READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — November 5, 2013 — Recommendation of Award, 7-25-13 — reading text

Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 93-Recommendation of Award_ 7-25-13.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Zafz.e5e.04] Zot, AVCON, INC. ENGINEERS & PLANNERS 320 Bayshore Drive, Suite A Niceville, Florida 32578 Phone: (850) 678-0050 2012.050.09/Recommendation of Award 7-25-13 Fax: (850) 678-0040 www.aveoninc.com July 25, 2013 Mr. Tracy Stage, A.A.E. Deputy Airports Director Okaloosa County Airports 1701 State Road 85 North Eglin Air Force Base, FL 32542 Reference: Tabulation of Bids and Recommendation of Award Eglin Air Force Base ARFF Development Eglin Air Force Base, Florida Dear Mr. Stage: On Thursday, July 25, 2013 at 3:00 p.m. local time, bids were received at the Okaloosa County office at 302 N. Wilson Street in Crestview for the Eglin Air Force Base ARFF Development project at Eglin Air Force Base. A total of seven bids were received and a tabulation of the bids is enclosed herein as Attachment A for your reference. The total bid amounts are summarized as follows: Bidder Total Bid 1. Birkshire Johnstone, LLC $2,616,793.60 2. Speegle Construction, Inc. $2,712,852.70 3. Cathey Construction and Development, LLC $2,729,127.71 4. Lord and Son Construction, Inc. $2,744,542.63 5. The Green-Simmons Company, Inc. $2,822,566.93 6. Ram Construction and Development, LLC $2,866,994.00 7, Design/Build Systems, Inc. $3,412,074.69 As stated in Item 10, Page BF-Page 4 of 6, “the Basis of Award shall be the Total Bid Amount, price and other factors considered.” Based on our review of the submittals by the seven bidders, Birkshire Johnstone, LLC appears to be a responsible contractor with the lowest Total Bid Amount. We have reviewed the scope of work and DBE goals with Birkshire Johnstone and have confirmed their understanding of the project. The Total Bid Amount by Birkshire Johnstone is approximately 11.3% higher than the Engineer’s Estimate ($2,350,353.50). Factors contributing to this variation may include additional efforts related to controlled access to the project site (personnel, deliveries, badging, etc.), compared to standard construction costs. In addition, integration of the Westnet mass notification system may require extended efforts to install and verify functionality. The difference between the Total Bid Amount for the apparent low bidder (Birkshire Johnstone) and the sixth lowest bidder (Ram Construction and Development, LLC) is only 9.6%; therefore, the bids received appear to validate that the low bid is a reasonable cost for this project. CIVIL & STRUCTURAL ENGINEERING @™ AIRPORT & AVIATION CONSULTING @™ TRANSPORTATION DESIGN & PLANNING Mr. Tracy Stage, A.A.E. July 25, 2013 Page 2 of 2 A review of the bid proposal submitted by Birkshire Johnstone, LLC identified two discrepancies between the multiplication of the unit prices and the quantities. For example, the Total Amount for Bid Item No. 10 was provided as “$6,278.00”; however, the