READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 8-11-14--proposed budget — reading text
Part 21 of 86. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-33538-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
53. 0
Man
a
planning, fleet, and facilities. These expenses ` s25
have been on the decline due to staffing and S2. 0
sls
operational budget cuts, as well as property &
Sl. o,
casualty insurance normalizing after spiking as a S° w,-
result of the 2004 & 2005 Florida hurricane S°. o .
General Gov' t
seasons. The dramatic decrease in FY 2012 -13
was due to an accounting change to record the x2010 -11 x2011 - 12 - 2012 - 13 aBudget
2013 -14
aBudget
2013 -15
cost allocation plan as reimbursements ( e. g.
decreases in expenses) rather than transfers among funds. The $ 126K, or 4. 5 %, decrease for FY
2014 -15 is attributable to general operational adjustments to achieve a sustainable budget.
Debt Service – This category totals $ 2. 6M, or 7. 1 %, of total expenses and includes principal and
interest payments for the City' s equipment and facilities funded via capital lease /purchase, bond
issue, or other debt financing. Overall, debt expense is only $ 222K, or 8. 4 %, more than the
previous year due to the true -up of the final expenses on the State Revolving Fund Loan for
Pump Station # 1 and Force Main. No new debt was issued.
City of Fort Wahon Beach. FL
Expenditures
Capital Outlay/ Improvement – This category $ 18. 0
comprises $ 2. IM, or 5. 8 %, of total expenses. $ 16. 0
Capital outlay includes the purchase of 514. 0
computers, vehicles, equipment, and other assets S12 -0m
with a value greater than $ 1, 000 and a useful life 1:S 10-0
L ss. o
of more than one year. Capital improvement
6. 0
includes the acquisition, construction, $
0
replacement, or renovation of facilities and
S2.
s2. o
infrastructure with a value greater than $ 25, 000 so0 — — -
Capital lmpmvemem
and a useful life of ten years or
more ( e. g. Capital Outlay
buildings, parks, streets, water and sewer lines). u2010 -11 02011 - 12 u2012- 13 oBudget w Budget
2013 -14 2014 -IS
IT funding of $64K includes a network switch,
new servers, and various laptops and desktops replacements. Vehicle replacements in the
amount of $504K includes 5 patrol vehicles, 2 utility bed trucks, 2 SUVs, 1 frontloader. The
following capital improvement projects are budgeted at a total cost of $ 1. 17M: water line
replacement, sewer system grouting & lining, lift station rehab, multiple a/ c unit replacements,
street resurfacing/ restripping, and storm drainage improvement. The increase in FY 2012 -13 was
due to the construction of the new pump station and force main.
Interfund Transfers – Interfund transfers represent $ 1. 7M, or 4. 6 %, of total expenses.
Transfers to the General Fund total $ 1. 7M based on the Cost Allocation Plan, which provides
reasonable and proportionate reimbursement for services provided to the enterprise funds such as
city attorney), city manager, administrative services ( i. e.
city clerk, city council ( including
human resources, risk management, information technology), financial services ( i. e. budget,
grants, accounting, accounts payable, payroll, purchasing), and engineering services ( i. e.
engineering, fleet, facilities). This category remains relatively flat.
Economic Environment – This category totals S1. 6 —
1. 2M, or 3. 1 %, of total expenses and includes S14
the Community Development Block Grant 11 .2
CDBG) program for low- moderate income S1. 0 s
families and Community Redevelopment SO- 8'
Agency ( CRA) program to revitalize blighted S0. 6
areas. CDBG funding comes from the U.S." SOA
Department of Housing and Urban Development, 50. 2
w
and although fewer federal dollars are allocated
0.0
CRA
to the City, costs are slightly up due to a required CDBG
AIFH Study in FY 2015 and higher costs 02010 -II 02011 - 12 u2012 -13 aBudget
2013 -14
WBudget
2014 - 15
allocated from the General Fund. CRA activities
are funded from a portion of City and County tax dollars. Ad valorem revenues are anticipated
accounting for the budgetary increase of $ 16K, or 1. 5 %. The timing of
to increase 1. 71 %,
capital projects explains annual fluctuations in prior years.
City of Fort Wahon Beach. FL
Expenditures
Transportation — This category represents So. e
L I M, or 2. 9 %, of total expenses and includes
so. s
streets, right -of -way, and engineering. Roadway -
504
related expenses are funded in large part by local
option fuel tax proceeds ( two total, one of which ` $ 0.3
was new as of Jan 2014) and reimbursements
SO. 2
from the Florida Department of Transportation.
The $ 29K, or 2. 8 %, increase in this category is SO. I
primarily due to the new second option fuel tax. Soo
Streets Rightof -Way Engineering
612010 - 11 02011 - I2 ta2012 - 13 aBudget aBudget
2013 -14 2014 - 15
Reserves — Reserve funds are budgeted if anticipated revenues exceed budgeted expenses or for
the specific purpose of rebuilding fund balance ( governmental funds) or net assets ( enterprise
funds). Reserves totaling $ 848K, or 2. 3 %, of expenses are budgeted in the Florida Building
Code, Utilities, Sanitation, Stormwater, and Beal Memorial Cemetery funds.
Contingencies —Contingency funds total $ 251K, or 0. 7 %, of total expenses and are budgeted to
guard against unanticipated price increases ( e. g. fuel, utilities), emergency. repairs, or revenue
shortfalls. The City budgets 1% of personnel and operating expenses as contingency funds in the
General, Florida Building Code, Utilities, Sanitation, and Stormwater funds.
Citv of Fort Wahon Beach, FL
CITY OF FORT WALTON BEACH, FL
Total Expenditures by Category - All Funds
Council 124. 514 221, 225 210 345.345. 949949 355. 664 9.9. 715)715) 2.2. 7%
7%
Manager 315. 547 10. 419 900 425 327191327191 261. 354 65. 937 25 2%
mation Technolog 203. 559 173. 450 5. 100 850 382, 959 368.368. 860860 14. 099 3.3. 8989
ian Resources 192. 835 40, 133 638 233,233, 606606 225,225, 729729 7. 877 3. 5%
Management 592. 454 592. 454 568, 065 24.24. 389389 4. 39-
Clerk 159. 168 44. 107 638
