READ ALONGSIDE THE SOURCE
Fort Walton Beach Council minutes — 05-25-1982 Regular — reading text
Part 2 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-2692-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
way they
could interpret that ordinance to see if the ordinance
contemplates
two visits back to Council.
Mr. Baughman moved to strike the word "
preliminary". Motion seconded by Mrs.
Thornber. ( to make it plain the man did not have to come back to Council
again). Mr. Miller moved to rescind the previous action. Mr. Miller said
the motion must be to " rescind the action. II ( the motion had already passed)
Mrs. Thornber moved to rescind the action,. Motion seconded by Mr. Bishop.
Vote to the motion was aye unanimously.
Mrs. Thornber moved that they pass the same motion with the word " preliminary"
deleted. Motion seconded by Mr. Bishop. Mr. Miller said they now had
conceptual approval. Mr. Franklin wanted to discuss the tap fees.
Mayor felt they needed to clear the pending motion first. Mr. Smith
said he would not be asking for variances if. he had not listened and tried
to get them passed and would have saved a ton of money if he had not tried
to help the City of Fort Walton Beach by saying he would build off of where
there was a possible 4 laning of Brooks Street at the request of the RDA.
He said he would have had p,lenty of parking spaces and needed no variances.
He noted the real Brooks St. problem of drainage; saying the Engineer had
advised of the difficulties in getting right- of- way to ease that problem.
Mr. Smith felt he had 31 units ( taps) he felt he shou'ld be credited for
and he had discussed with the City Engineer the fact that he could go
out in the parking lot and not destroy the trees again anc:l . go through there
as long as the City would replace the parking. He said he had one tap and
one meter and he would like to have the one tap and one meter for the
entire project. He said if that matter needed to go under advisement that
was fine, he would come back and see if he could do it right the next time.
Mr. Miller asked the Attorney if his research had determined that he had
to come back to Council again if that would be
hisruJing tnat .
it would not be done any other way. The Attorney said the City could not
allow a building permit to be issued until the ordinances had been
complied with. Mr. Miller asked the Public Works Director if there had been
a full presentation to the Planning Board. The Public Works Director said
there had. Mr. Miller asked if the Public Works Director had developed
to his satisfaction such easements and physical facilities that he needed
available to the City to put in the utilities, etc. Public Works Director
said he and Mr. Smith had discussed this at some length. The Director said
the reason he was on the agenda that night was to talk about this.
The Director said he could not make the ruling on those items. Vote to the
motion was aye unanimously.
Mr. Baughman moved that this be referred back to the City Manager and
the Public Works Director and they get the RDA aFld discuss the easements
and the water tap and come back to Counci 1 with a recorrmendati on for the
next Council. Mr. Miller said they had the issue of water taps before
them as pending. Mr. Smith asked that that request be withdrawn, saying
that was expensive land and he had done his best as far as the City was
concerned.
5- 25- 82 069
INDUSTRIAL DEVELOPMENT COMMITTEE
Mr. Grant reported that the Industrial COll111ittee met May 15, 1982, and
reviewed the request from Rivers Air Conditioning, Inc. to change
the location they had requested for , property in the Industrial Park
to approximately 2. 8 acres at the corner of Anchors and Blake.
The Committee unanimously agreed to recommend that Council authorize the
bid be advertised for this pr.operty.
Mr. Grant moved approval of this recoll111endation. Motion seconded by Mr. Bishop
I and carried unanimously.
Mr. Grantreported that the committee was working with the National Guard
Planning people, saying they were tentatively offered a temporary location -
the building presently used as our warehouse. He indicated the National
Guard were extremely pleased with the facility; its existing capabilities
and the potential involved. He said the result of the discussions was
the National Guard intent' to review their earlier considerations as far
as the type and size of the unit. He said they were also interested that
the City was planning to move their workshop space and the existing facilities
there might be ideal for an organized maintenance shop which would entail
eight to twelve civil service positions. He reported also that they on a
tentative basis showed them the property at front of the Industrial Park
just south of Lovejoy as a candidate for a permament location and the National
Guard was estatic about that.
Mr. Miller asked if the pending item concerning Ready Avenue that did not
appear on the agenda was discussed. Mr. Grant said that was tabled at the
last meeting. Mr. Miller asked if he had any idea when he was going to bring
it up again. Mr. Grant said he did not. Mr. Miller said he had asked the
Public Works Director to give them an idea of the finances regarding that
thing and it was substantial-ly more than they had before them and he urged
each member of Council to take the time to discuss this with the Public
Works Director.