product of the unit price and the quantity is $6,044.40 and a similar discrepancy appears in Item No. 11. As stated in Section 17.1, Instruction to Contractors of the Bidding Documents, discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. These corrections have been depicted on the attached Bid Tabulation. Several of the remaining contractor’s bids included minor discrepancies which appear to have no direct bearing on our recommendation of award provided herein, but may require County legal review in the event that the project is ultimately awarded to a firm other than Birkshire Johnstone who provided the apparent low bid. The Disadvantaged Business Enterprise Program form (OC-10) submitted by Birkshire Johnstone includes subcontractors for fire protection, acoustical ceilings, electrical, flooring, and sitework but does not include estimated amounts for each subcontractor or a total estimated DBE participation percentage. We reviewed the DBE requirements of the bidding documents with Birkshire Johnstone and they confirmed that the 4.03% DBE participation requirement is reasonable and will be achieved for this project. Notwithstanding the County’s final review of the complete project documents and legal review of bid forms, we recommend award of the Eglin Air Force Base ARFF Development contract to Birkshire Johnstone, LLC at the bid amount of $2,616,793.60, subject to available funding and concurrence by FAA. . We stand ready to assist the Airport in the implementation of this project based on your determination of the desirability of the award at this time. Should you have any questions or require additional information, please do not hesitate to contact us at your convenience. Sincerely, AVCON, INC. John Collins, P.E. Project Manager Enclosures as list below: 1. Attachment A—Bid Tabulation ATTACHMENT A BID TABULATION Eglin Air Force Base ARFF Development Eglin Air Force Base, Florida BID OPENING: July 25, 2013 AT 3:00 PM 1. Engineer's Opinion of Construction Cost recommended a 10% contingency. Recommended budget was $2,350,353.50 fhe Gin -25-)3 ENGINEER'S ESTIMATE ITEM EXTENDED NUMBER BID ITEM ITEM DESCRIPTION UNIT] QUANTITY} = UNIT PRICE TOTAL 1 M-101-1 MOBILIZATION AND MAINTENANCE OF TRAFFIC LS 1 $ 25,000.00 | $ 25,000.00 2 P-151-1 STRIPPING AND STOCKPILING SY 10,900 $ 1.00 | $ 10,900.00 3 P-152-1 EXCAVATION AND EMBANKMENT LS 1 $ 20,000.00 | $ 20,000.00 4 P-152-2 SUBGRADE PREPARATION SY 3,600 $ 1.50 | $ 5,400.00 5 P-156-1 EROSION AND POLLUTION CONTROL LS 1 $ 7,000.00 | $ 7,000.00 6 P-209-1 CRUSHED AGGREGATE BASE COURSE, 6” SY 1,300 $ 18.00 | $ 23,400.00 | § £ P-211-1 LIMEROCK BASE COURSE, 8" SY 1,100 $ 15.00 | $ 16,500.00 } 8 P-501-1 PCC PAVEMENT, 10" SY 1,250 $ 110.00 | $ 137,500.00 9 T-904-1 SODDING, BAHIA ARGENTINA sY 7,700 $ 3.00 | $ 23,100.00 10 D-701-1 18" RCP, CLASS IIl LF 207 $ 40.00 | $ 8,280.00 al D-701-2 18" RCP, CLASS V LF 32 $ 60.00 | $ 1,920.00 12 D-751-1 TYPE F DITCH BOTTOM INLET EA 3 $ 3,300.00 | $ 9,900.00 13 D-751-2 18" MES EA 2 $ 1,500.00 | $ 3,000.00 14 334-1 