READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2025-27 Amending the Comprehensive Fee Schedule — reading text
Part 5 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-42231-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
to Board of
1,500.00 Res 2023-14 09/26/23
Adjustment $
Request for Administrative Waiver $ 125.00 Res 2012-15 06/26/12
Variance Request/Metal Building Façade Waiver $ 925.00 Res 2023-14 09/26/23
Comprehensive Plan Text Amendment $ 925.00 Res 2023-14 09/26/23
Comprehensive Plan Future Land Use Map
2,225.00 Res 2023-14 09/26/23
Amendment $
Rezoning $ 925.00 Res 2023-14 09/26/23
Land Development Code Text Amendment $ 925.00 Res 2023-14 09/26/23
Zoning Determination $ 35.00 Res 2012-15 06/26/12
Minor Plat $ 270.00 Res 2012-15 06/26/12
Platting and subdivision, final Minimum $440.00 or Actual Cost Res 2023-14 09/26/23
Vacate Eassement, Right-of-Way, or Plat $ 520.00 Res 2023-14 09/26/23
Expansion of a Nonconforming Structure or
520.00 Res 2023-14 09/26/23
Characteristic of Use $
Special Events Application Fee $ 36.00 Res 2023-14 09/26/23
150.00 per diameter inch for total inches of protected
Tree Mitigation $ Res. 2015-1 01/13/15
trees removed at the time of mitigation
Development Agreement $ 2,500.00 Res 2012-15 06/26/12
Development Agreement Amendment $ 2,500.00 Res. 2016-11 09/20/16
Planned Unit Development Application $ 1,650.00 Res 2012-15 06/26/12
Pre-Application Conference/Pre-Construction $ 75.00 Res. 2016-11 09/20/16
Posted Property Notice, per sign $ 45.00 Res 2012-15 06/26/12
Mailed Notices $ 30.00 Res 2025-19 9/23/25
Development Orders
Application for Expedited Development Order $ 39.00 Res 2012-15 06/26/12
Application for Major Development Order $ 725.00 Res 2012-15 06/26/12
Minor Amendment to Development Order $ 75.00 Res 2012-15 06/26/12
Major Amendment to Development Order $ 450.00 Res 2012-15 06/26/12
Advertisement Fee Direct Cost of the Advertisement Res 2025-19 9/23/25
Site Plan Reviews - new construction commercial or 4 units or more multifamily residential
Gross Building Floor Area or Improved Site Area
cost per 100 sq ft Res 2012-15 06/26/12
whichever is greater
Up to 5,000 sq feet $ 1.50 $ 1.50 Res. 2010-25 09/28/10
Site Plan Review fee 5,001 to 10,000 $ 1.35 $ 1.35 Res. 2010-25 09/28/10
added to permit fee 10,001 to 25,000 $ 1.15 $ 1.15 Res. 2010-25 09/28/10
25,001 to 50,000 $ 1.00 $ 1.00 Res. 2010-25 09/28/10
50,001 to 100,000 $ 0.90 $ 0.90 Res. 2010-25 09/28/10
over 100,000 $ 0.85 $ 0.85 Res. 2010-25 09/28/10
9
Department and/or Enacting Resolution /
Fee Description Current Rate
Service Ordinance
BUILDING PERMIT FEES (Sec. 3.02.05)*
A surcharge will be collected in accordance with and for the purposes stated in F.S. 468.631 and F.S. 553.721. Res. 2010-25 09/28/10
General Fees
Building permit processing fee $ 22.50 Res. 2010-25 09/28/10
25.75 per submittal SFD $ 51.50
Revisions to approved permit, per submittal per submittal MF $ 77.25 per Res 2008-15 04/08/08
submittal Com
Penalty for commencement prior to permitting
Three (3) times the permit fee Res 2024-13 09/24/24
Sec. 3.01.05)
Change of contractor, transfer of permit
Prorate balance of work Res 2003-01 1/28/03
Sec. 3.01.12)
Notice of Commencement (NOC) (Sec. 713.135)$ 5.00
Expired permit (Sec. 3.01.08) Re-issuance requires fee to be paid Res 07-15 09/05/07
Conditional; no work has commenced and permit has
Refund of permit fee (Sec. 3.01.10) Res 07-15 09/05/07
not expired; requires written notice to the BO
Construction Permit Fees
No permit required for cosmetic work only, such as
carpet, tile, painting, landscaping, etc. Exceptions
500 or less Res 07-15 09/05/07
include any structural change or any work that
requires an inspection per the FBC.
39.00 for the first thousand, plus $6.60 for each
501 to $50,000 $ Res. 2010-25 09/28/10
Permit based on value thousand or fraction thereof, to and including $50,000
of work, includes labor,
materials, site work, 360.55 for first $50,000 plus $5.25 for each
and design fees 50,001 to $100,000 additional thousand or fraction thereof to and Res. 2010-25 09/28/10
including $100,000
623.00 for the first $100,000 plus $4.00 for each
100,001 to $500,000 additional thousand or fraction thereof to and Res. 2010-25 09/28/10
including $500,000
2,219.00 for the first $500,000 plus $2.75 for each
500,001 and up $ Res. 2010-25 09/28/10
additional thousand or fraction thereof
Plan check fee 50% of building fee (Sec. 3.02.06) Res 2009-35 09/09/09
Threshold building transmittal/processing fee/ICC $ 206.00 Res 2008-15 04/08/08
Moving Fee $ 113.50 Res 2008-15 04/08/08
59.50 plus $9.45 per 2,000 sq ft above 20,000 sq ft
Demolition Fee $ Res. 2010-25 09/28/10
or fraction thereof
Additional Inspection Fee $ 38.00 Res. 2010-25 09/28/10
Additional Inspection Fee - after hours $ 50.00 per hour (2 hour minimum) Res 2014-2 02/11/14
Re-Inspection Fee (the building inspector returns to First - $38.00
the job site to review corrected work denied on the Second - $38.00 Res. 2010-25 09/28/10
previous inspection for the same violation)