GARNIER' S POST OFFICE BUILDING
Mayor asked for Council IS desires on the report on the Garniers Post Office
Building - $ 7, 700. 00 . already spent on restoration and an estimated cost
of $ 500. 00 to $ 600. 00 to ,complete ' the suggested finish'ing touches.
Mr. Baughman moved for app~ oval. Motion seconded by Mrs. Thornber, and carried
un an imous ly .
CABLEVISION - RAY GORAL, KEN HARVEY, JOHN LAKIN
Ray Goral spoke to .Council to discuss the telemeter system Warner was proposing
at great expense that would eventually have to be paid by subscribers. He
I
said it was the feeling of those formerly on a cablevision watchdog committee
for the City ,that Warner could achieve the same results by simply adding
height to the existing tower.. He indicated they would like to research
the City files and test the check points for signals. He indicated they would
like to study the Biro study done just a few years back. He indicated they
would give the Council guidance on how' to work with the cable people
getting the people of Fort Walton ~ each decent cable service. Mr. Goral said
the proposed microwave would not make any difference - that it would add to
the problem. Mr. Baughman said he would Hke to turn this over in his mind
until the next meeting. The Mayor noted a letter written to these individuals
in 1973 appointing them to such a c0111l1ittee. Mr. Franklin said since these
gentlemen were offering their services again - asking if they were familiar
with the recent packet given Council - saying it might be if they were
I.
5- 25- 82
070
CABLEVISION, continued
given that packet to look at them and come back to Council at the next
meeting and tell Council what it said. Mr. Goral said they would like to
review any data.
Mr. Miller asked why it was necessary for Council to take any action for
them to do something they could do as a customer of the cable company anyway.
Mr. Goral said the committee disbanded back then. Mr. Miller said he meant
as just citizens of interest or customers of the cable joining together to
do that and come in and make any presentation at any time. Mr. Goral said
the data that is supposedly available to the City was not available to them.
Mr. Miller said that was public record, they could come in and get it.
Mr. Goral said they had to be able to work with the cable company to get
the information. Mr. Miller asked if they would review the technical
report from Biro Engineering firm employed jointly by Warner and the City
and that recent report received at the last meeting. Mr. Miller asked if
they would review those packages and see what additional information - -
saying if three interested citizens could join together on their on
independently and anyone is free to come in and make a presentation at
any time he did not see the need for Council to take any action.
Mrs. Thornber said they were offering what information the City had for
his committee. Mayor thanked' Mr. Goral.
MR. SMITH - REFERENCE PROPOSED BROOKS STREET PROJECT
Mr. Smith returned to the meeting from the Board of Adjustment meeting
and asked Council for conceptual approval of his project and remov~ his
request for variances and not worry about the four- laning which was only
proposed and that removed any variances to the project; ' then it would seem
if Council approved that plan all' he needed to do was get his building
permit. Mr. Baughman moved that conceptual approval ~ n the basis that Mr.
Smith had stated. The Mayor ask.ed what Mr. Seibold thought about it.
Mr. Seibold said the RDA approved it on the proposition he presented that
the widening of Brooks Street and' he could speak to the Board to see if
they wanted to take a look at it again; saying the information presented
to the Board at that time was trying to work wi'th them on a different
approach.
Mr. Smith said the only person troucle seemed to be made for because of the
discussion of four.- laning of Brooks Street was him. He said he had worked
for weeks and weeks with planners , in conjunction wHh future plans of the
City. Mr. Smith said he could move within the C- 2 requirements, eliminate
all his variances and be under construction in a matter of a few days,
otherwise, he had a lot of money invested and four or five weeks would
hurt him. He said the only plalll '. was a wide master plan.
Mr. Miller felt it was an impossibility pecause they had the RDA and the
Planning Board who had approved t~e plan that had come to Council that night.
Mr. Baughman felt the fault lay with the City; the Ci:ty had made the mistakes
and it was up to the City to cerrect it.
Mayor asked on the Downtown Development plan if Brooks Street were not to
be widened. Mr. Seibold sald they anticipated that Brooks Street would
have to be widened to accommodate redevelopment that would take place along
the Sound.
t.
5- 25 '. 82
071
MR. SMITH -