SUPERPAVE ASPHALTIC CONCRETE TON 200 $ 130.00 | $ 26,000.00 | 15 520-1 CONCRETE SPILLWAY LS 1 $ 5,000.00 | $ 5,000.00 16 520-2 CONCRETE "F" CURB LF 450 $ 20.00 | $ 9,000.00 | § 17 520-3 CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON LS 1 $ 13,000.00 | $ 13,000.00 18 522-1 CONCRETE SIDEWALK SY 240 $ 40.00 | $ 9,600.00 19 527-1 DETECTABLE WARNING SURFACE EA 2 $ 400.00 | $ 800.00 20 530-1 RIPRAP (RUBBLE) (18" DEPTH) SY 70 $ 100.00 | $ 7,000.00 21 700-1 VEHICULAR SIGNAGE LS 1 $ 500.00 | $ 500.00 22 710-1 VEHICULAR PAVEMENT MARINGS LS 1 $ 4,000.00 | $ 4,000.00 23 02660-1 POTABLE WATER IMPROVEMENTS LS 1 $ 35,000.00 | $ 35,000.00 24 02730-1 SANITARY SEWER IMPROVEMENTS LS 1 $ 15,000.00 | $ 15,000.00 | 25 SS-1 SEPTIC SYSTEM, COMPLETE LS 4 $ 40,000.00 | $ 40,000.00 26 WH-1 WHEEL STOP EA ii $ 55.00 | $ 385.00 27 SD-1 41 WAY 4" PVC SPLIT DUCT CONCRETE ENCASED LF 75 $ 20.00 | $ 1,500.00 28 AL-1 SIGNAGE ALLOWANCE AL 1 $ 20,000.00 | $ 20,000.00 29 AL-2 UTILITY ALLOWANCE AL 1 $ 10,000.00 | $ 10,000.00 30 AL-3 TRANSFORMER ALLOWANCE AL 1 $50,000.00 | $ 50,000.00 | 31 AL-4 OWNERS ALLOWANCE AL 1 $50,000.00 | $ 50,000.00 32 ARFF-1 ARFF BUILDING, COMPLETE LS i $ 1,548,000.00 | $ _1,548,000.00 Total Bid Amount: $ 2,136,685.00 $ 2,350,353.50 (See Note 1) | SPEEGLE CONSTRUCTION, INC. CATHEY CONSTRUCTION AND DEVELOPMENT, LLC EXTENDED EXTENDED UNIT PRICE TOTAL UNIT PRICE TOTAL $71,553.18 | $ 71,553.18] $ 41,901.57 | $ 41,901.57 $ 0.92 | $ 10,028.00 | $ 2.33 | $ 25,397.00 $22,611.92 | $ 22,611.92 | $ 44,943.84 | $ 44,943.84 $ 0.65 | $ 2,340.00 | $ 3.67 | $ 13,212.00 $ 2,441.18 | $ 2,441.18] $ 13,987.51 | $ 13,987.51 $ 14.66 | $ 19,058.00 | $ 13.96 | $ 18,148.00 $ 21.52 |$ 23,672.00 | $ 15.39 | $ 16,929.00 $ 73.44 | $ 91,800.00 | $ 79.95 | $ 99,937.50 $ 2.62 |$ 20,174.00 | $ 3.25 | $ 25,025.00 $ 38.91 | $ 8,054.37 | $ 40.80 | $ 8,445.60 $ 33.26 | $ 1,064.32 | $ 52.45 | $ 1,678.40 $ 1,906.23 | $ 5,718.69 | $ 2,331.25 | $ 6,993.75 $ 1,062.12 | $ 2,124.24 | $ 699.38 | $ 1,398.76 $ 143.711 $ 28,742.00 | $ 139.88 | $ 27,976.00 $ 2,548.24 | $ 2,548.24 | $ 1,566.60 | $ 1,566.60 $ 19.53 | $ 8,788.50 | $ 20.98 | $ 9,441.00 $13,016.80 | $ 13,016.80 | $ 8,444.96 | $ 8,444.96 $ 35.37 | $ 8,488.80 | $ 34.97 | $ 8,392.80 $ 296.80 | $ 593.60 | $ 349.69 | $ 699.38 $ 62.75 | $ 4,392.50 | $ 54.20 | $ 3,794.00 $ 604.20 | $ 604.20 | $ 437.11 | $ 437.11 $ 1,335.60 | $ 1,335.60 | $ 2,044.86 | $ 2,044.86 $29,015.38 | $ 29,015.38] $ 28,082.29 | $ 28,082.29 $ 6,552.92 | $ 6,552.92 | $ 9,082.77 | $ 9,082.77 $15,746.30 | $ 15,746.30] $ 44,293.77 | $ 44,293.77 $ 71.78 | $ 502.46 | $ 87.42 | $ 611.94 $ 25.14 | $ 1,885.50 | $ 31.74 | $ 2,380.50 $20,000.00 | $ 20,000.00] $ 20,000.00 | $ 20,000.00 $10,000.00 | $ 10,000.00] $ 10,000.00 | $ 10,000.00 $50,000.00 | $ 50,000.00] $ 50,000.00 | $ 50,000.00 $50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 $ 2,180,000.00 | $ _2,180,000.00 | $ 2,133,881.80 } $ _2,133,881.80 $ 2,712,852.70 $ 2,729,127.71 ATTACHMENT A BID TABULATION Eglin Air Force Base ARFF Development Eglin Air Force Base, Florida BID