000.00 | $ 50,000.00
32 ARFF-1 ARFF BUILDING, COMPLETE LS i $ 1,548,000.00 | $ _1,548,000.00
Total Bid Amount: $ 2,136,685.00
$ 2,350,353.50
(See Note 1)
| SPEEGLE CONSTRUCTION, INC.
CATHEY CONSTRUCTION AND
DEVELOPMENT, LLC
EXTENDED EXTENDED
UNIT PRICE TOTAL UNIT PRICE TOTAL
$71,553.18 | $ 71,553.18] $ 41,901.57 | $ 41,901.57
$ 0.92 | $ 10,028.00 | $ 2.33 | $ 25,397.00
$22,611.92 | $ 22,611.92 | $ 44,943.84 | $ 44,943.84
$ 0.65 | $ 2,340.00 | $ 3.67 | $ 13,212.00
$ 2,441.18 | $ 2,441.18] $ 13,987.51 | $ 13,987.51
$ 14.66 | $ 19,058.00 | $ 13.96 | $ 18,148.00
$ 21.52 |$ 23,672.00 | $ 15.39 | $ 16,929.00
$ 73.44 | $ 91,800.00 | $ 79.95 | $ 99,937.50
$ 2.62 |$ 20,174.00 | $ 3.25 | $ 25,025.00
$ 38.91 | $ 8,054.37 | $ 40.80 | $ 8,445.60
$ 33.26 | $ 1,064.32 | $ 52.45 | $ 1,678.40
$ 1,906.23 | $ 5,718.69 | $ 2,331.25 | $ 6,993.75
$ 1,062.12 | $ 2,124.24 | $ 699.38 | $ 1,398.76
$ 143.711 $ 28,742.00 | $ 139.88 | $ 27,976.00
$ 2,548.24 | $ 2,548.24 | $ 1,566.60 | $ 1,566.60
$ 19.53 | $ 8,788.50 | $ 20.98 | $ 9,441.00
$13,016.80 | $ 13,016.80 | $ 8,444.96 | $ 8,444.96
$ 35.37 | $ 8,488.80 | $ 34.97 | $ 8,392.80
$ 296.80 | $ 593.60 | $ 349.69 | $ 699.38
$ 62.75 | $ 4,392.50 | $ 54.20 | $ 3,794.00
$ 604.20 | $ 604.20 | $ 437.11 | $ 437.11
$ 1,335.60 | $ 1,335.60 | $ 2,044.86 | $ 2,044.86
$29,015.38 | $ 29,015.38] $ 28,082.29 | $ 28,082.29
$ 6,552.92 | $ 6,552.92 | $ 9,082.77 | $ 9,082.77
$15,746.30 | $ 15,746.30] $ 44,293.77 | $ 44,293.77
$ 71.78 | $ 502.46 | $ 87.42 | $ 611.94
$ 25.14 | $ 1,885.50 | $ 31.74 | $ 2,380.50
$20,000.00 | $ 20,000.00] $ 20,000.00 | $ 20,000.00
$10,000.00 | $ 10,000.00] $ 10,000.00 | $ 10,000.00
$50,000.00 | $ 50,000.00] $ 50,000.00 | $ 50,000.00
$50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00
$ 2,180,000.00 | $ _2,180,000.00 | $ 2,133,881.80 } $ _2,133,881.80
$ 2,712,852.70 $ 2,729,127.71
ATTACHMENT A
BID TABULATION
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
BID OPENING: July 25, 2013 AT 3:00 PM
LORD AND SON CONSTRUCTION,
THE GREEN-SIMMONS.
RAM CONSTUCTION AND
DESIGN/BUILD SYSTEMS, INC.
