READ ALONGSIDE THE SOURCE
Fort Walton Beach Ordinance — 1865 - Flood Plain Management — reading text
Part 3 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31107-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
within 180 days after its issuance, or if
the work authorized is suspended or abandoned for a period of 180 days after the work
commences. Extensions for periods of not more than 180 days each shall be requested in
writing and justifiable cause shall be demonstrated.
G. Suspension or revocation. The Floodplain Administrator is authorized to suspend or
revoke a floodplain development permit or approval if the permit was issued in error, on
the basis of incorrect, inaccurate or incomplete information, or in violation of this section
or any other ordinance, regulation or requirement of this community.
3. 05. 05 Site Plans and Construction Documents.
A. Information for development in flood hazard areas. The site plan or construction
documents for any development subject to the requirements of this section shall be drawn
to scale and shall include, as applicable to the proposed development:
I. Delineation of flood hazard areas, floodway boundaries and flood zone( s), base
flood elevation( s), and ground elevations if necessary for review of the proposed
development.
2. Where Flood hazard areas, base flood elevations, or floodway data are not
included on the FIRM or in the Flood Insurance Study, they shall be established
in accordance with section 3. 05. 05 ( B) of this code.
3. Where the parcel on which the proposed development will take place will have
more than 50 lots or is larger than 5 acres and the base flood elevations are not
included on the FIRM or in the Flood Insurance Study, such elevations shall be
established in accordance with section 3. 05. 05 ( B) ( I ) or (2) of this code.
4. Location of the proposed activity and proposed structures, and locations of
existing buildings and structures; in coastal high hazard areas, new buildings shall
be located landward of the reach of mean high tide.
5. Location, extent, amount, and proposed final grades of any filling, grading, or
excavation.
6. Where the placement of fill is proposed, the amount, type, and source of fill
material; compaction specifications; a description of the intended purpose of the
fill areas; and evidence that the proposed fill areas are the minimum necessary to
achieve the intended purpose.
7. Delineation of the Coastal Construction Control Line or notation that the site is
seaward of the coastal construction control line, if applicable.
8. Extent of any proposed alteration of sand dunes or mangrove stands, provided
such alteration is approved by the Florida Department of Environmental
Protection.
9. Existing and proposed alignment of any proposed alteration of a watercourse.
The Floodplain Administrator is authorized to waive the submission of site plans,
construction documents, and other data that are required by this section but that are not
required to be prepared by a registered design professional if it is found that the nature of
the proposed development is such that the review of such submissions is not necessary to
ascertain compliance with this section.
B. Information in flood hazard areas without base flood elevations ( approximate
Zone A). Where flood hazard areas are delineated on the FIRM and base flood elevation
data have not been provided, the Floodplain Administrator shall:
1. Obtain, review, and provide to applicants base flood elevation and floodway data
available from a federal or state agency or other source or require the applicant to
obtain and use base flood elevation and floodway data available from a federal or
state agency or other source; or
2. Require the applicant to develop base flood elevation data prepared in accordance
with currently accepted engineering practices; or
3. Where base flood elevation data are not available from another source, assume
the base flood elevation is not less than two ( 2) feet above the highest adjacent
grade at the location of the development, provided there is no evidence indicating
flood depths have been or may be greater than two ( 2) feet.
4. Where the base flood elevation data are to be used to support a Letter of Map
Change from FEMA, advise the applicant that the analyses shall be prepared by a
Florida licensed engineer in a format required by FEMA, and that it shall be the
responsibility of the applicant to satisfy the submittal requirements and pay the
processing fees.
C. Additional analyses and certifications. As applicable to the location and nature of
the proposed development activity, and in addition to the requirements of this section, the
applicant shall have the following analyses signed and sealed by a Florida licensed
engineer for submission with the site plan and construction documents:
1. For development activities proposed to be located in a regulatory floodway, a
floodway encroachment analysis that demonstrates that the encroachment of the
proposed development will not cause any increase in base flood elevations; where
the applicant proposes to undertake development activities that do increase base
flood elevations, the applicant shall submit such analysis to FEMA as specified in
10
section 3. 05.05 ( D) of this code and shall submit the Conditional Letter of Map
Revision, if issued by FEMA, with the site plan and construction documents.
2. For development activities proposed to be located in a riverine flood hazard area
for which base flood elevations are included in the Flood Insurance Study or on
the FIRM and floodways have not been designated, a floodway encroachment
analysis which demonstrates that the cumulative effect of the proposed
development, when combined with all other existing and anticipated flood hazard
area encroachments, will not increase the base flood elevation more than one ( 1)
foot at any point within the community. This requirement does not apply in
isolated flood hazard areas not connected to a riverine flood hazard area or in
flood hazard areas identified as Zone AO or Zone AH.