OPENING: July 25, 2013 AT 3:00 PM LORD AND SON CONSTRUCTION, THE GREEN-SIMMONS. RAM CONSTUCTION AND DESIGN/BUILD SYSTEMS, INC. 4. Engineer's Opinion of Construction Cost recommended a 10% contingency. Recommended budget was $2,350,353.50 INC. COMPANY, INC. DEVELOPMENT ITEM EXTENDED EXTENDED EXTENDED EXTENDED NUMBER BID ITEM ITEM DESCRIPTION UNIT] QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 M-101-1 MOBILIZATION AND MAINTENANCE OF TRAFFIC LS 1 $ 204,737.13 | $ 204,737.13 $ 19,591.00 | $ 19,591.00] $ 16,000.00 | $ 16,000.00] $ 19,200.00 | $ 19,200.00 2 P-151-1 STRIPPING AND STOCKPILING sY 10,900 $ 0.35 | $ 3,815.00 | $ 0.11 | $ 1,199.00 | $ 1.00 | $ 10,900.00 | $ 1.20 | $ 13,080.00 3 P-152-1 EXCAVATION AND EMBANKMENT LS 4 $ 40,000.00 | $ 40,000.00] $ 59,829.00 | $ 69,829.00] $ 17,000.00 | $ 17,000.00 | $ 20,400.00 | $ 20,400.00 4 P-152-2 SUBGRADE PREPARATION sY 3,600 $ 1.90 | $ 6,840.00 | $ 1.40 | $ 5,040.00 | $ 3.00 | $ 10,800.00 | $ 3.60 | $ 12,960.00 5 P-156-1 EROSION AND POLLUTION CONTROL LS 1 $ 4,800.00 | $ 4,800.00 | $ 4,758.00 | $ 4,758.00 | $ 5,000.00 | $ 5,000.00 | $ 6,000.00 | $ 6,000.00 6 P-209-1 CRUSHED AGGREGATE BASE COURSE, 6" SY 1,300 $ 15.00 | $ 19,500.00 | $ 21.33 | $ 27,729.00 | $ 20.75 | $ 26,975.00 | $ 24.90 | $ 32,370.00 7 P-211-1 LIMEROCK BASE COURSE, 8" SY 1,100 $ 13.10 | $ 14,410.00 | $ 27.54 |$ 30,294.00 | $ 19.18 | $ 21,098.00 | $ 23.02 | $ 25,322.00 8 P-501-1 PCC PAVEMENT, 10” SY 1,250 $ 95.80 | $ 119,750.00 | $ 112.24 | $ 140,300.00 | $ 92.00 | $ 115,000.00 | $ 127.20 | $ 159,000.00 9 T-904-4 SODDING, BAHIA ARGENTINA SY 7,700 $ 3.50 | $ 26,950.00 | $ 3.36 | $ 25,872.00 | $ 3.50 | $ 26,950.00 | $ 4.20 |$ 32,340.00 10 D-701-1 18" RCP, CLASS Ill LF 207 $ 34.50 | $ 7,141.50 | $ 50.38 | $ 10,428.66 | $ 32.00 | $ 6,624.00 | $ 33.92 | $ 7,021.44 11 D-701-2 18" RCP, CLASS V LF 32 $ 38.00 | $ 1,216.00 | $ 55.97 | $ 1,791.04 | $ 40.50 | $ 1,296.00 | $ 48.60 | $ 1,555.20 12 D-751-1 TYPE F DITCH BOTTOM INLET EA 3 $ 2,500.00 | $ 7,500.00 | $ 2,407.00 | $ 7,221.00 | $ 3,000.00 | $ 9,000.00 | $ 3,600.00 | $ 10,800.00 13 D-751-2 18" MES EA 2 $ 700.00 | $ 1,400.00 | $ 1,063.50 | $ 2,127.00 | $ 1,200.00 | $ 2,400.00 | $ 1,440.00 | $ 2,880.00 14 334-1 SUPERPAVE ASPHALTIC CONCRETE TON 200 $ 124.00 | $ 24,800.00 | $ 109.15 | $ 21,830.00 | $ 120.00 | $ 24,000.00 | $ 144.00 | $ 28,800.00 15 520-1 CONCRETE SPILLWAY LS 1 $ 2,300.00 | $ 2,300.00 | $ 4,422.00 | $ 4,422.00 | $ 5,500.00 | $ 5,500.00 | $ 6,600.00 | $ 6,600.00 16 520-2 CONCRETE "F" CURB LF 450 $ 18.00 | $ 8,100.00 | $ 18.47 | $ 8,311.50 | $ 15.50 | $ 6,975.00 | $ 18.60 | $ 8,370.00 17 §20-3 CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON _| LS 1 $ 5,963.00 | $ 5,963.00 | $ 11,322.00 | $ 11,322.00 | $ 1,500.00 | $ 4,500.00 | $ 6,036.00 | $ 6,036.00 18 522-1 CONCRETE SIDEWALK sY 240 $ 36.00 | $ 8,640.00 | $ 46.92 | $ 11,260.80 | $ 33.00 | $ 7,920.00 | $ 39.60 | $ 9,504.00 19 527-1 DETECTABLE WARNING SURFACE EA 2 $ 280.00 | $ 560.00 | $ 313.50 | $ 627.00 | $ 350.00 | $

Download this text file with its original spacing ↓