Okaloosa County BOCC — August 16, 2016 — Project List — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Project List — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
COUNTY ADMINISTRATOR’S OFFICE
RESTORE Act Pot 3 Project List
Project Nomination Forms to be submitted to the Gulf Consortium for the State Expenditure Plan
PUBLIC WORKS:
1. Gap Creek Stormwater Improvements - $1M
Gap Creek is a major drainage basin that discharges into Cinco Bayou; many neighborhoods in this
drainage basin experience flooding during storms. Studies have identified $2M dollars in potential
improvements, with stormwater detention and conveyance improvements being estimated at $1M. Some
of the potential improvements could be challenging to construct, due to unwilling property owners or
unknown wetland impacts.
2. Lake Lorraine Stormwater Improvements - $1M
Phase 1 of Lake Lorraine Stormwater Improvements were completed in 2015. Phase 2 of the project will
allow the installation of hydrodynamic separators, new detention basins, and connecting pipes.
3. Dorcas Road Dirt to Pave - $2M
Dorcas Road is an east-west connector in northeast Okaloosa County, connecting Highway 393 to
Richardson Road in Walton County. This roadway goes underwater several times each year, and
maintenance is required to make the dirt road passable after it erodes into Pond Creek, which drains into
the Shoal River. Paving this dirt road would keep sediment from entering Pond Creek and Shoal River,
and it would be designed to handle a 10-year storm so that it is not closed each year during routine storms.
4. Stormwater Outfall Rehabilitation - $3M
In the Fort Walton Beach area, there are five outfalls into bayous around Choctawhatchee Bay that need
rehabilitation and improvement: 930 Pocahontas Dr., 5 Mooney Rd. NE, 120 Monahan Dr. NE, 202
Lafitte Crescent, and Barataria Ln. Sediment is deposited into the bayous through stormwater pipe
outfalls through a variety of sources including: grass clippings, leaves, litter, erosion, and damaged
stormwater pipes. Hydrodynamic separators are needed to treat stormwater before it enters the bayous,
and the outfalls need to be cleaned of sediment to allow the natural ecosystems to reestablish.
TOURIST DEVELOPMENT:
1. Choctawhatchee Bay Estuary Program - $2M
The Choctawhatchee Bay Estuary Program will be a non-regulatory program that would work to improve
the waters, habitats, living resources, and economy of the Choctawhatchee Bay watershed. The initial
funds would be used to “stand up” the Estuary Program, hire staff, and develop a Comprehensive
Conservation and Management Plan. This plan would identify critical need projects throughout the
estuary and begin the construction of those projects that could include stormwater improvements, water
quality improvements, restoration initiatives, and dirt road paving among others.
2. Fish Aggregating Device Network (FADS) - $0.5M
FADS are floating objects designed and strategically placed to attract pelagic fish and will consist of a
network of 6-10 buoys anchored several miles apart and 30-90 nautical miles offshore. The FAD network
will enhance Okaloosa County’s reputation as a premier fishing destination increasing angling tourism
and in turn promoting the local tourism economy. These funds would be used to construct the network of
FADS.
3. Veterans Park, Living Shoreline Phase - $1.5M
The project aims to restore the currently eroding shoreline using natural materials and vegetation to create
a "living shoreline," as well as a diverse and complex ecosystem within the nearshore and coastal uplands.
The living shoreline will include low and high saltwater marsh creation areas, seagrass recruitment areas,
and segmented, nearshore oyster-reef breakwaters to attenuate wave energy and provide habitat for fish
and wildlife.
WATER & SEWER:
1. Bob Sikes Industrial Park Lift Station & Force Main Upgrade - $1M
The Bob Sikes Industrial Park (BSIP) has seen significant growth from various DOD support facilities
supporting aircraft testing and modifications. Continuing to provide sufficient infrastructure is a necessity
to attract and continue to grow the BSIP, its partnership with the military, and other industrial facilities.
This project will have a significant economic impact, as it will replace and upsize the primary wastewater
pumping station and force main (under the runway) to posture the industrial park to meet the future
growth needs of the region.
2. Bob Sikes Water Reclamation Facility Effluent Disposal Expansion - $1.5M
Project would expand the effluent disposal capacity from 0.38 million gallons per day (MGD) to 1.117
MGD to match that of the water reclamation facility, better posturing for economic growth at the Bob
Sikes Industrial Park and other areas of unincorporated Crestview, such as Hwy 90 East (Shoal River
Ranch area) or areas north of Airport road. Project is already designed and permitted by the Florida
Department of Environmental Protection.
3. Hwy 90 East Water & Sewer Mains (to Shoal River Ranch Area Industrial Park) - $2.1M
These water and sewer main extensions would help spur economic growth to Hwy 90 East. Estimate is
for main extensions to the intersection of Hwy 90 and Jericho Road. Project could posture the county
much better for a future industrial park in the vicinity of Hwy 90 East, Interstate 10, and the CSX railroad.