READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — September 3, 2013 — Passenger Boarding Bridges LPA_Task Order 15 — reading text

Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 17-Passenger Boarding Bridges LPA_Task Order 15.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Use Aeroturn for aircraft wing tip spacing, 6 6 positioning, and ultimate alignment Apron layout concept 2 4 8 12 26 Determine Boarding Bridge Layout 1 3 4 16 24 Marking Plan 1 2 6 15 24 Site Electrical Modifications 3 10 6 5 24 Engineer's Estimate 1 2 2 5 Develop Plans 14 14 28 RFP Front End Documents 4 6 5 15 RFP Technical Requirements 4 30 3 2 39 Quality Control Review 3 3 Total: 34 101 70 79 11 295 Rate/Hour: $150.00 $100.00 $75.00 $60.00 $45.00 Total Direct Labor: $5,100.00 $10,100.00 $5,250.00 $4,740.00 $495.00 $25,685.00 PRE-DESIGN GEOTECHNICAL TESTING = PSI, Inc $1,000.00 DIRECT COSTS Printing, travel $2,200.00 Total Direct Costs 200. $2,200.00 Total Phase 1 (Lump Sum): $28,885.00 NWF Regional Airport 10/11/2013 Page B-2 of B-4 Boarding Bridges EXIHIBIT B MANHOUR AND FEE ESTIMATE OKALOOSA COUNTY NORTHWEST FLORIDA REGIONAL AIRPORT Boarding Bridges A-1 and A-2 PHASE 2 - BIDDING PHASE 2-BIDDING —__ _ SR. Project Professional SR.CAD CAD Item/Task Description Manager Engineer Designer_ _Technician__ Clerical Totals Advertise and Coordinate 3 3 Distribution of Bidding Documents 1 2 6 9 General Coordination 4 6 5 13 Answers to Bidders/Issue Addenda 1 12 4 5 22 Bid Opening 4 4 Review Bids for Responsiveness 4 14 4 22 Bid Tab 1 1 2 4 Total: 18 33 0 6 20 77 Rate/Hour: $150.00 $100.00 $75.00 $60.00 $45.00 Total Direct Labor: $2,700.00 $3,300.00 $0.00 $360.00 $900.00 $7,260.00 DIRECT COSTS Reimbursable (plans, spec books, travel) $900.00 Total Direct Costs $900.00 $900.00 Total Phase 2 (Lump Sum): $8,160.00 NWF Regional Airport 10/11/2013 Page B-3 of B-4 Boarding Bridges EXIHIBIT B MANHOUR AND FEE ESTIMATE OKALOOSA COUNTY NORTHWEST FLORIDA REGIONAL AIRPORT Boarding Bridges A-1 and A-2 PHASE 3 - CONSTRUCTION MANAGEMENT _ PHASE 3 - CONSTRUCTION MANAGEMENT ASSUME 60 DAY CONS TRUS TON SCHEDULE f PLUS Pane LIST WORK CONSTRUCTION ADMINISTRATION _ SR. Project Professional SR.CAD CAD Item/Task Description Manager Engineer Designer_ Technician _ Clerical Totals General Coordination with the County 4 4 6 14 General Coordination with the 5 3 4 12 Contractor, subconsultants Prepare for attend Pre-Construction 3 4 3 15 Conference Prepare minutes to Pre-Con 2 3 5 Review Submittals 2 6 1 9 Review Pay Applications 2 2 1 5 Review Payrolls, DBE Reports, EEO 2 2 1 5 Reports Periodic Site Visits (8 total) 64 2 66 Review and Respond to RFI's 4 8 1 13 Prepare Change Orders 1 2 1 4 Final Inspection/ Punch List items 8 4 2 14 Prepare Closeout Documents 4 16 5 25 Total: 106 51 0. 3 27 187 Rate/Hour: $150.00 $100.00 $75.00 $60.00 $45.00 Total Direct Labor: $15,900.00 $5,100.00 $0.00 $180.00 $1,215.00 $22,395.00 CONSTRUCTION INSPECTION. = Not included $0.00 QUALIFY ASSURANCE TESTING. Not included $0.00 DIRECT COSTS Reimbursable (travel, FedEx, printing, closeout books) $4,000.00 Total Direct Costs $4,000.00 $4,000.00 Total Phase 3 (Lump Sum): $26,395.00 NWF Regional Airport Boarding Bridges 10/11/2013 Page B-4 of B-4

Download this text file with its original spacing ↓