4. Engineer's Opinion of Construction Cost recommended a 10% contingency.
Recommended budget was $2,350,353.50
INC. COMPANY, INC. DEVELOPMENT
ITEM EXTENDED EXTENDED EXTENDED EXTENDED
NUMBER BID ITEM ITEM DESCRIPTION UNIT] QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
1 M-101-1 MOBILIZATION AND MAINTENANCE OF TRAFFIC LS 1 $ 204,737.13 | $ 204,737.13 $ 19,591.00 | $ 19,591.00] $ 16,000.00 | $ 16,000.00] $ 19,200.00 | $ 19,200.00
2 P-151-1 STRIPPING AND STOCKPILING sY 10,900 $ 0.35 | $ 3,815.00 | $ 0.11 | $ 1,199.00 | $ 1.00 | $ 10,900.00 | $ 1.20 | $ 13,080.00
3 P-152-1 EXCAVATION AND EMBANKMENT LS 4 $ 40,000.00 | $ 40,000.00] $ 59,829.00 | $ 69,829.00] $ 17,000.00 | $ 17,000.00 | $ 20,400.00 | $ 20,400.00
4 P-152-2 SUBGRADE PREPARATION sY 3,600 $ 1.90 | $ 6,840.00 | $ 1.40 | $ 5,040.00 | $ 3.00 | $ 10,800.00 | $ 3.60 | $ 12,960.00
5 P-156-1 EROSION AND POLLUTION CONTROL LS 1 $ 4,800.00 | $ 4,800.00 | $ 4,758.00 | $ 4,758.00 | $ 5,000.00 | $ 5,000.00 | $ 6,000.00 | $ 6,000.00
6 P-209-1 CRUSHED AGGREGATE BASE COURSE, 6" SY 1,300 $ 15.00 | $ 19,500.00 | $ 21.33 | $ 27,729.00 | $ 20.75 | $ 26,975.00 | $ 24.90 | $ 32,370.00
7 P-211-1 LIMEROCK BASE COURSE, 8" SY 1,100 $ 13.10 | $ 14,410.00 | $ 27.54 |$ 30,294.00 | $ 19.18 | $ 21,098.00 | $ 23.02 | $ 25,322.00
8 P-501-1 PCC PAVEMENT, 10” SY 1,250 $ 95.80 | $ 119,750.00 | $ 112.24 | $ 140,300.00 | $ 92.00 | $ 115,000.00 | $ 127.20 | $ 159,000.00
9 T-904-4 SODDING, BAHIA ARGENTINA SY 7,700 $ 3.50 | $ 26,950.00 | $ 3.36 | $ 25,872.00 | $ 3.50 | $ 26,950.00 | $ 4.20 |$ 32,340.00
10 D-701-1 18" RCP, CLASS Ill LF 207 $ 34.50 | $ 7,141.50 | $ 50.38 | $ 10,428.66 | $ 32.00 | $ 6,624.00 | $ 33.92 | $ 7,021.44
11 D-701-2 18" RCP, CLASS V LF 32 $ 38.00 | $ 1,216.00 | $ 55.97 | $ 1,791.04 | $ 40.50 | $ 1,296.00 | $ 48.60 | $ 1,555.20
12 D-751-1 TYPE F DITCH BOTTOM INLET EA 3 $ 2,500.00 | $ 7,500.00 | $ 2,407.00 | $ 7,221.00 | $ 3,000.00 | $ 9,000.00 | $ 3,600.00 | $ 10,800.00
13 D-751-2 18" MES EA 2 $ 700.00 | $ 1,400.00 | $ 1,063.50 | $ 2,127.00 | $ 1,200.00 | $ 2,400.00 | $ 1,440.00 | $ 2,880.00
14 334-1 SUPERPAVE ASPHALTIC CONCRETE TON 200 $ 124.00 | $ 24,800.00 | $ 109.15 | $ 21,830.00 | $ 120.00 | $ 24,000.00 | $ 144.00 | $ 28,800.00
15 520-1 CONCRETE SPILLWAY LS 1 $ 2,300.00 | $ 2,300.00 | $ 4,422.00 | $ 4,422.00 | $ 5,500.00 | $ 5,500.00 | $ 6,600.00 | $ 6,600.00
16 520-2 CONCRETE "F" CURB LF 450 $ 18.00 | $ 8,100.00 | $ 18.47 | $ 8,311.50 | $ 15.50 | $ 6,975.00 | $ 18.60 | $ 8,370.00
17 §20-3 CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON _| LS 1 $ 5,963.00 | $ 5,963.00 | $ 11,322.00 | $ 11,322.00 | $ 1,500.00 | $ 4,500.00 | $ 6,036.00 | $ 6,036.00
18 522-1 CONCRETE SIDEWALK sY 240 $ 36.00 | $ 8,640.00 | $ 46.92 | $ 11,260.80 | $ 33.00 | $ 7,920.00 | $ 39.60 | $ 9,504.00
19 527-1 DETECTABLE WARNING SURFACE EA 2 $ 280.00 | $ 560.00 | $ 313.50 | $ 627.00 | $ 350.00 | $