3. For alteration of a watercourse, an engineering analysis prepared in accordance
with standard engineering practices which demonstrates that the flood -carrying
capacity of the altered or relocated portion of the watercourse will not be
decreased, and certification that the altered watercourse shall be maintained in a
manner which preserves the channel' s flood- carrying capacity; the applicant shall
submit the analysis to FEMA as specified in section 3. 05.05 ( D) of this code.
4. For activities that propose to alter sand dunes or mangrove stands in coastal high
hazard areas ( Zone V), an engineering analysis that demonstrates that the
proposed alteration will not increase the potential for flood damage.
D. Submission of additional data. When additional hydrologic, hydraulic or other
engineering data, studies, and additional analyses are submitted to support an application,
the applicant has the right to seek a Letter of Map Change from FEMA to change the
base flood elevations, change floodway boundaries, or change boundaries of flood hazard
areas shown on FIRMS, and to submit such data to FEMA for such purposes. The
analyses shall be prepared by a Florida licensed engineer in a format required by FEMA.
Submittal requirements and processing fees shall be the responsibility of the applicant.
3. 05. 06 Inspections
A. General. Development for which a floodplain development permit or approval is
required shall be subject to inspection.
B. Development other than buildings and structures. The Floodplain Administrator
shall inspect all development to determine compliance with the requirements of this
section and the conditions of issued floodplain development permits or approvals.
C. Buildings, structures and facilities exempt from the Florida Building Code. The
Floodplain Administrator shall inspect buildings, structures and facilities exempt from
the Florida Building Code to determine compliance with the requirements of this section
and the conditions of issued floodplain development permits or approvals.
D. Buildings, structures and facilities exempt from the Florida Building Code, lowest
floor inspection. Upon placement of the lowest floor, including basement, and prior to
11
further vertical construction, the owner of a building, structure or facility exempt from
the Florida Building Code, or the owner' s authorized agent, shall submit to the
Floodplain Administrator:
1. If a design flood elevation was used to determine the required elevation of the
lowest floor, the certification of elevation of the lowest floor prepared and sealed
by a Florida licensed professional surveyor; or
2. If the elevation used to determine the required elevation of the lowest floor was
determined in accordance with section 3. 05.05 ( B) ( 3) of this code, the
documentation of height of the lowest floor above highest adjacent grade,
prepared by the owner or the owner' s authorized agent.
E. Buildings, structures and facilities exempt from the Florida Building Code, final
inspection. As part of the final inspection, the owner or owner' s authorized agent shall
submit to the Floodplain Administrator a final certification of elevation of the lowest
floor or final documentation of the height of the lowest floor above the highest adjacent
grade; such certifications and documentations shall be prepared as specified in Section
3. 05. 06 ( F).
F. Manufactured homes. The Building Official shall inspect manufactured homes that
are installed or replaced in flood hazard areas to determine compliance with the
requirements of this section and the conditions of the issued permit. Upon placement of a
manufactured home, certification of the elevation of the lowest floor shall be submitted to
the Building Official.
3. 05.07 Variances and Appeals.
A. The Board of Adjustment shall hear and decide on requests for appeals and requests
for variances from the strict application of this section. Pursuant to section 553.73( 5),
F.S., the Board of Adjustment shall hear and decide on requests for appeals and requests
for variances from the strict application of the flood resistant construction requirements
of the Florida Building Code. This section does not apply to Section 3109 of the Florida
Building Code, Building.
B. Appeals. The Board of Adjustment shall hear and decide appeals when it is alleged
there is an error in any requirement, decision, or determination made by the Floodplain
Administrator in the administration and enforcement of this section. Any person
aggrieved by the decision of the Board of Adjustment may appeal such decision to the
Circuit Court, as provided by Florida Statutes.
C. Limitations on authority to grant variances. The Board of Adjustment shall base its
decisions on variances on technical justifications submitted by applicants, the
considerations for issuance in section 3. 05.07 ( G) of this code, the conditions of issuance
set forth in section 3. 05.07 ( H) of this code, and the comments and recommendations of
the Floodplain Administrator and the Building Official. The Board of Adjustment has the
right to attach such conditions as it deems necessary to further the purposes and
objectives of this section.
12
D. Restrictions in floodways. A variance shall not be issued for any proposed
development in a floodway if any increase in base flood elevations would result, as
evidenced by the applicable analyses and certifications
