Okaloosa County BOCC — September 1, 2015 — Utility Privatization Proposal powerpoint presentation
Utility Privatization Proposal powerpoint presentation in the September 1, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.
Preserved among the September 1, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1277). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used July 20, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Utility Privatization Proposal powerpoint presentation — extracted reading text
Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
Utility Privatization Proposal powerpoint presentation — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Water and Wastewater System
Utility Privatization Proposal
Eglin Air Force Base
Florida
Eglin AFB Utility Privatization
Project Overview
• Solicitation for Proposals from Utilities and
Private Companies
• Water and Wastewater Systems Privatization
• 50 year Contract Term and Bill of Sale
• Defense Logistics Agency (DLA) is Managing
the Procurement of Services
• Utility Privatization Project DOES NOT include
the Wastewater Treatment Facilities.
• Wastewater Treatment is Separate Contract
Eglin AFB Locations
Eglin AFB UP includes the following locations:
• Main Base • Santa Rosa Island
• Duke Field • Mid‐Bay Shores
• Camp Rudder Maxwell/Gunter
• 7th Special Forces Group Recreation Area (White
Point
• Navy EOD
• Numerous Test Sites
• Poquito Bay Housing and Ranges
Area
• Camp Pinchot
Eglin AFB Reservation Map
Water System Overview
Water assets include water distribution, storage,
water supply, and treatment:
• 652,000 (+) linear
feet of various
size/type of pipe
• 750 (+) fire hydrants
• 1300 (+) valves,
various size/types
• 80 (+) water wells,
pumps, etc.
Water System Overview
Water assets include water distribution, storage,
water supply, and treatment:
• 1000 (+) backflow
preventers, various
size/types
• 17 elevated tanks
and other ground
storage tanks
• associated chemical
systems and other
ancillary equipment
Wastewater System Overview
Wastewater assets include gravity collection
system, force mains, and pump stations :
• 400,000 (+) linear
feet of various
size/type of gravity
collection piping
• 1000 (+) manholes,
various sizes/types
• 80 (+) wastewater
pumping stations
Wastewater System Overview
Wastewater assets include gravity collection
system, force mains, and pump stations :
• 62,000 (+) linear feet
of various size/type
of force main piping
• Associated buildings,
systems, and other
ancillary equipment
Utility Privatization Procurement
Mar‐13: Submitted Initial 3 Proposals to DLA
• Water
• Wastewater
• Combined Water & Wastewater
June‐14: Received DLA Notification of Open Negotiation & 1st
Negotiation Message (NM#1)
July‐14: Submitted NM#1 Response
Oct‐14: Received DLA Negotiation Message (NM#2)
Oct‐14: Face‐to‐Face DLA Negotiation
Nov‐14: Submitted NM#2 Response
Mar‐15: Received DLA Negotiation Message (NM#3)
Mar‐15: Submitted NM#3 Response
May‐15: Received DLA Negotiation Message (NM#4)
June‐15: Submitted NM#4 Response
Aug‐15: Received DLA Negotiation Message (NM#5) and Final
Proposal Revision Request (FPR)
Aug 14, 2015: DLA Negotiation Phase Closed
Sept 17, 2015: FPR SUBMITTAL DEADLINE
Utility Privatization Procurement
Conveyance Determination (2 Steps)
• Conveyance Authority Approval (DLA)
– Gov’t Should Cost Estimate (GSCE)
• USAF Conveyance Approval
– Deputy Asst. Sec of Air Force
Transition & Final Contract Award
1. Transition Period (8‐10 months)
2. Final Negotiation and 50‐yr Contract
– Contract Terms and Conditions
• Sections B through K of the RFP
• Agreements reached as a result of negotiations
• The actual systems awarded
• Changes in terminology indicating the transition
from Offeror/RFP to Contractor/Contract
• Only discrete schedules and plans (e.g. ‐
Contingency Operations Plan, Section B Pricing
Schedule, etc.).
3. Bill of Sale‐Transfer of Ownership
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — September 1, 2015 — Utility Privatization Proposal powerpoint presentation.” September 1, 2015. Utility Privatization Proposal powerpoint presentation. Crypt of Echoes evidence ID LED-2026-f80dce6cf0cc49b595f67cd3e545ecd5. http://127.0.0.1:58097/evidence/LED-2026-f80dce6cf0cc49b595f67cd3e545ecd5. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, Utility Privatization Proposal powerpoint presentation, meeting materials for September 1, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=9248&MeetingID=1277
Preserved county public-record source. Third-party attachments may retain their original rights.