READ ALONGSIDE THE SOURCE
Fort Walton Beach Council minutes — 02-12-1991 Regular — reading text
Part 5 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-3065-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
acre using 25% coverage. She
then took an average of 35 jobs per acre for those
buildings; the going job rate per acre tends to be 20,
but with a lot of areas recommending 50, she went in the
middle. By doing all of that, the City would find an
availability of land that can be sold and bring over
1100 jobs to the City of Fort Walton Beach.
Mr. deVaux indicated there are a couple more spots
available where the City could possibly get land; a lot
of people hold opt ions on property who do not exercise
th~ir options and those are choice properties. Ms. Byrne
Riley felt option land was not available, therefore, did
not make a recommendation; if it becomes available. then
it is recommended it be used for the highest and best
use.
Mr. Wyatt commented that the language contained in the
paragraph pertaining to the bid process made a lot of
sense. Ms. Byrne Riley gave some background on the
language used in paragraph 5 regarding the bid process.
She expressed research made and this is specific
language used in other industrial parks; if this
language is used and bids put out were very specific,
there would not be as many problems as in the past.
Mr. deVaux asked if the whole
parcel " A" was a pistol
range. and told
majority of it was.
was the He then
I
stated their contract has a 30 or 90 day notice to
vacate. Ms. Byrne Riley repeated the property was an
extremely valuable piece of property and the pistol
range is not a good use of it.
Mr. Wyatt suggested when they start putting the Budget
Workshop calculations together that the EDC report be a
part of it. The Mayor expressed appreciation for the
work done by the Economic Development Council, and
remarked the report would be put back into workshop and
put to use.
278
2- 12- 91
CONSENT AGENDA Mr. Smith . oved to approve the Council workshop minutes
WORKSHOP/ REGULAR of 1- 15- 91, the Council workshop . inutes of 1- 21- 91, the
MINUTES regular Council ainutes of 1- 22- 91, the Special Council
minutes of 1- 30- 91, and the Council workshop minutes of
2- 4- 91. Motion was seconded Mr. Wyatt and carried
unanimously, with Smith, Rosenbaum, deVaux, Wyatt,
Haney, Nicholson, and Wyninegar in favor.
SEWAGE AND SEWERAGE Tom Maney reminded Council that Mr. Mikel has told them
TOM MANEY tha t as a result of the terrible rains, there was an
overflow problem on Alconese Avenue. After
going down
there, Mr. Maney said he saw City machinery pumping
sewage out of the sewer manhole into another manhole and
the water was coming out too fast to make much headway.
He decided to look into it further and wrote a note to
Mr. Keeler
telling him he wanted to mention it at this
meeting, and research was done. Mr. Maney checked on
Thursday. Friday, and again on Saturday to see that the
machinery was still there. On Thursday and Friday, he
saw raw human feces in the street. as well as toilet
tissue and such, going out Alconese Avenue into the
sound; by that time the auxiliary pump was taken away.
Mr. Maney indicated the Public Works Dir~ tor made a
point in his letter Council the day
to that after the
last heavy rain over 7 million gallons of water pumped
through the waste water treatment plant was more than
double the normal flow; average pumping at that station
during normal operation is 5 hours a day. During a
period of rain. both pumps pump 24 hours a day; they
still couldn' t keep up with it. A sanitary sewer is
supposed to be a totally independent. self contained
system with nothing going in or nothing going out except
at the proper orifices. When there is a situation like
this with hydrostatic pressure on the outside due to
rainwater, it is such that it gives a magnitude more
flow from 5 hours a day of pump to 24 hours a day of
one
two pumps. That says those pipes have a lot of holes in
them; the rain water is coming into the sewer system.
Also when it is dry outside. it is possible for the
sewage to go outside and get into the dirt. This is an
intolerable situation, the prospect for disease and bad
health is incalculable.
To help in correcting the
problem. preparations in
specifications for a company to
come in and evaluate the system and locate the problems
to eliminate this in flow thing. and the cost to do the
study will be $ 600, 000. Mr. Maney expressed he can' t
think of a better way to spend the money. He has found
out of other places in town with the same problem. He
explained to Council and the taxpayers he thinks that a
major expenditure may be faced in fixing the sewers. and
he thinks this is the best possible way to spend money
to take care of the health of the citizens. If the
study will cost $ 600. 000, then the cost of fixing should
be a lot more. The bottom line is to be prepared to
have to spend money to fix the sewer systan.
279
2- 12- 91
SEWAGE ( CONT . ) Mr. Maney said he would like the City Manager to take
the responsibility of notifying Council whenever there
is a sewage spill, where it is. and how bad it is so
they will know what the problem is. He asked the City
Manager if that is a fair request. The City Manager
replied in the affirmative.
I
Mr. Smith asked if the incident had happened before.
The Public Works Director explained it happened once
before when one of the pumps failed. He said he ~ s
looking at doing it in phases and not obligating
600, 000 at one time, hoping to start at a $ 50, 000 range
as the
money is available.
